CN201830631U - Greening and desalting system for saline-alkali soil - Google Patents

Greening and desalting system for saline-alkali soil Download PDF

Info

Publication number
CN201830631U
CN201830631U CN2010205230755U CN201020523075U CN201830631U CN 201830631 U CN201830631 U CN 201830631U CN 2010205230755 U CN2010205230755 U CN 2010205230755U CN 201020523075 U CN201020523075 U CN 201020523075U CN 201830631 U CN201830631 U CN 201830631U
Authority
CN
China
Prior art keywords
layer
salt discharge
desalting
saline
soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205230755U
Other languages
Chinese (zh)
Inventor
彭雪林
叶定良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Wenke Landscape Co Ltd
Original Assignee
SHENZHEN WENKE GARDENING INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN WENKE GARDENING INDUSTRY CO LTD filed Critical SHENZHEN WENKE GARDENING INDUSTRY CO LTD
Priority to CN2010205230755U priority Critical patent/CN201830631U/en
Application granted granted Critical
Publication of CN201830631U publication Critical patent/CN201830631U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture

Landscapes

  • Cultivation Of Plants (AREA)

Abstract

The utility model discloses a greening and desalting system for saline-alkali soil, which belongs to the technical field of garden greening engineering and comprises a saline-alkali isolating layer, desalting pipes, a partition layer, a leaching layer, a planting soil layer and desalting wells. The saline-alkali isolating layer, the desalting layer, the partition layer, the leaching layer, the planting soil layer and the desalting wells are sequentially distributed on different layers under the saline-alkali soil, wherein the saline-alkali isolating layer is formed by laying coal cinders, stones and saltpeter, the desalting pipes include a main pipe and branches, the bottom level of the desalting pipes is larger than drainage level, the partition player is used for isolating the desalting pipe from the leaching layer, the leaching layer is backfilled with melt cinder or saltpeter, the planting soil is backfilled on the leaching layer and tamped slightly, the desalting well is arranged at junctions of the desalting pipes and junctions of other pipelines and facilities, insert ports are reserved on the peripheries of the wells so that the desalting branches can be inserted. According to the water and salt motion rule of 'salt inflows along with water and outflows along with same', salt in soil can be discharged along with water and underground water is controlled under the clinical depth, and accordingly soil desalting and salinization prevention can be realized, city greening and environmental protection are promoted, and human settlement is improved and optimized.

Description

Saline land greening salt discharge system
Technical field
The utility model relates to a kind of saline land greening salt discharge system, belongs to the landscape engineering technical field.
Background technology
The saline land greening salt discharge is one of key measure of growing fine of plant.Urban landscaping often runs into many saline lands in building, and the greening difficulty is very big.The one big characteristics in saline land are exactly the subterranean water level height, have saline and alkaline moisture and use soil capillary to rise to the face of land, and after the water evaporates, the saline land can be trapped in the face of land, brings very big difficulty to greening work.Do not become system by the technology of laying the hidden pipe salt discharge in the past, do not reach long-term use, tackled the various good salt discharge effects that change naturally.
Summary of the invention
The purpose of this utility model is to provide a kind of saline land greening salt discharge system, in conjunction with advanced water conservancy salt discharge theory, carries out salt discharge at the rational drainage pipeline networks of underground laying.According to the water salt characteristics of motion of " salt comes with water, and salt goes with water ", lay hidden pipe the salinity in the soil drained with water, and with Groundwater Control below critical depth, reach the soil desalination and prevent saliferous purpose.
The technical solution of the utility model is as follows: a kind of saline land greening salt discharge system comprises saline and alkaline separation layer, salt discharge pipe, interlayer, pouring layer, plantation soil layer and salt discharge well.Described saline and alkaline separation layer, salt discharge pipe, interlayer, pouring layer, plantation soil layer are distributed in underground each layer in saline land to be afforested successively from the bottom to the upper strata, described salt discharge well is evenly distributed on the zone, saline land.
Described saline and alkaline separation layer is being cleared the saline land alkaline earth, on the basis, smooth place, is laid on the bottom in saline land.The degree of depth of clearing alkaline earth should adhere to specification, and accomplishes " to the end, to the limit, put in place ", to the smooth acceptance(check) in sectional dimension, elevation, bottom face of foundation trench.The used material of saline and alkaline separation layer is cinder, stone and stone nitre etc., and thickness is generally 15cm, and error band is at ± 1cm.By laying separation layer, prevent that original salinity of bottom, greenery patches from rising.Lay in the separation layer process, machinery, vehicle can not enter the greening place, avoid separation layer and bottom alkaline earth to force together, and lose or weaken buffer action.
Described salt discharge pipe divides to be responsible for and arm, and being responsible for and adopting 110mmUPVC grey feed pipe, arm is specialty infiltration ripple 32mm salt discharge pipe.The laying scope is according to green coverage size, spacing 4-5m.The person in charge should be lower than arm 10cm.The degree of depth of salt discharge pipe arm should be lower than planting soil 1m-1.2m.When laying the salt discharge pipe, check drawing earlier, the fixed point unwrapping wire; Fluting then, it is shallow to begin an end, terminal dark, for the ease of the control waviness, gets a control point, spot check absolute altitude every 3-5m; Lay the thick sand bedding course of 50cm, guarantee that salt discharge pipe bottom is stable; Salt discharge tube-surface parcel is laid, and prevents that fine grained soil from entering the salt discharge pipe, stops up the infiltration hole.The end absolute altitude of salt discharge pipe must be greater than discharge level, and the laying density of pipe and the gradient must meet the drawing requirement, lays spacing and is generally 5-10m, and the gradient is at 0.3%-0.8%, and the pipe fitting joint and the sleeve pipe of passing by on one's way all will be placed on request.
Described interlayer is used to isolate the salt discharge pipe and drenches layer, completely spreads the thick high-density polyethylene geomembrane of 2mm and one deck water drainage plastics clamping plate above the salt discharge pipe, prevents that the salt discharge pipe from being damaged by pressure by liquid slag or stone nitre etc.
Above described pouring layer is laid on after the water drainage plastics splinting layer is finished, earlier the salt discharge pipe trench is filled out extremely, the soil moved in to improve the original of both sides must not be sneaked into when backfill liquid slag or stone nitre and drench in the layer, otherwise can influence its effect.The laying depth that drenches layer should adhere to specification.
Described planting soil is after drenching above the layer, drenching layer acceptance(check), but the backfill planting soil, and slight compacting.But basal dressing carries out soil melioration before the planting soil backfill, and the amount of application of base manure wants strictness to carry out on request, after fertilizer evenly applies, requires unit in charge of construction to carry out mechanical agitation with suspend-tilling machine, ploughs rake three times repeatedly.Should consider the soil settlement factor during backfill planting soil, absolute altitude should adhere to specification during final acceptance of construction.
Described salt discharge well is provided with at the infall of salt discharge pipe and with other pipelines, facility infall, general dark 1.5m, and diameter 1.2m is 24 wall constructions.The spacing of salt discharge well is generally one of 30-40m.20cm foreign material precipitation is stayed in the bottom of salt discharge well.Stay 4-5 around the well and insert mouth, be used for arm and directly insert.Build by laying bricks or stones finish after, from the most significant end water filling, see whether water can verify its effect from the least significant end draining.
Though the urban landscaping difficulty in saline and alkaline area is very big,,,, still can realize afforesting and beautifying effect with the administrative skill of reasonably controlling salt, salt discharge measure and science according to the functional requirement and the soil condition of green belt as long as follow the water salt characteristics of motion.Use of the present utility model can realize the saline land greening salt discharge preferably, promotes the urban afforestation environmental protection, improves good human settlement.
Description of drawings
Structure distribution figure of the present utility model sees accompanying drawing.
Embodiment
Embodiment to wooden utility model is described further down and in conjunction with the accompanying drawings:
As shown in the figure, when implementing saline land greening salt discharge system, at first afforested areas is excavated smoothly, clear alkaline earth, the fixed point unwrapping wire indicates that the plantation acupuncture point puts and the planting groove sideline.Lay saline and alkaline separation layer (1) with cinder, stone, stone nitre etc. then, thickness is generally 15cm.The salt discharge pipe is laid in saline and alkaline separation layer (1) top, and it is the UPVC grey feed pipe of 110mm that the salt discharge pipe is responsible for (2), and salt discharge pipe arm (3) oozes salt ripple 32mm salt discharge pipe, one of density 4-5m for specialty.According to the green coverage size, the salt discharge pipe is responsible for (2) should be lower than salt discharge pipe arm (3) 10cm.The degree of depth of salt discharge pipe arm (3) should be lower than planting soil 1m-1.2m.Lay coarse sand bed course (4) around the salt discharge pipe.After the salt discharge pipe was completed, interlayer (5) was laid with geomembrane and plastic splint in the top.Interlayer (5) top is laid and is drenched layer (6).Drench layer (6) top backfill planting soil, form plantation soil layer (7).Determine the quantity of salt discharge well (8) according to the size of green coverage; a salt discharge well of general every 20m-30m (8); the dark 1.5m of specification of salt discharge well (8); diameter 1.2m; for going up little 24 walls down greatly; the gradient is 1%-2%, thick 1: 1.25 cement mortar protective course of interior deposited 30mm, and 20cm foreign material precipitation is stayed in the bottom., stay 4-5 around the salt discharge well (8) and insert mouth, be used for salt discharge pipe arm (3) and directly insert.Last delivery port should insert the municipal gully.

Claims (7)

1. saline land greening salt discharge system, comprise saline and alkaline separation layer, salt discharge pipe, interlayer, pouring layer, plantation soil layer and salt discharge well, it is characterized in that: described saline and alkaline separation layer, salt discharge pipe, interlayer, pouring layer, plantation soil layer are distributed in underground each layer in saline land to be afforested successively from the bottom to the upper strata, described salt discharge well is evenly distributed on the zone, saline land.
2. according to the described saline land greening salt discharge of right 1 system, it is characterized in that: the used material of described saline and alkaline separation layer is cinder, stone and stone nitre etc., and thickness is generally 15cm, and error band is at ± 1cm.
3. according to the described saline land greening salt discharge of right 1 system, it is characterized in that: described salt discharge pipe divides to be responsible for and arm, be responsible for and adopt 110mmUPVC grey feed pipe, arm is a specialty infiltration ripple 32mm salt discharge pipe, spacing 4-5m, the person in charge is lower than arm 10cm, and the degree of depth of arm is lower than planting soil 1m-1.2m.
4. according to the described saline land greening salt discharge of right 1 system, it is characterized in that: described interlayer is used to isolate the salt discharge pipe and drenches layer, completely spreads the thick high-density polyethylene geomembrane of 2mm and one deck water drainage plastics clamping plate above the salt discharge pipe.
5. according to the described saline land greening salt discharge of right 1 system, it is characterized in that: described pouring layer is laid on the interlayer top, forms by backfill liquid slag or stone nitre.
6. according to the described saline land greening salt discharge of right 1 system, it is characterized in that: described plantation soil layer is drenching above the layer, and by the backfill planting soil, and slight compacting forms.
7. according to the described saline land greening salt discharge of right 1 system, it is characterized in that: described salt discharge well is provided with at the infall of salt discharge pipe and with other pipelines, facility infall, general dark 1.5m, diameter 1.2m, be 24 wall constructions, spacing is generally one of 30-40m, and 20cm foreign material precipitation is stayed in the bottom, stay 4-5 to insert mouth on every side, be used for salt discharge pipe arm and insert.
CN2010205230755U 2010-09-07 2010-09-07 Greening and desalting system for saline-alkali soil Expired - Lifetime CN201830631U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205230755U CN201830631U (en) 2010-09-07 2010-09-07 Greening and desalting system for saline-alkali soil

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205230755U CN201830631U (en) 2010-09-07 2010-09-07 Greening and desalting system for saline-alkali soil

Publications (1)

Publication Number Publication Date
CN201830631U true CN201830631U (en) 2011-05-18

Family

ID=44000727

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205230755U Expired - Lifetime CN201830631U (en) 2010-09-07 2010-09-07 Greening and desalting system for saline-alkali soil

Country Status (1)

Country Link
CN (1) CN201830631U (en)

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102498771A (en) * 2011-10-20 2012-06-20 天津泰达园林规划设计院有限公司 Salt drainage well with non-return function and construction method thereof
CN103262727A (en) * 2013-04-27 2013-08-28 中国地质调查局西安地质调查中心 Manufacturing method of tail slag field reclamation returning-to-farmland isolation layer
CN103371072A (en) * 2013-06-21 2013-10-30 北京仁创科技集团有限公司 Plant planting system for saline-alkaline soil
CN103385096A (en) * 2013-07-01 2013-11-13 北京仁创科技集团有限公司 Improved saline-alkali soil plant cropping system
CN103385047A (en) * 2013-07-31 2013-11-13 武羡慧 Anti-salinization downstream drain well method
CN103444293A (en) * 2013-09-09 2013-12-18 天津泰达园林建设有限公司 Improvement method for underground soil of urban street trees on coastal saline and alkaline land region
CN103703886A (en) * 2013-12-24 2014-04-09 武羡慧 Moderate shallow shaft method for preventing and controlling salinization
CN103814647A (en) * 2014-03-07 2014-05-28 深圳市万信达生态环境股份有限公司 Saline land improvement method appropriate for arid and semi-arid region
CN103858555A (en) * 2014-04-08 2014-06-18 山东潍坊东盛园艺有限公司 Method for using caustic dross to establish nursery garden on saline and alkaline land
CN104206064A (en) * 2013-06-04 2014-12-17 河南山水园林绿化工程有限公司 Underground salt elimination method for saline and alkali land
CN104206065A (en) * 2014-08-25 2014-12-17 扬州大学 Device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt, and drainage method thereof
CN104472048A (en) * 2014-12-16 2015-04-01 康莱德国际环保植被(北京)有限公司 Alkaline land leakage pipe and manufacturing method thereof
CN105144890A (en) * 2015-07-31 2015-12-16 潍坊友容实业有限公司 Saline-alkali soil improving structure
CN105453749A (en) * 2016-02-04 2016-04-06 中国科学院武汉植物园 Salinization removing system for in-greenhouse cultivation soil
CN105855280A (en) * 2016-05-27 2016-08-17 盛世园林集团股份有限公司 Improvement method for highway medium separation area snow-melting agent salt damage soil
CN106376264A (en) * 2016-08-30 2017-02-08 山东胜伟园林科技有限公司 Saline-alkali land comprehensive improving system and improving method
CN106376428A (en) * 2016-08-26 2017-02-08 山东胜伟园林科技有限公司 Saline-alkali improving and drainage system with novel water collection tank
CN106376270A (en) * 2016-08-31 2017-02-08 杭州中艺生态环境工程有限公司 Sustainably improved planting structure of saline and alkaline land
CN106818280A (en) * 2017-01-19 2017-06-13 北京乾景园林股份有限公司 A kind of salt-soda soil arbor planting bed
CN108283031A (en) * 2017-11-07 2018-07-17 广州普邦园林股份有限公司 A kind of marine solonchak seepage pipe Salt discharge method
CN108781577A (en) * 2018-07-03 2018-11-13 武汉轻工大学 A kind of nanotube capillaries-hidden pipe joint soil Salt discharge method
CN109588186A (en) * 2018-12-05 2019-04-09 天津市德宇生物工程技术有限公司 Isolated planting tree plantation technique
CN110100518A (en) * 2019-05-25 2019-08-09 天津市海岸盐碱地生态绿化工程有限公司 A kind of comprehensive improving method for coastal saline soil
CN111264114A (en) * 2020-03-20 2020-06-12 中国市政工程华北设计研究总院有限公司 Method for promoting infiltration and reducing emission of saline-alkali soil greening soil

Cited By (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102498771A (en) * 2011-10-20 2012-06-20 天津泰达园林规划设计院有限公司 Salt drainage well with non-return function and construction method thereof
CN103262727B (en) * 2013-04-27 2016-02-03 中国地质调查局西安地质调查中心 A kind of manufacture method of tail slag field reclamation returning-to-farmlanisolation isolation layer
CN103262727A (en) * 2013-04-27 2013-08-28 中国地质调查局西安地质调查中心 Manufacturing method of tail slag field reclamation returning-to-farmland isolation layer
CN104206064A (en) * 2013-06-04 2014-12-17 河南山水园林绿化工程有限公司 Underground salt elimination method for saline and alkali land
CN103371072A (en) * 2013-06-21 2013-10-30 北京仁创科技集团有限公司 Plant planting system for saline-alkaline soil
CN103385096A (en) * 2013-07-01 2013-11-13 北京仁创科技集团有限公司 Improved saline-alkali soil plant cropping system
CN103385047A (en) * 2013-07-31 2013-11-13 武羡慧 Anti-salinization downstream drain well method
CN103385047B (en) * 2013-07-31 2016-05-04 武羡慧 A kind of following current row well method of preventing and treating salinization of soil
CN103444293A (en) * 2013-09-09 2013-12-18 天津泰达园林建设有限公司 Improvement method for underground soil of urban street trees on coastal saline and alkaline land region
CN103444293B (en) * 2013-09-09 2016-02-24 天津泰达绿化集团有限公司 The improvement method of beach saline land Regional City street tree underground
CN103703886A (en) * 2013-12-24 2014-04-09 武羡慧 Moderate shallow shaft method for preventing and controlling salinization
CN103814647A (en) * 2014-03-07 2014-05-28 深圳市万信达生态环境股份有限公司 Saline land improvement method appropriate for arid and semi-arid region
CN103858555A (en) * 2014-04-08 2014-06-18 山东潍坊东盛园艺有限公司 Method for using caustic dross to establish nursery garden on saline and alkaline land
CN104206065A (en) * 2014-08-25 2014-12-17 扬州大学 Device for improving farmland soil of coastal mud flat reclamation areas by combining short-term rapid drainage desalination with long-term control accumulation of salt, and drainage method thereof
CN104472048A (en) * 2014-12-16 2015-04-01 康莱德国际环保植被(北京)有限公司 Alkaline land leakage pipe and manufacturing method thereof
CN105144890A (en) * 2015-07-31 2015-12-16 潍坊友容实业有限公司 Saline-alkali soil improving structure
CN105453749B (en) * 2016-02-04 2017-06-30 中国科学院武汉植物园 Greenhouse indoor growing soil goes salination system
CN105453749A (en) * 2016-02-04 2016-04-06 中国科学院武汉植物园 Salinization removing system for in-greenhouse cultivation soil
CN105855280A (en) * 2016-05-27 2016-08-17 盛世园林集团股份有限公司 Improvement method for highway medium separation area snow-melting agent salt damage soil
CN105855280B (en) * 2016-05-27 2019-01-08 盛世生态环境股份有限公司 Point modification method with deicing salt salt damage soil in a kind of highway
CN106376428A (en) * 2016-08-26 2017-02-08 山东胜伟园林科技有限公司 Saline-alkali improving and drainage system with novel water collection tank
CN106376264A (en) * 2016-08-30 2017-02-08 山东胜伟园林科技有限公司 Saline-alkali land comprehensive improving system and improving method
CN106376270A (en) * 2016-08-31 2017-02-08 杭州中艺生态环境工程有限公司 Sustainably improved planting structure of saline and alkaline land
CN106818280A (en) * 2017-01-19 2017-06-13 北京乾景园林股份有限公司 A kind of salt-soda soil arbor planting bed
CN108283031A (en) * 2017-11-07 2018-07-17 广州普邦园林股份有限公司 A kind of marine solonchak seepage pipe Salt discharge method
CN108781577A (en) * 2018-07-03 2018-11-13 武汉轻工大学 A kind of nanotube capillaries-hidden pipe joint soil Salt discharge method
CN108781577B (en) * 2018-07-03 2020-11-20 武汉轻工大学 Nano capillary-concealed pipe combined soil salt elimination method
CN109588186A (en) * 2018-12-05 2019-04-09 天津市德宇生物工程技术有限公司 Isolated planting tree plantation technique
CN109588186B (en) * 2018-12-05 2021-09-14 天津市德宇生物工程技术有限公司 Planting process of lonely planted tree
CN110100518A (en) * 2019-05-25 2019-08-09 天津市海岸盐碱地生态绿化工程有限公司 A kind of comprehensive improving method for coastal saline soil
CN111264114A (en) * 2020-03-20 2020-06-12 中国市政工程华北设计研究总院有限公司 Method for promoting infiltration and reducing emission of saline-alkali soil greening soil

Similar Documents

Publication Publication Date Title
CN201830631U (en) Greening and desalting system for saline-alkali soil
CN106759825B (en) Construction method of sponge urban green land water storage system
CN101451355B (en) Water retention method of back fill course
CN102995599B (en) Anti-freeze anti-seepage water diversion treatment method of collapsible loess water-conveyance canal
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN102817366B (en) Prevention and treatment method for full-mechanized caving mining collapse trap area water disaster for shallow-buried ultra-thick coal seam
CN105586859B (en) Integral irrigation and drainage pipe system of saline-alkali soil farmland and construction method
CN107587557A (en) Outdoor water engineering construction method
CN101336593B (en) Method for constructing ecology garden landscape compound structures to improve salt-affected soil
CN104206064A (en) Underground salt elimination method for saline and alkali land
CN102383413A (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN102080381B (en) Method for managing landslip of side slope landslide for transformer substation
CN108049423B (en) Ecological landscape retaining wall
CN107152012A (en) Sluice construction technique
CN202444757U (en) Water and salt discharging system
CN101979781B (en) Method for constructing petroleum drilling waste slurry curing tank
WO2024046326A1 (en) Water and soil resource comprehensive improvement method for loess hilly and gully region channels
CN104904469A (en) Greening method for controlling salt elimination area by area in coastal saline area
CN106592346A (en) Head chute separated type ballastless track cutting bed structure for middle-strong salinized soil areas
CN202524735U (en) Composite concealed conduit for salt elimination and alkalinity reduction in saline-alkali land
CN101725159A (en) Method for building impervious liner of refuse landfill by utilizing earthiness firming agent and application thereof
CN105421314B (en) A kind of construction method of the three-dimensional regulator control system of accumulated water Farmland Water
CN208219799U (en) A kind of road biology delay tank
CN102704437A (en) Coal mining subsidence area cultivation water source reconstruction method suitable for complex mountain area
CN206143783U (en) Supporting device for preventing mud rock landslide

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENZHEN WENKE LANDSCAPE CORP., LTD.

Free format text: FORMER NAME: SHENZHEN WENKE HORTICULTURE INDUSTRY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: 26, east block, 518034 floor, CLP information building, 1 news Road, Shenzhen, Guangdong, Futian District

Patentee after: Shenzhen Wenke Landscape Co., Ltd.

Address before: 26, east block, 518034 floor, CLP information building, 1 news Road, Shenzhen, Guangdong, Futian District

Patentee before: Shenzhen Wenke Gardening Industry Co.,Ltd

DD01 Delivery of document by public notice

Addressee: Shenzhen Wenke Landscape Co., Ltd.

Document name: Notification to Pay the Fees

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110518