CN201778531U - 辅助抱杆固定底座 - Google Patents

辅助抱杆固定底座 Download PDF

Info

Publication number
CN201778531U
CN201778531U CN2010205231160U CN201020523116U CN201778531U CN 201778531 U CN201778531 U CN 201778531U CN 2010205231160 U CN2010205231160 U CN 2010205231160U CN 201020523116 U CN201020523116 U CN 201020523116U CN 201778531 U CN201778531 U CN 201778531U
Authority
CN
China
Prior art keywords
base plate
auxiliary
auxiliary pole
fixing base
iron tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010205231160U
Other languages
English (en)
Inventor
王光祥
景文川
吴开贤
黄剑波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
State Grid Corp of China SGCC
Original Assignee
Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Electric Power Transmission & Transformation Construction Co Ltd filed Critical Sichuan Electric Power Transmission & Transformation Construction Co Ltd
Priority to CN2010205231160U priority Critical patent/CN201778531U/zh
Application granted granted Critical
Publication of CN201778531U publication Critical patent/CN201778531U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

一种辅助抱杆固定底座,属输电线路组塔施工辅助装置。底板上焊接有两块平行设置的支撑板,两支撑板之间安装有一用作固定辅助抱杆底座的转轴,底板下部设置有两个用作与铁塔横担角钢相固定的固定钩。本新型具有结构简单、方便使用、安全可靠的特点。

Description

辅助抱杆固定底座
技术领域
本实用新型涉及输电线路组塔施工辅助装置,特别是铁塔组立施工中辅助抱杆的安装固定构件。
背景技术
铁塔组立时采用辅助抱杆吊装长横担的方法已较为广泛,但辅助抱杆底部与铁塔横担的固定方式尚不规范,操作不够方便,且存在一定的安全隐患。
实用新型内容
本实用新型的目的是提供一种结构简单、方便实用、安全可靠的辅助抱杆固定底座。
本新型的目的是这样实现的:一种辅助抱杆固定底座,底板上焊接有两块平行设置的支撑板,两支撑板之间安装有一用作固定辅助抱杆底座的转轴,底板下部设置有两个用作与铁塔横担角钢相固定的固定钩。
上述两个固定钩均从下向上穿过底板上条形孔后经螺帽固定在底板上。
上述两块支撑板上均焊接有加强筋。
上述底板上开有与铁塔横担角钢上预留孔相吻合的圆形螺孔。
本新型的有益效果是:结构简单、方便实用、安全可靠,具有很好的应用前景。
附图说明
图1、图2、图3分别是本新型的主视图、左视图和俯视图。
具体实施方式
图1、图2和图3示出,底板1上焊接有两块平行设置的支撑板2,两支撑板之间安装有一用作固定辅助抱杆底座的转轴6,底板1下部设置有两个用作与铁塔横担角钢7相固定的固定钩4。两个固定钩4均从下向上穿过底板1上条形孔1b后经螺帽5固定在底板1上。两块支撑板2上均焊接有加强筋3。底板1上开有与铁塔横担角钢上预留孔相吻合的圆形螺孔1a。
施工时,利用辅助人字抱杆作7支撑吊装:由于个别直线塔(如ZC27106、ZJC27101塔型)外侧横担较长、较重,进位安装较为困难,为保证吊装安全,故必须在中段横担上盖架设辅助人字抱杆作支撑对吊件进行吊装。辅助抱杆选用Φ150mm*10*1000m以上规格,抱杆底座安装于中横担上盖的辅助抱杆预留孔处,且抱杆顶部通过反向加强拉线(Φ13mm钢丝绳)与主抱杆顶部相连。

Claims (4)

1.一种辅助抱杆固定底座,其特征是:底板(1)上焊接有两块平行设置的支撑板(2),两支撑板之间安装有一用作固定辅助抱杆底座的转轴(6),底板(1)下部设置有两个用作与铁塔横担角钢(7)相固定的固定钩(4)。
2.根据权利要求1所述辅助抱杆固定底座,其特征是:所述两个固定钩(4)均从下向上穿过底板(1)上条形孔(1b)后经螺帽固定在底板(1)上。
3.根据权利要求1或2所述辅助抱杆固定底座,其特征是:所述两块支撑板(2)上均焊接有加强筋(3)。
4.根据权利要求3所述辅助抱杆固定底座,其特征是:所述底板(1)上开有与铁塔横担角钢上预留孔相吻合的圆形螺孔(1a)。
CN2010205231160U 2010-09-09 2010-09-09 辅助抱杆固定底座 Expired - Lifetime CN201778531U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010205231160U CN201778531U (zh) 2010-09-09 2010-09-09 辅助抱杆固定底座

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010205231160U CN201778531U (zh) 2010-09-09 2010-09-09 辅助抱杆固定底座

Publications (1)

Publication Number Publication Date
CN201778531U true CN201778531U (zh) 2011-03-30

Family

ID=43791745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010205231160U Expired - Lifetime CN201778531U (zh) 2010-09-09 2010-09-09 辅助抱杆固定底座

Country Status (1)

Country Link
CN (1) CN201778531U (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942923A (zh) * 2010-09-09 2011-01-12 四川电力送变电建设公司 辅助抱杆固定底座
CN102852371A (zh) * 2012-10-17 2013-01-02 国家电网公司 吊装钢杆用辅助工具
CN104100124A (zh) * 2014-07-23 2014-10-15 国家电网公司 一种抱杆底座连接固定装置
CN108868298A (zh) * 2018-06-26 2018-11-23 通号工程局集团有限公司 一种钢柱组立装置及其使用方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101942923A (zh) * 2010-09-09 2011-01-12 四川电力送变电建设公司 辅助抱杆固定底座
CN102852371A (zh) * 2012-10-17 2013-01-02 国家电网公司 吊装钢杆用辅助工具
CN102852371B (zh) * 2012-10-17 2014-09-17 国家电网公司 吊装钢杆用辅助工具
CN104100124A (zh) * 2014-07-23 2014-10-15 国家电网公司 一种抱杆底座连接固定装置
CN104100124B (zh) * 2014-07-23 2016-05-11 国家电网公司 一种抱杆底座连接固定装置
CN108868298A (zh) * 2018-06-26 2018-11-23 通号工程局集团有限公司 一种钢柱组立装置及其使用方法
CN108868298B (zh) * 2018-06-26 2024-03-15 通号工程局集团有限公司 一种钢柱组立装置及其使用方法

Similar Documents

Publication Publication Date Title
CN204607396U (zh) 一种定子铁芯吊具
CN201778531U (zh) 辅助抱杆固定底座
CN101942923A (zh) 辅助抱杆固定底座
CN201506693U (zh) 一种大型井盖起吊装置
CN202963967U (zh) 一种挂舵臂液压螺母安装装置
CN201501730U (zh) 大型风力发电机叶片专用吊具
CN102619377B (zh) 改进的辅助抱杆固定底座
CN202509842U (zh) 改进的辅助抱杆固定底座
CN102237654B (zh) 使用双角钢挂点更换跳线串的工具来更换跳线串的方法
CN203728448U (zh) 一种塔机用轻便型装卸架
CN202829361U (zh) 一种小型吊升机
CN202978098U (zh) 架空地线提升器
CN201756422U (zh) 两头吊塔式起重机
CN202729568U (zh) 新型风力发电机组变桨轴承装配装置
CN202609828U (zh) 一种矿用全液压吊装车
CN201868786U (zh) 输电线路220千伏避雷线检修专用提升器
CN202594608U (zh) 一种大型风力发电机组机架翻转装置
CN202226567U (zh) 升降机
CN202988576U (zh) 一种简易倒链提升支架
CN203014282U (zh) 一种输电线路架空地线提升装置
CN102344090A (zh) 两头吊塔式起重机
CN202886082U (zh) 一种大型风电叶片疲劳试验偏心激振器
CN202441098U (zh) 一种爬梯兼拉线型钢管塔
CN202231352U (zh) 一种倒向滑车固定架
CN201261681Y (zh) Rh炉环流管安装吊具

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20131227

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131227

Address after: 610051 No. 2 South Branch Road, Chenghua District, Sichuan, Chengdu

Patentee after: Sichuan Electric Power Transmission & Transformation Construction Co., Ltd.

Patentee after: State Grid Corporation of China

Address before: 610051 Chenghua District, Chengdu, Cui Cui shop north road, No. 1, No. 6, Sichuan

Patentee before: Sichuan Electric Power Transmission & Transformation Construction Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110330