CN201762702U - Drilling secant pile - Google Patents
Drilling secant pile Download PDFInfo
- Publication number
- CN201762702U CN201762702U CN2010205321152U CN201020532115U CN201762702U CN 201762702 U CN201762702 U CN 201762702U CN 2010205321152 U CN2010205321152 U CN 2010205321152U CN 201020532115 U CN201020532115 U CN 201020532115U CN 201762702 U CN201762702 U CN 201762702U
- Authority
- CN
- China
- Prior art keywords
- pile
- stake
- construction
- adjacent
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title abstract description 3
- 238000010276 construction Methods 0.000 abstract description 22
- 239000004567 concrete Substances 0.000 abstract description 7
- 230000011218 segmentation Effects 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 4
- 239000002689 soil Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000002950 deficient Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000004062 sedimentation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The utility model discloses a drilling secant pile has solved under unfavorable geological conditions, and the bored concrete pile that prior art adopted has mud overflow to cause the influence to the surrounding environment to the construction site occupies greatly, and the construction period is long, technical problem with high costs. The retaining wall comprises a pile A and a pile B, wherein the pile A and the pile B are arranged at intervals to form a row of retaining walls, the pile B is arranged between every two adjacent pile A, and each pile B is meshed with the adjacent pile A. The horizontal cross section of the pile A is the same as that of the pile B. The utility model discloses having realized the segmentation construction purpose to subway deep basal pit enclosure, having overcome the interference that cross construction brought, reduced occuping of construction site, practiced thrift the construction cost.
Description
Technical field
The utility model relates to a kind of space enclosing structure stake of Metro Deep Excavation.
Background technology
In the subway foundation pit civil engineering process of soft soil layer,, all can cause very big influence, even cause the sedimentation of ground high-rise building surrounding environment if the retaining of space enclosing structure soil and stagnant water effect are bad.Prior art generally is the method that adopts bored pile piling under unfavorable geological condition, and the defective that the used mud off of castinplace pile exists mud to overflow surrounding environment is impacted, and the construction plant takies greatly, and is long in time limit, the cost height.
Summary of the invention
The utility model provides a kind of boring interlock stake to solve under unfavorable geological condition, and the castinplace pile that prior art adopted exists mud to overflow surrounding environment is impacted, and the construction plant takies greatly, and is long in time limit, the technical problem that cost is high.
The utility model overcomes the above problems by following scheme:
A kind of boring interlock stake comprises A stake and B stake, it is characterized in that, A stake and B stake are arranged to a row formula retaining wall at interval, is provided with the B stake between per two adjacent A stakes, and each B stake all is interlocked with adjacent A stake.
Level cross-sectionn in described A stake is identical with the level cross-sectionn of B stake.
The utility model has been realized the section construction purpose to the subway Extra-Deep Foundation Pit, has overcome the interference that crossed construction brings, and has reduced taking of construction plant, has saved the construction funds.
Description of drawings:
Fig. 1 is a structural representation of the present utility model
Fig. 2 is a construction flow chart of the present utility model
Specific embodiment
A kind of boring interlock stake comprises A stake and B stake, it is characterized in that, A stake and B stake are arranged to a row formula retaining wall at interval, is provided with the B stake between per two adjacent A stakes, and each B stake all is interlocked with adjacent A stake.
Level cross-sectionn in described A stake is identical with the level cross-sectionn of B stake.
The all casing drill drilling construction is adopted in boring interlock stake, forms the foundation pit enclosure structure that mutual interlock is arranged between stake and stake.The arrangement mode of stake is that A stake and B stake are arranged at interval, construction B stake after the construction A stake earlier during construction, and require must finish before the super slow setting concrete initial set of A stake the construction of B stake.Adopt all casing drill to cut away the plain concrete of adjacent A stake intersection during the B pile driving construction, thereby realize interlock.
With the reinforced concrete pile is example, the construction technology process of single pile is led wall → drill machine with casing centering in place → lifting as: smooth place → measurement stake position → construction concrete and is laid first segment sleeve pipe → observing and controlling verticality → be pressed into first segment sleeve pipe → check and correction verticality → grab bucket to fetch earth, advance → measure hole depth → removing loosened soil with pipe bit, at the bottom of the inspection eye → B stake install reinforcing cage → put into concrete pouring conduit → perfusion concrete to pull out sleeve pipe → mensuration concrete face → stake machine displacement one by one.A type single pile construction technology and Type B pile foundation are originally identical, just do not have this operation of install reinforcing cage.
Claims (2)
1. a boring interlock stake comprises A stake and B stake, it is characterized in that A stake and B stake are arranged to a row formula retaining wall at interval, is provided with the B stake between per two adjacent A stakes, and each B stake all is interlocked with adjacent A stake.
2. a kind of boring interlock stake according to claim 1 is characterized in that, and is identical with the level cross-sectionn of B stake in the level cross-sectionn of described A stake.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205321152U CN201762702U (en) | 2010-09-17 | 2010-09-17 | Drilling secant pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010205321152U CN201762702U (en) | 2010-09-17 | 2010-09-17 | Drilling secant pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201762702U true CN201762702U (en) | 2011-03-16 |
Family
ID=43715313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010205321152U Expired - Fee Related CN201762702U (en) | 2010-09-17 | 2010-09-17 | Drilling secant pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201762702U (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103255764A (en) * | 2013-05-22 | 2013-08-21 | 浙江省地质矿产工程公司 | Construction method for vibrating sunken tube construction secant pile wall |
CN103276723A (en) * | 2013-04-27 | 2013-09-04 | 瑞华建设集团有限公司 | Construction method of concrete bored secant pile |
CN104060613A (en) * | 2013-03-22 | 2014-09-24 | 上海市城市建设设计研究总院 | Directional secant pile grouting structure and directional secant pile grouting soil reinforcement method |
CN104264662A (en) * | 2014-10-17 | 2015-01-07 | 中亿丰建设集团股份有限公司 | Construction method for deeply embedding hard rock secant pile in soil layer being rich in water |
CN109056740A (en) * | 2018-08-03 | 2018-12-21 | 浙江大学城市学院 | A kind of construction method whether novel judgement interlocking pile is engaged |
CN113866277A (en) * | 2021-09-22 | 2021-12-31 | 合诚工程咨询集团股份有限公司 | Nondestructive testing method for pile forming quality of large-diameter secant pile |
-
2010
- 2010-09-17 CN CN2010205321152U patent/CN201762702U/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060613A (en) * | 2013-03-22 | 2014-09-24 | 上海市城市建设设计研究总院 | Directional secant pile grouting structure and directional secant pile grouting soil reinforcement method |
CN104060613B (en) * | 2013-03-22 | 2016-04-20 | 上海市城市建设设计研究总院 | The directed slip casting structure of interlocking pile and interlocking pile directed grouting and reinforcing soil body method |
CN103276723A (en) * | 2013-04-27 | 2013-09-04 | 瑞华建设集团有限公司 | Construction method of concrete bored secant pile |
CN103255764A (en) * | 2013-05-22 | 2013-08-21 | 浙江省地质矿产工程公司 | Construction method for vibrating sunken tube construction secant pile wall |
CN104264662A (en) * | 2014-10-17 | 2015-01-07 | 中亿丰建设集团股份有限公司 | Construction method for deeply embedding hard rock secant pile in soil layer being rich in water |
CN109056740A (en) * | 2018-08-03 | 2018-12-21 | 浙江大学城市学院 | A kind of construction method whether novel judgement interlocking pile is engaged |
CN109056740B (en) * | 2018-08-03 | 2020-04-07 | 浙江大学城市学院 | Construction method for judging whether secant pile is secant or not |
CN113866277A (en) * | 2021-09-22 | 2021-12-31 | 合诚工程咨询集团股份有限公司 | Nondestructive testing method for pile forming quality of large-diameter secant pile |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105840207B (en) | Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body | |
CN108442382B (en) | In-situ protection and enclosure soil-retaining structure for pressure pipeline crossing deep foundation pit and construction method | |
CN104947690B (en) | Grooving construction method for embedding underground continuous wall into rock | |
CN106988302B (en) | A kind of high inclination-angle competent bed rotary digging pile driving construction engineering method | |
CN201762702U (en) | Drilling secant pile | |
CN203846485U (en) | Long pile percussion drill hole forming construction device | |
CN102286984A (en) | Water-stop curtain and construction method thereof | |
CN104153352A (en) | Karst geology rotary-drilling bored concrete pile hole forming process | |
CN101328712A (en) | Construction method of interlocking pile for soft soil and soil layer with obstacle | |
CN204491626U (en) | The foundation pit enclosure structure that Larsen steel sheet pile and prestressed anchor combine | |
CN103114599B (en) | Deep basal pit sealing dewatering device and construction method thereof | |
CN102286981A (en) | Waterproof curtain and construction method thereof | |
CN202194148U (en) | Waterproof curtain | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN108532586A (en) | A kind of construction method of garage parking diaphram wall | |
CN104612179A (en) | Construction method for underground diaphragm wall penetrating through super-thick silt layer | |
CN202194149U (en) | Water-proof curtain | |
CN105569051A (en) | Foundation pit support system of sandy pebble boulder geological stratification and construction method | |
CN104264663A (en) | Hard cutting construction technology for secant piles | |
CN106592605A (en) | Construction method of foundation pit bracing with tri-axial stirring piles overlapped with reinforced concrete cast-in-place piles to be driven | |
CN104314071A (en) | Construction method of underground diaphragm wall by employing rotary drilling rig | |
CN206428707U (en) | A kind of integrated pile tube dado structure of pattern foundation pit supporting structure precipitation | |
CN110241836A (en) | A kind of construction method of embedding rock water-stop curtain | |
CN105200994A (en) | Construction method for reserved shield crossing composite foundation pit support device | |
CN102220764B (en) | Construction method of deep foundation pit bracing system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110316 Termination date: 20180917 |