CN201685997U - Shipbuilding tooling utilizing floating dock - Google Patents

Shipbuilding tooling utilizing floating dock Download PDF

Info

Publication number
CN201685997U
CN201685997U CN201020162859XU CN201020162859U CN201685997U CN 201685997 U CN201685997 U CN 201685997U CN 201020162859X U CN201020162859X U CN 201020162859XU CN 201020162859 U CN201020162859 U CN 201020162859U CN 201685997 U CN201685997 U CN 201685997U
Authority
CN
China
Prior art keywords
complete cross
section
floating drydock
shipbuilding
floating dock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201020162859XU
Other languages
Chinese (zh)
Inventor
陶海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengxi Shipyard Co Ltd
Original Assignee
Chengxi Shipyard Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengxi Shipyard Co Ltd filed Critical Chengxi Shipyard Co Ltd
Priority to CN201020162859XU priority Critical patent/CN201685997U/en
Application granted granted Critical
Publication of CN201685997U publication Critical patent/CN201685997U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Ship Loading And Unloading (AREA)

Abstract

The utility model relates to a shipbuilding tooling utilizing a floating dock, which is characterized in that the tooling comprises the floating dock (1), various complete cross sections (2) of a new ship and a three-dimensional regulator (3), ballast water (6) is filled in a ballast tank of the floating dock (1), the complete cross sections (2) of the new ship are arranged on dock blocks (4) of the floating dock (1), and the three-dimensional regulator (3) is assembled on a pontoon deck (5) of the floating dock (1) and is padded at the bottoms of the complete cross sections (2) of the new ship. The shipbuilding tooling can resolve the problems of determining the ship reference line in the floating dock during shipbuilding and quickly adjusting and positioning complete cross sections of the new ship.

Description

Utilize the frock of floating drydock shipbuilding
(1) technical field
The utility model relates to a kind of frock of utilizing shiprepair to carry out shipbuilding with the floating drydock.Belong to the ship building technical field.
(2) background technology
Building berth, dry dock are ship closure and following drainage facility, are widely used in new shipbuilding; Floating drydock and dry dock are widely used in ship repair.These are critical facilitys of shipyard, and investment is big, and the cycle is long.
Along with the new ship demand in the world sharply enlarges, and new construction facilities can't increase in a short time fast, is to alleviate imbalance between supply and demand, and each shipyard will be used for being used for shipbuilding after the dry dock transformation of shiprepair one after another, but the floating drydock is adopted in shiprepair mostly.If the floating drydock also can be used for shipbuilding, then can realize shiprepair and shipbuilding resource sharing to a greater extent, be issued to the purpose that enlarges the shipbuilding production capacity in a short time to greatest extent in the situation that does not need very big fund input, thereby satisfy the demand of the world new ship.And when new ship demand reduced, the floating drydock still can be used for shiprepair, reduced idle facility.But the floating drydock is used for shipbuilding and has a following difficult problem:
Need definite datum line conduct when 1, closing up and close up benchmark, and the floating drydock can't provide the datum line as the land owing to new ship.Because:
1) floating drydock swims on the water surface, and its position and state change along with the variation of stormy waves, morning and evening tides and current.
2) when new ship segmentation (or complete cross section) when putting into the floating drydock, thereby the strained condition at floating drydock can change and produces distortion.
2, new ship segmentation (or complete cross section) is in floating drydock domestic demand quick adjusting location, to satisfy the requirement of shipbuilding period.
(3) summary of the invention
The purpose of this utility model is to overcome above-mentioned deficiency, provide a kind of can solve above-mentioned in the floating drydock the determining and the frock of utilizing the floating drydock shipbuilding of the quick adjusting orientation problem of new ship complete cross section of boats and ships datum line during shipbuilding.
The purpose of this utility model is to be achieved through the following technical solutions: a kind of frock of utilizing the floating drydock shipbuilding, comprise: each complete cross section and the three-dimensional adjustment machine of floating drydock, new ship, in the ballast tank at floating drydock, add ballast water, on the docking block at floating drydock, place each complete cross section of new ship, the three-dimensional adjustment machine of device on the pontoon deck at floating drydock, three-dimensional adjustment machine pad places the bottom of each complete cross section of described new ship.
The utility model has the advantages that:
1, this frock does not need the extensive new facility that increases, and only existing facility need be transformed.Can save input, instant effect greatly.
2, when not needing to adopt this method to build boats and ships, involved facilities and equipment can be used for shiprepair and building berth (or dry dock) shipbuilding, can not cause the idle of equipment, facility and place.Cut the waste.
3, realize shiprepair facility and construction facilities resource sharing, improved the alerting ability of factory operation greatly.
(4) description of drawings
Fig. 1 arranges scheme drawing for the complete cross section place that the utility model relates to.
Hydraulic trolley arrangement plan during complete cross section translation that Fig. 2 relates to for the utility model.
The layout scheme drawing (birds-eye view) of boats and ships in the floating drydock that Fig. 3 relates to for the utility model.
The layout scheme drawing (drawing in side sectional elevation) of boats and ships in the floating drydock that Fig. 4 relates to for the utility model.
The complete cross section lifting scheme drawing that Fig. 5 relates to for the utility model.
Reference numeral among the figure:
Floating drydock 1, boats and ships 2, three-dimensional adjustment machine 3, docking block 4, pontoon deck 5, ballast water 6.
The first complete cross section A, the second complete cross section B, the 3rd complete cross section C, the 4th complete cross section D, the 5th complete cross section E, the 6th complete cross section F.
(5) specific embodiment
Referring to Fig. 4, the layout scheme drawing (drawing in side sectional elevation) of boats and ships in the floating drydock that Fig. 4 relates to for the utility model.As seen from Figure 4, the utility model utilizes the frock of floating drydock shipbuilding, comprise: each complete cross section 2 and the three-dimensional adjustment machine 3 of floating drydock 1, new ship, in the ballast tank at floating drydock 1, add ballast water 6, on the docking block 4 at floating drydock 1, place each complete cross section 2 of new ship, the three-dimensional adjustment machine 3 of device on the pontoon deck 5 at floating drydock 1, three-dimensional adjustment machine 3 pads place the bottom of each complete cross section 2 of described new ship.Utilize the method for floating drydock shipbuilding as follows:
Step 1, in the ballast tank at floating drydock, add a certain amount of ballast water in advance.
Step 2, keeping under the ballast water yield unmodified situation, surveying the amount of deflection control line of standardized straight line on the wing wall in about the floating drydock as the floating drydock.On the pontoon deck at floating drydock, survey and mark the control line of new center line of boat as new center line of boat.
Step 3, new ship segmentation is closed up into a plurality of complete cross sections on total group place, as Fig. 1.And on each complete cross section, survey and draw line of centers, the height and position line of each complete cross section well.Then with hydraulic trolley with each? complete cross section moves to along the river, as Fig. 2.With crane barge first complete cross section is lifted up into the floating drydock again.
Step 4, will pump with the ballast water in the cooresponding ballast tank of first complete cross section, the weight of the ballast water that pumps equates substantially with the weight of first complete cross section.Utilize the described floating drydock of total station survey about in amount of deflection control line on the wing wall, and according to the ballast water in the measurement situation fine setting ballast tank, about making in the out-of-flat of amount of deflection control line on the wing wall less than 10mm.
Step 5, reach height and position all around with what three-dimensional adjustment machine was adjusted first complete cross section, as Fig. 4.
Step 6, second complete cross section is lifted up into the floating drydock,, repeated for the 4th step then as Fig. 5.
Step 7, adjust the position of second complete cross section with three-dimensional adjustment machine, line of centers that surveying on first complete cross section drawn and height and position line are as the benchmark that closes up of second complete cross section.
Step 8, repeat above operation and close up the 3rd complete cross section, with the line of centers of first and second complete cross sections after the balance and height and position line the benchmark that closes up as the 3rd complete cross section.By that analogy, close up up to all complete cross sections and to finish, as Fig. 3.

Claims (1)

1. frock of utilizing the floating drydock shipbuilding, it is characterized in that: described frock comprises: each complete cross section (2) and the three-dimensional adjustment machine (3) of floating drydock (1), new ship, in the ballast tank of floating drydock (1), add ballast water (6), the docking block of (1) (4) is gone up each complete cross section (2) of placing new ship at the floating drydock, the pontoon deck of (1) (5) is gone up the three-dimensional adjustment machine (3) of device at the floating drydock, and three-dimensional adjustment machine (3) pad places the bottom of each complete cross section (2) of described new ship.
CN201020162859XU 2010-04-09 2010-04-09 Shipbuilding tooling utilizing floating dock Expired - Fee Related CN201685997U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020162859XU CN201685997U (en) 2010-04-09 2010-04-09 Shipbuilding tooling utilizing floating dock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020162859XU CN201685997U (en) 2010-04-09 2010-04-09 Shipbuilding tooling utilizing floating dock

Publications (1)

Publication Number Publication Date
CN201685997U true CN201685997U (en) 2010-12-29

Family

ID=43374283

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020162859XU Expired - Fee Related CN201685997U (en) 2010-04-09 2010-04-09 Shipbuilding tooling utilizing floating dock

Country Status (1)

Country Link
CN (1) CN201685997U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104802955A (en) * 2014-12-05 2015-07-29 中集海洋工程研究院有限公司 Floating dock
CN107416131A (en) * 2017-07-28 2017-12-01 广船国际有限公司 A kind of dock positioner
CN107416129A (en) * 2017-07-28 2017-12-01 广船国际有限公司 A kind of dock positioner and its installation method
CN107719580A (en) * 2017-08-15 2018-02-23 舟山长宏国际船舶修造有限公司 A kind of horizontal building berth method on 10 ton ships
CN108862093A (en) * 2018-06-04 2018-11-23 芜湖恒安钢结构有限公司 A kind of shipbuilding hull clamping lifting means
CN111268060A (en) * 2020-04-01 2020-06-12 扬帆集团股份有限公司 Half ship folds device based on dock

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104802955A (en) * 2014-12-05 2015-07-29 中集海洋工程研究院有限公司 Floating dock
CN104802955B (en) * 2014-12-05 2017-02-08 中集海洋工程研究院有限公司 Floating dock
CN107416131A (en) * 2017-07-28 2017-12-01 广船国际有限公司 A kind of dock positioner
CN107416129A (en) * 2017-07-28 2017-12-01 广船国际有限公司 A kind of dock positioner and its installation method
CN107719580A (en) * 2017-08-15 2018-02-23 舟山长宏国际船舶修造有限公司 A kind of horizontal building berth method on 10 ton ships
CN107719580B (en) * 2017-08-15 2019-05-31 舟山长宏国际船舶修造有限公司 Horizontal building berth method on 10 10,000 tons ships of one kind
CN108862093A (en) * 2018-06-04 2018-11-23 芜湖恒安钢结构有限公司 A kind of shipbuilding hull clamping lifting means
CN111268060A (en) * 2020-04-01 2020-06-12 扬帆集团股份有限公司 Half ship folds device based on dock

Similar Documents

Publication Publication Date Title
CN201685997U (en) Shipbuilding tooling utilizing floating dock
CN204184555U (en) A kind of novel floating drydock
CN101817393B (en) Shipbuilding method by utilizing floating dock
CN105151236A (en) Platform device for submerging, surfacing, moving and carrying floating piers and towers and working method thereof
CN203996823U (en) Gravity swing ball formula following sea piston type hull self balancing device
CN105480380B (en) Tension leg platform (TLP) upper module and the closure workmanship of lower float structure
CN103910044A (en) Large-scale floating type ocean-structure semi-submersible lifting platform and application method thereof
CN104229099A (en) Offshore engineering vessel loading and launching system and method
CN102114899A (en) Extra-large float installation barge and design method thereof
CN104210627B (en) Build the device and method of lower water for jack-up unit level land
CN103241668A (en) Device and method for installing deep sea submarine storage tank
CN104743058A (en) Floating installation method for upper assembling block of tension leg platform
CN106522275A (en) Construction process for shipping large sinking pipes by self-propelled semi-submerged ship
CN203996826U (en) Pontoon type following sea piston type hull self balancing device
CN204916099U (en) Semi -submerged barge tilting dive stern deadwood
CN105586864A (en) Method for folding self-lifting-type platform truss-type pile legs
CN109178225B (en) Pull rod type undocking method for semi-submersible type ocean engineering platform
CN203902800U (en) Semi-submersible type lifting platform for large floating offshore structure
CN103921905B (en) Semi-submersible module for combining into large-scale floating body on the water and assembling method thereof
CN103569311A (en) Propeller installing and positioning device and propeller underwater installing method
CN201685988U (en) Height positioning device for afloat joining of main body of 1600-ton crane ship
CN202787291U (en) Main pier steel cover box on-site two-abreast-machine hoisting construction structure
CN104802950A (en) Self-elevating type underwater floater tension leg platform and establishing method thereof
CN206218146U (en) Offshore operation at sea platform
CN204979158U (en) Latent floating carrying platform device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101229