CN201588222U - Superposed digging/embedding foundation - Google Patents

Superposed digging/embedding foundation Download PDF

Info

Publication number
CN201588222U
CN201588222U CN2009200948564U CN200920094856U CN201588222U CN 201588222 U CN201588222 U CN 201588222U CN 2009200948564 U CN2009200948564 U CN 2009200948564U CN 200920094856 U CN200920094856 U CN 200920094856U CN 201588222 U CN201588222 U CN 201588222U
Authority
CN
China
Prior art keywords
foundation
digging
embedding
chassis
superposed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009200948564U
Other languages
Chinese (zh)
Inventor
刘洪义
张显峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN2009200948564U priority Critical patent/CN201588222U/en
Application granted granted Critical
Publication of CN201588222U publication Critical patent/CN201588222U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a superposed digging/embedding foundation which is characterized in that the foundation comprises a digging foundation and a round-table type embedding foundation, wherein the digging foundation is formed by a main post and a chassis, the round-table type embedding foundation is arranged below the digging foundation; the main post is a cylinder; the upper end of the main post is provided with a foundation bolt; the foundation chassis is positioned below the main post; main reinforced bars are distributed around the main post; the lower ends of the main reinforced bars are anchored in the embedding foundation through the foundation chassis; a plurality of round stirrups are distributed at the upper part and the lower part around the main reinforced bars; and the main post, the foundation chassis and the build-in foundation are superposed into a whole by the embedding foundation. By field in-situ test, the digging part and the embedding foundation part can coordinate and well resist outside load under ultimate bearing capacity; and the superposed digging/embedding foundation can fully utilize the good engineering mechanical performances such as high bearing capacity and little deformation of undisturbed ground foundation, meets the requirement of environment protection in engineering construction and saves material.

Description

Superposed type is drawn the embedding basis
Technical field
The utility model relates to the basic field of high pressure, super-pressure and extra-high voltage power line tower.
Background technology
According to the experience of sending electrical engineering in the past, build-in type basis widespread usage is in the circuit of each electric pressure, this is because the build-in type basis shows good load, durability and economy under the stressed condition of severely-weathered geology, big load, significant for the excavation that reduces the construction period earthwork, the construction equipment that is used for build-in type basis excavation of foundation pit in addition is simpler, general adopt traditional spade, original text or small-sized electric equipment get final product, this can save transportation as facility such as large-scale rigs for the difficult area of high mountain high hill transportation.For build-in type basis, inapplicable tower position, rock bolt type basis is first-selected replacement basic type, it often can save a large amount of concrete and basic steel amount with the heavy excavation basis under the condition, its theory of computation mainly adopts pulls out in the control of bonding force between base concrete and the rock and the method for verification shear of rock bearing capacity is carried out, but shortcoming that should basis pattern maximum is to need rock to be exposed to the face of land and globality is had relatively high expectations and the rock joint crack can not be too big, these all limited should the basis a large amount of uses, because general geology all is soil conditions such as clay in the plains region, and the mountain area also is soil layer with the surface, it is in the majority for the geological conditions of rock down, and rock shows as the trend that alleviates with degree of depth increasing weathering.And digging foundation is direct digging foundation hole in ground, insert reinforcing bar, penetration concrete and the basis that forms, this basis earthwork is less, less to landform and vegetation deterioration, can make full use of the undisturbed soil characteristic, pull out bearing capacity on it to improve, and can reduce the lateral deformation on basis, do not need formwork when casting concrete again, but the reduction of erection time is reduced operating expenses, but the theory of computation of all digging foundations all is to adopt shearing method on the power transmission sequence, this basic pattern is primarily aimed at the cohesive soil geological conditions, and what material usage will be big than rock foundation in its result of calculation is many.
The utility model content
Technical problem to be solved in the utility model provides a kind of drawing and digs and the superimposed environmental protection base of rock build-in; can make full use of undisturbed soil ground bearing capacity height, the little good engineering mechanics performance of distortion; satisfy the environmental protection requirement of engineering construction; especially (for example strained angled tower tower position) more can the economical with materials amount under big load, is convenient to construction.
For solving the problems of the technologies described above, the utility model provides a kind of superposed type to draw the embedding basis, it is characterized in that: comprise the digging foundation of forming by basic principal post and basic chassis, it is the circular platform type Embed based down, the basis principal post is a cylinder, principal post upper end, basis is provided with stone bolt, the chassis, basis is positioned at below the basic principal post, basis principal post circumference disposes main muscle, main muscle lower end anchors in the Embed based by basic chassis, main muscle circumference configuration is some circular stirrups up and down, and basic principal post and basic chassis and Embed based are superimposed as integral body by main muscle.
The utility model has carried out test in situ; but the basis is drawn and is dug part and the collaborative work of basic build-in part under ultimate bearing capacity; resist external load well; can make full use of undisturbed soil ground bearing capacity height, the little good engineering mechanics performance of distortion; satisfy the environmental protection requirement of engineering construction, the economical with materials amount.
Description of drawings
Fig. 1 draws embedding basis elevation for superposed type;
Fig. 2 draws embedding basis A-A sectional drawing for superposed type;
Fig. 3 draws embedding basis B-B sectional drawing for superposed type;
Fig. 4 draws the main muscle processing in embedding basis master drawing for superposed type.
The specific embodiment
With reference to Fig. 1, Fig. 2, Fig. 3, Fig. 4, the utility model comprises the digging foundation that is made of basic principal post 1 and basic chassis 2, the digging foundation bottom is an Embed based 3, the basis principal post is a cylinder, principal post upper end, basis is provided with stone bolt 6, the chassis, basis is positioned at below the basic principal post, basis principal post circumference disposes main muscle 4, main muscle lower end is run through the anchoring of basic chassis and is gone into Embed based bottom, main muscle circumference configuration is some circular stirrups 5 up and down, main muscle and stirrup colligation or weld together, digging foundation and Embed based are by the moulding of concrete one-time-concreting.
Chassis, basis and basic principal post adopt digging foundation to calculate principle and promptly adopt shearing method, and the bottom adopts Rock Embed based to calculate principle.Digging foundation part and build-in part are resisted the active force that the top iron tower transmits together, wherein the cohesion between the relative shearing of the soil body and Embed based and the rock is born jointly on the surface of shear that formed in the soil body by digging foundation of uplift force and horizontal force, and downforce and horizontal force are born by the ground under digging foundation chassis and the Embed based.

Claims (1)

1. a superposed type is drawn the embedding basis, it is characterized in that: comprise the digging foundation of forming by basic principal post and basic chassis, it is the circular platform type Embed based down, the basis principal post is a cylinder, and basic principal post upper end is provided with stone bolt, and basic chassis is positioned at below the basic principal post, basis principal post circumference disposes main muscle, main muscle lower end anchors in the Embed based by basic chassis, and main muscle circumference configuration is some circular stirrups up and down, and basic principal post and basic chassis and Embed based are superimposed as integral body by main muscle.
CN2009200948564U 2009-12-02 2009-12-02 Superposed digging/embedding foundation Expired - Lifetime CN201588222U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200948564U CN201588222U (en) 2009-12-02 2009-12-02 Superposed digging/embedding foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200948564U CN201588222U (en) 2009-12-02 2009-12-02 Superposed digging/embedding foundation

Publications (1)

Publication Number Publication Date
CN201588222U true CN201588222U (en) 2010-09-22

Family

ID=42747993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200948564U Expired - Lifetime CN201588222U (en) 2009-12-02 2009-12-02 Superposed digging/embedding foundation

Country Status (1)

Country Link
CN (1) CN201588222U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102828525A (en) * 2012-08-16 2012-12-19 国核电力规划设计研究院 Foundation structure of power transmission line tower
CN104499501A (en) * 2014-12-08 2015-04-08 国家电网公司 Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line
CN109898543A (en) * 2019-03-25 2019-06-18 东北大学 A kind of pulling-resistant and pressure-resistant power transmission tower basis and its construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102828525A (en) * 2012-08-16 2012-12-19 国核电力规划设计研究院 Foundation structure of power transmission line tower
CN104499501A (en) * 2014-12-08 2015-04-08 国家电网公司 Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line
CN104499501B (en) * 2014-12-08 2017-02-22 国家电网公司 Narrow-foundation-tower single-pile pier-type self-stabilized foundation for power transmission line
CN109898543A (en) * 2019-03-25 2019-06-18 东北大学 A kind of pulling-resistant and pressure-resistant power transmission tower basis and its construction method

Similar Documents

Publication Publication Date Title
CN102828525A (en) Foundation structure of power transmission line tower
CN202117068U (en) Micropile plate-type composite foundation
CN201809779U (en) Open caisson foundation of power transmission line iron tower
CN201485863U (en) Digging rock bolt compound environment-protection basis
CN204898672U (en) Discard device of pulling out of pile foundation
CN101718098B (en) Micro-pile combined dug composite foundation and construction method thereof
CN201232194Y (en) Anti-deformation power transmission tower
CN210395412U (en) Prestressed anchor pile uplift foundation suitable for overhead transmission line in mountain area
CN101691760B (en) Composite foundation combining anchor rods with excavation and construction method thereof
CN201588222U (en) Superposed digging/embedding foundation
CN102900095A (en) Transmission tower plate-type single rope foundation structure
CN201843135U (en) Composite foundation pile in power transmission line
CN202672162U (en) Combined type retaining structure
CN204435407U (en) A kind of batter post group anchor formula rock foundation
CN101691759A (en) Construction method for digging composite environmental protection base of anchorage bar adding rock
CN201502065U (en) Anchor rod joint excavation compound basis
CN102900094A (en) Transmission tower plate-type three-rope foundation structure
CN102900093A (en) Plate-type double-cable foundation structure of transmission tower
CN203498860U (en) Anchor rod foundation structure with concrete blocks for photovoltaic module brackets
CN208167770U (en) Assembled drilledpier foundation
CN201254728Y (en) Pile and earthwork cellular chamber composite foundation
CN201202120Y (en) Mixing pile foundation pit supporting structure
CN207092118U (en) A kind of top carries the caisson composite foundation of oblique anchor pole
CN203361182U (en) Unequal-length bottom-expanded rock anchor pile of power transmission pole tower
CN207109842U (en) A kind of rock foundation pole and tower foundation structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA POWER ENGINEERING CONSULTING GROUP NORTHEAST

Free format text: FORMER NAME: NORTHEASTERN ELECTRIC POWER DESIGN INSTITUTE, CHINA POWER ENGINEERING CONSULTING GROUP CORPORATION

CP01 Change in the name or title of a patent holder

Address after: 130021 Jilin City, Changchun province people's street, No. 4368

Patentee after: Co., Ltd of Northeastern Electric Power Design Institute, China Power Engineering Consulting Group Corporation

Address before: 130021 Jilin City, Changchun province people's street, No. 4368

Patentee before: Northeastern Electric Power Design Institute, China Power Engineering Consulting Group Corporation

CX01 Expiry of patent term

Granted publication date: 20100922

CX01 Expiry of patent term