CN201495467U CN2009200714059U CN200920071405U CN201495467U CN 201495467 U CN201495467 U CN 201495467U CN 2009200714059 U CN2009200714059 U CN 2009200714059U CN 200920071405 U CN200920071405 U CN 200920071405U CN 201495467 U CN201495467 U CN 201495467U
Authority
CN
China
Prior art keywords
grid
geo
band
grille
reinforced
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200714059U
Other languages
English (en)
Inventor
张石磊
张孟喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN2009200714059U priority Critical patent/CN201495467U/zh
Application granted granted Critical
Publication of CN201495467U publication Critical patent/CN201495467U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本实用新型涉及一种加强型土工格栅。它包括单向或双向土工格栅的水平横筋带和纵筋带,在上述土工格栅的水平横筋带与纵筋带连接处上部加设与格栅连接坚固的十字板构件,使土工格栅与填土发生锚固作用。本实用新型的土工格栅受力合理,能大幅提高土工格栅的加固效果。

Description

一种加强型土工格栅
技术领域
本实用新型涉及一种辅助路基,特别是一种加强型土工格栅。
背景技术
自1963年Henri Vidal在1963年提出加筋土概念后,土工加筋技术在岩土工程中已得到广泛应用。土工格栅是目前较常用的土工加筋材料之一,多用于加筋土路基工程、地基处理和填方护坡工程。然而在目前工程中采用的传统土工格栅因材料或制作工艺问题,土工格栅与土的相互作用并没有充分发挥,而且在筋带连接处常发生断裂,影响土工格栅的加固效果。
实用新型内容
本实用新型的目的在于提供一种加强型土工格栅,在其工程应用中能与填土发生锚固型加强作用,加固格栅筋带连接处,与填土间产生锚固作用,能与土体充分发挥相互作用,筋材连接不易断裂,从而提高土工格栅的加筋效果。
为达到上述目的,本实用新型采用下述技术方案实现:
1).上述的一种加强型土工格栅,包括单向或双向土工格栅的水平横筋带(1)和纵筋带(2),其特征在于在所述土工格栅的水平横筋带(1)与纵筋带(2)连接处上部加设与格栅连接坚固的十字板构件(3),使土工格栅与填土发生锚固作用。
2).上述的加强型土工格栅,在筋带表面刻设波浪状或方格状粗糙条纹、或者粗糙凸点(4),增大与土之间的摩擦作用力。
3).上述的加强型土工格栅,在横、纵筋带连接处增加筋材厚度,加固筋带连接部位(5),土工格栅材料可选取塑料或橡胶的聚合体。
本实用新型与现有技术相比较,具有以下优点:1、土工格栅上部布设十字板构件(3),使土工格栅与填土间产生锚固作用,增大土筋作用层厚度,在土工格栅上部形成加固土体区域,增强其加筋效果。2、在土工格栅筋带表面刻设波浪状、方格状粗糙条纹或者粗糙凸点(4),可增大筋材与土体间摩擦作用,使土工格栅的加固作用更加明显。3、在土工格栅横、纵筋带连接处采取加固措施,可避免筋带因连接处应力集中而断裂,延长土工格栅的工作寿命。
附图说明
图1为本实用新型一个实施例的结构示意图。
具体实施方式
参见附图,本实用新型的一个优选实施例结合图1说明如下:加强型土工格栅应把设有十字板3的一面向上进行现场铺设,回填土层超过十字板3高度2~3倍后进行机械压实,其他施工现场铺设步骤与普通土工格栅相同。
本加强型土工格栅,包括单向或双向土工格栅的水平横筋带1和纵筋带2,在所述土工格栅的水平横筋带1与纵筋带2连接处上部加设与格栅连接坚固的十字板构件3,使土工格栅与填土发生锚固作用。
在上述横筋带1和纵筋带2的表面刻设波浪状或方格状粗糙条纹或者粗糙凸点4,增大与土之间的摩擦作用力。
在横筋带1与纵筋带2连接处增加筋带厚度,形成增强型连接过渡区域5,加固筋带连接部位。

Claims (3)

1.一种加强型土工格栅,包括单向或双向土工格栅的水平横筋带(1)和纵筋带(2),其特征在于在所述土工格栅的水平横筋带(1)与纵筋带(2)连接处上部加设与格栅连接坚固的十字板构件(3)。
2.根据权利要求1所述的一种加强型土工格栅,其特征在于在所述横筋带(1)和纵筋带(2)的表面刻设波浪状或方格状粗糙条纹或者粗糙凸点(4)。
3.根据权利要求1所述的一种加强型土工格栅,其特征在于在横筋带(1)与纵筋带(2)连接处增加筋带厚度,形成增强型连接过渡区域(5)。
CN2009200714059U 2009-04-30 2009-04-30 一种加强型土工格栅 Expired - Fee Related CN201495467U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200714059U CN201495467U (zh) 2009-04-30 2009-04-30 一种加强型土工格栅

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200714059U CN201495467U (zh) 2009-04-30 2009-04-30 一种加强型土工格栅

Publications (1)

Publication Number Publication Date
CN201495467U true CN201495467U (zh) 2010-06-02

Family

ID=42438675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200714059U Expired - Fee Related CN201495467U (zh) 2009-04-30 2009-04-30 一种加强型土工格栅

Country Status (1)

Country Link
CN (1) CN201495467U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334419A (zh) * 2013-07-16 2013-10-02 山东大学 一种附设锚钉的新型土工格栅
CN107142803A (zh) * 2016-12-21 2017-09-08 中国铁道科学研究院铁道建筑研究所 土工格栅和路基施工方法
CN108589686A (zh) * 2018-05-09 2018-09-28 中国农业大学 一种格栅卡扣、格栅卡扣机以及格栅卡扣机使用方法

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334419A (zh) * 2013-07-16 2013-10-02 山东大学 一种附设锚钉的新型土工格栅
CN107142803A (zh) * 2016-12-21 2017-09-08 中国铁道科学研究院铁道建筑研究所 土工格栅和路基施工方法
CN107142803B (zh) * 2016-12-21 2019-04-19 中国铁道科学研究院铁道建筑研究所 土工格栅和路基施工方法
CN108589686A (zh) * 2018-05-09 2018-09-28 中国农业大学 一种格栅卡扣、格栅卡扣机以及格栅卡扣机使用方法

Similar Documents

Publication Publication Date Title
CN101550669A (zh) 一种加强型土工格栅
CN201495467U (zh) 一种加强型土工格栅
CN201232194Y (zh) 一种抗变形输电杆塔
CN207452895U (zh) 一种高边坡桩锚支护结构
CN202865855U (zh) 稳定板式锚固桩支挡结构
CN205152961U (zh) 一种预应力变截面抗滑桩
CN204343305U (zh) 深槽型潜在滑动边坡及滑坡加固治理装置
CN204356607U (zh) 控制软弱地基侧向变形的高速铁路复合地基构造
CN202672162U (zh) 一种复合式支挡结构
CN204530617U (zh) 一种带有缓冲坡的大坝
CN205501982U (zh) 一种斜坡软弱地基加固结构
CN201843135U (zh) 送电线路复合基础桩
CN102888855B (zh) 一种组合式衡重挡土墙
CN201826295U (zh) 双t型立体土工格栅
CN209011081U (zh) 一种适用于柔性护坡的新型护脚结构
CN205062795U (zh) 一种路基边坡夯实装置
CN204356606U (zh) 陡坡轻型路基结构
CN203113335U (zh) 扶壁式u型槽支挡结构
CN201089942Y (zh) 斜坡软弱地基填方构造
CN202689013U (zh) 斜坡松散堆积体加固构造
CN203021994U (zh) 带注浆钢管芯碎石桩复合地基
CN202989911U (zh) 一种预制混凝土后注浆桩
CN108660866B (zh) 一种岩堆滑坡区高速铁路抗滑移变形路基加固结构
CN208309302U (zh) 一种岩堆滑坡区高速铁路抗滑移变形路基加固结构
CN209722594U (zh) 一种滑坡深路堑无砟轨道路基结构

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Shilei

Inventor after: Zhang Mengxi

Inventor after: Zhang Taotao

Inventor before: Zhang Shilei

Inventor before: Zhang Mengxi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG SHILEI ZHANG MENGXI TO: ZHANG SHILEI ZHANG MENGXI ZHANG YAOYAO

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100602

Termination date: 20110430