CN201485790U - Balanced single-nose bridge girder erection machine - Google Patents

Balanced single-nose bridge girder erection machine Download PDF

Info

Publication number
CN201485790U
CN201485790U CN2009201040104U CN200920104010U CN201485790U CN 201485790 U CN201485790 U CN 201485790U CN 2009201040104 U CN2009201040104 U CN 2009201040104U CN 200920104010 U CN200920104010 U CN 200920104010U CN 201485790 U CN201485790 U CN 201485790U
Authority
CN
China
Prior art keywords
supporting leg
girder
lower transverse
transverse beam
rear support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201040104U
Other languages
Chinese (zh)
Inventor
王金祥
黄树军
魏福祥
刘会平
张广谭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Original Assignee
Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qinhuangdao Tianye Tolian Heavy Industry Co Ltd filed Critical Qinhuangdao Tianye Tolian Heavy Industry Co Ltd
Priority to CN2009201040104U priority Critical patent/CN201485790U/en
Application granted granted Critical
Publication of CN201485790U publication Critical patent/CN201485790U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a balanced single-nose bridge girder erection machine, which comprises a girder, a rear supporting leg, a front supporting leg, an intermediate supporting leg, a crane trolley and a carrier, wherein the rear supporting leg, the front supporting leg and the intermediate supporting leg are mounted on the girder, the crane trolley is arranged on the girder, and the carrier is arranged independently. Besides, the girder is a dual-straddle type girder, a horizontal and vertical walking mechanism is arranged on a lower crossbeam of the intermediate supporting leg, and the girder is provided with a lifting mechanism used for controlling and lifting displacement of a crossbeam of the rear supporting leg. Each supporting leg has a function of extension and can realize longitudinal slope regulation, the front supporting leg is provided with a swaying function and can get a bridge abutment in an extension form, thereby bringing convenience for erecting head and tail bridges and realizing longitudinal moving and span changing along the girder. The intermediate supporting leg can move transversely and longitudinally, and a hanging beam trolley with swaying functions can sway side beam in place at one step via eccentrically hanging. The balanced single-nose bridge girder erection machine is compact in structure, light in weight, convenient in transport and assembly, high in automation degree and working efficiency and the like.

Description

Balanced type single conducting beam bridge formation machine
Technical field
The utility model relates to T roof beam structure equipment in inter-city passenger rail, speedway, the railway Line of Existing Railway improvement project, is a kind of balanced type single conducting beam bridge formation machine specifically, can realize radius of curvature setting up more than or equal to 500 meters single line or double track railway T beam.
Background technology
At present, the widely used bridge formation machine that has 2 kinds of structures in construction of China railways ew line and the old line transformation.The one, single-beam simply-support, as JQ series, triumph type, DJK140 type; The 2nd, the twin beams simply-support is a type as Long March series and red flag.Single-beam simply-support bridge formation machine center of gravity is lower, walking safety, and horn is scalable, the traveling of can under the semi-cantilever operating mode, relying on oneself, and can lay the bridge floor section of track and upgrade short rail by cantilever.On curve and ramp circuit, can utilize horn yaw and new line, nodding action to fulfil assignment.Feeding beam voluntarily when setting a roof beam in place does not need to lay the end of the bridge siding, and construction adaptability is strong.Its major defect is that (except the JQ series) beam that can not directly fall when setting up the chip beam is in place, adopts the walking operation, and is time-consuming and safety is relatively poor.Two-way the setting a roof beam in place of twin beams freely-supported bridge formation function for another example, the beam that can directly fall when setting up the split blade type beam is in place, but the huge heaviness of body, slow from line speed, mobility is poor.Be subjected to the restriction of end of the bridge site condition bigger, construction adaptability is poor.Need freely-supported during the shop bridge floor section of track, change short rail difficulty, the efficient of working continuously is not high, and needs to disintegrate during long-distance transport, and assembling is inconvenient.
In sum, above-mentioned two kinds of bridge formation machines are supporting body with the railway locomotive all, and need be equipped with railway locomotive and transport the T beam, and efficiency of construction is low, the equipment cost height.Along with the development of construction technology, the site prefabrication technology is used more and more widely, has become present developing direction.
Summary of the invention
In view of above-mentioned present situation, the purpose of this utility model provides a kind of balanced type single conducting beam bridge formation machine, can realize radius of curvature setting up more than or equal to 500 meters single line or double track railway T beam.
For achieving the above object, the balanced type single conducting beam bridge formation machine that the utility model provides comprises girder and goes up rear support leg, front leg strut and the middle supporting leg of installing; On girder, be provided with rane trolley; With dispose independently Beam transportation vehicle; Wherein, described girder is the girder of one two straddle type; The supporting leg lower transverse beam is provided with vertically and horizontally walking mechanism in described; And have the hoist lifting mechanism of rear support leg lower transverse beam displacement of a control.Therefore, dolly can vertically move along girder ear beam by walking mechanism, by the transverse-moving mechanism on it, can make the traversing design attitude that drops down onto of concrete T-shaped beam.
According to such scheme, related middle supporting leg lower transverse beam vertically and horizontally walking mechanism comprises that symmetrically arranged middle supporting leg lower transverse beam is provided with two groups of road wheels; And the longeron that is arranged with between the supporting leg lower transverse beam in two is provided with two groups of road wheels.Transverse-moving mechanism is stressed when setting a roof beam in place, but traversing two-wire or the highway multi-disc beam of setting up of complete machine hanging beam; It is stressed to be converted to vertical shift mechanism during via hole, supports the anterior weight of bridge formation machine and along the bridge floor track travel.
Further, related rear support leg lifting mechanism comprises on the rear support leg lower transverse beam being symmetrically installed with wire rope, is connected with the electric block that is provided with on the girder.Therefore, promote the rear support leg lower transverse beam when setting a roof beam in place, removing obstacles makes Beam transportation vehicle carry beam to enter smoothly, can put down during via hole in order to support bridge formation drive end unit weight and along the bridge floor track travel.
The girder of two mentioned straddle types is meant that the length of girder is across two bridge piers in the utility model.Be mainly used in concrete T-shaped beam new line, the uneven horizontal problem of nodding when striding of solving.
In a word, the balanced type single conducting beam bridge formation machine that the utility model provides, because of girder is to adopt two straddle type girders, be equipped with on the ear beam that has by both sides, girder below two rane trolleys and on the hoisting mechanism that is equipped with and assembly pulley in order to the traversing design attitude that drops down onto of lifting concrete T-shaped beam; In addition, also having one can folding rear support leg lower transverse beam, opens when setting a roof beam in place to make Beam transportation vehicle carry beam to enter, can be closed during via hole to support bridge formation drive end unit weight and along the bridge floor track travel.In addition, be provided with vertically and horizontally walking mechanism at middle supporting leg lower transverse beam, transverse-moving mechanism is stressed when setting a roof beam in place, but traversing two-wire or the highway multi-disc beam of setting up of complete machine hanging beam; It is stressed to be converted to vertical shift mechanism during via hole, supports the anterior weight of bridge formation machine and along the bridge floor track travel.
Description of drawings
Fig. 1 is the novel structural representation of this use;
Fig. 2 is Fig. 1 right view;
Fig. 3 is a supporting leg lower transverse beam vertically and horizontally walking mechanism partial schematic diagram among Fig. 1.
The specific embodiment
The utility model is described in further detail below in conjunction with accompanying drawing embodiment.
Fig. 1 comprises girder 3 and the electrical system 11 of installing at afterbody to balanced type single conducting beam bridge formation machine shown in Figure 3; The rear support leg of on girder 3, installing 5, have before traverse rod 6 front leg strut 4 and have the middle supporting leg 2 of back traverse rod 7 and be arranged in the auxilliary supporting leg 9 at supporting leg 2 rear portions; Hydraulic system 8 is set on the supporting leg 2 in described and comprises having an independently Beam transportation vehicle 10.This girder 3 in novel is two straddle type girders, then on the ear beam that has in both sides below the girder 3 two overline cars 1 of slinging is housed, and hoisting mechanism (among the figure mark) and assembly pulley is housed in order to the lifting concrete T-shaped beam on the rane trolley 1.Therefore, rane trolley 1 can vertically move along girder ear beam by walking mechanism, by the transverse-moving mechanism on it, can make the traversing design attitude that drops down onto of concrete T-shaped beam.The lower transverse beam lifting mechanism of the rear support leg 5 that can hoist is installed on rear support leg 5 lower transverse beams of girder 3.In the present embodiment, the lower transverse beam lifting mechanism of related rear support leg comprises on the lower transverse beam of rear support leg being symmetrically installed with wire rope 13, is connected with the electric block 12 that is provided with on the girder 3.Therefore, promote the lower transverse beam of rear support leg when setting a roof beam in place, removing obstacles enters 10 years beams of Beam transportation vehicle smoothly; Can put down during via hole in order to support bridge formation drive end unit weight and along the bridge floor track travel.The middle supporting leg of installing on the girder 35 is provided with in length and breadth to walking mechanism.In the present embodiment, described middle supporting leg lower transverse beam vertically and horizontally walking mechanism comprises that symmetrically arranged middle supporting leg lower transverse beam 14 is provided with two groups of road wheels 15; And the longeron 16 that is arranged with between the supporting leg lower transverse beam 14 in two is provided with two groups of road wheels 17.Transverse-moving mechanism is stressed when setting a roof beam in place, but traversing two-wire or the highway multi-disc beam of setting up of complete machine hanging beam; It is stressed to be converted to vertical walking mechanism during via hole, supports the anterior weight of bridge formation machine and along the bridge floor track travel.

Claims (3)

1. balanced type single conducting beam bridge formation machine comprises girder and goes up rear support leg, front leg strut and the middle supporting leg of installing; On girder, be provided with rane trolley; With dispose independently Beam transportation vehicle; It is characterized in that described girder (3) is the girder of one two straddle type; Supporting leg in described (2) lower transverse beam is provided with in length and breadth to walking mechanism; And have the hoist lifting mechanism of lower transverse beam displacement of rear support leg (5) of a control.
2. balanced type single conducting beam bridge formation machine according to claim 1 is characterized in that, described middle supporting leg (2) lower transverse beam vertically and horizontally walking mechanism comprises that symmetrically arranged middle supporting leg lower transverse beam (14) is provided with two groups of road wheels (15); And the longeron (16) that is arranged with between the supporting leg lower transverse beam (14) in two is provided with two groups of road wheels (17).
3. balanced type single conducting beam bridge formation machine according to claim 1 is characterized in that, described rear support leg (5) lifting mechanism comprises being symmetrically installed with wire rope (13) on the rear support leg lower transverse beam, is connected with the electric block that is provided with on the girder (12).
CN2009201040104U 2009-07-29 2009-07-29 Balanced single-nose bridge girder erection machine Expired - Lifetime CN201485790U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201040104U CN201485790U (en) 2009-07-29 2009-07-29 Balanced single-nose bridge girder erection machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201040104U CN201485790U (en) 2009-07-29 2009-07-29 Balanced single-nose bridge girder erection machine

Publications (1)

Publication Number Publication Date
CN201485790U true CN201485790U (en) 2010-05-26

Family

ID=42424676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201040104U Expired - Lifetime CN201485790U (en) 2009-07-29 2009-07-29 Balanced single-nose bridge girder erection machine

Country Status (1)

Country Link
CN (1) CN201485790U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071641A (en) * 2010-12-02 2011-05-25 秦皇岛天业通联重工股份有限公司 Integral bridge girder erection machine of distributed landing leg type transportation rack of concrete beam packing bridge crane and bridge girder erection engineering method thereof
CN102154991A (en) * 2011-03-02 2011-08-17 黄效发 Single guiding beam retractable bridge erecting machine
CN104047231A (en) * 2014-06-27 2014-09-17 河南省中原起重机械总厂 Double-girder portal type running device of bridge girder erection machine
CN105908636A (en) * 2016-06-02 2016-08-31 石家庄铁道大学 Multifunctional rear supporting leg system of single-girder bridge girder erection machine
CN106400700A (en) * 2015-08-03 2017-02-15 北京万桥兴业机械有限公司 Double-line cantilever type bridge formation machine
CN106494525A (en) * 2016-12-01 2017-03-15 胡庆东 A kind of travelling bogie
CN109208478A (en) * 2017-06-30 2019-01-15 中交第二航务工程局有限公司 A kind of prefabricated assembled bridge integration rapid constructing method
CN110593131A (en) * 2019-10-16 2019-12-20 合肥正浩机械科技有限公司 Cross-sliding avoiding beam falling device of bridge girder erection machine and beam falling method thereof
CN110886233A (en) * 2019-12-17 2020-03-17 中交路桥建设有限公司 Construction method for connecting T-shaped beam with bridge

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102071641A (en) * 2010-12-02 2011-05-25 秦皇岛天业通联重工股份有限公司 Integral bridge girder erection machine of distributed landing leg type transportation rack of concrete beam packing bridge crane and bridge girder erection engineering method thereof
CN102071641B (en) * 2010-12-02 2015-11-25 秦皇岛天业通联重工股份有限公司 Cement beam packs bridge machine cloth supporting leg type integration of transporting and building Bridge Erector and bridge formation engineering method thereof
CN102154991A (en) * 2011-03-02 2011-08-17 黄效发 Single guiding beam retractable bridge erecting machine
CN102154991B (en) * 2011-03-02 2013-12-18 黄效发 Single guiding beam retractable bridge erecting machine
CN104047231A (en) * 2014-06-27 2014-09-17 河南省中原起重机械总厂 Double-girder portal type running device of bridge girder erection machine
CN106400700A (en) * 2015-08-03 2017-02-15 北京万桥兴业机械有限公司 Double-line cantilever type bridge formation machine
CN105908636A (en) * 2016-06-02 2016-08-31 石家庄铁道大学 Multifunctional rear supporting leg system of single-girder bridge girder erection machine
CN106494525A (en) * 2016-12-01 2017-03-15 胡庆东 A kind of travelling bogie
CN106494525B (en) * 2016-12-01 2020-09-29 胡庆东 Transport trolley
CN109208478A (en) * 2017-06-30 2019-01-15 中交第二航务工程局有限公司 A kind of prefabricated assembled bridge integration rapid constructing method
CN109208478B (en) * 2017-06-30 2021-03-19 中交第二航务工程局有限公司 Integrated rapid construction method for prefabricated bridge
CN110593131A (en) * 2019-10-16 2019-12-20 合肥正浩机械科技有限公司 Cross-sliding avoiding beam falling device of bridge girder erection machine and beam falling method thereof
CN110886233A (en) * 2019-12-17 2020-03-17 中交路桥建设有限公司 Construction method for connecting T-shaped beam with bridge

Similar Documents

Publication Publication Date Title
CN201485790U (en) Balanced single-nose bridge girder erection machine
CN102102317B (en) Method for laying mixed passenger and freight jointless track and bridge erecting machine for erecting railway T-beam
CN100572673C (en) Span continuous beam bridge fabrication machine in a kind of
CN104805773B (en) The Segmental assembling bridge-erecting machine of little curved bridge of constructing
CN202899044U (en) Vierendeel box-shaped double-girder bridge crane
CN102051860B (en) Bridge erecting and track laying machine for railway
CN110130229A (en) It a kind of several juxtaposed double cantilever erections machines and its sets a roof beam in place and passing method
CN103074829B (en) Railway switch changing construction method and railway switch track laying unit thereof
CN203021883U (en) Wheel-track railway track laying unit
CN201648969U (en) Railway T-girder bridge girder erection machine suitable for laying and erecting seamless lines for passenger and freight shared lines
CN201058969Y (en) Novel bridging machine
CN201015968Y (en) Large tonnage beam carrying vehicle
CN201284462Y (en) Bridging machine for both highway and railway
CN2937233Y (en) Midspan continuous beam bridge building machine
CN201943004U (en) Double-girder transporting and erecting integrated bridge girder erecting machine capable of realizing girder erecting at zero distance from tunnel portal
CN100395411C (en) Walking type box beam bridge formation machine
CN201077720Y (en) Tyre type doors hanging
CN101935978B (en) Overhead cable track and special track traveling crane thereof
CN101104499B (en) Tyre gantry crane
CN202081355U (en) Rail collection flatcar with lifting device
CN201605110U (en) Device for hoisting waveform steel webs at the front end of truss in cantilever construction
CN208183540U (en) Erection crane is used in steel box-girder installation
CN102535351B (en) Web plate type bridge fabrication machine for constructing bridge under strong wind and high altitude conditions and construction process
CN201915333U (en) Bridge erecting machine for erecting curved double-line twin girders at tunnel portal in zero-distance manner
CN212128890U (en) Box girder transverse pushing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20160621

Address after: 066004 No. 3 Tianshan Road, Qinhuangdao economic and Technological Development Zone, Hebei, China

Patentee after: QINHUANGDAO TIANYE TOLIAN HEAVY INDUSTRY CO., LTD.

Address before: 066100 Jincheng Road 48, Beidaihe District, Hebei, Qinhuangdao

Patentee before: Qinhuangdao Tianye Tolian Heavy Industry Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20100526