CN201473947U - Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile - Google Patents

Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile Download PDF

Info

Publication number
CN201473947U
CN201473947U CN2009201885632U CN200920188563U CN201473947U CN 201473947 U CN201473947 U CN 201473947U CN 2009201885632 U CN2009201885632 U CN 2009201885632U CN 200920188563 U CN200920188563 U CN 200920188563U CN 201473947 U CN201473947 U CN 201473947U
Authority
CN
China
Prior art keywords
pile
wire rope
outer tube
guide rail
reinforcing cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2009201885632U
Other languages
Chinese (zh)
Inventor
刘献刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LIU XI ANGANG
LIU XI'ANGANG
Original Assignee
LIU XI ANGANG
LIU XI'ANGANG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=42410194&utm_source=***_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=CN201473947(U) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by LIU XI ANGANG, LIU XI'ANGANG filed Critical LIU XI ANGANG
Priority to CN2009201885632U priority Critical patent/CN201473947U/en
Application granted granted Critical
Publication of CN201473947U publication Critical patent/CN201473947U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a full-tampering pile-expanding vibro-densification device of a multi-head expanded bore pile, which comprises a vertical frame, a base plate, a winch system and a hammer head and is characterized in that an inner tube is flexibly connected with a hammer cushion movable clamp and sleeved in an outer tube; the hammer head is flexibly connected with the inner tube through a pullover steel wire rope; a guide rail is fixed on the outer side of the vertical frame; a steel reinforcement cage inserted vibrator is placed on the guide rail and connected with a vibration energy transmission rod through a bolt; the vibration energy transmission rod is closely contacted with the lower end of the steel reinforcement cage; one end of a tube drawing steel wire rope is connected with the winch system and the other end of the tube drawing steel wire rope is connected with the steel reinforcement cage inserted vibrator; and the vibration energy transmission rod is hoisted for placement. By the utility model, a plurality of expansion heads can be formed at the bottom and the middle lower part of a pile body, the diameter of the pile body is greater than the diameter of the outer tube by 20-40 percent; and the inserted vibrator vertically moves and vibrates along the guide rail to drive the vibration energy transmission rod to lead a steel reinforcement cage to be sunken into concrete of the expansion head at the bottom of the pile body and secondarily vibrate and compact the concrete, thereby the reliability of the pile body quality can be greatly enhanced and the compact resistance and drawing resistance of the pile can also be greatly enhanced.

Description

The expansion stake of the full pound type bull expanded bore pile closely packed of shaking is put
Technical field
The utility model relates to the building lot treating apparatus, and especially relating to is that a kind of expansion stake of the full pound type bull expanded bore pile closely packed of shaking is put.
Background technology
Immersed tube bored compaction pile in the building lot construction is to ram in the pile body bottom to expand the expanded bore pile that forms an enlarged footing.Owing to be subjected to the limitation of pile driving equipment, can't form a plurality of enlarged footings, cause bearing capacity to be difficult for continuing to increase, and some unavoidable quality problems of existence behind the pile, as pile body honeycomb, necking down occur, hang pin, quality accident such as segregation, broken pile, in addition, stake end top is because concrete is loose, and compressive strength does not often reach designing requirement.Particularly when the bearing course at pile end bearing capacity was big inadequately, the pile bearing capacity of expanded bore pile was still very limited, does not usually reach designing requirement.
Summary of the invention
The purpose of this utility model is to provide a kind of expansion stake of full pound type bull expanded bore pile closely packed of shaking to put, and it not only can improve the pile concrete density, and can further improve bearing capacity of single pile, can guarantee the workmanship of foundation pile and improve bearing capacity of single pile.
The purpose of this utility model is achieved in that the utility model comprises stand, chassis, hoisting system and tup, stand is fixed on the chassis, feature is to comprise that also interior pipe, outer tube, tube drawing wire rope, pullover wire rope, pallet card alive, reinforcing cage insert electromagnetic shaker, guide rail and shake and can pass bar, pipe sticks into to go with pallet work and flexibly connects and be linked in the outer tube of downward insertion underground wherein, and the length of interior pipe and diameter all length and the diameter than outer tube are little, and interior pipe and tup flexibly connect by pullover wire rope; Guide rail is fixedly mounted on the outer side edges of stand, and reinforcing cage inserts electromagnetic shaker and is placed on the guide rail, and shake can pass bar and be connected by bolt with reinforcing cage insertion electromagnetic shaker, and shake can pass bar and closely contact with the lower end of reinforcing cage.
Tube drawing wire rope one end is connected with hoisting system, the other end is connected with the hangers of outer tube lateral margin, promotes outer tube, or the other end of tube drawing wire rope inserts electromagnetic shaker with reinforcing cage and is connected, and lifting is shaken can pass bar.
Interior pipe can move up and down with tup, also can separate with tup.
The utility model fall by the tup height hit apart from dredging, the low distance of tup is close hits interior pipe, the beneath concrete of pipe produces compacting, crowding-out effect in making, by the tube drawing wire rope outer tube is pulled up the appointment absolute altitude, thereby make pile body bottom and middle and lower part form a plurality of enlarged footings, and can enlarge pile body diameter, closely knit pile concrete thereupon; And inserting electromagnetic shaker by reinforcing cage moves up and down along guide rail, vibrations, driving shake can pass in the heavy people's concrete of bar guiding reinforcing cage, and secondary makes vibratory concrete closely knit under the vibration effect of direct percussion of tup and insertion electromagnetic shaker, stake end and middle enlarged footing diameter can increase exponentially, pile body diameter is than the big 20--40% of outer tube diameter, pile body frictional resistance area and the stake and the interlocking of pile peripheral earth had both been increased after the increase, give full play to pile peripheral earth carrying effect, simultaneously strengthen concrete piles density and reliability thereof again, guaranteed the high-bearing capacity effect of pile body.Therefore; the utility model not only can improve the pile concrete density; and can further improve bearing capacity of single pile; avoided the pile quality accident disadvantage of the on the low side and normal appearance of the bearing capacity of single pile of general immersed tube series castinplace pile or compaction pile; can guarantee the workmanship of foundation pile and improve bearing capacity of single pile; further improve the range of application and the economical and practical value of compaction pile and full pound type expanded bore pile, effectively saved material resources and construction costs.
Description of drawings
Fig. 1 is in the structural representation of position location for the utility model;
Fig. 2 lives for pallet and blocks the structural representation that is connected with interior pipe;
Fig. 3 is the structural representation of the utility model immersed tube to bearing stratum;
Fig. 4 is pipe in pulling out on the utility model and the concrete structural representation of perfusion enlarged footing;
Fig. 5 is the structural representation that the utility model stake end enlarges construction molding;
Fig. 6 is pipe in pulling out on the utility model and the concrete structural representation of perfusion pile body;
Fig. 7 is the structural representation of the utility model pile body and pile body enlarged footing construction molding;
Fig. 8 is a structural representation of removing placement of cage of reinforcing bar after the stand;
Fig. 9 is for inserting electromagnetic shaker, shaking the structural representation that can pass bar installation reinforcing cage by reinforcing cage;
Figure 10 is the structural representation of pile.
The specific embodiment
Below in conjunction with embodiment and contrast accompanying drawing the utility model is described in further detail.
Embodiment 1:
The utility model comprises that stand 1, chassis 2, hoisting system 3, tup 4, pullover wire rope 5, outer tube 6, hangers 7, tube drawing wire rope 8, interior pipe 9, pallet card 10 alive, reinforcing cage insertion electromagnetic shaker 11, guide rail 12, shake can pass bar 13, interior pipe 9 flexibly connects and is linked in the outer tube 6 of downward insertion underground with pallet card 10 alive, and the length of interior pipe 9 and diameter all length and the diameter than outer tube 6 are little, interior pipe 9 flexibly connects by pullover wire rope 5 with tup 4, and interior pipe 9 can move up and down with tup 4 in outer tube 6; Stand 1 is fixed on the chassis 2, and guide rail 12 is fixedly mounted on the outer side edges of stand 1, and reinforcing cage inserts electromagnetic shaker 11 and is placed on the guide rail 12, and shake can pass bar 13 goes into electromagnetic shaker 11 bolts with slotting reinforcing cage and be connected, and shake can pass bar 13 and closely contact with reinforcing cage 14 lower ends.
Tube drawing wire rope 8 one ends are connected with hoisting system 3, the other end is connected with the hangers 7 of outer tube lateral margin, promote outer tube 6.
In the construction, through the high hammer of tup 4 dredge hit and hang down that hammer is close and hit in pipe 9, obtain the full pound type stake, except enlarged footing 16 is formed on the bottom, the diameter of section of pile body 15 also obtains expansion, or the middle and lower part forms a plurality of enlarged footings 17; After pile body 15 forms, lay immediately that reinforcing cage inserts electromagnetic shaker 11 and shake can pass bar 13, reinforcing cage 14 is seated to the designing requirement absolute altitude, and then rise while shaking and to stir shake and can pass bar 13.
The full pound type bull bottom-enlarging filling pile of so finishing, strengthened in the following aspects:
1, according to various different soil characteristics and the long variation of stake one or more enlarged footings is set, the intensity of the soil of each layer below the substrate is fully utilized, increase the pile side friction effect, improve bearing capacity of single pile.
2, can carry out direct hammering (high strike or low hitting) to concrete in managing, pile body diameter be increased and the increase of concrete compactness; Produced the effect of secondary soil compaction simultaneously, all native intensity of stake is improved.
3, after stake footpath and concrete compactness were guaranteed, coarse aggregate in the concrete and all soil of stake became the nature interlock, have increased pile side friction in large quantities.
4, can be according to the stressed back taper relationship characteristic of pile body, appropriateness increases in the pile body, the concrete fullness coefficient on top, has improved in the pile body, the compressive strength problem on top.
5, can be according to various soil layer performance characteristics, the shrinkage stress that utilizes different concrete fullness coefficients to coordinate soil layer changes, and guarantees to reach the design-calculated pile body diameter.
6, lay the high strong vibration effect that produces when inserting reinforcing cage by vibrating, impel reinforcing cage successfully to enter in the enlarged footing of bottom, make the resistance to plucking ability of stake increase greatly, concrete compactness, intensity are further enhanced, and have eliminated pile quality accident (as hanging common faults such as pin, necking down, broken pile, pore, honeycomb, reinforcing cage bending deformation) more reliably.
Embodiment 2:
The structure of embodiment 2 is substantially the same manner as Example 1, and difference is:
Tube drawing wire rope 8 one ends are connected with hoisting system 3, the other end inserts electromagnetic shaker 11 with reinforcing cage and is connected, and promote shake and can pass bar 13.
Interior pipe 9 is also separable with tup 4.

Claims (4)

1. the expansion stake of the full pound type bull expanded bore pile closely packed of shaking is put, comprise stand (1), chassis (2), hoisting system (3) and tup (4), it is characterized in that: comprise that also interior pipe (9), outer tube (6), tube drawing wire rope (8), pullover wire rope (5), pallet card alive (10), reinforcing cage insert electromagnetic shaker (11), guide rail (12) and shake and can pass bar (13), in pipe 9 (with) the pallet card (10) of living flexibly connects and is linked in the outer tube (6) of downward insertion underground, interior pipe (9) flexibly connects by pullover wire rope (5) with tup (4); Stand (1) is fixed on the chassis (2), guide rail (12) is fixedly mounted on the outer side edges of stand (1), reinforcing cage inserts electromagnetic shaker (11) and is placed on the guide rail (12), shake can pass bar (13) and be connected with reinforcing cage insertion electromagnetic shaker (11) bolt, and shake can pass bar (13) and closely contact with reinforcing cage (14) lower end.
2. the expansion stake of the full pound type bull expanded bore pile as claimed in claim 1 closely packed of shaking is put, it is characterized in that: tube drawing wire rope (8) one ends are connected with hoisting system (3), the other end is connected with the hangers (7) of outer tube lateral margin, promote outer tube (6), or tube drawing wire rope (8) one ends are connected with hoisting system (3), the other end inserts electromagnetic shaker (11) with reinforcing cage and is connected, and promote shake and can pass bar (13).
3. the expansion stake of the full pound type bull expanded bore pile as claimed in claim 1 closely packed of shaking is put, and it is characterized in that: interior pipe (9) can move up and down with tup (4) in outer tube (6), or interior pipe (9) is also separable with tup (4).
4. the expansion stake of the full pound type bull expanded bore pile as claimed in claim 1 closely packed of shaking is put, and it is characterized in that: the length of interior pipe (9) and diameter are all little than length and diameter in the outer tube (6).
CN2009201885632U 2009-08-13 2009-08-13 Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile Expired - Lifetime CN201473947U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009201885632U CN201473947U (en) 2009-08-13 2009-08-13 Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009201885632U CN201473947U (en) 2009-08-13 2009-08-13 Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile

Publications (1)

Publication Number Publication Date
CN201473947U true CN201473947U (en) 2010-05-19

Family

ID=42410194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009201885632U Expired - Lifetime CN201473947U (en) 2009-08-13 2009-08-13 Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile

Country Status (1)

Country Link
CN (1) CN201473947U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444120A (en) * 2011-09-23 2012-05-09 刘献刚 Construction method of fully-tamped multi-head pedestal bored concrete pile
CN103147436A (en) * 2013-03-30 2013-06-12 马春根 Noise-free construction method of in-pipe ramming and diffusion pressure-filling head expansion pile
CN111395321A (en) * 2020-03-23 2020-07-10 江西基业科技有限公司 Construction method of full-ramming type secondary soil-squeezing multi-head club-footed pile
CN111395319A (en) * 2020-03-23 2020-07-10 江西基业科技有限公司 Construction method of full-ramming type secondary soil squeezing single-head club-footed pile

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444120A (en) * 2011-09-23 2012-05-09 刘献刚 Construction method of fully-tamped multi-head pedestal bored concrete pile
CN103147436A (en) * 2013-03-30 2013-06-12 马春根 Noise-free construction method of in-pipe ramming and diffusion pressure-filling head expansion pile
CN111395321A (en) * 2020-03-23 2020-07-10 江西基业科技有限公司 Construction method of full-ramming type secondary soil-squeezing multi-head club-footed pile
CN111395319A (en) * 2020-03-23 2020-07-10 江西基业科技有限公司 Construction method of full-ramming type secondary soil squeezing single-head club-footed pile

Similar Documents

Publication Publication Date Title
CN104929123B (en) A kind of pile sinking staving press
CN101392527B (en) Method for processing soft foundation by earthwork fabric granular pile
CN102733377B (en) Method for constructing concrete pile
CN106168027A (en) Vibration hammer equipment and the pressure type pile body construction method of shaking of this vibration hammer equipment of employing
CN201473947U (en) Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile
CN106351218B (en) Remediation method for broken tubular pile
CN201753450U (en) Piling machine
CN103821139A (en) Reamed carrier and stiffness core multi-component composite pile and soft soil foundation strengthening construction method
CN107338781A (en) A kind of compacting pile construction device and its construction method
CN101761081A (en) Construction method and equipment of holding and pressing type static-pressure driven cast-in-place pile
CN101942830B (en) Construction method of combined concrete soil pile with core pile
CN101126239A (en) Construction device and construction technique for concrete pipe base
CN104929125A (en) Carrier pile construction equipment and carrier pile construction method
CN102635110B (en) Construction method for concrete pile
JP6413469B2 (en) Pile foundation and pile foundation construction method
CN102444120A (en) Construction method of fully-tamped multi-head pedestal bored concrete pile
CN106759332A (en) The construction method and construction equipment of stake
CN109853564A (en) A kind of construction method and dedicated inner tamping tube hammer of compaction pile
CN112359815A (en) Dry-type vibroflotation gravel pile for soft foundation treatment and construction method thereof
CN102733379A (en) Construction method for concrete piles
CN1240910C (en) Immersed tube grout pile construction process and pile tip bearing capacity reinforcement equipment
CN106759289A (en) The construction method and construction equipment of a kind of
CN101187207A (en) Concrete pedestal pile construction equipment and its construction method
WO2010106216A1 (en) Method for placing a pile or anchoring pile into ground
CN104895058B (en) The all-hydraulic two-tube compound club-footed pile machine of static pressure and its construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Jiangxi Jiye Science & Technology Co., Ltd.

Assignor: Liu Xiangang

Contract record no.: 2014360000181

Denomination of utility model: Full-tampering pile-expanding vibro-densification device of multi-head expanded bore pile

Granted publication date: 20100519

License type: Exclusive License

Record date: 20140710

LICC Enforcement, change and cancellation of record of contracts on the licence for exploitation of a patent or utility model
CX01 Expiry of patent term

Granted publication date: 20100519

CX01 Expiry of patent term