CN107338781A - A kind of compacting pile construction device and its construction method - Google Patents

A kind of compacting pile construction device and its construction method Download PDF

Info

Publication number
CN107338781A
CN107338781A CN201710680357.2A CN201710680357A CN107338781A CN 107338781 A CN107338781 A CN 107338781A CN 201710680357 A CN201710680357 A CN 201710680357A CN 107338781 A CN107338781 A CN 107338781A
Authority
CN
China
Prior art keywords
sleeve
weight
pile
compacting
construction device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710680357.2A
Other languages
Chinese (zh)
Inventor
臧延伟
高江宁
章天杨
徐杭杰
王柳善
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201710680357.2A priority Critical patent/CN107338781A/en
Publication of CN107338781A publication Critical patent/CN107338781A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/08Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving
    • E02D7/06Power-driven drivers
    • E02D7/08Drop drivers with free-falling hammer

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The present invention relates to a kind of compacting pile construction device and its construction method.It is an object of the invention to provide a kind of compacting pile construction device and its construction method, it is intended to which the collapse hole that solves the problems, such as to run into during the Site of Collapsible Loess compacting pile construction containing loose interlayer is serious, pile body perpendicularity is unsatisfactory for requiring, ensures Foundation Treatment Effect.The technical scheme is that:A kind of compacting pile construction device, there is mobile platform and the pile frame being connected to through supporting mechanism on mobile platform, it is characterised in that:The boosted mechanism I in the pile frame upper end and hoisting mechanism II suspend sleeve in midair and can insert the weight in sleeve respectively, weight and the concentric coaxial arrangement of sleeve, the piling mechanism for being used for that sleeve to be squeezed into soil layer is housed, the sleeve has the stuffing hole of the filler into sleeve on the sleeve.The present invention is applied to the construction equipment in civil engineering groundwork process field.

Description

A kind of compacting pile construction device and its construction method
Technical field
The present invention relates to a kind of compacting pile construction device and its construction method, in particular for the settlement by soaking containing loose interlayer The method of compacting pile construction device and the compacted construction carried out using the device in Loess Site.Suitable for civil engineering groundwork Construction equipment in process field.
Background technology
Compaction pile method is the widely used reinforcing and processing method in Collapsible Loess District.Compaction pile method typically (is shaken with immersed tube Dynamic, hammering), impact or ram the methods of expanding pore-forming, it is compacted around the soil body is pressed against in pore forming process, then using element soil, The materials such as dirt, rendzinas, soil cement are backfilled and tamped to stake holes, form the pile body of increase diameter, and with after compacted Inter-pile soil form compound foundation together, eliminate the settlement by soaking of ground so as to reach, improve the purpose of bearing capacity of ground.
By practice and development for many years, more ripe compacting pile construction equipment and technique have been formd, can be compared with The basement process of homogeneous Site of Collapsible Loess is tackled well.But for containing loosening sand, flour sand, circle gravel interlayer it is wet Fall into the basement process of property Loess Site, existing compacting pile construction equipment also Shortcomings part.
Current compacting pile construction equipment is both needed to extract pore-forming equipment after pore-forming.And for the loess containing loose interlayer Stratum, after pore-forming equipment is extracted, loose interlayer soil will be slumped in stake holes, serious collapse hole phenomenon occur.Meanwhile During pile body rammer is filled out, influenceed by hammer ram vibration, loose interlayer soil also can be slumped to largely in stake holes, and compacting pile construction can not It is normally carried out.Also, in the Loess Layer containing loose interlayer, easily glance off, cause in current compaction pile pore forming process Compaction pile pile body perpendicularity is unsatisfactory for code requirement.
The content of the invention
The technical problem to be solved in the present invention is:Problem be present for above-mentioned, there is provided a kind of compacting pile construction device and its Construction method, it is intended to solve that the collapse hole that runs into during the Site of Collapsible Loess compacting pile construction containing loose interlayer is serious, stake The problem of body perpendicularity is unsatisfactory for requiring, ensure Foundation Treatment Effect.
The technical solution adopted in the present invention is:A kind of compacting pile construction device, there is mobile platform and through supporting mechanism The pile frame being connected on mobile platform, it is characterised in that:The boosted mechanism I in the pile frame upper end and hoisting mechanism II distinguish hanging cover It cylinder and can insert the weight in sleeve, weight and the concentric coaxial arrangement of sleeve, be equipped with the sleeve for sleeve to be squeezed into soil The piling mechanism of layer, the sleeve have the stuffing hole of the filler into sleeve.
The hoisting mechanism I has hoist engine I, rope I and assembly pulley I, and wherein hoist engine I is fixed on the mobile platform On, assembly pulley I is installed on the pile frame upper end, and the one end of rope I is wound on hoist engine I, the other end through assembly pulley I it is backward under connect Connect the sleeve.
The hoisting mechanism II has hoist engine II, rope II and assembly pulley II, and wherein hoist engine II is fixed on the shifting On moving platform, assembly pulley II is installed on the pile frame upper end, and the one end of rope II is wound on hoist engine II, and the other end is through assembly pulley The II backward lower connection weight.
The piling mechanism is to be fixed on the mesopore vibration hammer of the sleeve upper end, is had on mesopore vibration hammer described in being available for The mesopore that weight is passed through and connected with sleeve.
The pile frame corresponds to the mesopore vibration hammer and is provided with the guide slide for being available for mesopore vibration hammer to move up and down along it.
The pile frame lower end corresponds to the sleeve and is connected to positioner for positioning and guiding sleeve.
The stuffing hole is opened in the side wall of the sleeve, have can either on or off door.
The construction method that compacting pile construction device described in a kind of application item is constructed, it is characterised in that:
A, weight and sleeve positioning centering are carried out by adjusting mobile platform and positioner;
B, by the lifting weight of hoisting mechanism II to certain altitude, then discharging weight makes its free-falling in sleeve, Ram ground and form stake holes;Starting piling mechanism makes sleeve synchronously sink to soil layer;
C, lifting weight and free-falling are repeated, until ramming to setting hole depth, and keeps sleeve synchronously to follow up;
D, lifted above weight to stuffing hole, insert a certain amount of filler into sleeve by stuffing hole;
E, the filler top inserted by the lifting sleeve of hoisting mechanism I to step d;
F, lifting weight and free-falling is repeated, by the filler in tamping stake holes to setting compactness;
G, repeat step d~f, filled out until completing whole pile body and ramming.
The beneficial effects of the invention are as follows:1st, it is compacted instant invention overcomes being carried out in the Site of Collapsible Loess containing loose interlayer The collapse hole serious problems of pile driving construction;2nd, the present invention improves the pile body perpendicularity of compaction pile in compaction pile pore forming process;3rd, this hair Bright middle compaction pile pore-forming and pile body are rammed to fill out and completed by an equipment.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment.
Embodiment
As shown in figure 1, the present embodiment is a kind of compacting pile construction device, for handling the collapsible loess containing loose interlayer Place ground, there is mobile platform 1 and the pile frame 2 being connected to through supporting mechanism on mobile platform, the boosted mechanism I in the upper end of pile frame 2 Sleeve 5 and the weight 4 that can be inserted in sleeve, weight and the concentric coaxial arrangement of sleeve are suspended in midair respectively with hoisting mechanism II, on sleeve 5 Equipped with the piling mechanism for sleeve to be squeezed into soil layer, the sleeve has the stuffing hole 8 of the filler into sleeve, and stuffing hole 8 opens up In in the side wall of sleeve 5, have can either on or off door.
In the present embodiment, piling mechanism is to be fixed on the mesopore vibration hammer 6 of the upper end of sleeve 5, and having on mesopore vibration hammer can The mesopore for passing through for weight and being connected with sleeve.The corresponding mesopore vibration hammer 6 of pile frame 2, which is provided with, is available for mesopore vibration hammer edge to move down thereon Dynamic guide slide.The lower end of pile frame 2 corresponds to sleeve 5 and is connected to positioner 7 for positioning and guiding sleeve.
Hoisting mechanism I has the hoist engine I 9, rope I 10 and assembly pulley I 11 for being used for lifting mesopore vibration hammer 6, rope The one ends wounds of I 10 on hoist engine I 9, the other end is through being fixed on the assembly pulley I 11 on the top of pile frame 2 and hanging downwards has Mesopore vibration hammer 6;Mesopore vibration hammer 6 draws the guide slide along pile frame 2 under hoist engine I 9 driving effect through rope I 10 Move up and down.
Hoisting mechanism II has the hoist engine II 12, rope II 13 and assembly pulley II 14 for being used for lifting weight 4, rope The one ends wounds of II 13 on hoist engine II 12, the other end lets droop through being fixed on the assembly pulley II 14 on the top of pile frame 2 Weight 4 is hung, weight 4, through the traction enhancements of rope II 13, and ensures that weight 4 can be with hoist engine II 12 driving effect The free-falling in the mesopore and sleeve 5 of mesopore vibration hammer 6.
Hoist engine I 9 and hoist engine II 12 phases being fixed on mobile platform 1 across a certain distance, and hoist engine I 9 is placed in Between hoist engine II 12 and pile frame 2;Assembly pulley II 14 is located at directly over assembly pulley I 11.
Supporting mechanism includes the support bar 3 being hingeably secured between mobile platform 1 and pile frame 2 being tilted towards, wherein one Support bar one end is articulated between hoist engine I 9 and hoist engine II 12, and another support bar is close to mobile platform 1 and pile frame 2 Intersection point is arranged.
The construction procedure of the present embodiment is as follows:
A, weight 4 and the positioning centering of sleeve 5 are carried out by adjusting mobile platform 1 and positioner 7;
B, weight 4 is lifted to certain altitude by hoisting mechanism II, then discharging weight makes it in sleeve 5 under freedom Fall, ram ground and form stake holes;Starting piling mechanism makes sleeve 5 synchronously sink to soil layer;
C, lifting weight 4 and free-falling are repeated, until ramming to setting hole depth, and keeps the synchronous follow-up of sleeve 5;
D, lifted above weight 4 to stuffing hole, a certain amount of filler is inserted into sleeve 5 by stuffing hole;
E, the filler top inserted by the lifting sleeve of hoisting mechanism I to step d;
F, lifting weight 4 and free-falling is repeated, by the filler in tamping stake holes to setting compactness;
G, repeat step d~f, filled out until completing whole pile body and ramming.

Claims (8)

1. a kind of compacting pile construction device, there is mobile platform (1) and the pile frame (2) being connected to through supporting mechanism on mobile platform, It is characterized in that:The boosted mechanism I in pile frame (2) upper end and hoisting mechanism II suspend sleeve (5) in midair and can insert sleeve respectively Interior weight (4), weight and the concentric coaxial arrangement of sleeve, the piling for being used for that sleeve to be squeezed into soil layer is housed on the sleeve (5) Mechanism, the sleeve have the stuffing hole (8) of the filler into sleeve.
2. compacting pile construction device according to claim 1, it is characterised in that:The hoisting mechanism I has hoist engine I (9), rope I (10) and assembly pulley I (11), wherein hoist engine I are fixed on the mobile platform (1), and assembly pulley I is installed on institute Pile frame (2) upper end is stated, the one end of rope I is wound on hoist engine I, and the other end connects the sleeve (5) through assembly pulley I is lower backward.
3. compacting pile construction device according to claim 1 or 2, it is characterised in that:The hoisting mechanism II has elevator Machine II (12), rope II (13) and assembly pulley II (14), wherein hoist engine II are fixed on the mobile platform (1), assembly pulley II is installed on the pile frame (2) upper end, and the one end of rope II is wound on hoist engine II, and the other end connects through assembly pulley II is lower backward The weight (4).
4. compacting pile construction device according to claim 1, it is characterised in that:The piling mechanism is to be fixed on the set The mesopore vibration hammer (6) of cylinder (5) upper end, have on mesopore vibration hammer and be available for the mesopore that the weight is passed through and connected with sleeve.
5. compacting pile construction device according to claim 4, it is characterised in that:The corresponding mesopore of the pile frame (2) shakes Dynamic hammer (6), which is provided with, is available for the guide slide that mesopore vibration hammer moves up and down along it.
6. compacting pile construction device according to claim 1, it is characterised in that:Pile frame (2) lower end corresponds to the set Cylinder (5) is connected to the positioner (7) for positioning and guiding sleeve.
7. compacting pile construction device according to claim 1, it is characterised in that:The stuffing hole (8) is opened in the set Cylinder (5) side wall on, have can either on or off door.
8. a kind of construction method constructed using compacting pile construction device described in claim 1~7 any one, its feature It is:
A, weight (4) and sleeve (5) positioning centering are carried out by adjusting mobile platform (1) and positioner (7);
B, weight (4) is lifted to certain altitude by hoisting mechanism II, then discharging weight makes its free-falling in sleeve, rams Hit ground and form stake holes;Starting piling mechanism makes sleeve (5) synchronously sink to soil layer;
C, lifting weight (4) and free-falling are repeated, until ramming to setting hole depth, and keeps sleeve (5) synchronously to follow up;
D, lifted above weight (4) to stuffing hole (8), insert a certain amount of filler into sleeve by stuffing hole;
E, the filler top inserted by the lifting sleeve of hoisting mechanism I (5) to step d;
F, lifting weight (4) and free-falling is repeated, by the filler in tamping stake holes to setting compactness;
G, repeat step d~f, filled out until completing whole pile body and ramming.
CN201710680357.2A 2017-08-10 2017-08-10 A kind of compacting pile construction device and its construction method Pending CN107338781A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710680357.2A CN107338781A (en) 2017-08-10 2017-08-10 A kind of compacting pile construction device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710680357.2A CN107338781A (en) 2017-08-10 2017-08-10 A kind of compacting pile construction device and its construction method

Publications (1)

Publication Number Publication Date
CN107338781A true CN107338781A (en) 2017-11-10

Family

ID=60217812

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710680357.2A Pending CN107338781A (en) 2017-08-10 2017-08-10 A kind of compacting pile construction device and its construction method

Country Status (1)

Country Link
CN (1) CN107338781A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729435A (en) * 2018-05-07 2018-11-02 中航旭日(北京)岩土工程技术有限公司 The construction method of automated packing tamping apparatus and compaction pile basement process
CN108952560A (en) * 2018-07-25 2018-12-07 张刚 Mining building site hammers body
CN110616702A (en) * 2019-09-25 2019-12-27 机械工业勘察设计研究院有限公司 System and method for monitoring construction quality of compaction pile
CN110792080A (en) * 2019-10-17 2020-02-14 龙德建设有限公司 Vertical pile driving device for precast pile
CN113863274A (en) * 2021-09-29 2021-12-31 台州立昌工程建设有限公司 Construction method of stable foundation
CN114517480A (en) * 2022-01-26 2022-05-20 机械工业勘察设计研究院有限公司 Filling and ramming integrated device based on static pressure immersed tube pore-forming

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1209489A (en) * 1997-08-22 1999-03-03 中航勘察设计研究院 Construction method for composite foundation by tamping expanding piles and compacting soil around piles
CN1226624A (en) * 1998-11-17 1999-08-25 王继忠 Method for reinforcement of foundation ground
CN104314078A (en) * 2014-11-05 2015-01-28 王继忠 Concrete pile construction equipment and construction method thereof
CN104563116A (en) * 2015-02-12 2015-04-29 王继忠 Construction equipment for automatically controlling tamping of heavy hammer
CN104727308A (en) * 2015-02-12 2015-06-24 刘清洁 Immersed tube compaction pile or cast-in-place concrete pile construction device and method
CN205776209U (en) * 2016-04-29 2016-12-07 中国建筑第七工程局有限公司 The construction equipment of concrete-pile
CN206289629U (en) * 2016-11-25 2017-06-30 王继忠 A kind of construction equipment of carrier pile
CN207277312U (en) * 2017-08-10 2018-04-27 中国电建集团华东勘测设计研究院有限公司 A kind of compacting pile construction device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1209489A (en) * 1997-08-22 1999-03-03 中航勘察设计研究院 Construction method for composite foundation by tamping expanding piles and compacting soil around piles
CN1226624A (en) * 1998-11-17 1999-08-25 王继忠 Method for reinforcement of foundation ground
CN104314078A (en) * 2014-11-05 2015-01-28 王继忠 Concrete pile construction equipment and construction method thereof
CN104563116A (en) * 2015-02-12 2015-04-29 王继忠 Construction equipment for automatically controlling tamping of heavy hammer
CN104727308A (en) * 2015-02-12 2015-06-24 刘清洁 Immersed tube compaction pile or cast-in-place concrete pile construction device and method
CN205776209U (en) * 2016-04-29 2016-12-07 中国建筑第七工程局有限公司 The construction equipment of concrete-pile
CN206289629U (en) * 2016-11-25 2017-06-30 王继忠 A kind of construction equipment of carrier pile
CN207277312U (en) * 2017-08-10 2018-04-27 中国电建集团华东勘测设计研究院有限公司 A kind of compacting pile construction device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
田奇: "《建筑机械使用与维护》", 31 August 2003, 中国建材工业出版社 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729435A (en) * 2018-05-07 2018-11-02 中航旭日(北京)岩土工程技术有限公司 The construction method of automated packing tamping apparatus and compaction pile basement process
CN108952560A (en) * 2018-07-25 2018-12-07 张刚 Mining building site hammers body
CN108952560B (en) * 2018-07-25 2020-08-07 东阳市天齐科技有限公司 Mining site hammering body
CN110616702A (en) * 2019-09-25 2019-12-27 机械工业勘察设计研究院有限公司 System and method for monitoring construction quality of compaction pile
CN110616702B (en) * 2019-09-25 2023-09-29 机械工业勘察设计研究院有限公司 System and method for monitoring construction quality of compaction pile
CN110792080A (en) * 2019-10-17 2020-02-14 龙德建设有限公司 Vertical pile driving device for precast pile
CN113863274A (en) * 2021-09-29 2021-12-31 台州立昌工程建设有限公司 Construction method of stable foundation
CN114517480A (en) * 2022-01-26 2022-05-20 机械工业勘察设计研究院有限公司 Filling and ramming integrated device based on static pressure immersed tube pore-forming
CN114517480B (en) * 2022-01-26 2023-12-01 机械工业勘察设计研究院有限公司 Filling and tamping integrated device based on static pressure immersed tube pore-forming

Similar Documents

Publication Publication Date Title
CN107338781A (en) A kind of compacting pile construction device and its construction method
US9512586B2 (en) Soil densification system and method
CN104929125A (en) Carrier pile construction equipment and carrier pile construction method
CN104790395A (en) Construction equipment and construction method of carrier pile
CN101831908A (en) Large-diameter ultra-deep static-pressure single tube immersing ramming grouting pile construction process and device
CN101761081A (en) Construction method and equipment of holding and pressing type static-pressure driven cast-in-place pile
CA2809673C (en) Method and apparatus for making an expanded base pier
CN108642987A (en) A kind of sandy soil liquefied foundation processing method
CN107938666B (en) Pile end inner hammering pile sinking with pile shoe and synchronous end grouting structure and process
CN207277312U (en) A kind of compacting pile construction device
CN102808407B (en) Construction method of soft-foundation reinforced concrete cast-in-place pile
CN104711975B (en) Construction technology for long spiral cast-in-situ bored pile
CN207739253U (en) Slip casting structure is surveyed at hammer piling and synchronous end in band shoe pipe pile end
CN101748720B (en) Construction method of composite foundation
US20210164185A1 (en) Methods and apparatuses for compacting soil and granular materials
CN105926594A (en) Double-pipe construction method for static pressure pipe-sinking carrier cast-in-place pile
CN102444120A (en) Construction method of fully-tamped multi-head pedestal bored concrete pile
CN104895058B (en) The all-hydraulic two-tube compound club-footed pile machine of static pressure and its construction method
CN211948416U (en) Immersed tube pile extruding machine
CN112030961B (en) Vibration pipe following construction process for long spiral cast-in-place pile
CN210459189U (en) Novel BNT carrier pile and construction equipment thereof
CN1112486C (en) Construction equipment for in-site pouring concrete pile
RU2475593C2 (en) Method to produce wells in soil for erection of filling pile and device for its realisation
CN105887812B (en) A kind of single casing construction method of static pressure, immersed tube carrier bored concrete pile
EA030503B1 (en) Method of constructing a pile with enlargement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171110