CN201424018Y - Orbit launching trolley for floating pipelines - Google Patents

Orbit launching trolley for floating pipelines Download PDF

Info

Publication number
CN201424018Y
CN201424018Y CN2009200973481U CN200920097348U CN201424018Y CN 201424018 Y CN201424018 Y CN 201424018Y CN 2009200973481 U CN2009200973481 U CN 2009200973481U CN 200920097348 U CN200920097348 U CN 200920097348U CN 201424018 Y CN201424018 Y CN 201424018Y
Authority
CN
China
Prior art keywords
track
pipeline
steel plate
arc
dolly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200973481U
Other languages
Chinese (zh)
Inventor
汪建伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN TIMEAST OFFSHORE ENGINEERING Co Ltd
Original Assignee
TIANJIN TIMEAST OFFSHORE ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN TIMEAST OFFSHORE ENGINEERING Co Ltd filed Critical TIANJIN TIMEAST OFFSHORE ENGINEERING Co Ltd
Priority to CN2009200973481U priority Critical patent/CN201424018Y/en
Application granted granted Critical
Publication of CN201424018Y publication Critical patent/CN201424018Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

The utility model relates to an orbit launching trolley for floating pipelines. The launching trolley is provided with two steel plates; the upper edge of each steel plate is arc-shaped, and the loweredge thereof is linear; the connection lines of the two edges present a 90 DEG included angle; an arc-shaped pallet is welded on the upper surface of each steel plate; a rubber plate in tight fit with the arc-shaped steel plate is stuck on the surface of the arc-shaped pallet; two ends at the lower end of each steel plate are fixed with backing plates, respectively; the backing plates are placedon angle iron so as to connect two shafts into a whole; the steel plates, the backing plates and the angle iron are fixedly connected with the shafts; and two wheels are fixed at two ends of each shaft, respectively. The utility model has the advantages that the structure is simple; a single vehicle can support more than 10 T goods; the integral gravity center is lower, so that the utility model has low possibility of overturn; the use is safe and reliable; the trolley is detachable, so as to provide convenience for site assembly and routine maintenance; the wheels can rotate flexibly; as therolling frictional resistance between the wheels and orbits is lower, the starting tractive force is smaller, and the anticorruption layer of a pipeline can be protected effectively; the trolley is prevented from being damaged when lifted, placed or moved; and the cost is low.

Description

The track emission dolly of pipeline swims
Technical field
The utility model relates to a kind of dolly, particularly relates to a kind of track emission dolly of the pipeline that swims simple in structure, easy to use.
Background technology
As everyone knows, at present, submerged pipeline installs that method commonly used has pipelaying vessel metbod and two kinds of the methods of swimming, and pipelaying vessel metbod is installed submerged pipeline and is subjected to the environmental influence factor more, and is especially harsh especially to the requirement of the depth of water; And the method for swimming is suitable for operating water depth more shallow (especially in the beach position) and the short submerged pipeline of distance is installed, it is the pipeline launch installation that the method for swimming is installed its critical equipment of submerged pipeline, conventional roller launch installation advances because of pipeline rolls on roller, so in use quite serious to the damage of pipeline anticorrosion coating especially cement counterweight pipe.
Summary of the invention
Main purpose of the present utility model is to overcome above deficiency and provides a kind of track simple in structure, easy to use, good to the pipe protection performance and the reusable pipeline that swims to launch dolly.
The technical scheme that its technical matters that solves the utility model adopts is: it comprises roller and track, it is characterized in that: the emission dolly has two block plates, the top of steel plate is curved, bottom is a straight line, the line on both sides is 90 °, be welded with the arc pallet above two block plates, the surface of arc pallet is stained with the rubber plate docile with curved plate, two of two block plate lower ends is fixing with the backing plate welding respectively, backing plate is placed on two axles is fused, and with steel plate, backing plate, angle steel is captiveed joint with axle, the two ends of two axles are fixed with two wheels respectively, wheel is fixed by bolt and nut of clip, and wheel supports in orbit.
The utility model can also adopt following technical measures:
Described steel plate, backing plate, angle steel and axle adopt four clevis bolts to captive joint or weld captive joint;
Described wheel is supported on the light rail or square steel of 18kg-24kg.
Advantage and the good effect that the utlity model has are: the emission vehicle structure is simple, stressed reasonable, the bicycle load-bearing can reach more than the 10T, and deadweight generally between 40kg~80kg, is convenient to reclaim and carrying, the whole center of gravity of emission dolly is lower, be difficult for rollover, safe and reliable, the emission dolly is detachable, be convenient to assembled on site and daily maintenance, for ease of maintenaince and part replacement.Sticker rubber plate on the arc pallet can effectively be protected pipeline anticorrosion coating, prevent hang with moving process in damaged.The load-bearing of emission dolly is bigger, but rotates flexibly, and the rolling friction resistance between the wheel track is less, so it is less to start tractive force, does not need large-sized power plant, therefore greatly reduces cost.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the connection diagram of emission dolly, pipeline 12 and cursory 13.
Among Fig. 1, Fig. 2: 1. steel plate, 2. arc pallet, 3. rubber plate, 4. backing plate, 5. angle steel, 6. spool, and 7. wheel, 8. nut, 9. spring cotter, 10. track, 11.U shape bolt, 12. pipelines, 13. is cursory.
The specific embodiment
For further understanding summary of the invention characteristics of the present utility model and effect following examples for example now, and conjunction with figs. is described in detail as follows, and sees also Fig. 1, Fig. 2.
As shown in Figure 1: the emission dolly has two block plates 1, the top of steel plate 1 is curved, bottom is a straight line, the line on both sides is 90 °, be welded with arc pallet 2 above two block plates 1, the surface of arc pallet 2 is stained with the rubber plate 3 docile with arc pallet 2, two of two block plates, 1 lower end is fixing with backing plate 4 welding respectively, backing plate 4 is placed on two axles 6 is fused, and with steel plate 1, backing plate 4, angle steel 5 is captiveed joint with axle four clevis bolts 11 of 6 usefulness or welding, the two ends of two axles 6 are fixed with two wheels 7 respectively, wheel 7 is fixing by nut 8 and spring cotter 9, and wheel 7 is supported on the track 10.The emission dolly is that the carrying pipeline is along track 10 passive mobile a kind of devices of laying in advance.
During use, the operation on the track of laying in advance 10 of emission dolly, track 10 generally selects for use the light rail of 18kg~24kg or square steel to get final product, track 10 is laid on sleeper or the bar shaped reinforced concrete foundation usually, basic spacing depends on the material of track, and track 10 also can be laid immediately on the smooth cement flooring.The weight that goes up according to the carrying pipeline along the line of track 10 generally will be considered 2~3 times conservative factor, equidistant emission dolly of laying.The running orbit of track 10 on horizontal surface is designed to straight line as far as possible, and the bending spring of curve must not be lower than 1000m, otherwise the emission dolly is subjected to the side-bend shearing to be easy to damage.The emission end of track 10 is generally made the slope of the gradient about 15%, make the emission dolly arrive the end after natural downslide break away from pipeline, be convenient to crane or manual recovery.Because of emission dolly itself can not produce power,, use wirerope to be connected on the prefabricated tube section so that traction dilatory force and controlling plumbing fixtures emission gait of march are provided so respectively arrange a winch at the head and the tail two ends of track 10.As shown in Figure 2: pipeline 12 pipe be prefabricated on the stand requirement length and on the pipeline 12 after a segment distance is fastened one cursory 13, uses 3~4 cranes to hang onto on the arc pallet 2 of launching dolly.Generally speaking, need the dilatory emission of row again after on the track 10 2~3 sections prefabricated tube sections being connected into big section.Whether influence obstacle that dolly advance, and regularly track 11 is carried out examination and maintenance if will check to exist on the track before the pipeline 12 dilatory emissions.Pipeline 12 is spurred by winch, and pipeline 12 drives the emission moving of car, pulls out a segment pipe 12 and just can take out an emission dolly, because of binding on the pipeline 12 have cursory 13, so pipeline 12 all behind time water, will be kept afloat, after taking off cursory 13, then at the bottom of whole piece pipeline 12 cascading waters.
Its advantage is: launching trolley is simple in structure, reasonable stress, and the bicycle load-bearing can reach more than the 10T, from Heavy generally between 40kg~80kg, to be convenient to reclaim and carrying, the whole center of gravity of launching trolley is lower, is difficult for Rollover, safe and reliable, launching trolley is detachable, is convenient to Assembling and daily maintenance, easily In maintenance and part replacement. Sticker rubber plate on the arc pallet can effectively be protected pipeline anticorrosion coating, and is anti-End hang with moving process in damaged. The launching trolley load-bearing is bigger, but rotates flexibly, wheel track it Between the rolling frictional resistance littler, so it is littler to start tractive force, do not need large-sized power plant, therefore greatly Reduced cost.

Claims (3)

1. the track of the pipeline that swims is launched dolly, it comprises roller and track, it is characterized in that: the emission dolly has two block plates (1), the top of steel plate (1) is curved, bottom is a straight line, the line on both sides is 90 °, be welded with arc pallet (2) above two block plates (1), the surface of arc pallet (2) is stained with the rubber plate (3) docile with arc pallet (2), two of two block plates (1) lower end is fixing with backing plate (4) welding respectively, backing plate (4) is placed on two axles (6) is fused, and with steel plate (1), backing plate (4), angle steel (5) is captiveed joint with axle (6), the two ends of two axles (6) are fixed with two wheels (7) respectively, wheel (7) is fixing by nut (8) and spring cotter (9), and wheel (7) is supported on the track (10).
2. the track of the pipeline that swims according to claim 1 emission dolly is characterized in that: described steel plate (1), backing plate (4), angle steel (5) and axle (6) four clevis bolts of employing (11) are captiveed joint or are welded captive joint.
3. the track emission dolly of the pipeline that swims according to claim 1, it is characterized in that: described wheel (7) is supported on the light rail or square steel of 18kg-24kg.
CN2009200973481U 2009-06-26 2009-06-26 Orbit launching trolley for floating pipelines Expired - Fee Related CN201424018Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200973481U CN201424018Y (en) 2009-06-26 2009-06-26 Orbit launching trolley for floating pipelines

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200973481U CN201424018Y (en) 2009-06-26 2009-06-26 Orbit launching trolley for floating pipelines

Publications (1)

Publication Number Publication Date
CN201424018Y true CN201424018Y (en) 2010-03-17

Family

ID=42023454

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200973481U Expired - Fee Related CN201424018Y (en) 2009-06-26 2009-06-26 Orbit launching trolley for floating pipelines

Country Status (1)

Country Link
CN (1) CN201424018Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106862871A (en) * 2017-03-02 2017-06-20 南南铝业股份有限公司 The preparation method and device of a kind of full aluminium car bottom component

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106862871A (en) * 2017-03-02 2017-06-20 南南铝业股份有限公司 The preparation method and device of a kind of full aluminium car bottom component

Similar Documents

Publication Publication Date Title
CN202358280U (en) Special ship for transporting large-diameter steel pipe piles and assisting in pile hoisting construction
CN103231717B (en) A kind of ocean pipeline balance weight production line transports the rail mounted carrier loader of pipeline
CN201240487Y (en) Apparatus for mounting ship stern structure
CN205101674U (en) Be used for large -scale steel pipe to pass through road bed sheathed tube mobile device
CN201753190U (en) Ground rail vehicle for production workshop
CN201195687Y (en) Tube internal traction device
CN201424018Y (en) Orbit launching trolley for floating pipelines
CN204739326U (en) Steel truss or piping lane gallows poling auxiliary device
CN201953312U (en) Polar low-temperature mechanically driven trailer-mounted drill rig
CN108275579B (en) Quick dismantling device for pipeline in tunnel
CN210457330U (en) Device for manufacturing and installing glass fiber reinforced plastic group tank on anti-corrosion basis on site
CN103241683B (en) Under a kind of ocean pipeline balance weight production line, the rail mounted of pipe lifts pipe device
CN104512676A (en) Rail transportation system of steel structure roof
CN102530735B (en) Entire loading and transporting technology and equipment for portal crane
CN102311057A (en) Floating crane revolving support dismounting method
CN202594664U (en) Mast type hoisting device for electromechanical equipment of super high-rise building
CN202264775U (en) Pipeline transporting trolley
CN215249228U (en) Simple large-scale pipeline installation adjusting device
CN211731737U (en) Support for assisting butt joint of ship material lifting pipelines
CN214573175U (en) A distributing device for town road engineering curb
CN110282577B (en) Device for manufacturing and installing glass fiber reinforced plastic group tank on site on anti-corrosion basis and construction method
CN205745642U (en) Large-diameter steel pipe distance passes through culvert pipe constructing device
CN108946496B (en) Anti-tipping device of marine crane
CN202379616U (en) Movable simple hoisting device
CN113818478A (en) Overweight prefabricated pipe gallery installation system and construction method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100317

Termination date: 20170626

CF01 Termination of patent right due to non-payment of annual fee