CN201401177Y CN2009200664115U CN200920066411U CN201401177Y CN 201401177 Y CN201401177 Y CN 201401177Y CN 2009200664115 U CN2009200664115 U CN 2009200664115U CN 200920066411 U CN200920066411 U CN 200920066411U CN 201401177 Y CN201401177 Y CN 201401177Y
Authority
CN
China
Prior art keywords
double
columns
blocks
lining structure
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2009200664115U
Other languages
Chinese (zh)
Inventor
徐旭
宋辉
张孟喜
沈永东
李向红
张文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
University of Shanghai for Science and Technology
Original Assignee
University of Shanghai for Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by University of Shanghai for Science and Technology filed Critical University of Shanghai for Science and Technology
Priority to CN2009200664115U priority Critical patent/CN201401177Y/en
Application granted granted Critical
Publication of CN201401177Y publication Critical patent/CN201401177Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model relates to a double-column lining structure for a double-circular shield tunnel. The lining structure adopts two pipelines shaped like circular rings and is made up of two columns, four single-wing block with identical specifications, as well as more than two standardized blocks, wherein two columns are erected between the two circular rings, the two single-wing blocks are positioned at the top parts of the two columns after combination, and the other two single-wing blocks are positioned at the bottom parts of the two columns after combination. The single-wing blocks and thestandardized blocks are assembled in sequence to form closed double rings; pre-buried ductile cast iron hand holes and nuts among the standardized blocks as well as among the standardized blocks andthe single-wing blocks are fixedly connected by using single-head short and straight bolts; the straight bolts among the single-wing blocks are fixedly connected by using nuts in a manner of respectively passing through the prepared trapezoid hand holes of the two blocks and the straight bolt holes; and a rubber water bar capable of expanding after meeting water is adopted for seam water prevention. The utility model has the advantages that the integral seismic performance of the double-column lining structure is superior to that of the single-column lining structure, an effective pathway is formed between the double columns so as to enable people to disperse successfully after occurrences of safe accidents; and the pathway between the double columns can be used for storing daily maintenance equipment, thereby facilitating tunnel maintenance.

Description

The upright post lining structure of double in double-O-tube shield method tunnel
Technical field
The utility model relates to the construction of tunnel technical field, specifically is the upright post lining structure of double in a kind of double-O-tube shield method tunnel.
Background technology
The shield tunnel technology since have little to surrounding environment influence, adapt to advantages such as various stratum and different buried depth, mechanization of building operation degree height, speed are fast, safety height, in the urban compact district with pass through under water and obtained in the construction of building construction of tunnel widely using, it is regional very widely particularly to distribute at weak soils such as Shanghai, Guangzhou, has more the unique technique advantage.Along with shield structure technology is perfect day by day, earth pressure balanced shield, EPBS, mud balance shield have been widely used in the shield-tunneling construction city underground in China.Japan's construction of tunnel circle proposed the imagination of double-O-tube shield tunnel in 1981.Double-O-tube shield is in shape just as two conjuncted single targe structures, and it just can finish two tunnels by once advancing.Double-O-tube shield tunnel has that the underground space of taking is little, efficiency of construction is high, the native amount of digging less, advantage such as section effective rate of utilization height, engineering cost be low.The construction technology of two circular tunnels was studied by Japan in 1987, and had carried out the construction of first the double-O-tube shield in the world at Hiroshima,Japan in 1989.Through the development of more than ten years, the design of double-O-tube shield, manufacturing technology are perfect day by day, have successively built 11 double-O-tube shields in Japan, have built up 6 two circular tunnel rail lines.The yellow emerging green floor site of Shanghai rail transit M8 line to way station of Xiang Yin Dynasty running tunnel is the tunnel of Chinese first strip adoption double-O-tube shield machine tunneling construction.This running tunnel formally tunneled since on August 8th, 2003, was open to traffic on December 31st, 2003.China becomes second country that uses the double-O-tube shield machine to finish tunnel piercing in the world thus.
Find through literature search prior art, Chinese patent application number: 03115651.7, denomination of invention: the liner structure in double-O-tube shield method tunnel, publication number: CN1470742, this patent readme is: " shape of this liner structure is two crossing circular pipelines; mainly by big flying bird piece; little flying bird piece; column piece and the calibrated bolck more than two constitute; wherein big flying bird piece is positioned at the bottom of column; little flying bird piece is positioned at the top of column, greatly, the both sides of little flying bird piece respectively by be circular-arc calibrated bolck successively assembly unit connect into closed circular, fixedly connected between piece and the piece.Its advantage is, can save the underground space, reduces construction investment, speed up the work, improves construction quality, can improve the economic benefit of city underground, roads and tunnels investment greatly ..." middle standing pillar of this patent is monolithic, exists big not enoughly aspect anti-seismic performance, and anti-seismic performance is to estimate the important indicator of underground structure.
The utility model content
The purpose of this utility model is the weak point at existing liner structure, and the upright post lining structure of double in a kind of double-O-tube shield method tunnel is provided, about two ring intersections support with two column pieces, improve its anti-seismic performance.
The utility model purpose is realized by following technical scheme:
The upright post lining structure of double in a kind of double-O-tube shield method tunnel is characterized in that the two circular liner structure in tunnel is made of two column pieces, four identical single wing piece and calibrated bolcks more than two of specification.Wherein, erect described two columns between two annulus, two described single wing piece combinations are placed on the top of described two columns, and two single wing pieces make up the bottom that is placed on described two columns in addition.Described single wing piece and described calibrated bolck assembly unit successively form the two annulus of sealing.Be that pre-buried ductile iron hand hole machine nut is connected with the short straight bolt of single head between adjacent two calibrated bolcks and between calibrated bolck and the single wing piece; Between adjacent two single wing pieces straight bolt is fixedlyed connected with nut with straight bolt hole by the trapezoidal hand hole that two pieces are reserved respectively.All seam waterproofs adopt water-swelling rubber water bar.
Two circular pipelines in the utility model intersect the location and depend on its diameter, and common two circle ring center are apart from being R~2R, and R is the annulus outer radius in two annulus tunnels.
Two column spacings in the utility model are R/5~R/6, and R is the annulus outer radius in two annulus tunnels.
The utility model has the advantages that the anti-seismic performance of upright post lining structure of double integral body is better than single upright post type liner structure.Form effective passage in the middle of two columns, personnel can be evacuated after security incident takes place smoothly.Two column center-aisles can be deposited regular maintenance equipment, are convenient to tunnel maintenance.
Description of drawings
Accompanying drawing 1 is the utility model profile
Accompanying drawing 2 is the utility model list wing piece front view
Accompanying drawing 3 is the vertical view of Fig. 2
Accompanying drawing 4 is the utility model calibrated bolck front view
Accompanying drawing 5 is Fig. 4 lateral view
Accompanying drawing 6 is the utility model column piece front view
Accompanying drawing 7 is the right view of Fig. 6
Accompanying drawing 8 is the connected mode I schematic diagram between the utility model building block and the building block
Accompanying drawing 9 is the connected mode II schematic diagram between the utility model building block and the building block
The specific embodiment
In conjunction with the accompanying drawings, the utility model is described in further detail by embodiment: shown in Fig. 1-8, always represent respectively with reference to label 1-5: column piece 1, single wing piece 2, calibrated bolck 3, pre-buried ductile iron hand hole 4, nut 5, trapezoidal hand hole 6, straight bolt hole 7.
The shape of the described liner structure of this example is two crossing circular pipelines: be made of the identical column of two specifications 1, four single wing pieces 2 that specification is identical and eight calibrated bolcks 3.Wherein, erect the top that 1, two single wing piece 2 combination of two columns are placed on two columns between two rings, two single wing pieces make up the bottom that is placed on two columns 1 in addition.Single wing piece 2 forms the two annulus of sealing with calibrated bolck 3 assembly unit successively.Be that the short straight bolt of pre-buried ductile iron hand hole 4 and nut 5 usefulness single heads is connected between adjacent two calibrated bolcks 3 and between calibrated bolck 3 and the single wing piece 2; Between adjacent two single wing pieces 2 straight bolt is fixedlyed connected with straight bolt hole 7 usefulness nuts by the trapezoidal hand hole 6 that two pieces are reserved respectively.All seam waterproofs adopt water-swelling rubber water bar.

Claims (3)

1, the upright post lining structure of double in a kind of double-O-tube shield method tunnel, it is characterized in that: the two circular liner structure in tunnel is made of two columns (1), four identical single wing piece (2) and calibrated bolcks more than two (3) of specification, wherein, erect described two columns (1) between two annulus, two described single wing pieces (2) combination is placed on the top of described two columns (1), and two described single wing pieces (2) combination is placed on the bottom of described two columns (1) in addition; Described four single wing pieces (2) form the two annulus of sealing with described calibrated bolck (3) assembly unit successively respectively, are that pre-buried ductile iron hand hole machine nut is lacked straight bolt with single head and is connected between the adjacent calibrated bolck (3) and between calibrated bolck (3) and the single wing piece (2); Between adjacent two single wing pieces (2) straight bolt is fixedlyed connected with nut with straight bolt hole by the trapezoidal hand hole that two pieces are reserved respectively; All seam waterproofs adopt water-swelling rubber water bar.
2, the upright post lining structure of double in double-O-tube shield method according to claim 1 tunnel is characterized in that two column spacings are R/5~R/6, and R is the annulus outer radius in two annulus tunnels.
3, the upright post lining structure of double in double-O-tube shield method according to claim 1 tunnel is characterized in that two circle ring center spacing is R~2R, and R be the annulus outer radius in pair annulus tunnels.
CN2009200664115U 2009-01-04 2009-01-04 Double-column lining structure for double-circular shield tunnel Expired - Fee Related CN201401177Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009200664115U CN201401177Y (en) 2009-01-04 2009-01-04 Double-column lining structure for double-circular shield tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009200664115U CN201401177Y (en) 2009-01-04 2009-01-04 Double-column lining structure for double-circular shield tunnel

Publications (1)

Publication Number Publication Date
CN201401177Y true CN201401177Y (en) 2010-02-10

Family

ID=41660978

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009200664115U Expired - Fee Related CN201401177Y (en) 2009-01-04 2009-01-04 Double-column lining structure for double-circular shield tunnel

Country Status (1)

Country Link
CN (1) CN201401177Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392648A (en) * 2011-10-12 2012-03-28 北京市轨道交通建设管理有限公司 Method for building subway station by expansively digging large-diameter shield tunnel
CN115341916A (en) * 2022-10-20 2022-11-15 中铁第六勘察设计院集团有限公司 Double-track tunnel arch circular shield lining structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392648A (en) * 2011-10-12 2012-03-28 北京市轨道交通建设管理有限公司 Method for building subway station by expansively digging large-diameter shield tunnel
CN115341916A (en) * 2022-10-20 2022-11-15 中铁第六勘察设计院集团有限公司 Double-track tunnel arch circular shield lining structure
CN115341916B (en) * 2022-10-20 2022-12-13 中铁第六勘察设计院集团有限公司 Double-line tunnel arch circular shield lining structure

Similar Documents

Publication Publication Date Title
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN103321659B (en) Large-diameter tube curtain support underground excavation construction super-shallow burying large-section subway station structure and construction method
CN103277106B (en) Highway tunnel three-step five-procedure excavation construction method
CN105240024A (en) Parallel shield tunneling method for extended construction of subway station
CN109630155A (en) A kind of top-bottom cross method for tunnel construction of different section type
CN102213099A (en) Composite liner structure of four-track large-span wall-foundation arched tunnel
CN109458185B (en) Construction method for vertically overlapped crossed parallel tunnel shield
CN201407053Y (en) Support and waterproof structure for metro tunnel of tunnel boring machine construction
CN205296223U (en) Combine utility tunnel cross well and end well node structure arranged
CN109958445A (en) The frame construction method in Large Underground space is buried for an ultra shallow
CN105909268A (en) Pre-stress combined well/tunnel module structure construction method and module structure
CN204959762U (en) Barricade formula portal crane track girder construction
CN101457649A (en) Double upright post lining structure of double-circle shield-tunneling-method tunnel
CN205955746U (en) Adopt prefabrication of rectangular shield construction to assemble utility tunnel structure
CN206706773U (en) The more annulus integral supporting structures of armored concrete in a kind of deep big foundation pit
CN106930768B (en) Tunnel Construction and application
CN201401177Y (en) Double-column lining structure for double-circular shield tunnel
CN202090933U (en) Four-wire large-span platform base composite arched tunnel lining structure
CN108374674A (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN201581902U (en) Sand layer pipe jacking shield machine
CN208917850U (en) A kind of miniature steel pipe pile adds grid to spray anchor deep foundation ditch combination supporting scheme system
CN204059401U (en) Novel combined traffic tunnel
CN203476348U (en) Arch cover combined construction structure for shallow-buried underground excavation long-span tunnel pilot tunnels
CN206036408U (en) Span pipeline normal position of foundation ditch and suspend protection architecture in midair

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20100210

Termination date: 20110104