CN201373910Y - Accumulator capacity detecting device of mobile communication base station - Google Patents

Accumulator capacity detecting device of mobile communication base station Download PDF

Info

Publication number
CN201373910Y
CN201373910Y CN200920112342U CN200920112342U CN201373910Y CN 201373910 Y CN201373910 Y CN 201373910Y CN 200920112342 U CN200920112342 U CN 200920112342U CN 200920112342 U CN200920112342 U CN 200920112342U CN 201373910 Y CN201373910 Y CN 201373910Y
Authority
CN
China
Prior art keywords
unit
module
processing unit
base station
central processing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN200920112342U
Other languages
Chinese (zh)
Inventor
方有仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Gemwell Network Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN200920112342U priority Critical patent/CN201373910Y/en
Application granted granted Critical
Publication of CN201373910Y publication Critical patent/CN201373910Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The utility model discloses an accumulator capacity detecting device of a mobile communication base station. The device includes a power supply, a data acquisition unit, a data processing unit and a display unit, wherein the data acquisition unit includes a voltage acquisition module, a current acquisition module and a temperature acquisition module; the data processing unit is a central processing unit; the voltage acquisition module, the current acquisition module and the temperature acquisition module are connected with the central processing unit through an A/D conversion module; and the central processing unit is connected with the display unit and a data storage unit. The detecting device effectively solves the problems of the existing testing equipment such as big volume, heaviness and inconvenience for carrying, and can also conduct remote testing after added with a communication module and a background control unit, thus solving the problem that the existing testing equipment can not continuously detect the accumulator on line.

Description

A kind of mobile communication base station accumulator capacity pick-up unit
Technical field
The utility model relates to a kind of measuring instrument, particularly a kind of mobile communication base station accumulator capacity pick-up unit.
Background technology
In the operation maintenance of mobile communication base station power supply,, facts have proved that the testing result of a lot of detection methods and actual conditions differ greatly, and can not reflect practical problems at present though there has been multiple mode to test the performance of accumulator.From user's angle, still the volume ratio with the method test accumulator of full capacity discharge is of practical significance.But testing apparatus in the past is long-pending big, the heavy discharge load of belt body all, and a whole set of tester weighs 30 to 40 kilograms, and the mobile communication base station is with in the majority in the mountain area, and the testing apparatus of being inconvenient to carry heaviness like this is really gone test.In addition, going to the base station to carry out accumulator detects and can not long-time continuous carry out, therefore can not in time detect usually and lose efficacy or the low accumulator of performance, in case battery malfunction is arranged, the backup battery capacity of base station will wretched insufficiency, thereby cause the clothes that move back of base station after this base station is had a power failure easily, have influence on user's use.Therefore the mobile communication operator urgently wishes to have a kind of accumulator checkout equipment easy to carry, simple to operate, it is effectively detected accumulator, safeguard the accumulator of base station, thus the working time that can under the work of accumulator, keep design after the base station is had a power failure.Open day be that the patent document that May 28, publication number in 2008 are CN101188846A discloses a kind of system and method for realizing the base station remote detection, this document discloses the system that realizes the base station remote detection, comprise: the remote detection control module, be used for initiating to detect and send test item, receive and analysis detecting data; Detect portable terminal, be used for when detecting beginning, request channel is to insert detected base station, after being linked into detected base station, receiving remote detects the information that control module sends, be transmitted to detected base station, and the information of receiving remote detection proxy module transmission, this information is sent to the remote detection control module; The remote detection proxy module, be used for receiving information by detected base station, control detected base station for detecting the portable terminal allocated channel, control detected base station according to test item by sense command and carry out detection, receive the detection data of detected base station, will detect data and send to the remote detection control module by detected base station and detection portable terminal.Thereby, realize the base station remote detection by portable terminal.The system of this base station remote detection mainly is the wireless index at the base station, as detections such as the emission bit error rate, receiving sensitivity, emissive power, up-downgoing balanced degree, has ignored detection and maintenance to the base station battery system.
The utility model content
The utility model problem big, heavy for the volume that solves existing testing apparatus existence, that carry inconvenience provides a kind of volume mobile communication base station accumulator capacity pick-up unit little, in light weight, easy to carry.
But another purpose of the present utility model be for solve that existing testing apparatus exists can not online detection provide a kind of can be more than 24 hours continuous detecting mobile communication base station accumulator capacity pick-up unit.
The utility model is to reach the concrete technical scheme that above-mentioned technical purpose adopts to be: a kind of mobile communication base station accumulator capacity pick-up unit, comprise power supply, data acquisition unit, data processing unit and display unit, described data acquisition unit is voltage acquisition module, current acquisition module and temperature collect module, described data processing unit is a central processing unit, voltage acquisition module, current acquisition module and temperature collect module connect central processing unit by the A/D modular converter, and central processing unit connects display unit and data memory.The utility model adopts battery on-line testing mode, utilize of the load of the transmitter of base station self as accumulator, with voltage, electric current and the temperature value under voltage acquisition module, current acquisition module and the temperature collect module collection battery-operated state, carry out data processing through A/D modular converter conversion back by central processing unit, the data after central processing unit will be handled reach by the test result that calculates and deposit data memory in and show on display unit.Like this, saved big, the heavy discharge load of volume in the accumulator full capacity discharge test method, reached the technical requirement little, in light weight, easy to carry of accumulator capacity checkout equipment volume.
As preferably, voltage acquisition module is 24 road voltage collecting devices.Because 48 volts power-supply system is all used in existing base station, adopt 24 groups 2 volts accumulator power supply in support, for every group storage battery is effectively detected, voltage acquisition module has adopted 24 tunnel voltage collecting device.
Also be connected with warning device and external-connected port on the central processing unit.When test reached regular hour or certain other qualificationss, alarm sent chimes of doom, played the effect of reminding operating personnel, can easily test data be copied to external storage such as USB flash disk, portable hard drive etc. by external-connected port.
Also be provided with operating switch on the pick-up unit, an end of operating switch connects central processing unit, and the other end connects display unit, and described display unit is the LCDs of band touch key-press.Operating switch can the control detection device duty, as in long-time test, automatically during record data, can close the demonstration of LCDs.
The utility model can also adopt following technical scheme:
A kind of mobile communication base station accumulator capacity pick-up unit, comprise detecting unit and background control unit, detecting unit comprises power supply, data acquisition unit, data processing unit, communication unit and display unit, described data acquisition unit is a voltage acquisition module, current acquisition module and temperature collect module, described data processing unit is a central processing unit, voltage acquisition module, current acquisition module and temperature collect module connect central processing unit by the A/D modular converter, central processing unit connects display unit and data memory, described communication unit is the gsm communication module of band SIM card, communication module one end connects central processing unit, and the other end connects antenna.Different with the aforementioned techniques scheme is, the technical program has increased the remote measurement and control function on the basis of aforementioned techniques scheme, gsm communication module and antenna and background control unit by the band SIM card that is provided with at detecting unit, realized Long-distance Control, thereby can realize continuous detecting more than 24 hours mobile communication base station battery-operated state to the accumulator capacity pick-up unit.Like this, can in time find the problem that the mobile communication base station accumulator exists, strengthen the daily servicing of accumulator, ensure the safe operation of base station.
Background control unit is provided with wireless modem, wireless modem connects database module and antenna, database module connects estimates module, data processing module and data management module discharge time, and data management module connects wireless modem by note/GPRS communication module.Note/GPRS communication module is the driver module of wireless modem, data management module plays coordinative role, under the coordination of data management module, drive wireless modem by note/GPRS communication module, set up communication contact by antenna and relevant detection device, begin and stop related works such as test, data transmission, for the unit, backstage provides corresponding test data.The effect of data processing module is under the coordination of data management module, can become the data preparation in the database module short and sweet diagrammatic form to show, demonstrate each monomer voltage and the current value of electric power storage group in the discharge test process intuitively, make the user can judge the quality of accumulator intuitively, reach the purpose of test; The effect of estimating module discharge time is under the coordination of data management module, can be according to the discharge time of front, how long roughly estimate this group storage battery can also discharge, and makes the unnecessary threshold value that discharges into of full capacity discharge test, save the test duration, improved testing efficiency.
As preferably, be connected with external interface on the database module.Can easily test data be copied to external storage such as USB flash disk, portable hard drive etc. by external interface.
Other auxiliary equipments and the function of detecting unit are identical with the aforementioned techniques scheme.
The beneficial effects of the utility model are: it has solved the problem that the volume that existing testing apparatus exists is big, heavy, carry inconvenience effectively.Simultaneously, also having solved prior art can not detect in real time and to lose efficacy or the problem of the accumulator that performance is low, the utility model volume is little, in light weight, easy to carry, can carry out continuous detecting more than 24 hours to accumulator, thereby strengthen the daily servicing of accumulator, ensured the safe operation of base station.
Description of drawings
Fig. 1 is a kind of structured flowchart of the utility model mobile communication base station accumulator capacity pick-up unit embodiment 1.
Fig. 2 is a kind of structured flowchart of the utility model mobile communication base station accumulator capacity pick-up unit embodiment 2 detecting units.
Fig. 3 is a kind of structured flowchart of unit, accumulator capacity pick-up unit embodiment 2 backstage, the utility model mobile communication base station.
Embodiment
Below by embodiment, and in conjunction with the accompanying drawings the embodiment of technical solutions of the utility model is further described.
Embodiment 1
In embodiment 1 as shown in Figure 1, a kind of mobile communication base station accumulator capacity pick-up unit, comprise power supply 8, data acquisition unit, data processing unit and display unit, described data acquisition unit is a voltage acquisition module 10, current acquisition module 11 and temperature collect module 12, voltage acquisition module 11 is 24 road voltage collecting devices, data processing unit is a central processing unit 6, voltage acquisition module 11, current acquisition module 12 and temperature collect module 13 connect central processing unit 6 by A/D modular converter 9, and central processing unit 6 connects display unit 5 and data memory 7.Also be connected with warning device 14 and external-connected port 3 on the central processing unit 6.Also be provided with operating switch 4 on the pick-up unit, an end of operating switch 4 connects central processing unit 6, and the other end connects display unit 5, and described display unit 5 is the LCDs of band touch key-press.
When the accumulator pick-up unit of embodiment 1 type uses, the sample line of voltage collecting device is connected on the electrode of 24 joint accumulators by label, then receive in the detector by standard 25 pin plugs the other end; The current transformer that connects on the current acquisition module is connected on the output bus of battery pack, to obtain current sampling signal, cuts off Alternating Current Power Supply on electrical power control cabinet, makes storage battery power supply to base station equipment work.Open relevant operating switch, begin test after setting the threshold value of monomer voltage and total voltage, starting inner timer picks up counting, p.s. the once sampling accumulator each monomer voltage, total voltage, total current, environment temperature, be stored in the inner data-carrier store, and on LCD screen, show.When one of monomer voltage or total voltage reach threshold value, then stop to detect, stop timer, hummer is sounded a buzzer and is pointed out the tester to finish test simultaneously, recovers Alternating Current Power Supply.
Embodiment 2
In embodiment 2 as shown in Figure 2, mobile communication base station accumulator capacity pick-up unit, comprise detecting unit and background control unit (see figure 3), detecting unit comprises power supply, data acquisition unit, data processing unit, communication unit and display unit, described data acquisition unit is a voltage acquisition module 10, current acquisition module 11 and temperature collect module 12, voltage acquisition module 11 is 24 road voltage collecting devices, data processing unit is a central processing unit 6, also be connected with warning device 14 and external-connected port 3 on the central processing unit 6, voltage acquisition module 11, current acquisition module 12 and temperature collect module 13 connect central processing unit 6 by A/D modular converter 9, central processing unit 6 connects display unit 5 and data memory 7, described communication unit is the gsm communication module 13 of band SIM card, communication module 13 1 ends connect central processing unit 6, and the other end connects antenna.Also be provided with operating switch 4 on the detecting unit, an end of operating switch 4 connects central processing unit 6, and the other end connects display unit 5, and described display unit 5 is the LCDs of band touch key-press.
Background control unit is provided with wireless modem 21, wireless modem 21 connects database module 25, be connected with external interface 28 on the database module 25, be connected with antenna on the wireless modem 21, database module 25 connects estimates module 26, data processing module 27 and data management module 24 discharge time, and data management module 24 connects wireless modem 21 by note/GPRS communication module 23.
It is identical when the detecting unit of embodiment 2 uses separately with embodiment 1.When enabling remote detection, test cell can be set up radio contact with the unit, backstage, begins and stop operations such as test, data transmission, and the course of work of unit, backstage is as follows:
(1), under the coordination of database management module, drive wireless modem by note/GPRS communication module, carry out radio contact by antenna and relevant detection unit, begin with stop test, data transmission be to database module (can also copy data in the database by external interface), for data processing etc. provides corresponding data.
(2), data processing module is under the coordination of data management module, can become the data preparation in the database module short and sweet diagrammatic form to show, demonstrate each monomer voltage and the current value of electric power storage group in the discharge test process intuitively, make the user can judge the quality of accumulator intuitively, reach test purpose.
(3), estimate module discharge time under the coordination of data management module, can be according to the discharge time of front, how long roughly estimate this group storage battery can also discharge.Make the unnecessary threshold value that discharges into of full capacity discharge test, saved the test duration, improved testing efficiency.
Only it is pointed out that needs change 24 road voltage collecting devices into the total voltage harvester, power consumption that then can real-time testing base station equipment.
Voltage collecting device is gathered the operating voltage of base station transmitter during application, and current collecting device is gathered the working current (current transformer being connected on the power lead of base station transmitter) of transmitter.Wireless communication connection is set up in detecting unit and unit, backstage, receiving the order that starts test when detecting unit after, the operating voltage and the working current of the active equipment of sampling per 2 seconds, data are kept in the data-carrier store of test cell; Be of the restriction of abatement apparatus memory capacity to the test duration, can be provided with every 30 minutes (time can be provided with) test data is passed back to the unit, backstage by the gsm communication module by GPRS network, then this proving installation can 24 hours follow-on tests, are not subjected to the restriction of storage size.After detecting unit is received the instruction that the unit, backstage stops to test, then stop test, and all data are passed back to the backstage, the backstage calculates equipment in the power consumption of this section in the time according to formula P=U*I.

Claims (10)

1. mobile communication base station accumulator capacity pick-up unit, comprise power supply, data acquisition unit, data processing unit and display unit, it is characterized in that: described data acquisition unit is voltage acquisition module (10), current acquisition module (11) and temperature collect module (12), described data processing unit is central processing unit (6), voltage acquisition module (11), current acquisition module (12) and temperature collect module (13) connect central processing unit (6) by A/D modular converter (9), and central processing unit (6) connects display unit (5) and data memory (7).
2. mobile communication base station according to claim 1 accumulator capacity pick-up unit is characterized in that described voltage acquisition module (11) is 24 road voltage collecting devices.
3. mobile communication base station according to claim 1 accumulator capacity pick-up unit is characterized in that also being connected with on the described central processing unit (6) warning device (14) and external-connected port (3).
4. according to claim 1 or 2 or 3 described mobile communication base station accumulator capacity pick-up units, it is characterized in that also being provided with on the pick-up unit operating switch (4), one end of operating switch (4) connects central processing unit (6), the other end connects display unit (5), and described display unit (5) is the LCDs of band touch key-press.
5. mobile communication base station accumulator capacity pick-up unit, comprise detecting unit and background control unit, detecting unit comprises power supply, data acquisition unit, data processing unit, communication unit and display unit, it is characterized in that: described data acquisition unit is voltage acquisition module (10), current acquisition module (11) and temperature collect module (12), described data processing unit is central processing unit (6), voltage acquisition module (11), current acquisition module (12) and temperature collect module (13) connect central processing unit (6) by A/D modular converter (9), central processing unit (6) connects display unit (5) and data memory (7), described communication unit is the gsm communication module (13) of band SIM card, communication module (13) one ends connect central processing unit (6), and the other end connects antenna.
6. mobile communication base station according to claim 5 accumulator capacity pick-up unit, it is characterized in that described background control unit is provided with wireless modem (21), wireless modem (21) connects database module (25), database module (25) connects estimates module (26), data processing module (27) and data management module (24) discharge time, and data management module (24) connects wireless modem (21) by note/GPRS communication module (23).
7. mobile communication base station according to claim 5 accumulator capacity pick-up unit is characterized in that described voltage acquisition module (11) is 24 road voltage collecting devices.
8. mobile communication base station according to claim 5 accumulator capacity pick-up unit is characterized in that also being connected with on the described central processing unit (6) warning device (14) and external-connected port (3).
9. mobile communication base station according to claim 6 accumulator capacity pick-up unit is characterized in that being connected with external interface (28) on the described database module (25), and wireless modem is connected with antenna on (21).
10. according to claim 5 or 6 or 7 or 8 or 9 described mobile communication base station accumulator capacity pick-up units, it is characterized in that also being provided with on the detecting unit operating switch (4), one end of operating switch (4) connects central processing unit (6), the other end connects display unit (5), and described display unit (5) is the LCDs of band touch key-press.
CN200920112342U 2009-01-09 2009-01-09 Accumulator capacity detecting device of mobile communication base station Expired - Fee Related CN201373910Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920112342U CN201373910Y (en) 2009-01-09 2009-01-09 Accumulator capacity detecting device of mobile communication base station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920112342U CN201373910Y (en) 2009-01-09 2009-01-09 Accumulator capacity detecting device of mobile communication base station

Publications (1)

Publication Number Publication Date
CN201373910Y true CN201373910Y (en) 2009-12-30

Family

ID=41499996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920112342U Expired - Fee Related CN201373910Y (en) 2009-01-09 2009-01-09 Accumulator capacity detecting device of mobile communication base station

Country Status (1)

Country Link
CN (1) CN201373910Y (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101806829A (en) * 2010-04-20 2010-08-18 中兴通讯股份有限公司 Power consumption testing device of active equipment and method
CN102081146A (en) * 2010-12-09 2011-06-01 奇瑞汽车股份有限公司 High-voltage battery voltage detection device
CN102207540A (en) * 2010-03-30 2011-10-05 河南电力试验研究院 Remote storage battery checking discharging test device
CN103135059A (en) * 2011-11-30 2013-06-05 海洋王照明科技股份有限公司 Battery short-circuiting circuit and battery short circuit testing method
CN104571058A (en) * 2015-01-22 2015-04-29 汪福利 Remote online intelligent monitoring system for storage batteries
CN105548910A (en) * 2016-02-02 2016-05-04 国网甘肃省电力公司检修公司 Novel storage battery capacity test system
CN108646193A (en) * 2018-05-25 2018-10-12 中国铁塔股份有限公司 A kind of accumulator capacity appraisal procedure and terminal
CN109728528A (en) * 2018-12-29 2019-05-07 国网山东省电力公司聊城供电公司 A kind of device and its working method for being exclusively used in screen in substation and pushing up small bus bar bridging

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102207540A (en) * 2010-03-30 2011-10-05 河南电力试验研究院 Remote storage battery checking discharging test device
CN101806829A (en) * 2010-04-20 2010-08-18 中兴通讯股份有限公司 Power consumption testing device of active equipment and method
CN101806829B (en) * 2010-04-20 2013-07-03 中兴通讯股份有限公司 Power consumption testing device of active equipment and method therefor
CN102081146A (en) * 2010-12-09 2011-06-01 奇瑞汽车股份有限公司 High-voltage battery voltage detection device
CN103135059A (en) * 2011-11-30 2013-06-05 海洋王照明科技股份有限公司 Battery short-circuiting circuit and battery short circuit testing method
CN103135059B (en) * 2011-11-30 2016-01-20 海洋王照明科技股份有限公司 The method of testing of a kind of battery short circuit circuit and battery short circuit
CN104571058A (en) * 2015-01-22 2015-04-29 汪福利 Remote online intelligent monitoring system for storage batteries
CN105548910A (en) * 2016-02-02 2016-05-04 国网甘肃省电力公司检修公司 Novel storage battery capacity test system
CN108646193A (en) * 2018-05-25 2018-10-12 中国铁塔股份有限公司 A kind of accumulator capacity appraisal procedure and terminal
CN108646193B (en) * 2018-05-25 2021-04-20 中国铁塔股份有限公司 Storage battery capacity evaluation method and terminal
CN109728528A (en) * 2018-12-29 2019-05-07 国网山东省电力公司聊城供电公司 A kind of device and its working method for being exclusively used in screen in substation and pushing up small bus bar bridging

Similar Documents

Publication Publication Date Title
CN201373910Y (en) Accumulator capacity detecting device of mobile communication base station
CN103064027B (en) A kind of 750KV intelligent wireless accumulator on-line monitoring and maintenance system
CN203218398U (en) Power battery management system of electric automobile
CN204256042U (en) A kind of for line loss and monitoring analysis system of opposing electricity-stealing
CN105004918B (en) The harvester of city rail train energy consumption data
CN104767001A (en) Battery management system
CN203377624U (en) Communication lithium iron phosphate battery remote communication alarm device
CN202267721U (en) Lightning arrester online monitoring device having GPRS module
CN209311646U (en) A kind of battery group on-line monitoring system
CN205484727U (en) Wireless battery system of patrolling and examining
CN203037317U (en) Remote water level monitoring device based on global system for mobile communication (GSM)
CN202815188U (en) Dynamic intelligent detection device system of an electric automobile storage battery
CN105303799A (en) Wireless data collector
CN202794330U (en) Three-phase four-wire charge intelligent electric energy meter
CN202075850U (en) Lithium battery pack remote monitoring system
CN204632880U (en) Intelligent accummulator diagnosis prediction system
CN103439562A (en) Portable stray current tester
CN207366715U (en) A kind of battery SOC estimation device based on CAN bus
CN111077459A (en) Car as a house power monitoring management system
CN201876530U (en) Storage battery discharging detector
CN102402204B (en) Multipurpose data acquisition system
CN204154877U (en) Accumulator cell charging and discharging test apparatus and accumulator cell charging and discharging Test Data Acquisition System
CN204166107U (en) A kind of accumulator routing inspection circuit
CN205426752U (en) Ground net corrosion detection device based on solar energy power supply
CN211603305U (en) Device for rapidly detecting electricity stealing of user

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: HANGZHOU ENTONG NETWORK TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: FANG YOUREN

Effective date: 20130523

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 311700 HANGZHOU, ZHEJIANG PROVINCE TO: 310000 HANGZHOU, ZHEJIANG PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20130523

Address after: 310000, room 882, 211 Xixi Road, Xihu District, Zhejiang, Hangzhou, China

Patentee after: Hangzhou Gemwell Network Technology Co., Ltd.

Address before: 311700 room 12, 202 Nanyuan village, thousand Lake Town, Chunan County, Zhejiang Province

Patentee before: Fang Youren

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091230

Termination date: 20150109

EXPY Termination of patent right or utility model