CN108646193A - A kind of accumulator capacity appraisal procedure and terminal - Google Patents

A kind of accumulator capacity appraisal procedure and terminal Download PDF

Info

Publication number
CN108646193A
CN108646193A CN201810516789.4A CN201810516789A CN108646193A CN 108646193 A CN108646193 A CN 108646193A CN 201810516789 A CN201810516789 A CN 201810516789A CN 108646193 A CN108646193 A CN 108646193A
Authority
CN
China
Prior art keywords
clothes
equipment
condition
move back
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810516789.4A
Other languages
Chinese (zh)
Other versions
CN108646193B (en
Inventor
黄伟
李小言
麻小龙
董添
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tower Co Ltd
Original Assignee
China Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tower Co Ltd filed Critical China Tower Co Ltd
Priority to CN201810516789.4A priority Critical patent/CN108646193B/en
Publication of CN108646193A publication Critical patent/CN108646193A/en
Application granted granted Critical
Publication of CN108646193B publication Critical patent/CN108646193B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of accumulator capacity appraisal procedure of present invention offer and terminal, this method include:When monitoring that equipment has a power failure, the power off time of the equipment is obtained;If monitor the equipment meet preset at least two move back in the condition of clothes any move back the condition of clothes, it is determined that the equipment moves back clothes, and obtains the time out of service of the equipment;Based on the power off time and the time out of service, the accumulator capacity of the equipment is assessed.Accumulator capacity provided by the invention assesses terminal when equipment has a power failure, can by preset at least two move back in the condition of clothes any move back the condition of clothes and determine whether the equipment moves back clothes, and power off time that can be based on the equipment and time out of service, the accumulator capacity of the equipment is assessed, to extend the judgment mode finished to battery discharging, and then the equipment scope of application can be expanded.

Description

A kind of accumulator capacity appraisal procedure and terminal
Technical field
The present invention relates to field of communication technology more particularly to a kind of accumulator capacity appraisal procedures and terminal.
Background technology
Accumulator is the key foundation equipment for ensureing communications facility electric power, is directly related to the quantity of operation of network.In reality In the application of border, the actual capacity of accumulator can be influenced by factors such as duration of service, maintenance levels, be sent out with its rated capacity Raw deviation, therefore, periodically carrying out assessment to the actual capacity of accumulator is particularly important.Existing battery capacity evaluation method Mainly have discharge test method, ampere-hour chronometry and open circuit voltage method etc., wherein discharge test method without external detection equipment, Technical threshold is relatively low, and is most easy-operating method in most reliable and existing net.
Currently, the method assessed communication base station accumulator capacity is mainly based upon the power-off condition actually occurred, The time for moving back clothes alarm is sent out by monitoring base station power off time and base station, to assess battery capacity.However in practice, only greatly About 50% base station, which has to move back, takes alarm function, fails the case where reporting wherein can also there is portion of base stations, and this comments Estimate in mode, the judgment mode finished to battery discharging is more single, so that narrow scope of application.
Invention content
A kind of accumulator capacity appraisal procedure of offer of the embodiment of the present invention and terminal are applicable in model to solve existing appraisal procedure Enclose relatively narrow problem.
In order to solve the above technical problems, the invention is realized in this way:
In a first aspect, an embodiment of the present invention provides a kind of accumulator capacity appraisal procedure, commented applied to accumulator capacity Estimate terminal, the method includes:
When monitoring that equipment has a power failure, the power off time of the equipment is obtained;
If monitor the equipment meet preset at least two move back in the condition of clothes any move back the condition of clothes, it is determined that The equipment moves back clothes, and obtains the time out of service of the equipment;
Based on the power off time and the time out of service, the accumulator capacity of the equipment is assessed.
Second aspect, the embodiment of the present invention provide a kind of accumulator capacity assessment terminal, including:
Acquisition module, for when monitoring that equipment has a power failure, obtaining the power off time of the equipment;
First determining module, if moving back appointing in the condition of clothes for monitoring that the equipment meets preset at least two One moves back the condition of clothes, it is determined that the equipment moves back clothes, and obtains the time out of service of the equipment;
Evaluation module, for being based on the power off time and the time out of service, to the accumulator capacity of the equipment into Row assessment.
In the embodiment of the present invention, when equipment has a power failure, it can be moved back in the condition of clothes by preset at least two It is any move back the condition of clothes to determine whether the equipment moves back clothes, and power off time and moving back that can be based on the equipment is when taking Between, the accumulator capacity of the equipment is assessed, to extend the judgment mode finished to battery discharging, Jin Erke Expand the equipment scope of application.
Description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, needed in being described below to the embodiment of the present invention Attached drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, For those of ordinary skill in the art, without having to pay creative labor, it can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is a kind of flow chart of accumulator capacity appraisal procedure provided in an embodiment of the present invention;
Fig. 2 is the flow chart of another accumulator capacity appraisal procedure provided in an embodiment of the present invention;
Fig. 3 is the flow chart of another accumulator capacity appraisal procedure provided in an embodiment of the present invention;
Fig. 4 is a kind of structural schematic diagram of accumulator capacity assessment terminal provided in an embodiment of the present invention;
Fig. 5 is the structural schematic diagram of another accumulator capacity assessment terminal provided in an embodiment of the present invention;
Fig. 6 is the structural schematic diagram of another accumulator capacity assessment terminal provided in an embodiment of the present invention.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair Embodiment in bright, the every other implementation that those of ordinary skill in the art are obtained without creative efforts Example, shall fall within the protection scope of the present invention.
It is a kind of flow chart of accumulator capacity appraisal procedure provided in an embodiment of the present invention referring to Fig. 1, Fig. 1, is applied to Accumulator capacity assesses terminal, as shown in Figure 1, the described method comprises the following steps:
Step 101, when monitor equipment have a power failure when, obtain the power off time of the equipment.
Above equipment can be the arbitrary equipment not only supported external power supply Alternating Current Power Supply but also supported accumulator direct current supply, example Such as:Communication base station, computer or server etc..It is to stop external power supply power supply that above equipment, which has a power failure, and the equipment is stopping It when externally fed, will be powered by its accumulator, wherein the accumulator is that rechargeable battery.
It is above-mentioned when monitoring that equipment has a power failure in the embodiment of the present invention, the power off time of the equipment is obtained, can be institute It states accumulator capacity assessment terminal and establishes communication connection with the equipment, therefore when the equipment has a power failure, the electric power storage Tankage assessment terminal can monitor the power failure of the equipment, and record the power off time of the equipment.
It is above-mentioned when monitor equipment have a power failure when, obtain the power off time of the equipment, can also be the accumulator capacity Terminal is assessed to establish through connection with monitoring device, and the monitoring device is connect with the equipment, for monitoring the equipment Operating status, to when the equipment has a power failure, the accumulator capacity, which assesses terminal, can pass through the monitoring device Monitor that the power failure of the equipment, the power off time of the above-mentioned acquisition equipment can be then to obtain the monitoring device note The time that the equipment of record has a power failure.
If step 102 monitors that the equipment meets any move back that preset at least two move back in the condition of clothes and takes item Part, it is determined that the equipment moves back clothes, and obtains the time out of service of the equipment.
The above-mentioned condition of clothes of moving back can be understood as determining that the equipment moves back the condition of clothes, wherein moves back clothes and is appreciated that To exit service.In the embodiment of the present invention, the accumulator capacity assessment terminal can preset at least two and move back the condition of clothes, For judging whether the equipment moves back clothes, such as:Can preset two move back the condition of clothes, three move back the condition of clothes or five Move back the condition of clothes etc..Usually, when equipment is when outage is moved back and taken, it is believed that the exhaustion of accumulator of equipment finishes.
Wherein, a condition of clothes of moving back that can be used for determining that the equipment moves back clothes can monitor that the equipment is sent out Clothes alarm is moved back, can also be to monitor that the equipment sends out load and disconnects alarm, can also be and monitor for monitoring described set Standby monitoring device is in off-line state etc., described at least two move back the condition of clothes then can be include at least two it is different can For determining that the equipment moved back clothes moves back the condition of clothes.
In the step, if monitor the equipment meet preset at least two move back in the condition of clothes any move back clothes Condition, you can determine that the equipment moves back clothes.
The time out of service of the above-mentioned acquisition equipment is to obtain the time that the equipment moves back clothes, and the equipment is sent out The raw time for moving back clothes is determined according to the condition that takes of moving back that the equipment meets.Specifically, described in often meeting in the equipment extremely Few two some moved back in the condition of clothes are moved back when taking condition, can be recorded the equipment and be met the time for moving back the condition of clothes, this Sample, when the equipment only meet preset at least two move back in the condition of clothes one move back take condition when, then can will be described Equipment meets this and moves back time out of service of the time of the condition of clothes as the equipment;When the equipment only meet it is preset At least two move back in the condition of clothes it is multiple move back when taking condition, then can be subject to that one of them moves back the condition of clothes, and by the equipment Meet the time out of service of the time for moving back the condition of clothes as the equipment.Such as:Item is taken with multiple move back that the equipment is met Accuracy is highest in part moves back subject to the condition of clothes, and what the equipment of being either subject to met at first moves back the condition of clothes also or with institute That states that equipment finally meets moves back subject to the condition of clothes.
In this way, moving back the condition of clothes by the way that setting is multiple, the mode that the battery discharging of the judgement equipment finishes can be made no longer It is single, when the equipment, which does not support some to move back, takes condition, also it can move back the condition of clothes by other and determine that the equipment is moved back Clothes, and then the equipment scope of application can be expanded.
Step 103 is based on the power off time and the time out of service, comments the accumulator capacity of the equipment Estimate.
It is getting the power off time of the equipment and after time out of service, the power off time and described can be based on Time out of service assesses the accumulator capacity of the equipment, that is, discharge test principle is based on, to the accumulator of the equipment Capacity is assessed.
Therefore, in the step, it can be based on the power off time and the time out of service, determine the accumulator of the equipment Continuation of the journey duration, and can be set described in assessment according to the accumulator obtained in advance in the average discharge current of outage Standby accumulator capacity.
It specifically, can be every the storage of the primary equipment of set time acquisition during the equipment is in and has a power failure The discharge current of battery obtains multiple discharge current sampled values;Then, being averaged for the accumulator is calculated according to sampled value to put Electric current, if the equipment be in have a power failure in a period of, fail to collect discharge current value, then can by record with it is described This time power off time is closest and is put as being averaged for this assessment for the average discharge current in same time period for equipment Electric current;Finally, the continuation of the journey duration of the determining accumulator can be multiplied by average discharge current, obtains the accumulator Capacity Assessment is as a result, can also be modified assessment result according to current environmental temperature, to obtain more accurate battery appearance Measure assessed value.
In the embodiment of the present invention, above-mentioned accumulator capacity assessment terminal can be any equipment with storaging medium, example Such as:Computer (Computer), mobile phone, tablet computer (Tablet Personal Computer) or laptop computer Terminal devices such as (Laptop Computer).
Accumulator capacity appraisal procedure in the present embodiment, when equipment has a power failure, can by it is preset extremely Few two move back in the condition of clothes it is any move back the condition of clothes to determine whether the equipment moves back clothes, and can be based on the equipment Power off time and time out of service assess the accumulator capacity of the equipment, are finished to battery discharging to extend Judgment mode, and then the equipment scope of application can be expanded.
It is the flow chart of another accumulator capacity appraisal procedure provided in an embodiment of the present invention, application referring to Fig. 2, Fig. 2 Terminal is assessed in accumulator capacity.On the basis of the present embodiment embodiment shown in Fig. 1, adds and determined the power off time The step of time interval of time away from equipment last time power failure, and the step of taking is moved back to the determination equipment and is carried out Refinement, occurs influence of the continuous power outage to accumulator capacity assessment result so that electric power storage pool capacity to eliminate equipment Amount assessment result has higher accuracy.As shown in Fig. 2, the described method comprises the following steps:
Step 201, when monitor equipment have a power failure when, obtain the power off time of the equipment.
The specific implementation mode of the step may refer to the embodiment of step 101 in embodiment of the method shown in FIG. 1, and Identical advantageous effect can be reached, to avoid repeating, which is not described herein again.
Step 202, the time interval for determining the time that the power off time had a power failure away from the equipment last time.
If step 203, the time interval are more than prefixed time interval, and it is preset to monitor that the equipment meets At least two move back in the condition of clothes any move back the condition of clothes, it is determined that the equipment moves back clothes, and obtain the equipment moves back clothes Time.
In the present embodiment, when monitoring that the equipment has a power failure, the time that the equipment this time has a power failure can also be first determined Time interval away from the time that the last time has a power failure, to judge whether the time interval is more than prefixed time interval, and described In the case that time interval is more than prefixed time interval, just the accumulator capacity of the equipment is assessed, and when described Between interval be less than or equal to prefixed time interval in the case of, the accumulator capacity of the equipment can not be assessed, with It avoids in the case of the electricity underfill of the accumulator, obtaining the not high Cell Evaluation capacity of accuracy.
Wherein, the prefixed time interval can according to the accumulator under certain charging voltage needed for charging time into Row setting, such as:Charging time needed for the accumulator of communication base station is 12 hours, therefore institute's prefixed time interval can be 12 small When.
Can just record and preserve the equipment when monitoring that the equipment has a power failure every time in the present embodiment Power off time, in this way, when monitoring that the equipment has a power failure, can find that the equipment last time has a power failure when Between, so as to calculate the time interval for the time that the equipment last time has a power failure described in the time interval that the equipment this time has a power failure.
Optionally, described at least two move back the condition of clothes including first move back the condition of clothes, second move back the condition of clothes, third moves back and takes item Part, the 4th move back the condition of clothes and the 5th move back in the condition of clothes at least two, wherein:
Described first move back the condition of clothes be the equipment send out move back clothes alarm;
Described second moves back the condition of clothes sends out load disconnection alarm for the equipment;
It is that the monitoring device being connect with the equipment is in off-line state that the third, which moves back the condition of clothes,;
Described 4th voltage for moving back the accumulator that the condition of clothes is the equipment drops to voltage threshold;
Described 5th decrease speed for moving back the electric current for the accumulator that the condition of clothes is the equipment is more than predetermined threshold value, and described The electric current of accumulator drops to current threshold.
In the embodiment, described at least two can be preset move back the condition of clothes and move back the condition of clothes including first, second move back Take condition, third moves back the condition of clothes, the 4th move back the condition of clothes and the 5th move back in the condition of clothes at least two.
Wherein, described first move back the condition of clothes be the equipment send out move back clothes alarm, such as:Have in the equipment and moves back clothes announcement In the case of alert function, the equipment move back take when, terminal transmission will be assessed to the accumulator capacity move back clothes and alert, or Clothes alarm is moved back to the monitoring device transmission being connect with the equipment, then clothes alarm will be moved back by the monitoring device and be sent to the storage Battery capacity assessment terminal.In this way, when the equipment sends out and moves back clothes alarm, it may be determined that the equipment moves back clothes.
Described second moves back the condition of clothes sends out load disconnection alarm for the equipment, such as:It is moved back though not having in the equipment Take alarm function, but have load disconnect alarm function in the case of, if the equipment because move back clothes due to cause load disconnect, institute Load disconnection alarm will be sent to the monitoring device being connect with the equipment by stating equipment, and the monitoring device again disconnects load Alarm is sent to the accumulator capacity assessment terminal.In this way, when the equipment sends out load and disconnects alarm, it is believed that institute The accumulator for stating equipment has stopped powering to the equipment, only powers to the monitoring device, also therefore can determine the equipment Move back clothes.
The third moves back the condition of clothes and is that the monitoring device being connect with the equipment is in off-line state, such as:It is set described In the case of not having any alarm function, if monitoring, the monitoring device being connect with the equipment is in off-line state, It is considered that the accumulator of the equipment has stopped powering to the equipment and the monitoring device.Therefore, when the accumulator When Capacity Assessment terminal monitoring is in off-line state to the monitoring device, it may be determined that the equipment moves back clothes.
Described 4th voltage for moving back the accumulator that the condition of clothes is the equipment drops to voltage threshold, such as:Described Equipment does not have any alarm function and in the case that the monitoring device is offline, if monitoring, the voltage of the accumulator is held Continuous to drop to voltage threshold, then it is believed that the accumulator of the equipment has been powered to the limit, the accumulator should stop at this time It powers to the equipment, wherein the voltage threshold can be understood as the minimum voltage value needed for the equipment normal work, If the operating voltage threshold value of communication base station is 46V.Therefore, when monitoring that the voltage of the accumulator drops to voltage threshold When, it is believed that the battery discharging finishes, and determines that the equipment moves back clothes.
Described 5th decrease speed for moving back the electric current for the accumulator that the condition of clothes is the equipment is more than predetermined threshold value, and described The electric current of accumulator drops to current threshold, wherein the decrease speed of the electric current of the accumulator is more than predetermined threshold value can be with The electric current for being interpreted as the accumulator at a time occurs to drop suddenly, and electric current decrease speed is more than the equipment in normal work shape Current variation speeds under state, the current threshold can be regarded as the threshold of the equipment in normal operation The current threshold of value, usual communication base station is 10A.Such as:Do not have any alarm function and the monitoring in the equipment In the case that equipment is not offline, if monitoring, the electric current of the accumulator at a time drops to threshold from 12A suddenly Value 10A, it may be considered that the accumulator should stop powering to the equipment.Therefore, when the electric current for monitoring the accumulator Decrease speed be more than predetermined threshold value, and when the electric current of the accumulator drops to current threshold, it is believed that the electric power storage Tank discharge finishes, and determines that the equipment moves back clothes.
In this way, in the embodiment, moves back the condition of clothes and move back the condition of clothes including first, second move back and take item due to described at least two Part, third move back the condition of clothes, the 4th move back the condition of clothes and the 5th move back in the condition of clothes at least two, therefore, clothes are moved back by any of the above-described Condition can relatively accurately determine the equipment there is a situation where moving back to take, to not only expand the equipment scope of application, also It can guarantee that the Capacity Assessment result of the accumulator has higher accuracy.
Certainly, which is equally applicable in embodiment shown in FIG. 1, and can reach identical advantageous effect.
Optionally, the time out of service for obtaining the equipment, including:
When the quantity for moving back the condition of clothes that the equipment is met is more than 2, each of is met according to the equipment and move back clothes The priority of condition, determine that the equipment met move back highest priority in the condition of clothes move back the condition of clothes;
The time for moving back the condition of clothes that the equipment is met to the highest priority is determined as the time out of service of the equipment.
The embodiment can be according to the equipment institute when the quantity for moving back the condition of clothes that the equipment is met is more than 2 Each of satisfaction moves back the priority of the condition of clothes, determines the time out of service of the equipment.Specifically, described in can presetting at least Two are moved back the priority that the condition of clothes is each moved back in the condition of clothes, and item is taken when the equipment meets two or more and move back simultaneously in outage When part, the priority for moving back the condition of clothes each of can be met according to the equipment, determines that wherein moving back for highest priority takes item Part, and the time for moving back the condition of clothes that the equipment is met to this highest priority be determined as the time out of service of the equipment.Wherein, Respectively moving back the priority level initializing rule of the condition of clothes can set according to error minimum principle, i.e., will most can determine that the equipment is moved back The condition of clothes of moving back of clothes is set as highest priority, and the lower condition of clothes of moving back of relatively accurate rate is set as lower priority.
Such as:It moves back the condition of clothes and described second if the equipment meets described first and moves back the condition of clothes, and described first moves back clothes Therefore the equipment can be met described first and move back clothes by the priority of condition higher than the described second priority for moving back the condition of clothes The time of condition is determined as the time out of service of the equipment.
It, can be in the case where the quantity for moving back the condition of clothes that the equipment is met is more than 2 in this way, in the embodiment Determine that the equipment met move back highest priority in the condition of clothes move back the condition of clothes, and the equipment is met into the priority The highest time for moving back the condition of clothes is determined as the time out of service of the equipment, and described set is quickly determined so as to more convenient Standby time out of service, and also ensure that identified time out of service has higher accuracy.
Optionally, described first move back the condition of clothes, described second move back the condition of clothes, the third moves back the condition of clothes, the described 4th moves back It takes condition and the 5th priority for moving back the condition of clothes is successively decreased successively.
In the embodiment, due to determining the equipment moving back the condition of clothes using described first and move back the condition of clothes to the described 5th Whether move back when taking, described first moves back the accuracy of judgement degree that the condition of clothes moves back the condition of clothes to the described 5th reduces successively, therefore, can With set described first move back the condition of clothes, described second move back the condition of clothes, the third moves back the condition of clothes, the described 4th moves back the condition of clothes and institute It states the priority that the 5th moves back the condition of clothes successively to successively decrease, to ensure the accuracy of the time out of service of the equipment to the full extent.
When obtaining the time out of service of the equipment, can come true according to the priority orders set in the embodiment The time out of service of the fixed equipment.The embodiment is specifically described with a citing below:
As shown in figure 3, when monitoring that equipment has a power failure, it can first judge this power off time of the equipment away from the last time Whether the time interval of power off time is more than prefixed time interval;If the time interval is less than or equal to prefixed time interval, Then terminate flow;If the time interval is more than prefixed time interval, flow is judged into clothes are moved back.
Specifically, it can first judge whether the equipment meets first and move back the condition of clothes, if the equipment, which meets first, moves back clothes Condition then met for the described first time for moving back the condition of clothes based on the equipment, assesses the accumulator capacity of the equipment, Obtain accumulator capacity assessment result;If the equipment is unsatisfactory for first and moves back the condition of clothes, continue to judge whether the equipment is full Foot second moves back the condition of clothes.
If the equipment, which meets described second, moves back the condition of clothes, based on the equipment meet described second move back the condition of clothes when Between, the accumulator capacity of the equipment is assessed, accumulator capacity assessment result is obtained;If the equipment is unsatisfactory for described Second moves back the condition of clothes, then continues to judge whether the equipment meets third and move back the condition of clothes.
If the equipment, which meets the third, moves back the condition of clothes, based on the equipment meet the third move back the condition of clothes when Between, the accumulator capacity of the equipment is assessed, accumulator capacity assessment result is obtained;If the equipment is unsatisfactory for described Third moves back the condition of clothes, then continues to judge whether the equipment meets the 4th and move back the condition of clothes.
If the equipment, which meets the described 4th, moves back the condition of clothes, based on the equipment meet the described 4th move back the condition of clothes when Between, the accumulator capacity of the equipment is assessed, accumulator capacity assessment result is obtained;If the equipment is unsatisfactory for described 4th moves back the condition of clothes, then continues to judge whether the equipment meets the 5th and move back the condition of clothes.
If the equipment, which meets the described 5th, moves back the condition of clothes, based on the equipment meet the described 5th move back the condition of clothes when Between, the accumulator capacity of the equipment is assessed, accumulator capacity assessment result is obtained;If the equipment is unsatisfactory for described 5th moves back the condition of clothes, then can export alerting signal, to prompt accumulator capacity that can not assess, and terminates flow.
In this way, in the embodiment, the priority that the condition of clothes moves back the condition of clothes to the described 5th is moved back by setting described first Successively decrease successively, can ensure the accuracy of the time out of service of the equipment to the full extent, and then ensure the electric power storage of the equipment Tankage assessment result has high accuracy.
Step 204 is based on the power off time and the time out of service, comments the accumulator capacity of the equipment Estimate.
The specific implementation mode of the step may refer to the embodiment of step 101 in embodiment of the method shown in FIG. 1, and Identical advantageous effect can be reached, to avoid repeating, which is not described herein again.
In the present embodiment, on the basis of embodiment shown in Fig. 1, adds and determined the power off time away from the equipment The step of time interval for the time that last time has a power failure, and the step of taking is moved back to the determination equipment and is refined, from And eliminate equipment and influence of the continuous power outage to accumulator capacity assessment result occurs so that accumulator capacity assessment result Has higher accuracy.In addition, also adding the implementation of plurality of optional on the basis of the present embodiment embodiment shown in Fig. 1 Mode, these optional embodiments can be combined with each other realization, can also be implemented separately, and are attained by and expand equipment and be applicable in The technique effect of range.
It is the structural schematic diagram that a kind of accumulator capacity provided in an embodiment of the present invention assesses terminal referring to Fig. 4, Fig. 4, such as Shown in Fig. 4, accumulator capacity assessment terminal 400 includes:
Acquisition module 401, for when monitoring that equipment has a power failure, obtaining the power off time of the equipment;
First determining module 402, if being moved back in the condition of clothes for monitoring that the equipment meets preset at least two Any move back the condition of clothes, it is determined that the equipment moves back clothes, and obtains the time out of service of the equipment;
Evaluation module 403, for being based on the power off time and the time out of service, to the accumulator capacity of the equipment It is assessed.
Optionally, as shown in figure 5, accumulator capacity assessment terminal 400 further includes:
Second determining module 404, the time for the time having a power failure away from the equipment last time for determining the power off time Interval;
If first determining module 402 is more than prefixed time interval for the time interval, and monitors described set It is standby meet preset at least two move back in the condition of clothes any move back the condition of clothes, it is determined that the equipment moves back clothes.
Optionally, described at least two move back the condition of clothes including first move back the condition of clothes, second move back the condition of clothes, third moves back and takes item Part, the 4th move back the condition of clothes and the 5th move back in the condition of clothes at least two, wherein:
Described first move back the condition of clothes be the equipment send out move back clothes alarm;
Described second moves back the condition of clothes sends out load disconnection alarm for the equipment;
It is that the monitoring device being connect with the equipment is in off-line state that the third, which moves back the condition of clothes,;
Described 4th voltage for moving back the accumulator that the condition of clothes is the equipment drops to voltage threshold;
Described 5th decrease speed for moving back the electric current for the accumulator that the condition of clothes is the equipment is more than predetermined threshold value, and described The electric current of accumulator drops to current threshold.
Optionally, as shown in fig. 6, first determining module 402 includes:
First determination unit 4021, when the quantity for moving back the condition of clothes for being met when the equipment is more than 2, according to described Equipment each of is met the priority for moving back the condition of clothes, and determine that the equipment met moves back moving back for highest priority in the condition of clothes Take condition;
Second determination unit 4022, the time for moving back the condition of clothes for the equipment to be met to the highest priority determine For the time out of service of the equipment.
Optionally, described first move back the condition of clothes, described second move back the condition of clothes, the third moves back the condition of clothes, the described 4th moves back It takes condition and the 5th priority for moving back the condition of clothes is successively decreased successively.
Accumulator capacity assessment terminal 400 can realize each process in the embodiment of the method for Fig. 1 to Fig. 3, to avoid It repeats, which is not described herein again.The accumulator capacity assessment terminal 400 of the embodiment of the present invention can be when equipment has a power failure, can With by preset at least two move back in the condition of clothes it is any move back the condition of clothes and determine whether the equipment moves back clothes, and Power off time that can be based on the equipment and time out of service, the accumulator capacity of the equipment is assessed, to extend The judgment mode that battery discharging is finished, and then can expand the equipment scope of application.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that process, method, article or device including a series of elements include not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this There is also other identical elements in the process of element, method, article or device.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art Going out the part of contribution can be expressed in the form of software products, which is stored in a storage medium In (such as ROM/RAM, magnetic disc, CD), including some instructions are used so that a station terminal (can be mobile phone, computer, service Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited in above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form belongs within the protection of the present invention.

Claims (10)

1. a kind of accumulator capacity appraisal procedure, which is characterized in that be applied to accumulator capacity and assess terminal, the method packet It includes:
When monitoring that equipment has a power failure, the power off time of the equipment is obtained;
If monitor the equipment meet preset at least two move back in the condition of clothes any move back the condition of clothes, it is determined that it is described Equipment moves back clothes, and obtains the time out of service of the equipment;
Based on the power off time and the time out of service, the accumulator capacity of the equipment is assessed.
If 2. according to the method described in claim 1, it is characterized in that, it is described monitor the equipment meet it is preset extremely Few two move back in the condition of clothes any move back the condition of clothes, it is determined that before the equipment moves back clothes, the method further includes:
Determine the time interval for the time that the power off time had a power failure away from the equipment last time;
If it is described monitor the equipment meet preset at least two move back in the condition of clothes any move back the condition of clothes, it is determined that The equipment moves back clothes, including:
If the time interval is more than prefixed time interval, and monitors that the equipment meets preset at least two and moves back clothes Any in condition moves back the condition of clothes, it is determined that the equipment moves back clothes.
3. method according to claim 1 or 2, which is characterized in that described at least two move back the condition of clothes moves back clothes including first Condition, second move back the condition of clothes, third moves back the condition of clothes, the 4th move back the condition of clothes and the 5th move back in the condition of clothes at least two, wherein:
Described first move back the condition of clothes be the equipment send out move back clothes alarm;
Described second moves back the condition of clothes sends out load disconnection alarm for the equipment;
It is that the monitoring device being connect with the equipment is in off-line state that the third, which moves back the condition of clothes,;
Described 4th voltage for moving back the accumulator that the condition of clothes is the equipment drops to voltage threshold;
Described 5th decrease speed for moving back the electric current for the accumulator that the condition of clothes is the equipment is more than predetermined threshold value, and the electric power storage The electric current in pond drops to current threshold.
4. according to the method described in claim 3, it is characterized in that, the time out of service for obtaining the equipment, including:
When the quantity for moving back the condition of clothes that the equipment is met is more than 2, each of is met according to the equipment and move back the condition of clothes Priority, determine that the equipment met move back highest priority in the condition of clothes move back the condition of clothes;
The time for moving back the condition of clothes that the equipment is met to the highest priority is determined as the time out of service of the equipment.
5. according to the method described in claim 4, it is characterized in that, described first moves back the condition of clothes, described second moves back the condition of clothes, institute Third is stated to move back the condition of clothes, the described 4th move back the condition of clothes and the 5th priority for moving back the condition of clothes is successively decreased successively.
6. a kind of accumulator capacity assesses terminal, which is characterized in that including:
Acquisition module, for when monitoring that equipment has a power failure, obtaining the power off time of the equipment;
First determining module, if for monitor the equipment meet preset at least two move back in the condition of clothes any move back Take condition, it is determined that the equipment moves back clothes, and obtains the time out of service of the equipment;
Evaluation module comments the accumulator capacity of the equipment for being based on the power off time and the time out of service Estimate.
7. accumulator capacity according to claim 6 assesses terminal, which is characterized in that the accumulator capacity assesses terminal Further include:
Second determining module, the time interval for the time having a power failure away from the equipment last time for determining the power off time;
If first determining module is more than prefixed time interval for the time interval, and it is pre- to monitor that the equipment meets What at least two first set moved back in the condition of clothes any moves back the condition of clothes, it is determined that the equipment moves back clothes.
8. accumulator capacity described according to claim 6 or 7 assesses terminal, which is characterized in that described at least two move back and take item Part include first move back the condition of clothes, second move back the condition of clothes, third moves back the condition of clothes, the 4th moves back the condition of clothes and the 5th and move back in the condition of clothes extremely It is two few, wherein:
Described first move back the condition of clothes be the equipment send out move back clothes alarm;
Described second moves back the condition of clothes sends out load disconnection alarm for the equipment;
It is that the monitoring device being connect with the equipment is in off-line state that the third, which moves back the condition of clothes,;
Described 4th voltage for moving back the accumulator that the condition of clothes is the equipment drops to voltage threshold;
Described 5th decrease speed for moving back the electric current for the accumulator that the condition of clothes is the equipment is more than predetermined threshold value, and the electric power storage The electric current in pond drops to current threshold.
9. accumulator capacity according to claim 8 assesses terminal, which is characterized in that first determining module includes:
First determination unit expires when the quantity for moving back the condition of clothes for being met when the equipment is more than 2 according to the equipment Each of foot moves back the priority of the condition of clothes, determine that the equipment met move back highest priority in the condition of clothes move back the condition of clothes;
Second determination unit, the time for moving back the condition of clothes for the equipment to be met to the highest priority are determined as described set Standby time out of service.
10. accumulator capacity according to claim 9 assesses terminal, which is characterized in that described first moves back the condition of clothes, described Second moves back the condition of clothes, the third moves back the condition of clothes, the described 4th moves back the condition of clothes and the described 5th and move back the priority of the condition of clothes successively Successively decrease.
CN201810516789.4A 2018-05-25 2018-05-25 Storage battery capacity evaluation method and terminal Active CN108646193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810516789.4A CN108646193B (en) 2018-05-25 2018-05-25 Storage battery capacity evaluation method and terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810516789.4A CN108646193B (en) 2018-05-25 2018-05-25 Storage battery capacity evaluation method and terminal

Publications (2)

Publication Number Publication Date
CN108646193A true CN108646193A (en) 2018-10-12
CN108646193B CN108646193B (en) 2021-04-20

Family

ID=63758269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810516789.4A Active CN108646193B (en) 2018-05-25 2018-05-25 Storage battery capacity evaluation method and terminal

Country Status (1)

Country Link
CN (1) CN108646193B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116634473A (en) * 2023-07-21 2023-08-22 中国铁塔股份有限公司云南省分公司 Method and device for predicting failure of power failure and service withdrawal of wireless station

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201373910Y (en) * 2009-01-09 2009-12-30 方有仁 Accumulator capacity detecting device of mobile communication base station
CN101742541A (en) * 2008-11-13 2010-06-16 ***通信集团河北有限公司 Early warning method and system of base station service quit
CN106785124A (en) * 2017-01-24 2017-05-31 深圳企管加企业服务有限公司 battery internet of things monitoring method and system
CN107465531A (en) * 2016-06-03 2017-12-12 ***通信集团安徽有限公司 Power generation dispatching method and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101742541A (en) * 2008-11-13 2010-06-16 ***通信集团河北有限公司 Early warning method and system of base station service quit
CN201373910Y (en) * 2009-01-09 2009-12-30 方有仁 Accumulator capacity detecting device of mobile communication base station
CN107465531A (en) * 2016-06-03 2017-12-12 ***通信集团安徽有限公司 Power generation dispatching method and device
CN106785124A (en) * 2017-01-24 2017-05-31 深圳企管加企业服务有限公司 battery internet of things monitoring method and system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116634473A (en) * 2023-07-21 2023-08-22 中国铁塔股份有限公司云南省分公司 Method and device for predicting failure of power failure and service withdrawal of wireless station
CN116634473B (en) * 2023-07-21 2023-10-10 中国铁塔股份有限公司云南省分公司 Method and device for predicting failure of power failure and service withdrawal of wireless station

Also Published As

Publication number Publication date
CN108646193B (en) 2021-04-20

Similar Documents

Publication Publication Date Title
CN110062978B (en) Adapter, terminal equipment, battery safety monitoring method and monitoring system thereof
JP5924346B2 (en) Battery status monitoring system
EP1994452B1 (en) System and methods for a self-healing grid using demand side management techniques and energy storage
EP2629387A1 (en) Power management system
US20120194130A1 (en) Power pack partial failure detection and remedial charging control
CN110908360B (en) Communication power supply monitoring system and high-frequency switching power supply charging module self-checking method
CN109581122A (en) Method, device and system for detecting abnormal awakening of vehicle
CN111277008A (en) Storage battery online monitoring method and device, equipment, system and storage medium thereof
JP2018518142A (en) Battery pack charge control apparatus and method
CN112737043A (en) Power supply energy storage system, and control method and device of power supply energy storage system
CN106936172A (en) A kind of intelligent charger and its control method and control device
JPWO2014076839A1 (en) Storage battery voltage leveling device and storage battery state monitoring system
KR101291287B1 (en) Equipped with a spare battery for the maintenance of UPS Systems
CN109167108A (en) Tappered rating in battery management system limits guard method
CN108646193A (en) A kind of accumulator capacity appraisal procedure and terminal
CN105449299B (en) A kind of long-range charging/discharging thereof of battery based on float charge voltage
CN109782178A (en) A kind of battery core Rong Fangfa and core capacitance device
CN115356653A (en) Emergency power supply state monitoring method
CN210894564U (en) Direct current looped netowrk on-line monitoring system
CN210894563U (en) Direct current looped netowrk on-line monitoring system
CN109301890B (en) Voltage balancing method and system for storage battery pack of direct current system
CN208890458U (en) A kind of control system of energy accumulation current converter
JPWO2014027462A1 (en) Energy management device and control method of energy management device
CN218996821U (en) Battery core capacity system
JP2000067933A (en) Method and device for discriminating residual lifetime of lead-acid storage battery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant