CN201366435Y CNU2009200694322U CN200920069432U CN201366435Y CN 201366435 Y CN201366435 Y CN 201366435Y CN U2009200694322 U CNU2009200694322 U CN U2009200694322U CN 200920069432 U CN200920069432 U CN 200920069432U CN 201366435 Y CN201366435 Y CN 201366435Y
Authority
CN
China
Prior art keywords
coil
strip
dolly
equipment
strip dolly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200694322U
Other languages
Chinese (zh)
Inventor
徐从保
程良键
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Engineering and Technology Group Co Ltd
Original Assignee
Shanghai Baogang Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baogang Engineering Technology Co Ltd filed Critical Shanghai Baogang Engineering Technology Co Ltd
Priority to CNU2009200694322U priority Critical patent/CN201366435Y/en
Application granted granted Critical
Publication of CN201366435Y publication Critical patent/CN201366435Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Winding, Rewinding, Material Storage Devices (AREA)

Abstract

The utility model relates to combined coiling equipment for a steel coil trolley, which comprises more than two steel coil trolleys, more than two ground carrier rollers, a band binding and unbinding manipulator, a pinch roll, a hydraulic shearing machine, and two rotary tables. The steel coil trolleys covey the steel coils on a saddle in a crossing manner; the band binding and unbinding manipulator, the pinch roll and the hydraulic shearing machine are sequentially arranged above the ground carrier rollers and implement the binding and the unbinding of bands; and the two rotary tables are respectively arranged at the tail part of the device, wherein a first decoiling unit is mounted above a first rotary table and a second decoiling unit is mounted above a second decoiling unit. The combined coiling equipment is used for coiling processed lines of hot rolling strip steels, can fully replace the walking-beam conveyor, realizes the transportation and the deflection rectification of steel coils, binds and unbinds bands, completes the preprocessing of the head parts of the strip steels, and achieves high-speed and high-output production. The combined coiling equipment has the advantages of simple structure, flexible control and convenient maintenance.

Description

Volume equipment is gone up in the combination of coil of strip dolly
Technical field
The utility model relates to metallurgical manufacturing industry, relates to being used for the volume of going up that the continous way hot-strip is handled line, relates in particular to a kind ofly to have the coil of strip dolly combination of tearing tie and band steel toe portion preprocessing function open and go up volume equipment.
Background technology
At present, the continous way band process for producing line of known high yield generally all is provided with two uncoilers, its objective is the downtime that reduces entrance, improves output.Every uncoiler is furnished with usually on the platform and rolls up dolly, on roll up dolly and get volume from transitional facility.These transitional facilities can be step rate conveyer, transfer ear, panoramic table, saddle etc., and the configuration of these equipment is diversified in actual applications.In order to roll up and tear open tie on the multireel position, in the equipment configuration commonly used step rate conveyer 16 is arranged, Fig. 1 has represented upward volume equipment of conventional step rate combination.Other label among Fig. 1: 9 is the 3rd coil of strip dolly, and 12 is the 4th coil of strip dolly, and 13 is the 5th coil of strip dolly, and 14 is first uncoiler, and 15 is second uncoiler, and 17 is the coil of strip centralising device.Though the step rate conveyer has its advantage, the equipment structure is complicated, and weight of equipment is big, and Equipment Foundations are also darker, and cost of investment is big, maintenance difficult.
The utility model content
In order to overcome the above-mentioned shortcoming of existing step rate conveyer, particularly in order to reduce investment outlay significantly, task of the present utility model provides a kind of multi-functional coil of strip dolly combination and goes up volume equipment, to replace existing step rate conveyer, problems such as complex structure, the weight that has solved the step rate conveyer is big, Equipment Foundations are dark and investment is big, maintenance difficult.
Technical solution of the present utility model is as follows:
Volume equipment is gone up in a kind of coil of strip dolly combination, and it comprises the coil of strip dolly, it is characterized in that, it also comprises two with the upper ground surface carrying roller, tears the tie manipulator open for one, a pinch roll, a hydraulic shear, and two panoramic tables;
Described coil of strip dolly is two above coil of strip dollies, and the coil of strip dolly is crossed and striden the coil of strip of carrying on the saddle, tears tie manipulator, pinch roll and hydraulic shear open and is placed in the top of ground carrying roller respectively and implements to tear open tie;
Described two panoramic tables are placed in the rear portion of equipment respectively, and first uncoiler is housed above first panoramic table, and second uncoiler is housed above second panoramic table.
The utility model is taked following further technical measures:
The coil of strip dolly is housed on described first panoramic table reaches upward volume with width and height centering to coil of strip.
The coil of strip dolly is housed on described second panoramic table reaches upward volume with width and height centering to coil of strip.
Coil of strip dolly combination of the present utility model is gone up volume equipment and is used for the volume of going up that the continous way hot-strip is handled line, can replace the step rate conveyer fully, the transportation of realization coil of strip and coil of strip correction, the preliminary treatment of tearing tie open and finishing band steel toe portion, realize fast pace, the high yield of production, and saved investment significantly.
The beneficial effect that volume equipment is gone up in coil of strip dolly combination of the present utility model is: have the preprocessing function of tearing tie and band steel toe portion open, can realize fast pace, the high yield of producing; Reduced weight of equipment significantly, adopted two coil of strip dollies to replace the step rate conveyer, made the mean depth of foundation of civil work reduce half simultaneously; Travelling speed is fast, and off-position is accurate, saves the mechanical coil of strip centralising device of a cover; Simple in equipment, control flexibly, and is easy to maintenance.
Description of drawings
Below in conjunction with accompanying drawing the utility model is elaborated.
Fig. 1 is the structural representation elevation that volume equipment is gone up in conventional step rate combination.
Fig. 2 is the structural representation that volume equipment is gone up in a kind of coil of strip dolly combination of the present utility model.
Fig. 3 is the A-A cutaway view among Fig. 2.
Fig. 4 is the enlarged diagram of the previous section structure of Fig. 3 equipment.
Fig. 5 is the enlarged diagram of the aft section structure of Fig. 3 equipment.
Fig. 6 is that the profile of tie work is torn in the demonstration of Fig. 3 equipment open.
Fig. 7 is that Fig. 3 equipment indicating strip head carries out pretreated profile.
Fig. 8 is the facade structures schematic diagram of coil of strip dolly.
Label in the accompanying drawing:
1 is saddle, and 2 is the first coil of strip dolly, and 3 for tearing the tie manipulator open, 4 is pinch roll, and 5 is hydraulic shear, and 6 is the first ground carrying roller, 7 is the second coil of strip dolly, and 8 is the second ground carrying roller, and 9 is the 3rd coil of strip dolly, 10 is first panoramic table, and 11 is second panoramic table, and 12 is the 4th coil of strip dolly, 13 is the 5th coil of strip dolly, and 14 is first uncoiler, and 15 is second uncoiler, 16 is the step rate conveyer, and 17 is the coil of strip centralising device.
The specific embodiment
Referring to Fig. 2 to Fig. 8, the utility model is that volume equipment is gone up in the combination of a kind of coil of strip dolly, mainly by the first coil of strip dolly 2, the second coil of strip dolly 7, the 3rd coil of strip dolly 9, the 4th coil of strip dolly 12, the 5th coil of strip dolly 13, the first ground carrying roller 6, the second ground carrying roller 8, one tear tie manipulator 3, pinch roll 4, hydraulic shear 5 and first panoramic table 10 open and second panoramic table 11 is formed.Fig. 8 amplifies the structure that has shown the coil of strip dolly.
Tear tie manipulator 3, pinch roll 4 and hydraulic shear 5 open and be placed in the top of the first ground carrying roller 6, the second ground carrying roller 8 respectively, the first coil of strip dolly 2 is crossed the coil of strip on the saddle 1 to stride and is delivered to the first ground carrying roller 6, tear tie (as shown in Figure 6) open at this, be transported to of the preliminary treatment (as shown in Figure 7) of the second ground carrying roller 8 by the second coil of strip dolly 7 then with steel toe portion.
First panoramic table 10 and second panoramic table 11 are placed in the rear portion of equipment respectively, and first uncoiler 14 is housed above first panoramic table 10, and second uncoiler 15 is housed above second panoramic table 11.
Above first panoramic table 10 and be positioned at first uncoiler 14 below the 4th coil of strip dolly 12 is installed, with to the width and the height centering of coil of strip and go up volume.Above second panoramic table 11 and be positioned at second uncoiler 15 below the 5th coil of strip dolly 13 is installed, with to the width and the height centering of coil of strip and go up volume.
The utility model adopts the i.e. longer distance transportation of the first coil of strip dolly, 2 realization coil of strips of a coil of strip dolly; Adopt a coil of strip dolly promptly the second coil of strip dolly 7, two tread carrying rollers promptly the first ground carrying roller 6 and the second ground carrying roller 8, one tear tie manipulator 3, pinch roll 4, the preliminary treatment that realization such as hydraulic shear 5 are torn tie open and are with steel toe portion open; Adopt three coil of strip dollies i.e. the 3rd coil of strip dolly 9, the 4th coil of strip dolly 12 and the 5th coil of strip dolly 13, and two panoramic tables are that first panoramic table 10 and second panoramic table 11 realize that the postorder of coil of strips transports, distributes and load onto uncoiler.
Coil of strip after the first coil of strip dolly 2 will be handled is delivered to first panoramic table 10 or second panoramic table 11 by the 3rd coil of strip dolly 9, coil of strip is carried out the width and the height centering of coil of strip and is gone up volume by the 4th coil of strip dolly 12 and the 5th coil of strip dolly 13 respectively again through the panoramic table half-twist.
Certainly, those skilled in the art in the present technique field will be appreciated that, the foregoing description only is to be used for illustrating the utility model, and be not with opposing qualification of the present utility model, as long as in connotation scope of the present utility model, all will drop in the scope of the utility model claim conversion, the modification of the foregoing description.

Claims (3)

1. volume equipment is gone up in a coil of strip dolly combination, and it comprises the coil of strip dolly, it is characterized in that, it also comprises two with the upper ground surface carrying roller, tears the tie manipulator open for one, a pinch roll, a hydraulic shear, and two panoramic tables;
Described coil of strip dolly is two above coil of strip dollies, and the coil of strip dolly is crossed and striden the coil of strip of carrying on the saddle, tears tie manipulator, pinch roll and hydraulic shear open and is placed in the top of ground carrying roller respectively and implements to tear open tie;
Described two panoramic tables are placed in the rear portion of equipment respectively, and first uncoiler is housed above first panoramic table, and second uncoiler is housed above second panoramic table.
2. coil of strip dolly according to claim 1 makes up goes up volume equipment, it is characterized in that, the coil of strip dolly is housed on described first panoramic table reaches upward volume with width and height centering to coil of strip.
3. coil of strip dolly according to claim 1 makes up goes up volume equipment, it is characterized in that, the coil of strip dolly is housed on described second panoramic table reaches upward volume with width and height centering to coil of strip.
CNU2009200694322U 2009-03-26 2009-03-26 Combined coiling equipment for steel coil trolley Expired - Fee Related CN201366435Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200694322U CN201366435Y (en) 2009-03-26 2009-03-26 Combined coiling equipment for steel coil trolley

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200694322U CN201366435Y (en) 2009-03-26 2009-03-26 Combined coiling equipment for steel coil trolley

Publications (1)

Publication Number Publication Date
CN201366435Y true CN201366435Y (en) 2009-12-23

Family

ID=41485336

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200694322U Expired - Fee Related CN201366435Y (en) 2009-03-26 2009-03-26 Combined coiling equipment for steel coil trolley

Country Status (1)

Country Link
CN (1) CN201366435Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102992023A (en) * 2012-11-30 2013-03-27 中冶南方工程技术有限公司 Rotary lifting roller way
CN112678291A (en) * 2020-12-30 2021-04-20 阳江宏旺实业有限公司 Steel coil saddle, steel coil bale breaking device and using method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102992023A (en) * 2012-11-30 2013-03-27 中冶南方工程技术有限公司 Rotary lifting roller way
CN112678291A (en) * 2020-12-30 2021-04-20 阳江宏旺实业有限公司 Steel coil saddle, steel coil bale breaking device and using method thereof

Similar Documents

Publication Publication Date Title
CN203725524U (en) Ultra-high-speed roll steel bar production line
CN204817966U (en) Knockout mechanism is sent to rectangular bloom conticaster heat
CN105290110B (en) Chill strip compound straightening machine
CN201111501Y (en) Floating type board-belt steering clamp feeding device
CN202933987U (en) Processing device for reinforcing ribs for wallboard and door panel of elevator car
CN103084431A (en) Steel coil material loading trolley
CN108273856B (en) Hydraulic stepping square billet feeding device with automatic steel dividing function
CN201366435Y (en) Combined coiling equipment for steel coil trolley
CN201367241Y (en) Steel-coil walking-beam conveyor
CN101885013A (en) Multistation automatic upper sleeve system
CN201720276U (en) Multi-station automatic sleeve installing device
CN102114503B (en) Rotating mechanism for tubes and bars on horizontal straightening machine
CN202411151U (en) High-speed cold rolling and rewinding production line with straightening machine
CN201428113Y (en) Rear hanging bracket propulsive trolley of downgoing moving die carrier
CN101633001A (en) Roll-changing machine and roll-changing method therefor
CN203409030U (en) Steel coil loading trolley
CN203900152U (en) Packing paper device for producing cold-rolled steel coil
CN202766136U (en) Crane with good stability
CN103056196A (en) Steel coil car
CN202316636U (en) Auxiliary strip threading device of pickling line winding machine
CN202192240U (en) Independent rack clamp type withdrawal and straightening unit with upper and lower roller dual drive function
CN217971244U (en) Cold-rolled strip steel coil striding conveying device
CN203679207U (en) Small continuous casting machine flexible dummy bar hydraulic turning mechanism
CN201406216Y (en) Metal coil guide roll
CN202591461U (en) Blanking device for cooling bed

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: BAOSTEEL ENGINEERING + TECHNOLOGY GROUP CO., LTD

Free format text: FORMER OWNER: BAOGANG ENGINEERING TECHN CO., LTD., SHANGHAI

Effective date: 20100720

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20100720

Address after: 201900 Shanghai city Baoshan District Tieli Road No. 2510

Patentee after: Baosteel Engeneering &Technology Group Co., Ltd.

Address before: 201900 Shanghai city Baoshan District Tieli Road No. 2510

Patentee before: Shanghai Baogang Engineering Technology Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091223

Termination date: 20150326