CN201262097Y - Coal mine down-hole block-resistant producing area coal bunker - Google Patents

Coal mine down-hole block-resistant producing area coal bunker Download PDF

Info

Publication number
CN201262097Y
CN201262097Y CNU2008200266819U CN200820026681U CN201262097Y CN 201262097 Y CN201262097 Y CN 201262097Y CN U2008200266819 U CNU2008200266819 U CN U2008200266819U CN 200820026681 U CN200820026681 U CN 200820026681U CN 201262097 Y CN201262097 Y CN 201262097Y
Authority
CN
China
Prior art keywords
coal
coal bunker
reducing
bunker
openings
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200266819U
Other languages
Chinese (zh)
Inventor
刘玉果
于传明
张磊鑫
孙常军
秦立伦
王敏
李长录
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG HUAHENG MINE CO Ltd
Original Assignee
SHANDONG HUAHENG MINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG HUAHENG MINE CO Ltd filed Critical SHANDONG HUAHENG MINE CO Ltd
Priority to CNU2008200266819U priority Critical patent/CN201262097Y/en
Application granted granted Critical
Publication of CN201262097Y publication Critical patent/CN201262097Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The utility model discloses a coal mine downhole clogging-prevention mining district coal bunker, which comprises a downhole coal bunker body with a volume of 1,000 tones and a round section. The lower necking openings are double-tunnel type bunker openings; each lower necking opening has a hyperbolic curve-shaped necking opening; a high-pressure water pipe is pre-buried on the periphery of the lower necking opening; and the inner wall surface of the coal bunker is supported via an anchor rod, a metal mesh and concrete. The mining district coal bunker has the advantages of large volume, low clogging liability of the lower necking openings, high support strength, shock resistance, no collapse of coal wall.

Description

Block-resistant type district coal bin under the coal mine
Technical field
The utility model relates to the colliery gate road bunker.
Background technology
In coal production process, district coal bin must be arranged in each exploiting field.Along with the raising of mining machinery degree, the pit mining scope is increasing, and the exploiting field strike length is more and more longer, and exploiting field production capacity more and more higher is also more and more longer to the transportation range of mine shaft coal pocket from district coal bin.
The general design capacity of past district coal bin is 200~300 tons; The coal bunker support form is spray of anchor net or concreting supporting; Following reducing is the straight line reducing, single Hatch Opening.Mainly there is the following aspects problem in conventional district coal bin:
1, the district coal bin capacity is less, and capacity is generally less than the output of a circulation of a work plane, in case main haulage roadway overhauls or goes wrong, just causes the exploiting field to stop production, and the district coal bin of low capacity seriously restricts production.
2, supporting intensity is little, easily wall caving.Along with continuing to increase of the pit mining degree of depth, mine pressure is increasing, because supporting intensity is on the low side, coal flows down drop impact, often causes coal bunker wall caving, stifled storehouse, even causes coal bunker to use, and has a strong impact on the safety in production of mine.
3, because stifled storehouse difficulty is handled in the existence of stifled storehouse phenomenon, dangerous.Often occur stifled storehouse phenomenon in process of production, adopt the stifled storehouse accident of handling of blowing out usually, dangerous big, gently then destroy the coal bunker bulkhead, blow up funnel, heavy then the personal safety accident takes place, potential safety hazard is many.
The existence of above problem makes the practice of high-yield and high-efficiency construction of coal mine be subjected to serious restriction, and is unfavorable for safety in production, for addressing the above problem, now proposes a kind of big capacity, anti-blocking district coal bin.
Summary of the invention
Have the technical problem that coal bunker exists now for solving, the utility model provides big, the difficult stifled storehouse of a kind of capacity, the stifled storehouse of processing to be easy to district coal bin.
The technical solution of the utility model is: it comprises the coal bunker body of the circular cross section of volume more than 1000 tons of a down-hole developing, it is characterized in that: two funneling Hatch Openings are adopted in reducing under the coal bunker body; Each is the reducing pattern of reducing employing hyperbola down; Pre-buried high-pressure water pipe around following reducing is convenient to handle stifled storehouse with water under high pressure; Coal bunker body internal face employing anchor pole adds wire lath and adds concrete combined support form.
The utility model good effect is:
1, because capacity is big and adopt two funneling Hatch Openings to design, the accumulating ability is increased, adapt to the needs of large-scale mine.2, because following reducing is a hyperbola, be difficult for resulting in blockage.3, because pre-buried high-pressure water pipe, can be directly with the stifled storehouse of down-hole high pressure water treatment, handling safety is not destroyed coal bunker funnel.4, owing to adopt the combined supporting pattern, supporting intensity is big, and is shock-resistant, and the wall caving phenomenon does not take place.
Description of drawings
Fig. 1 is that the district coal bin of the embodiment of the invention is arranged schematic top plan view;
Fig. 2 is A-A sectional view of Fig. 1; Only show down the shape of reducing among the figure;
Fig. 3 is B-B sectional view of Fig. 1; Only show the arrangement form of the two funnels of two Hatch Openings among the figure;
Marginal data: 1---coal bunker body; 2---reducing under the coal bunker; 3---anchor pole; 4---wire lath; 5---high-pressure water pipe; 6---girder steel; 7---concrete; 8---the bend arrangement of reinforcement; 9---blow out gate; 10---mining roadway.
The specific embodiment
As Fig. 1, Fig. 2, shown in Figure 3: district coal bin body 1 is that an excavation is built in the height 30~40m at mining roadway 10 tops, the circular well body of diameter 6m, and bulkhead adopts anchor pole 3 to add wire lath 4 and concrete seven combined supporting form.Two funneling Hatch Openings are adopted in the following reducing 2 of coal bunker 1, and each Hatch Opening is the rectangle Hatch Opening; Hyperbolic shape is adopted in following reducing 2, Hatch Opening is supported by girder steel 6, put coal gate 9 by girder steel 6 installations, supporting and protection structure is with relayable rail prewire hyperbolic shape, as reducing bend arrangement of reinforcement 8 under the coal bunker, bend arrangement of reinforcement 8 arranged props up template placing of concrete 7 again after putting, during pouring coagulation 7 under coal bunker even pre-buried six roots of sensation high-pressure water pipe 5 around the reducing 2.

Claims (1)

1, block-resistant type district coal bin under a kind of coal mine, it comprises the coal bunker body of the circular cross section of volume more than 1000 tons of a down-hole developing, it is characterized in that: two funneling Hatch Openings are adopted in reducing under the coal bunker body; Each is the reducing pattern of reducing employing hyperbola down; Pre-buried high-pressure water pipe around following reducing; Coal bunker body internal face employing anchor pole adds wire lath and adds concrete combined support form.
CNU2008200266819U 2008-08-05 2008-08-05 Coal mine down-hole block-resistant producing area coal bunker Expired - Fee Related CN201262097Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200266819U CN201262097Y (en) 2008-08-05 2008-08-05 Coal mine down-hole block-resistant producing area coal bunker

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200266819U CN201262097Y (en) 2008-08-05 2008-08-05 Coal mine down-hole block-resistant producing area coal bunker

Publications (1)

Publication Number Publication Date
CN201262097Y true CN201262097Y (en) 2009-06-24

Family

ID=40808572

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200266819U Expired - Fee Related CN201262097Y (en) 2008-08-05 2008-08-05 Coal mine down-hole block-resistant producing area coal bunker

Country Status (1)

Country Link
CN (1) CN201262097Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949227A (en) * 2010-08-26 2011-01-19 晋中市煤炭规划设计研究院 Silo constructed in mountain and construction method thereof
CN103046788A (en) * 2012-12-12 2013-04-17 中国五冶集团有限公司 Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin
CN107697485A (en) * 2017-11-07 2018-02-16 贵州大学 A kind of coal bunker in the colliery with the anti-accumulation of multilayer buffer structure
CN110878706A (en) * 2019-12-16 2020-03-13 徐永佳 Coal mine rapid tunneling gangue transportation system
CN110939465A (en) * 2019-12-12 2020-03-31 淮北工业建筑设计院有限责任公司 Construction method of novel coal bunker suitable for reciprocating load action
CN112554939A (en) * 2020-12-02 2021-03-26 太原理工大学 Non-ventilation mining area coal chute and coal bunker and use method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101949227A (en) * 2010-08-26 2011-01-19 晋中市煤炭规划设计研究院 Silo constructed in mountain and construction method thereof
CN103046788A (en) * 2012-12-12 2013-04-17 中国五冶集团有限公司 Steel funnel of coal blending bin and installation method of traditional steel funnel of coal blending bin
CN107697485A (en) * 2017-11-07 2018-02-16 贵州大学 A kind of coal bunker in the colliery with the anti-accumulation of multilayer buffer structure
CN110939465A (en) * 2019-12-12 2020-03-31 淮北工业建筑设计院有限责任公司 Construction method of novel coal bunker suitable for reciprocating load action
CN110878706A (en) * 2019-12-16 2020-03-13 徐永佳 Coal mine rapid tunneling gangue transportation system
CN112554939A (en) * 2020-12-02 2021-03-26 太原理工大学 Non-ventilation mining area coal chute and coal bunker and use method

Similar Documents

Publication Publication Date Title
CN201262097Y (en) Coal mine down-hole block-resistant producing area coal bunker
CN201232558Y (en) Fully-mechanized mining cutting hole full-section anchored net support
CN104763434B (en) A kind of without coal column double lanes driving method
CN204039921U (en) A kind of Construction Support without support bent cap
CN203113352U (en) Pre-stressed beam for retaining and protection of foundation pit
CN109899109B (en) Grouting filling method for irregular goaf
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN202851078U (en) High water material filling column bag body
CN203547753U (en) Profile steel concrete shaft wall base
CN206280090U (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility
CN101915112A (en) Strong-side and strong-corner coal entry anchor rod support method
CN205348194U (en) It spouts compound supporting construction of stake with anchor rope soon to throw to one side to prop
CN205857173U (en) A kind of Novel steel casing sheath applying bored concrete pile on the water
CN204041105U (en) A kind of skip bucket main vertical shaft fine ore collection device
CN106761867A (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process
CN204139191U (en) A kind of pile-raft foundation structure
CN210948737U (en) Efficient and rapid tunneling roadway support facility for inclined small-section half-coal-rock roadway with thin coal seam
CN205577187U (en) Prefabricated steel pipe concrete constructional column rammed earth wall
CN201314241Y (en) Built-in three-dimensional strengthening rib-strengthened filled wall structure for roadway retained for next sublevel
CN204125931U (en) Foundation pile structure
CN204530682U (en) A kind of mechanical hole perfusion post
CN106481358A (en) A kind of board wall telescopic column of mine filling recoverable
CN202266298U (en) Outburst prevention metal barrier for full faces of driving working faces of outburst regions
CN108708729B (en) A consolidate sealing device that is used for blasting in pit to mine mouth
CN205259172U (en) Building bored concrete pile structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090624

Termination date: 20110805