CN206280090U - High-dipping surrounding rock of actual mining roadway stabilization supporting facility - Google Patents

High-dipping surrounding rock of actual mining roadway stabilization supporting facility Download PDF

Info

Publication number
CN206280090U
CN206280090U CN201621423735.6U CN201621423735U CN206280090U CN 206280090 U CN206280090 U CN 206280090U CN 201621423735 U CN201621423735 U CN 201621423735U CN 206280090 U CN206280090 U CN 206280090U
Authority
CN
China
Prior art keywords
anchor
tunnel
arch
vault
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621423735.6U
Other languages
Chinese (zh)
Inventor
欧钦
魏有贵
曹建辉
杨建均
康虹
兰胜华
邹勇
罗洪彬
孙超
周荣强
张仕佳
冯军成
余祥旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Guang Wang Energy Development (group) Co Ltd
Original Assignee
Sichuan Guang Wang Energy Development (group) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Guang Wang Energy Development (group) Co Ltd filed Critical Sichuan Guang Wang Energy Development (group) Co Ltd
Priority to CN201621423735.6U priority Critical patent/CN206280090U/en
Application granted granted Critical
Publication of CN206280090U publication Critical patent/CN206280090U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses high-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process, wherein the drift section of stope drift active workings of the present utility model is sloping core arch;Surface is vault;Top board is sloping core, and base plate is the anti-bottom of arch, and vault lower section is tunnel bottom surface, and tunnel bottom surface is divided into next section coal seam and flat.Supporting facility includes the bolting with wire mesh formed by anchor pole, anchor cable, steel band, wire netting and the whitewashing confining bed on tunnel surface.The support process that the utility model is provided is installed and in tunnel surface gunite concrete by anchor net.This technology is for repeated mining influence driving along next gob tunnel, using High strength bolt, anchor cable, with reference to W steel band of model, wire netting, in conjunction with the asymmetric multimedium coupling supporting mode of tunnel surface pneumatically placed concrete, roadway deformation can be effectively controlled, tunnel safety production is met.Half-edge coal seam accounts for gross reserves 15% 20% in its reserves of China, and this technology is laid a good foundation for such heading supporting, and promotion prospect is wide.

Description

High-dipping surrounding rock of actual mining roadway stabilization supporting facility
Technical field
The utility model is related to a kind of digging laneway supporting facility in colliery.Belong to coal mining field.
Background technology
Half-edge coal seam preservation angle is more than 45 °, is internationally recognized hard-to-recovery reserve.China's high inclination-angle and high-dipping coal Layer accounts for 15%~20% reserves, and its annual production accounts for 10% or so of national coal total output.The top board in half-edge coal seam tunnel, Two help with base plate that each lithology is different, and rock stratum easily slides along aspect, so the surrouding rock stress distribution in tunnel, ore deposit pressure manifest and prop up The load situation of frame will be more complicated than other coal seams, and it is mainly characterized in that:(1) deformation of the surrounding rock in tunnel and destruction has asymmetric Property;(2) because seam inclination is big, gravity increases along the active force in layer reason direction, after being influenceed by back production, easily causes very much rock mass along aspect Sliding;(3) half-edge coal seam roadway floor is generally coal seam, and its intensity is generally lower than adjoining rock, especially high-dipping coal When the roof and floor of layer differs greatly with the intensity in coal seam, floor lift in gallery phenomenon is serious.It can be seen that, the ore deposit pressure in half-edge coal seam tunnel is aobvious Now relatively acutely, the stand under load situation of support has asymmetry, and now all solely copies gently inclined seam tunnel to use with support To bear the symmetry support based on top pressure, cause support because being damaged by stress raisers, tunnel generally requires repeatedly The demand of mine safety production can not be still met after repairing and overhauling, road maintenance expense substantially exceeds into lane expense, substantial amounts of Scrapped because maintenance is improper in tunnel.
In practice, advanced using exploiting field, drawing back coal-mining method is exploited in area.First adopt day-coal, after adopt down One section-layer coal.Upper and lower layer keeps certain crossover distance.Stope drift active workings mainly by the way of gob side entry retaining, the areas of Ji Shang mono- The haulage way of section working face gives over to the tailgate of next section working face.
Therefore, the stope drift active workings arranged along coal seam will be influenceed by adopting face back production more than twice.
Under the conditions of existing roadway support, deformation of the surrounding rock in tunnel destruction generally has following characteristics:(1) roadway deformation amount Greatly, without stationary phase under H shaped steel shack supporting, obvious soft-rock tunnel characteristic is shown.(2) tunnel becomes first since base plate , there is pucking in shape, then causes side pin unstability, finally results in and crushes.(3) roadway deformation is asymmetric, and " base plate is grand for presentation Rise, top board drop " mutual sliding deformation feature.(4) cap does not have an obvious buckling phenomenon, and canopy leg occur it is serious curved Bent, torsion and brill bottom phenomenon.(5) part location tunnel is influenceed by water, and argillization swelling occurs in country rock, causes tunnel Deformation is aggravated.
Many times, stope drift active workings meeting deformation failure in tunneling process is serious, and subregion roof to floor convergence is approached 1m or so, two help coal and rock loose crushing, and generally need to repeatedly repair could reluctantly maintain tunnel basicly stable, repair Meteorological Height, the tunnel is that will be safeguarded more by mining influence more times, Drift stability after follow-up coal-face is serviced later in addition Plus it is difficult, normal production is had a strong impact on, therefore, it is highly desirable to solve stope drift active workings support issues, kept using stope drift active workings Stabilization, is more follow-up exploitation services.
Utility model content
In order to solve the above problems, the utility model provides a kind of high-dipping surrounding rock of actual mining roadway stabilization supporting facility, And the construction technique of supporting facility.
The technology that the utility model is provided is as follows.
The high-dipping surrounding rock of actual mining roadway stabilization supporting facility that the utility model is provided, is arranged in stope drift active workings, back production Tunnel is provided with vault, top board, base plate.The drift section of described stope drift active workings is sloping core arch;Specially:Stope drift active workings Surface is vault 3;Top board 4 is sloping core, downward along seam inclination straight incline from tunnel vault;Base plate is the anti-bottom 5 of arch, from Tunnel dome portions camber line arch is downwards to flat 6;Vault lower section is tunnel bottom surface, and tunnel bottom surface is divided into left and right sides, near top Plate side is next section coal seam 11, is flat 6 near base plate side;Described vault 2.4-2.6m high, tunnel bottom surface 3- wide 4m。
Described supporting facility includes the bolting with wire mesh being collectively forming by anchor pole 1, anchor cable 2, steel band, wire netting 12;And The whitewashing confining bed 7 that gunite concrete is formed on tunnel surface.
4 row's anchor poles are set on described top board, and the row's anchor pole near vault rolls oblique 37-43 degree to vault side;Remaining 3 row's anchor poles perpendicular to top board set.
Described vault arranges row's anchor pole, tangent line of the anchor pole perpendicular to vault arc.
4 row's anchor poles are arranged at the anti-bottom 5 of described arch, and anchor pole is each perpendicular to the tangent line of the anti-bottom arc of arch.
Described flat 6 set two row's anchor poles, wherein row's anchor pole is arranged on the anti-bottom of arch and flat angle, and to The anti-bottom direction of arch inclines 40-50 degree, and another row's anchor pole is arranged on flat middle part, and inclines 12-17 degree to the anti-bottom direction of arch.
The described middle part of top board 4 sets 1 row's anchor cable, and perpendicular to top board;Vault middle part sets 1 row's anchor cable, and to top board Roll oblique 8-12 degree;Arch 3 row's anchor cables of anti-bottom setting, and the tangent line of the anti-bottom arc of arch is each perpendicular to, anchor cable array pitch is 950- 1050mm。
High-dipping surrounding rock of actual mining roadway stabilization supporting facility as described above, illustrates further as described wire netting For 10# galvanized wires are worked out, 80 × 80mm of grid specification;Described steel band is W steel band of model, and width 280mm, thickness 3mm, Fracture Force is big In 30KN.
High-dipping surrounding rock of actual mining roadway stabilization supporting facility as described above, illustrates further as described back production lane The array pitch of the anchor pole in road everywhere is 0.8m, and the spacing between anchor pole is 0.8m;Anchor pole is diameter 20mm, and length is 2500mm, Pretightning force is not less than 70KN.
High-dipping surrounding rock of actual mining roadway stabilization supporting facility as described above, illustrates further as described arch is anti- Three its array pitch of row's anchor cable that bottom is set are 1000mm.
High-dipping surrounding rock of actual mining roadway stabilization supporting facility as described above, illustrates further as described back production lane Anchor cable length in road everywhere is 9000mm, and anchor cable spacing is 3200mm.
Beneficial effect:
This technology influences driving along next gob tunnel for repeated mining, using High strength bolt, anchor cable, with reference to W steel band of model, gold Category net, in conjunction with the asymmetric multimedium coupling supporting mode of tunnel surface pneumatically placed concrete, can effectively control roadway surrounding rock Deformation, meets tunnel safety Production requirement.
Before this technology, the shed shoring of Coal Exploitation, by repeatedly maintenance, greatly increased the maintenance in tunnel into This.And after using this support technology, support efficiency is greatly increased, reduce maintenance cost, it is ensured that working face is normally given birth to Produce, increased raw coal output.
This technology also greatly reduces labor strength, improves operating environment, eliminates driving with exploitation work Face potential safety hazard.
This technology is that serving for mining area popularization anchor net flexibility Combined Support Technology is demonstrated and impetus.
Enclose in the tunnel that this technology proposes " active support, reinforced support in key position, secondary pneumatically placed concrete, coupling supporting " Rock stability control principle, forms half-edge coal seam repeated mining along empty soft-rock tunnel multimedium coupling supporting theory and skill Art, the exploitation for enriching China's high-dipping angle coal seam is theoretical, has expanded Core Technology Research field, effectively promotes the industry The further raising of scientific and technical research level.
Half-edge coal seam accounts for gross reserves 15%-20% in its reserves of China, and the pit mining of mine of western more than 50% should Class coal seam, and be the main mining coal seam of many mining areas or mine.This technology is that solid base has been established in such heading supporting Plinth, its market is huge, and popularizing application prospect is boundless.
Brief description of the drawings
Fig. 1 is the utility model tunnel structure distribution map.
Fig. 2 is the utility model roadway support structure chart.
Drawing reference numeral correspondence:1- anchor poles, 2 anchor cables, 3- vaults, 4- top boards, the anti-bottom of 5- arches, 6- is flat, 7- whitewashing closings Layer, 8- roof stratas, 9- floor stratas, 10- coal seams, the next section coal seams of 11-, 12- wire nettings.
Specific embodiment
The utility model implementation process produces the principle of good result as follows:
Influence high-dipping improving stability of surrounding rocks in roadway three factors be:Surrouding rock stress, Surrounding Rock Strength, supporting.
(1) surrouding rock stress is improved.In the rock mass not influenceed by back production, the surrouding rock deformation in tunnel is by laneway stress collection In, and the influence in adjacent tunnel causes.Rational cross-section shape of roadway can reduce roadway surrounding rock stress, and control country rock becomes Shape.For the tunnel for having drastic deformation under high stress, by the deformation allowance in tunnelling, and flexibility can be used Active support form, makes country rock high stress be discharged in the compatible deformation with supporting and is carried jointly.
(2) Surrounding Rock Strength is strengthened.Surrounding Rock Strength is strengthened in suspension roof support, and anchor pole is bonded together with rock mass, improves rock mass Bulk strength, enhance the non-deformability of rock mass, strengthen the globality of rock mass;Due to the drawing-resistant function of anchor pole, work as anchor Bar pass through broken rock deeply stablize rock stratum when, suspension function is played to unstable formation;For beded rock mass, due to anchor pole Effect, to certain inhibition that has of rock stratum absciss layer, and increases the frictional force between rock stratum, with anchor pole resisting in itself The effect of cutting produces relative slip between bottling up rock stratum, so as to step up to form combination beam each rock stratum, improve the carrying energy of rock stratum Power.
(3) strengthening supporting.The active supports such as anchor pole, anchor cable, wire netting, pneumatically placed concrete layer, can be achieved with supporting construction Actively carry in time, it is to avoid Free Transform occurs in country rock, while anchor pole, anchor cable are stretched into breaking surrounding rock is played very well inside rock stratum Reinforcement effect, the self-bearing ability of country rock can be given full play to.Flexible supporting structure has preferable compatibility of deformation ability, can be in branch Its bearing capacity is given full play to during shield.Supporting construction should have preferable in addition to having bearing capacity higher, also Structural stability, should use the anchor preferable support form of net equistability.
In summary analysis result, the reinforcement means of single small range tends not to effectively control the deformation of roadway surrounding rock With destruction, using High strength bolt, anchor cable, with reference to W steel bands, wire netting, in conjunction with the asymmetric many of tunnel surface pneumatically placed concrete Medium couples support pattern, can effectively control the deformation of roadway surrounding rock, meet tunnel safety Production requirement.
Example one:
The utility model is experimentally implemented, and its experiment implementation condition is as follows:
Mine stope drift active workings have following feature:
(1) half-coal rock roadway is belonged to, and the roof and floor in tunnel is respectively provided with half petrographic property, the both sides in tunnel are respectively coal seam Top board and base plate, this is completely different with general inclination angle coal seam.
(2) coal rock strength residing for tunnel is small, and inclination angle is big (average 64 °), and roof and floor is mud, carbonaceous soft rock, bottom Plate is away from next coal seam apart from small, only 1.78m, segment section distance only 0.3m.
(4) stope drift active workings should work as next exploiting field section coal seam again as the transportation roadway in this coal mining section coal seam The return aircourse in face, belongs to gob side entry, and the service time more general stope drift active workings in tunnel are long.
(5) tunnel digging blasting vibrations are big to country rock disturbing influence, and roadway forming is difficult.
The stope drift active workings of this example are set:
Stope drift active workings section is sloping core arch, specially:The surface of stope drift active workings is vault 3;Top board 4 is sloping core, from Tunnel vault is downward along seam inclination straight incline;Base plate is the anti-bottom 5 of arch, and from tunnel, dome portions camber line arch is extremely flat downwards 6;Vault lower section is tunnel bottom surface, and tunnel bottom surface is divided into left and right sides, is next section coal seam 11 near top board side, the bottom of near Plate side is flat 6;Described vault 2.5m high, tunnel bottom surface 3.4m wide.Top board is upwards roof strata, the surface of vault It is this section coal seam 10, coal seam inclines to the anti-bottom side of arch, is high inclination-angle half-edge coal seam.The anti-bottom of arch with it is flat wipe to sop up liquid into In floor strata 9.Top board 4 is upwards roof strata 8.
Supporting is set:
Supporting facility includes the bolting with wire mesh being collectively forming by anchor pole, anchor cable, steel band, wire netting;And on tunnel surface The whitewashing confining bed that gunite concrete is formed.
4 row's anchor poles are set on described top board, are rolled to vault side near row's anchor pole of vault oblique 40 degree;Remaining 3 Row's anchor pole is set perpendicular to top board.
Described vault arranges row's anchor pole, tangent line of the anchor pole perpendicular to vault arc.
The anti-base fabric of described arch puts 4 row's anchor poles, and anchor pole is each perpendicular to the tangent line of the anti-bottom arc of arch.
The described row's anchor pole of flat setting two, wherein row's anchor pole is arranged on the anti-bottom of arch and flat angle, and to The anti-bottom direction of arch inclines 45 degree, and another row's anchor pole is arranged on flat middle part, and inclines 15 degree to the anti-bottom direction of arch.
Described top board middle part sets 1 row's anchor cable, and perpendicular to top board;Vault middle part sets 1 row's anchor cable, and to top board side Incline 10 degree;Arch 3 row's anchor cables of anti-bottom setting, and the tangent line of the anti-bottom arc of arch is each perpendicular to, anchor cable array pitch is 1000mm.
This example support process:
1st, the installation of anchor pole.
(1), anchor pole spacing is 0.8m, array pitch 0.8m, and anchor pole fully enters rock mass during construction, and protruded length is not more than 50mm, anchor pole spacing, array pitch deviation are no more than 100mm.
(2) it is 28mm that, anchor pole eyelet bores footpath, and eyelet must be got in stabilization rock stratum, the deep 2450~2500mm of eyelet.
(3) resin explosive roll, is delivered into bottom hole with anchor pole, is slowly advanced during feeding and continuously stirred, the time is 20-30 seconds, Every anchor pole fills 2 resin explosive rolls.
(4) after, resin anchor stirring is finished, connect machine with anchor pole and support 2-3 minutes, treat that resin anchoring agent solidification takes anchor again Bar connects machine.
(5), installing anchor rod pallet board should be carried out after stirring is completed 2 minutes.It is width 200mm that anchor rod pallet board uses specification, Length 200mm, the adjusting center pallet of thick bottom 14mm.
2nd, after rockbolt installation is finished, then wire netting, steel band are installed.Wire netting is worked out using 10# galvanized wires, and grid specification 80 × 80mm.Width of steel band 280mm, thickness 3.0mm, Fracture Force are more than 304kN.
The 3rd, anchor cable is installed.
Anchor cable uses bifilar cage type anchor cable.Sub-thread anchor cable steel strand wires Φ 17.8mm, intensity rank is 1860MPa, and sub-thread breaks Disconnected load is not less than 250kN, anchor cable length 9000mm.Anchorage style uses resin explosive roll end anchor, and cement injection total length to reinforce.
Anchor rope grouting reinforcing cement mortar uses common 425# portland cements, and the amount of glass that adds water is the 3% of cement weight, its The ratio of mud is (water:Cement)=1:2.Grouting Pipe makes (internal diameter 15mm, wall thickness 3.5mm) using common 4 points of welded still pipes.Exhaust Pipe uses internal diameter 4mm, the plastic tube of external diameter 6mm.
Anchor cable eyelet is got in the rock stratum of stabilization, and strict control eye is deep consistent with anchor cable length, anchor cable protruded length control System is in 250~300mm, 23~24MPa of pretightning force (80~100kN), anchor force 200kN.The aperture of anchor cable eyelet, anchor cable diameter It is consistent with Anchor Agent diameter, anchor cable spacing, array pitch allowable error ± 100mm.Work progress is as follows:
(1), perforating:Anchor cable eyelet footpath 65mm, the deep 8700mm of eye.
(2), anchor cable is installed:Grouting Pipe self-adhesive tape is fixed on one end of anchor cable, Grouting Pipe go deep into anchor cable 0.5m~ 1.0m, Grouting Pipe afterbody exceeds anchor cable outermost end 300mm.Anchor cable is stretched, blast pipe is tied up away from anchor cable end 30mm~50mm Place, is fixed with adhesive tape, and blast pipe afterbody exceeds anchor cable outer end 2m~3m.Anchor cable is together sent into brill together with blast pipe, Grouting Pipe In hole.Anchor cable eyelet surrounding is encapsulated tightly with cotton yarn, then tightly ensures not spillage with quick-hardening cement closure.
(3), slip casting:Mixed in water and the ratio of cement 1: 2, add waterglass stirring and complete with slurry.By blast pipe It is put into the bucket for filling with water, starting grouting pump carries out slip casting, slip casting while stirring.Observation blast pipe, it is found that bubble is emerged most Slow down injection speed when many, show that anchor cable hole has been filled when blast pipe no longer steams.
After cement mortar conserves 24h, upper anchor cable pallet, fastening anchor cable, anchor cable pallet are made of 18# channel-section steels, and length is 1600mm, upper and lower two anchor cables share a channel-section steel pallet.
4th, gunite concrete.Concrete proportioning is, cement:Sand:Stone=1:2:2, cement selection 425# silicate cements Mud, grain river sand in sand selection, cobble-stone diameter is not more than 15mm, and accelerator consumption is the 4% of cement weight, and the ratio of mud is 0.4 ~0.5, concrete strength is 15MPa, and jetting thickness is 100mm, is sprayed at twice.Anchor net, W steel bands first just spray after installing 40mm, 60mm is sprayed after 24 hours again again.Tunnel surface smoothness is not more than ± 100mm after whitewashing, without obvious mismatch, tunnel perception Quality is good, surfacing, without obvious crack, honeycomb, hole, dew muscle phenomenon.
5th, the present embodiment is during experimental use, and the conclusion for obtaining is as follows:
(1), deformation of the surrounding rock in tunnel amount is digging 25 days or so the time, deformation of the surrounding rock in tunnel of tunnel in range of normal value Into stationary phase.From observation data display, the bottom distension at the anti-bottom of arch is significantly greater than sloping core top board, the anti-bottom displacement of wall rock of arch Significantly greater than sloping core top board.
(2), roof rock deep displacement:Top board displacement in the range of 2m is 6mm to the maximum, in 2~6m scope intrinsic displacements Amount reaches 38mm, and roof strata absciss layer amount is relatively small, illustrates that anchor rete cord+steel band combined supporting is relatively reliable, and fully sends out The effect of its active support is waved.
(3), monitored by field observation and anchor ergometer and shown, anchor pole end stress size is maximum vault, arch Return bottom to take second place, top board is minimum.Vault and arch return bottom rockbolt stress after installing 4 days, begin to decline, and tend towards stability afterwards, and Arch is returned bottom anchor pole end stress and is slowly increased.
(4), observation lasts 278 days, and period only returns bottom to tunnel experimental section arch and carried out 1~2 undercut treatment, tunnel Substantially can guarantee that normal production.
Therefore, after using this technology, lane surface displacement change belongs in normal range (NR), maintains the entirety of roof strata Property, it is effectively controlled surrouding rock deformation, it is to avoid repeatedly reprocessing before adopt face back production during the firm canopy supporting of I-shaped.
Above-mentioned implementation method is used for illustrating the utility model, is limited rather than to the utility model, in this reality With in new spirit and scope of the claims, any modifications and changes made to the utility model both fall within this reality With new protection domain.

Claims (5)

1. high-dipping surrounding rock of actual mining roadway stabilization supporting facility, is arranged in stope drift active workings, and stope drift active workings are provided with vault, top Plate, base plate, it is characterised in that the drift section of described stope drift active workings is sloping core arch;Specially:The surface of stope drift active workings It is vault;Top board is sloping core, downward along seam inclination straight incline from tunnel vault;Base plate is the anti-bottom of arch, from tunnel vault Portion's camber line arch is extremely flat downwards;Vault lower section is tunnel bottom surface, and tunnel bottom surface is divided into left and right sides, under being near top board side One section coal seam, is flat near base plate side;Described vault 2.4-2.6m high, tunnel bottom surface 3-4m wide;
Described supporting facility includes the bolting with wire mesh being collectively forming by anchor pole, anchor cable, steel band, wire netting;And in tunnel table The whitewashing confining bed that face gunite concrete is formed;
4 row's anchor poles are set on described top board, and the row's anchor pole near vault rolls oblique 37-43 degree to vault side;Remaining 3 row Anchor pole is set perpendicular to top board;
Described vault arranges row's anchor pole, tangent line of the anchor pole perpendicular to vault arc;
The anti-base fabric of described arch puts 4 row's anchor poles, and anchor pole is each perpendicular to the tangent line of the anti-bottom arc of arch;
The described row's anchor pole of flat setting two, wherein row's anchor pole is arranged on the anti-bottom of arch and flat angle, and to arch Anti- bottom direction inclines 40-50 degree, and another row's anchor pole is arranged on flat middle part, and inclines 12-17 degree to the anti-bottom direction of arch;
Described top board middle part sets 1 row's anchor cable, and perpendicular to top board;Vault middle part sets 1 row's anchor cable, and is rolled to top board oblique 8-12 degree;Arch 3 row's anchor cables of anti-bottom setting, and the tangent line of the anti-bottom arc of arch is each perpendicular to, anchor cable array pitch is 950-1050mm.
2. high-dipping surrounding rock of actual mining roadway as claimed in claim 1 stablizes supporting facility, it is characterised in that described wire netting For 10# galvanized wires are worked out, 80 × 80mm of grid specification;Described steel band is W steel band of model, and width 280mm, thickness 3mm, Fracture Force is big In 30KN.
3. high-dipping surrounding rock of actual mining roadway as claimed in claim 1 stablizes supporting facility, it is characterised in that described back production lane The array pitch of the anchor pole in road everywhere is 0.8m, and the spacing between anchor pole is 0.8m;Anchor pole is diameter 20mm, and length is 2500mm, Pretightning force is not less than 70KN.
4. high-dipping surrounding rock of actual mining roadway as claimed in claim 1 stablizes supporting facility, it is characterised in that described arch is anti- The array pitch of three row's anchor cables that bottom is set is 1000mm.
5. high-dipping surrounding rock of actual mining roadway as claimed in claim 1 stablizes supporting facility, it is characterised in that described back production lane Anchor cable length in road everywhere is 9000mm, and anchor cable spacing is 3200mm.
CN201621423735.6U 2016-12-23 2016-12-23 High-dipping surrounding rock of actual mining roadway stabilization supporting facility Expired - Fee Related CN206280090U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621423735.6U CN206280090U (en) 2016-12-23 2016-12-23 High-dipping surrounding rock of actual mining roadway stabilization supporting facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621423735.6U CN206280090U (en) 2016-12-23 2016-12-23 High-dipping surrounding rock of actual mining roadway stabilization supporting facility

Publications (1)

Publication Number Publication Date
CN206280090U true CN206280090U (en) 2017-06-27

Family

ID=59071165

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621423735.6U Expired - Fee Related CN206280090U (en) 2016-12-23 2016-12-23 High-dipping surrounding rock of actual mining roadway stabilization supporting facility

Country Status (1)

Country Link
CN (1) CN206280090U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661677A (en) * 2018-05-09 2018-10-16 山西交科桥梁隧道加固维护工程有限公司 A kind of W steel band of model anchor pole composite entity support structures reinforced for tunnel-liner
CN110219683A (en) * 2019-06-10 2019-09-10 华北科技学院 A kind of coal mine clamped protection unit of sloping mining approach alley way anchor
CN110905568A (en) * 2019-12-10 2020-03-24 山东东山矿业有限责任公司株柏煤矿 Support method for roadway of steeply inclined coal seam

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661677A (en) * 2018-05-09 2018-10-16 山西交科桥梁隧道加固维护工程有限公司 A kind of W steel band of model anchor pole composite entity support structures reinforced for tunnel-liner
CN110219683A (en) * 2019-06-10 2019-09-10 华北科技学院 A kind of coal mine clamped protection unit of sloping mining approach alley way anchor
CN110905568A (en) * 2019-12-10 2020-03-24 山东东山矿业有限责任公司株柏煤矿 Support method for roadway of steeply inclined coal seam

Similar Documents

Publication Publication Date Title
CN102562093B (en) Full-length anchoring supporting method with intensive resin anchor rod and anchor-shotcrete net
CN104763434B (en) A kind of without coal column double lanes driving method
CN102140924B (en) Double-shell coupling supporting method of deep soft rock tunnel
CN104533453A (en) Substep dynamic coupling support method for roadway fault fracture zone
CN103603675A (en) Supporting method of permeable soft broken rock stratum roadway
CN105909289B (en) A kind of asymmetric roadway support structure of deep three-soft seam
CN212296427U (en) Double-lane arrangement working face outer lane narrow coal pillar stable supporting structure
CN103075170A (en) Method for controlling surrounding rock deformation of gateway subjected to repeated overhead mining by using hollow grouting anchor cable
CN106194203A (en) A kind of coal-mine soft-rock method for protecting support
CN106321113B (en) A kind of lane space frame structure and its method for protecting support for being used to wear goaf
CN106761867A (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility and support process
CN103410528A (en) Tunnel lining structure and construction method
CN110118089B (en) Mining FRP grid-coal gangue-self-compacting concrete regenerated top plate and construction method thereof
CN108087008A (en) A kind of three-soft seam gob side entry method for protecting support
CN206280090U (en) High-dipping surrounding rock of actual mining roadway stabilization supporting facility
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN105569726A (en) Gob-side entry retaining method for GFRP (Glass Fiber Reinforced Polymer) tube concrete pier stud and gangue concrete wall
CN109707422B (en) High-pressure grouting reinforcing and supporting method for small coal pillars along empty conveying roadway
CN111425205B (en) Mining support method for steeply inclined extremely thin ore body
CN109779652A (en) A kind of expansion of coal-mine soft-rock tailentry is repaired and method for protecting support
CN110645018B (en) Mine underground strong dynamic pressure roadway prestress anchor-charging integrated supporting structure and method
CN106401609A (en) Bottom plate pressure relief and reinforcement structure for controlling floor heave of deep roadway and construction method of bottom plate pressure relief and reinforcement structure
CN206707726U (en) A kind of gob side entry retaining roadside support system
CN105569699A (en) Inclined shaft development support technology for isolated coal pillar
CN107939419A (en) A kind of tunnel U-shaped steel covers canopy supporting construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170627

Termination date: 20171223

CF01 Termination of patent right due to non-payment of annual fee