CN201258496Y - One-column and one-pile correcting device - Google Patents

One-column and one-pile correcting device Download PDF

Info

Publication number
CN201258496Y
CN201258496Y CNU200820151822XU CN200820151822U CN201258496Y CN 201258496 Y CN201258496 Y CN 201258496Y CN U200820151822X U CNU200820151822X U CN U200820151822XU CN 200820151822 U CN200820151822 U CN 200820151822U CN 201258496 Y CN201258496 Y CN 201258496Y
Authority
CN
China
Prior art keywords
well
steel
locating rack
shaped frame
post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU200820151822XU
Other languages
Chinese (zh)
Inventor
朱骏
金毅
周蓉峰
王正兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Co Ltd
Original Assignee
Shanghai Mechanized Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Co Ltd filed Critical Shanghai Mechanized Construction Co Ltd
Priority to CNU200820151822XU priority Critical patent/CN201258496Y/en
Application granted granted Critical
Publication of CN201258496Y publication Critical patent/CN201258496Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model relates to a column-to-pile alignment device, which comprises a locating rack connected with a ground pre-embedded iron, and is characterized in that a well-shaped frame which is arranged horizontally is installed on the locating rack; the well-shaped frame is supported by four vertical oil cylinders; a horizontal bracket which is welded at the top of a steel upright post suspended in a pile hole is positioned above the well-shaped frame, and driven by four horizontal oil cylinders; a wire tensioner is arranged on the well-shaped frame; a wire cable positioned in the wire tensioner is connected with a hoop of the steel upright post and a strengthening rib on a steel reinforcement cage; a laser light emission steel tube which is arranged in the steel upright post is homocentric with the steel upright post; and a light target is put on the well-shaped frame. A limit groove is formed on the locating rack; the well-shaped frame is put in the limit groove; a horizontal adjustment screw is arranged on a light target foot; and a track level bar is put on the light target in the form of a regular triangle. The alignment device has the advantages as follows: the verticality of the column is convenient to be corrected, and a special pump truck is not needed to transport concrete when the concrete is cast, and a concrete mixer can be directly used for perfusion.

Description

Means for correcting of one post
Technical field
The utility model relates to a kind of means for correcting, means for correcting of a particularly a kind of post.
Background technology
The utilization in pile foundation construction of one on one post is extensively promptly inserted a steel post on bored pile, builds simultaneously then, and as the load-carrying members in the foundation ditch support system, even sometimes also as being the load-carrying members of superstructure.For reaching certain bearing capacity, after the steel post that a post is inserted bored pile, its verticality must satisfy designing requirement.So will proofread and correct its verticality before transferring to design elevation steel post in the construction.At present, common bearing calibration of a post is: after pouring pile hole finishes, place the calibrated mount of a steel on the stake position, calibrated mount is general high 3 meters, and each 2 meters of length and width respectively have the screw rod of 4 correction usefulness up and down.The top mark height of invar column is generally at below ground, so connect earlier one section about 3 meters long pile cover before proofreading and correct on steel post.Steel post is transferred in the hole after muscle welds with the hanging of reinforcing cage of bored pile, after transferring to design elevation, can only see pile cover more than the general ground, fixing a little earlier with the screw rod on the calibrated mount to pile cover, at the stake position four direction transit of putting on the shelf, the verticality of observation pile cover is proofreaied and correct it by each 4 screw rod up and down, correction finish the back pile cover is welded fixing, concreting then.The precision of this bearing calibration is relatively poor, and 3 meters high calibrated mounts of this bearing calibration utilization, causes the follow-up concreting must be by the pump truck pumping.And because though the upper end pile cover of steel post has welded fixing, but the lower end still is unsettled, in the process of concreting, often take place to cause the verticality of " steel post of having proofreaied and correct " can't reach designing requirement because concrete extruding makes the steel post lower end that skew take place.
Summary of the invention
The purpose of this utility model is to solve one on a present post to proofread and correct in the work progress and need not fix the problem that existing verticality can't reach designing requirement with the invar column lower end that higher calibrated mount carries out existing in the steel post rectify perpendicular, provides the theory of a kind of utilization " long limit is determined on long limit " to proofread and correct; With highly low calibrated mount, build at every turn and can directly build; Means for correcting of a post that two ends can all be fixed about the steel post when building.The utility model designs means for correcting of a post, comprise the locating rack that is connected with the ground embedded iron, it is characterized in that: the well cabinet frame that horizontal positioned is arranged on locating rack, the well cabinet frame is supported by four vertical oil cylinders, hang on the top of the steel post in the stake hole and be welded with horizontal stand, horizontal stand is positioned on the well cabinet frame, drive horizontal stand by four cross cylinders, on the well cabinet frame, wire tensioner is arranged, in wire tensioner, there is wire rope to connect the iron hoop of steel post and the reinforcing rib on the reinforcing cage, a laser light emission steel pipe is arranged in steel post, and laser light emission steel pipe is concentric with steel post, places light target on the well cabinet frame.Stopper slot is arranged on locating rack, and stopper slot is placed the well cabinet frame, and the height of locating rack is 40-50 centimetres.The light target footing has horizontal set screw, has on the light target to be the spirit level that positive triangle is placed.The utility model has the advantages that the rectify perpendicular that makes things convenient for coupled columns, and when fluid concrete, do not need special-purpose pump truck delivering concrete, and directly can pour into by truck-transit mixer.
Description of drawings
Fig. 1 is the attached view of structure of the present utility model,
Fig. 2 is a texture edge schematic diagram of the present utility model,
Fig. 3 is a light target structural representation of the present utility model,
Below in conjunction with accompanying drawing and example the utility model is elaborated.
Concrete form of construction work
Comprise the locating rack 2 that is connected with ground embedded iron 1 among the figure, it is characterized in that: the well cabinet frame 3 that horizontal positioned is arranged on locating rack 2, hang on the top of the steel post 5 in stake hole 4 and be welded with horizontal stand 6, horizontal stand 6 is positioned on the well cabinet frame 3, drive supporting horizontal stand 6 by the vertical oil cylinder 8 of four cross cylinders 7 with four, wire tensioner 9 is arranged on well cabinet frame 3, in wire tensioner 9, there is wire rope 10 to connect the iron hoop 11 of steel post 5 and the reinforcing rib 13 on the reinforcing cage 12, a laser light emission steel pipe 14 is arranged in steel post 5, laser light emission steel pipe 14 is concentric with steel post 5, places light target 15 on well cabinet frame 3.Stopper slot 16 is arranged on locating rack 2, and stopper slot 16 is placed well cabinet frame 3, and the height of locating rack 2 is 40-50 centimetres.Light target 15 footing have horizontal set screw 17, have on the light target 15 to be the spirit level 18 that positive triangle is placed.
During practice of construction, at first lay locating rack, and weld with the embedded iron on the terrace, the center line of guaranteeing the locating rack four edges is on the cross axis of stake position.Lay 4 oil pumps of vertical direction and well cabinet frame, the well cabinet frame is supported by 4 oil pumps and is positioned at stopper slot on the locating rack.Hang steel post, make insert the steel post reinforcing cage and reach projected depth after, muscle is hung in welding, fixedly iron hoop and reinforcing cage add putting more energy into of weldering and bind round in the wire tensioner that is fixed at last on the well cabinet frame four direction with four on four 5mm steel wire penetrating steel columns.Then steel post is hung in a hole with reinforcing cage, after treating that steel post arrives design elevation, the horizontal stand that welds on the top of steel post is shelved on the well cabinet frame, and the horizontal stand of adjusting on the steel post by four oil pumps of horizontal direction makes its center, align piles position, center.After this on the well cabinet frame, place light target, regulate the screw on four angles of light target, observe the bubble in the spirit level on three directions on the light target and make it placed in the middle, guarantee the light target level.Mobile slightly light target is observed by the transit that the both direction frame stands on the axis, makes its center, align piles position, center.Open the light source switch in the laser light emission steel pipe in the steel post, regulate four oil pumps on the vertical direction, the drive steel post moved after oil pump pushed horizontal stand.When radium-shine light passes the light target center hole, show that the verticality of steel post can meet design requirement.Turn the wire tensioner drag hook wire rope is strained this moment, and the deadweight that utilizes reinforcing cage is the lower end of steel post fixedly, prevents to be offset in pouring subsequently.At this moment, horizontal stand and well cabinet frame firm welding, steel post all fixing up and down moves in the time of can preventing the concrete pouring in construction subsequently.

Claims (3)

1, means for correcting of one post, comprise the locating rack that is connected with the ground embedded iron, it is characterized in that: the well cabinet frame that horizontal positioned is arranged on locating rack, hang on the top of the steel post in the stake hole and be welded with horizontal stand, horizontal stand is positioned on the well cabinet frame, by the vertical hydraulic oil cylinder driving supporting of four cross cylinders horizontal stand with four, on the well cabinet frame, wire tensioner is arranged, in wire tensioner, there is wire rope to connect the iron hoop of steel post and the reinforcing rib on the reinforcing cage, a laser light emission steel pipe is arranged in steel post, laser light emission steel pipe is concentric with steel post, places light target on the well cabinet frame.
2, by means for correcting of the described post of claim 1, it is characterized in that: stopper slot is arranged on locating rack, and stopper slot is placed the well cabinet frame, and the height of locating rack is 40-50 centimetres.
3, by means for correcting of the described post of claim 1, it is characterized in that: the light target footing has horizontal set screw, has on the light target to be the spirit level that positive triangle is placed.
CNU200820151822XU 2008-08-11 2008-08-11 One-column and one-pile correcting device Expired - Fee Related CN201258496Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU200820151822XU CN201258496Y (en) 2008-08-11 2008-08-11 One-column and one-pile correcting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU200820151822XU CN201258496Y (en) 2008-08-11 2008-08-11 One-column and one-pile correcting device

Publications (1)

Publication Number Publication Date
CN201258496Y true CN201258496Y (en) 2009-06-17

Family

ID=40772730

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU200820151822XU Expired - Fee Related CN201258496Y (en) 2008-08-11 2008-08-11 One-column and one-pile correcting device

Country Status (1)

Country Link
CN (1) CN201258496Y (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767182A (en) * 2012-07-18 2012-11-07 上海建工二建集团有限公司 Verticality adjustment system for lattice column correcting mount and construction method thereof
CN104110035A (en) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN104499485A (en) * 2014-12-08 2015-04-08 上海建工集团股份有限公司 One-column one-pile full-automatic hydraulic verticality adjusting system and method
CN106555401A (en) * 2016-10-21 2017-04-05 开普天(上海)国际贸易有限公司 For the stand of guide pipe top positioning
CN107270879A (en) * 2017-07-25 2017-10-20 上海建工二建集团有限公司 Suitable for the position of form center concentrator marker and its application method of different pipe calibers
CN108149723A (en) * 2017-12-20 2018-06-12 上海建工集团股份有限公司 A kind of plumbing device and its correcting method for contrary sequence method low Low Level steel-pipe pile
CN108942122A (en) * 2018-09-28 2018-12-07 萍乡焱鑫支承环有限公司 One kind is exempted to correct cross axle processing method and center uprighting processing unit (plant)
CN110219326A (en) * 2019-05-23 2019-09-10 海天建设集团有限公司 The underwater vertical adjustment construction technology of inverse method one-column one-pile
CN113430973A (en) * 2021-07-02 2021-09-24 深圳市智宇实业发展有限公司 High-stability electric car stopping structure and construction method of structure
CN113550317A (en) * 2021-07-30 2021-10-26 浙江交工地下工程有限公司 Permanent-temporary combined supporting structure and construction method for open excavation reverse construction foundation pit of large shield starting well

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102767182B (en) * 2012-07-18 2015-01-07 上海建工二建集团有限公司 Verticality adjustment system for lattice column correcting mount and construction method thereof
CN102767182A (en) * 2012-07-18 2012-11-07 上海建工二建集团有限公司 Verticality adjustment system for lattice column correcting mount and construction method thereof
CN104110035A (en) * 2013-04-16 2014-10-22 中冶天工上海十三冶建设有限公司 Perpendicularity correcting device for concrete-filled steel tube columns constructed by top-down process and construction method implemented by perpendicularity correcting device
CN104499485A (en) * 2014-12-08 2015-04-08 上海建工集团股份有限公司 One-column one-pile full-automatic hydraulic verticality adjusting system and method
CN104499485B (en) * 2014-12-08 2017-01-04 上海建工集团股份有限公司 One pile for one column fully automatic hydraulic verticality-regulating system and vertical adjustment method
CN106555401B (en) * 2016-10-21 2019-10-01 开普天(上海)国际贸易有限公司 Rack for the positioning of guide pipe top
CN106555401A (en) * 2016-10-21 2017-04-05 开普天(上海)国际贸易有限公司 For the stand of guide pipe top positioning
CN107270879A (en) * 2017-07-25 2017-10-20 上海建工二建集团有限公司 Suitable for the position of form center concentrator marker and its application method of different pipe calibers
CN107270879B (en) * 2017-07-25 2023-09-26 上海建工二建集团有限公司 Centroid position marker applicable to different pipe diameters and application method thereof
CN108149723A (en) * 2017-12-20 2018-06-12 上海建工集团股份有限公司 A kind of plumbing device and its correcting method for contrary sequence method low Low Level steel-pipe pile
CN108942122A (en) * 2018-09-28 2018-12-07 萍乡焱鑫支承环有限公司 One kind is exempted to correct cross axle processing method and center uprighting processing unit (plant)
CN108942122B (en) * 2018-09-28 2021-01-08 萍乡焱鑫支承环有限公司 Correction-free cross shaft machining method and center hole correction machining device
CN110219326A (en) * 2019-05-23 2019-09-10 海天建设集团有限公司 The underwater vertical adjustment construction technology of inverse method one-column one-pile
CN113430973A (en) * 2021-07-02 2021-09-24 深圳市智宇实业发展有限公司 High-stability electric car stopping structure and construction method of structure
CN113430973B (en) * 2021-07-02 2022-07-08 深圳市智宇实业发展有限公司 High-stability electric car stopping structure and construction method of structure
CN113550317A (en) * 2021-07-30 2021-10-26 浙江交工地下工程有限公司 Permanent-temporary combined supporting structure and construction method for open excavation reverse construction foundation pit of large shield starting well

Similar Documents

Publication Publication Date Title
CN201258496Y (en) One-column and one-pile correcting device
CN205296874U (en) Information -based construction monitor positioning device of stake integration
CN112281849B (en) Concrete filling pile construction equipment and construction method
CN104389313A (en) Positioning perpendicularity adjusting device and method of dual-spliced I-shaped steel latticed column
CN105887811A (en) Ultra-deep soft soil pile integral construction method based on high-precision information monitoring
CN103103987A (en) Combined steel plate pile construction guide frame and construction method of combined steel plate pile
CN106013206A (en) Steel pipe column positioning device and steel pipe concrete column and pile foundation connecting structure
CN101864825B (en) Reinforced concrete prefabricated column positioning device and construction method thereof
CN105317052B (en) Tower crane foundation bolt fixing method
CN205955239U (en) Calibrated mount is used in lattice column construction
CN208650087U (en) Steel pipe column fast-positioning device for contrary sequence method
CN209369328U (en) A kind of removable die carrier structure of lateral wall mould
CN214459689U (en) Cast-in-place box girder support of weak soil foundation
CN212956530U (en) Upright pile verticality control and positioning leading-in device
CN210194603U (en) Empty pile steel pipe column positioning device
CN202265906U (en) Fixing device for anchor bolts of embedded type steel tube concrete column feet
CN116575451A (en) Pile sinking method and device for prefabricated U-shaped concrete sheet pile hole guiding
CN201397153Y (en) Root and stone detector
CN202266034U (en) Fixing device for anchor bolts of embedded type diamond combined steel and concrete column feet
CN214116620U (en) Adjustable support for accurate positioning of permanent double-steel-pipe column
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN201381516Y (en) Embedded bracket for mounting foundation bolt with large diameter
CN208056464U (en) A kind of novel lattice column device
CN209397590U (en) A kind of installation of steel reinforcement cage and concrete casting platform
CN205804392U (en) Steel pipe column positioner

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20090617

Termination date: 20160811

CF01 Termination of patent right due to non-payment of annual fee