CN201129550Y - Pipe support frame - Google Patents

Pipe support frame Download PDF

Info

Publication number
CN201129550Y
CN201129550Y CNU2007202013548U CN200720201354U CN201129550Y CN 201129550 Y CN201129550 Y CN 201129550Y CN U2007202013548 U CNU2007202013548 U CN U2007202013548U CN 200720201354 U CN200720201354 U CN 200720201354U CN 201129550 Y CN201129550 Y CN 201129550Y
Authority
CN
China
Prior art keywords
pipeline
utility
model
overhang
support frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007202013548U
Other languages
Chinese (zh)
Inventor
***
鲁德海
王珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Sixth Metallurgical Construction Co., Ltd.
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNU2007202013548U priority Critical patent/CN201129550Y/en
Application granted granted Critical
Publication of CN201129550Y publication Critical patent/CN201129550Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model discloses a pipeline support frame, which comprises a column (1) provided with a cantilever beam (2) vertically and a support (3) under the cantilever beam (2). When exchanges pipeline, the utility model only needs to cut off the damage portion and the pipeline can be detached by a lifter, and the new pipeline can be installed via same operation, the exchange process is not interfered with the pipeline frame and other lower pipelines, and the utility model has simple and quick exchange.

Description

The pipeline supporting frame
Technical field:
The utility model belongs to a kind of supporting frame.
Background technique:
The transfer line supporting frame of at present a lot of factories all is to adopt the portal trestle structure, and promptly several array of pipes are positioned on the beam side by side, and its problem is that when pipeline damages because pipeline is in the door shape frame, repair and replacement are very inconvenient.
Summary of the invention:
The technical problems to be solved in the utility model is: a kind of Cantilever is provided, makes the pipeline repair and replacement convenient, to overcome the deficiencies in the prior art.
Formation of the present utility model: it comprises pillar (1), and overhang (2) is arranged on the pillar (1), and overhang (2) is vertical with pillar (1), and support (3) is arranged under the overhang (2).
Overhang (2) has more than one or one.
This is compared with prior art novel, only needs when pipeline is changed after the breakage cutting, and promptly available lifting device unloads.And the pipeline that more renews also only needs reverse operating to get final product; Not can with pipe support and all the other lower floor's pipeline interferences, it is convenient to change, quick.
Description of drawings:
Fig. 1 is the portal trestle schematic representation;
Fig. 2 is the utility model structural representation.
Embodiment:
Embodiment of the present utility model: 2 overhangs 2 are arranged on the pillar 1, and overhang 2 is vertical with pillar 1, and overhang has support 3 for 2 times.Pipeline is positioned on the overhang 2 of pillar 1 both sides.Be embedded in the foundation of civil work and then make whole by the weight balancing of two pipelines self and pillar 1 through structural stability.

Claims (2)

1. pipeline supporting frame, it comprises pillar (1), it is characterized in that: overhang (2) is arranged on the pillar (1), and overhang (2) is vertical with pillar (1), and support (3) is arranged under the overhang (2).
2. pipeline supporting frame according to claim 1 is characterized in that: overhang (2) has more than one or one.
CNU2007202013548U 2007-11-14 2007-11-14 Pipe support frame Expired - Fee Related CN201129550Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007202013548U CN201129550Y (en) 2007-11-14 2007-11-14 Pipe support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007202013548U CN201129550Y (en) 2007-11-14 2007-11-14 Pipe support frame

Publications (1)

Publication Number Publication Date
CN201129550Y true CN201129550Y (en) 2008-10-08

Family

ID=40017396

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007202013548U Expired - Fee Related CN201129550Y (en) 2007-11-14 2007-11-14 Pipe support frame

Country Status (1)

Country Link
CN (1) CN201129550Y (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477805A (en) * 2010-11-30 2012-05-30 沈阳铝镁设计研究院有限公司 Double-layer gas cleaning piping support structure in electrolytic plant
CN103953792A (en) * 2014-04-21 2014-07-30 江苏赛宝龙石化有限公司 Multipurpose pipeline supporting frame
CN104019285A (en) * 2014-06-18 2014-09-03 周紫阳 Adjustable pipeline support
CN107215769A (en) * 2017-07-31 2017-09-29 四川弘毅智慧知识产权运营有限公司 A kind of highly effective petroleum pipeline swing pipe device
CN109915659A (en) * 2019-03-06 2019-06-21 中交建研(北京)设计咨询有限公司 The comprehensive suspension and support of antidetonation and the building with the suspension and support

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102477805A (en) * 2010-11-30 2012-05-30 沈阳铝镁设计研究院有限公司 Double-layer gas cleaning piping support structure in electrolytic plant
CN103953792A (en) * 2014-04-21 2014-07-30 江苏赛宝龙石化有限公司 Multipurpose pipeline supporting frame
CN104019285A (en) * 2014-06-18 2014-09-03 周紫阳 Adjustable pipeline support
CN107215769A (en) * 2017-07-31 2017-09-29 四川弘毅智慧知识产权运营有限公司 A kind of highly effective petroleum pipeline swing pipe device
CN107215769B (en) * 2017-07-31 2019-02-01 建宇(上海)石油科技有限公司 A kind of highly effective petroleum pipeline swing pipe device
CN109915659A (en) * 2019-03-06 2019-06-21 中交建研(北京)设计咨询有限公司 The comprehensive suspension and support of antidetonation and the building with the suspension and support
CN109915659B (en) * 2019-03-06 2019-12-24 中交建研(北京)设计咨询有限公司 Anti-seismic comprehensive support and hanger and building with same

Similar Documents

Publication Publication Date Title
CN201129550Y (en) Pipe support frame
CN204478334U (en) modular integrated refrigeration station
CN201891171U (en) Integral bolt assembling frame
CN203781754U (en) Movable weight hoister
CN201303279Y (en) Motor assembly and disassembly tools of narrow and small terminal surface location in space
CN102179786A (en) Adjustable supporting and positioning device
CN204470643U (en) A kind of bridge combined member bar drilling equipment
CN103362315B (en) Hanger for integral hoisting of pipeline and construction method thereof
CN216923436U (en) Water supply and drainage pipe fixed mounting structure for building
CN202088128U (en) Adjustable supporting and positioning device
CN104929375A (en) Large-span truss short-stroke hydraulic jack synchronous slide method and device
CN201136020Y (en) Punching apparatus for tube of timber support
CN204588460U (en) A kind of hoisting fixture
CN103302607B (en) Tool for manufacturing exhaust pipe bracket
CN203461710U (en) Novel tower crane console
CN202107373U (en) Cable and steel wire rope roller support device
CN202164616U (en) Embedded parts and embedded part group of steel structure base for fixing base station
CN202081631U (en) Jacking seat
CN205934959U (en) Punching production line multilayer combo boxes puts up basis
CN204295559U (en) A kind of OCTG rack
CN202631056U (en) Ultrasonic level gauge mounting bracket
CN203656493U (en) Large base cross groove connection device
CN204546232U (en) Profile cut-off machine
CN216190875U (en) Water pump stop valve's change strutting arrangement
CN207103989U (en) A kind of pipe cutter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO

Free format text: FORMER NAME: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

CP03 Change of name, title or address

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

ASS Succession or assignment of patent right

Owner name: CHINA SIXTH METALLURGICAL CONSTRUCTION CO., LTD.

Free format text: FORMER OWNER: GUIYANG ALUMINIUM MAGNESIUM DESIGN + RESEARCH INSTITUTE

Effective date: 20121123

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550081 GUIYANG, GUIZHOU PROVINCE TO: 450000 ZHENGZHOU, HENAN PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20121123

Address after: 450000 No. 36 West Huaihe Road, Henan, Zhengzhou

Patentee after: China Sixth Metallurgical Construction Co., Ltd.

Address before: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee before: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081008

Termination date: 20161114

CF01 Termination of patent right due to non-payment of annual fee