CN201110180Y - Universal placing bracket with bottom beam - Google Patents

Universal placing bracket with bottom beam Download PDF

Info

Publication number
CN201110180Y
CN201110180Y CNU2007201406075U CN200720140607U CN201110180Y CN 201110180 Y CN201110180 Y CN 201110180Y CN U2007201406075 U CNU2007201406075 U CN U2007201406075U CN 200720140607 U CN200720140607 U CN 200720140607U CN 201110180 Y CN201110180 Y CN 201110180Y
Authority
CN
China
Prior art keywords
bottom girder
mudsill
hydraulic prop
supporting
general
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201406075U
Other languages
Chinese (zh)
Inventor
郝正聪
郝莉群
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007201406075U priority Critical patent/CN201110180Y/en
Application granted granted Critical
Publication of CN201110180Y publication Critical patent/CN201110180Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a general caving supporting stand with a mudsill, which is a supporting facility of a general mining and caving top coal working face and mainly comprises single hydraulic props, the mudsill and a top beam, wherein the lower ends of the single hydraulic props on two ends of the supporting stand are fixedly connected with the mudsill through a screw bolt or are cooperatively connected with the mudsill through a sleeve, and the upper end of the single hydraulic prop in the middle is connected with the top beam in a suspended mode. The supporting stand increases the integrality and the stability of the supporting facility and can prevent roof falling accidents, which guarantees personal security, simultaneously, and the supporting stand alleviates the labor intensity of workers and increases the working efficiency.

Description

The general support of putting of band bottom girder
Technical field
The utility model relates to a kind of support, is used for the general roof timbering of adopting top-coal caving face in colliery.
Background technology
General taking and placing top coal (the being called for short general putting) work plane in the colliery, roof fall accident are the very big hidden danger that personal safety was produced, threatened in influence.The surperficial reason of analyzing roof fall accident is that excessive, the soft group of roof pressure puts coal hydraulic prop excessive or that set up and just do not wait.Its basic reason is not connect mutually between the hydraulic prop, independent roof supporting separately, and post when impacting, takes place when hydraulic prop is subjected to unusual external force (roof weighting, blow out and collapse post and rock crash etc.) in the poor stability of pillar easily, causes roof fall.
In addition, the general work plane of putting moves when establishing support and advancing transporter, must remove middle hydraulic prop earlier, and then install again, and hydraulic prop frequently props up, removes in the middle of causing, and working strength of workers is big, inefficiency.
The utility model content
The technical problems to be solved in the utility model provides a kind of simple in structure, is easy to the general support of putting of the combined type band bottom girder that supporting is stable is installed, both can increase the stability of hydraulic prop, reduce the generation of roof fall accident, can reduce labour intensity again, raise labour efficiency.
The general support of putting of the utility model band bottom girder mainly is made up of three hydraulic props, back timber, a foundation beam and a corresponding connector.Bottom girder is placed on perpendicular to rib on the base plate of work plane, under the transporter.The hydraulic prop upper end supporting top beam at bottom girder two ends, the lower end is connected with bolt with bottom girder by connector or is connected with sleeve; The connector that connects with bolt is the footwear plate of fixedlying connected with the hydraulic prop base, by bolt footwear plate and bottom girder are fixed together, the connector that is connected with sleeve is the sleeve that is welded on the bottom girder, and hydraulic prop inserts in the sleeve and is combined together with bottom girder; Hydraulic prop upper end in the middle of the bottom girder hangs with back timber and is connected, and the lower end is supported on the bottom girder, and the intensity of the back-moving spring of this post can be mentioned oil cylinder after should being increased to the pillar unloading, so that support and transporter are pushed ahead.
The general support of putting of the utility model band bottom girder, base plate at work plane is set up bottom girder, hydraulic prop is linked together by connector and bottom girder, the globality and the stability of whole supporting facility have been strengthened, improved shock proof ability, can play preventing that roof fall accident from taking place, guarantee ordinary production, avoid the effect of personal injury.Simultaneously, middle hydraulic prop hangs with back timber and is connected, and moves when establishing support and advancing transporter, and hydraulic prop is suspended on the back timber, needn't prop up repeatedly again, remove, thereby alleviate labor strength, has improved operating efficiency.
Description of drawings
Fig. 1 installs connection diagram for the general support bracket bolt structure of putting of the utility model band bottom girder;
Fig. 2 is that the A of Fig. 1 is to schematic diagram;
Fig. 3 installs connection diagram for the general bracket sleeve tube structure of putting of the utility model band bottom girder;
Fig. 4 is that the A of Fig. 3 is to schematic diagram.
The specific embodiment
By Fig. 1 to Fig. 4 as seen, the general support of putting of the utility model band bottom girder comprises pillar 2,3, back timber 1, bottom girder 4, connector 5,6,7 etc.Pillar is generally three hydraulic props, pillar upper end supporting top beam, the pillar lower end at bottom girder two ends is connected with the bottom girder vertical fixing by connector or is connected, and the pillar lower end in the middle of the bottom girder is supported on the bottom girder, and the upper end hangs by connector with back timber and is connected.
The pillar 2 at bottom girder 4 two ends has two kinds with the connected mode of bottom girder 4: first bolt is connected (as shown in Figure 1), and the footwear plate 5 of fixedlying connected with hydraulic prop 2 bases is fixedlyed connected with bottom girder 4 by bolt; It two is that sleeve connects (as shown in Figure 3), and at the two ends of bottom girder 4 welded sleeve 6, hydraulic prop 2 inserts in the sleeves 6, is connected.
The hydraulic prop 3 in the middle of the bottom girder 4 and the connected mode of back timber 1: use bolt that hydraulic prop 3 is hung by connector 7 and be connected on the back timber 1.
The general support of putting of the utility model band bottom girder is assembled in work plane, is torn open and remove.
Moving when establishing support, can use hydraulic prop or other similar equipment (as jack), support integral body is passed forward, avoid frequent twelve Earthly Branches, removed hydraulic prop, can reduce working strength of workers, increase work efficiency.

Claims (1)

1. general support of putting with bottom girder, described support is assembled by connector by three hydraulic props, back timber, a foundation beam; The hydraulic prop lower end that it is characterized in that described bottom girder two ends is connected with bolt with bottom girder or sleeve is connected; Hydraulic prop upper end in the middle of the described bottom girder hangs by connector with back timber and is connected.
CNU2007201406075U 2007-03-16 2007-03-16 Universal placing bracket with bottom beam Expired - Fee Related CN201110180Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201406075U CN201110180Y (en) 2007-03-16 2007-03-16 Universal placing bracket with bottom beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201406075U CN201110180Y (en) 2007-03-16 2007-03-16 Universal placing bracket with bottom beam

Publications (1)

Publication Number Publication Date
CN201110180Y true CN201110180Y (en) 2008-09-03

Family

ID=39894710

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201406075U Expired - Fee Related CN201110180Y (en) 2007-03-16 2007-03-16 Universal placing bracket with bottom beam

Country Status (1)

Country Link
CN (1) CN201110180Y (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682077A (en) * 2020-12-31 2021-04-20 山东建筑大学 Mining anti-impact three-column parallel type retractable pier column structure with active roof connection, supporting system and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682077A (en) * 2020-12-31 2021-04-20 山东建筑大学 Mining anti-impact three-column parallel type retractable pier column structure with active roof connection, supporting system and construction method

Similar Documents

Publication Publication Date Title
CN201090230Y (en) Fission top beam flexible support
CN201433762Y (en) Novel advance support mechanical boring machine
CN103032091A (en) Self-moving hydraulic support
CN102322281B (en) Tunnel quick-tunneling advance support integrated device
CN101749037B (en) Self-advancing gallery temporary ahead supporting device
CN201513191U (en) Roadway temporary support self-advancing hydraulic support
CN201110180Y (en) Universal placing bracket with bottom beam
CN201225163Y (en) Self-moving hydraulic support for coal mine shortwalling
CN205297613U (en) Formula temporary support support is moved certainly in colliery headwork face in pit
CN204572024U (en) A kind of cantilever extension protector for underground driving working faces
CN202090874U (en) Integrated advance support device for mine speedy drivage
CN201786365U (en) Hydraulic telescopic bracket for borehole coal mine
CN201273194Y (en) Combined hydraulic press frame
CN202645606U (en) Cantilever type heading machine vehicle-mounted matched supporting and anchoring system
CN210396782U (en) Single-beam temporary supporting structure
CN208310827U (en) Gob side entry forces side column Special anchor rod pallet
CN201650328U (en) Self-advancing advance timbering hydraulic support in roadway
CN202866848U (en) Top coal caving support capable of preventing extensible beam from offsetting
CN201144709Y (en) Suspension-shift hydraulic support with overturning beam
CN201396160Y (en) Combined support with mudsill
CN205532330U (en) Tunnel well drilling impels support
CN100497888C (en) Machine-carried forepoling device
CN204646282U (en) Novel return airway advance timbering
CN212898548U (en) Edge spalling prevention device for coal mine tunnel excavation working face
CN203796292U (en) Automatic mining double-stand-column hydraulic beam installation device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080903