CN1970893A - Connecting structure for use in piled anchor supporting system and its construction method - Google Patents
Connecting structure for use in piled anchor supporting system and its construction method Download PDFInfo
- Publication number
- CN1970893A CN1970893A CN 200610200683 CN200610200683A CN1970893A CN 1970893 A CN1970893 A CN 1970893A CN 200610200683 CN200610200683 CN 200610200683 CN 200610200683 A CN200610200683 A CN 200610200683A CN 1970893 A CN1970893 A CN 1970893A
- Authority
- CN
- China
- Prior art keywords
- pile
- anchor
- steel plate
- bar
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 65
- 239000010959 steel Substances 0.000 claims abstract description 65
- 239000004567 concrete Substances 0.000 claims abstract description 30
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 22
- 238000000034 method Methods 0.000 claims abstract description 12
- 238000003466 welding Methods 0.000 claims abstract description 11
- 239000011083 cement mortar Substances 0.000 claims abstract description 9
- 238000004873 anchoring Methods 0.000 claims description 5
- 239000004568 cement Substances 0.000 claims description 5
- 238000002347 injection Methods 0.000 claims description 5
- 239000007924 injection Substances 0.000 claims description 5
- 239000004570 mortar (masonry) Substances 0.000 claims description 5
- 238000009412 basement excavation Methods 0.000 claims description 3
- 238000003780 insertion Methods 0.000 claims description 2
- 230000037431 insertion Effects 0.000 claims description 2
- 238000009415 formwork Methods 0.000 claims 1
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000005553 drilling Methods 0.000 abstract 2
- 239000003351 stiffener Substances 0.000 abstract 2
- 239000000463 material Substances 0.000 abstract 1
- 238000011065 in-situ storage Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 241000357293 Leptobrama muelleri Species 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000007943 implant Substances 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention relates to a connecting structure for pile-anchor supporting system and the implementation method, belonging to base foundation engineering technology. The invention contains three parts that the first part comprises drilling hole, anchorage bars and cement mortar, in which steel bar inserts into the drilling hole on the retaining pile and cement mortar is jetted to anchor the steel bar; the second part comprises concrete and pre-buried steel plate, after support framework the wedge is formed by jetted concrete, steel bar and steel plate; the third part comprises connecting steel plate and stiffener. When it is implemented in detail the first step is locating steel bar, chiseling hole, planting reinforcing bar, jetting cement mortar to anchor; the second step is welding the pre-buried steel plate and anchorage bar, forming wedge by cast-in-place concrete; the final step is welding the connecting steel bar and stiffener on the pre-buried steel plate. The invention is provided with safe and reliable supporting system, low cost, short engineering period. Because steel middle beam is canceled, a mass of steel material is saved so as to decrease engineering cost is greatly, simplify construction procedure and shorten the construction period.
Description
Technical field
The invention belongs to the ground foundation engineering technical field, relate to the deep-foundation pit engineering that adopts the pile-anchor supporting system construction, specially refer to a kind of syndeton and implementation method thereof that is used for pile-anchor supporting system.
Background technology
At present, in the deep-foundation pit engineering that adopts the pile-anchor supporting system construction, the general waist rail of making by i iron or channel-section steel that adopts of connection between lagging pile and the anchor cable, with anchorage cable anchoring on waist rail, connect by certain construction measure and lagging pile, guarantee that the overall coordination of whole pile-anchor supporting system is stressed.Therefore, waist rail plays an important role in whole support system as the force transferring structure of anchor cable (bar) pre-applied force.Waist rail generally is welded by shaped steel, yet weld constructing operation condition is poor, and weldquality is difficult to guarantee, easily forms weak part, the whole unstability of waist rail usually takes place or comes off, and make support system ineffective, causes the deep foundation ditch unstability to be caved in.In addition, this method not only exists the consumption of steel many, and multiple tracks working procedure, constructional difficulties and the trouble such as location, installation of waist rail need be arranged.Therefore there are shortcomings such as poor stability, cost height, operation are many, long in time limit in the contact method of existing pile-anchor supporting system.
Summary of the invention
The purpose of this invention is to provide a kind of syndeton that is used for pile-anchor supporting system, to solve shortcomings such as the poor stability, cost height, the operation that exist are many, long in time limit in the pile-anchor retaining structure connects, reach and improve the pile-anchor supporting system overall security, reduce cost, and simplify working procedure and the purpose of reduction of erection time.
The syndeton that is used for pile-anchor supporting system that the present invention proposes comprises following content: by the concrete mats wedge is set on lagging pile, on the concrete mats wedge, be welded to connect steel plate, with anchorage cable anchoring in the connection steel plate on, thereby realized behind the cancellation waist rail connectivity problem of anchor cable and lagging pile.
The syndeton of technical solution of the present invention design mainly comprises three parts: first mainly is made up of boring, anchor bar and cement mortar, and in the boring on the reinforcing bar insertion lagging pile, the cement injection mortar carries out anchoring; Second portion mainly is made up of concrete and pre-buried steel backing plate, and outside billet and inboard reinforcing bar weld together behind the location, concreting then, and the pad wedge of reinforcing bar, billet and concrete formation becomes one with lagging pile; Third part is to connect steel plate and stiffening rib.
Connecting steel plate is to be welded on the pre-buried steel backing plate of concrete mats wedge two face down bonding stiffening ribs.Connecting steel plate can adopt a block plate vertical welding to be connected on the pre-buried steel backing plate of pad wedge; Connecting steel plate also can adopt the steel plate of two obliques to be welded on the pre-buried steel backing plate of pad wedge.
Anchor cable among the present invention between two (bar) two anchor cables (bar) of can constructing, the anchor cable (bar) of also can constructing is connected with the both sides lagging pile respectively.
Effect of the present invention and benefit are:
1. safe and reliable.The present invention is directly delivered to anchor cable on the lagging pile with the power of anchor cable by connecting steel plate and concrete mats wedge, makes concrete become the bearing of anchor cable maintenance.Made full use of the very high anti-pressure ability of concrete mats wedge, anchor cable and lagging pile are can well overall coordination stressed, and the good integrity of supporting and protection structure is safe and reliable.And must the power of anchor cable could be delivered on the lagging pile by the steel waist rail in traditional pile-anchor supporting system, after soil pressure reached certain value, local buckling and whole unstability can take place and the destruction that causes whole supporting structure system in waist rail.
2. cost is low.Syndeton of the present invention has been cancelled the connected mode of using waist rail in traditional pile-anchor supporting system, has saved the shaped steel steel greatly, has cancelled a large amount of connection batten plate, welding rod and economize on electricity, saves construction costs about 1/3rd.
3. operation is few, the duration short.The present invention has been owing to cancelled the contact method of traditional employing waist rail, the welding job of having saved large amount of complex, and more important is the installation work of having avoided heavy and dangerous waist rail, has simplified working procedure, has shortened the construction period.
Description of drawings
Fig. 1 is the floor map of a kind of mode of syndeton of the present invention.Construction two anchor cables (bar) are connected with the lagging pile of both sides respectively between two.
Fig. 2 is the floor map of the another kind of mode of syndeton of the present invention.A construction anchor cable (bar) with an anchor cable (bar) separated into two parts, is connected with the lagging pile of both sides respectively between two.
Fig. 3 is the floor map of syndeton pattern 1 of the present invention.Connecting steel plate adopts a block plate vertical welding to be connected on the pre-buried steel backing plate of pad wedge.
Fig. 4 is the floor map of syndeton pattern 2 of the present invention.The steel plate that connects two obliques of steel plate employing is welded on the pre-buried steel backing plate of pad wedge.
Fig. 5 is the elevational schematic view of syndeton pattern 1 of the present invention.Connecting steel plate adopts a block plate vertical welding to be connected on the pre-buried steel backing plate of pad wedge.
Fig. 6 is the elevational schematic view of syndeton pattern 2 of the present invention.The steel plate that connects two obliques of steel plate employing is welded on the pre-buried steel backing plate of pad wedge.
Fig. 7 is the generalized section of syndeton pattern 1,2 of the present invention.
Fig. 8 is the foundation ditch elevational schematic view of a kind of pattern of the embodiment of the invention.Construction two anchor cables (bar) are connected with the lagging pile of both sides respectively between two.
Fig. 9 is the foundation ditch elevational schematic view of the another kind of pattern of the embodiment of the invention.A construction anchor cable (bar) with an anchor cable (bar) separated into two parts, is connected with the lagging pile of both sides respectively between two.
Figure 10 is the foundation ditch generalized section of embodiments of the invention.
Among Fig. 1~Figure 10: 1 lagging pile; The reinforced hole that 2 cement mortar are built; 3 reinforcing bars; 4 pre-buried steel backing plates; 5 cast-in-situ concretes; 6 stiffening ribs; 7 connect steel plate; 8 anchor cables (bar); 9 anchor heads; 10 ground; 11 fore shaft beams; 12 substrates.
The specific embodiment
Below in conjunction with technical scheme and accompanying drawing, be described in detail the specific embodiment of the present invention and embodiment.
The present invention design be used for the pile-anchor supporting system syndeton, its schematic diagram such as Fig. 1~shown in Figure 7 bore anchor hole 2 on lagging pile 1, implant reinforcing bar 3 in anchor hole, the cement injection mortar carries out anchoring in anchor hole then; Billet 4 welds together with inboard reinforcing bar 3, and concreting 5 then, makes reinforcing bar 3, pre-buried steel backing plate 4 become one with cast-in-situ concrete 5, is close on lagging pile 1 outer wall, forms the concrete mats wedge; Connecting steel plate 7 is welded on the pre-buried steel backing plate that fills up wedge.
The syndeton implementation step that is used for pile-anchor supporting system provided by the invention is as follows:
(bar) projected depth along the lagging pile excavation pit to anchor cable; Draw a logical line in that anchor cable (bar) position along continuous straight runs is elongated, and be set on the lagging pile as anchor cable (bar) position, hole baseline; Then on lagging pile apart from baseline each determining deviation 100mm ~ 200mm up and down, carry out location, reinforced hole position; Carry out behind the location punchinging with hammer drill according to design aperture and the degree of depth, hole depth should have surplus, and the cement injection mortar is implanted the two rows reinforcing bar, and the design size of mat wedge and angle adjustment two rows reinforcing bar are exposed at lagging pile length outward.
Step 2
The concrete of the lagging pile pile body in the pad wedge scope is cut a hole hair handles, treat that cement mortar reaches design strength after, with billet and reinforcing bar firm welding; Prop up template then and carry out concrete building under the billet, treat that concrete reaches form removal after the design strength, has formed the concrete mats wedge;
Step 3 is welded to connect steel plate and stiffening rib on the pre-buried steel backing plate of pad wedge;
Step 4
Anchor cable is passed from the preformed hole that connects steel plate, ground tackle is installed, the stretch-draw anchor cable has been finished the connection construction of pile-anchor supporting system.
The present invention design be used for the pile-anchor supporting system syndeton, its main feature is:
Utilize position and the length of implanting reinforcing bar 3 in the lagging pile 1 to adjust at any time; Utilize the intensity of the billet 4 that welds together with reinforcing bar 3 and cast-in-situ concrete 5 self, bear the vertical direction component that anchor cable bears; Form one by the reinforcing bar 3 and the cast-in-situ concrete 5 of implanting in 1 of the lagging pile with lagging pile 1, be welded on the billet 4 that fills up wedge connecting steel plate 7, guaranteed the globality of syndeton, owing to cancelled the waist rail in traditional pile-anchor supporting system, saved great deal of steel, avoided complicated welding and installation procedure, therefore structural integrity is good, safe and reliable, saved cost greatly simultaneously, shortened the duration.
By abovementioned technology, guaranteed the safety and the stability of supporting and protection structure, improve the pile-anchor supporting system bulk strength, reach the stable purpose of foundation ditch.
Embodiment
To the relatively poor deep-foundation pit engineering of geological conditions, adopt pile-anchor supporting system usually.Shown in Fig. 8,9,10, the dark 12.4m of this routine foundation ditch, the long 15m of lagging pile stake of employing, stake footpath 0.8m, pile spacing 1.6m arrange two row's anchor cables, 25 ° at anchor cable inclination angle respectively in 5.0m, 7.5m position.
As Fig. 1~shown in Figure 7, carry out lagging pile 1 construction according to design drawing, 10 excavation pits carry out first construction of arranging anchor cable 8 to 5.0m from ground then; At first draw a logical line, accurately make first row's anchor cable, 8 borings, 2 position absolute altitudes at upper edge, 5.0m position lagging pile 1; Concrete mats wedge dimension a=125mm, b=208mmmm among Fig. 7 can calculate reinforcing bar position and length in reserve according to the size of a, b, and wherein going up placing of reinforcement 3 protruded lengths is 140mm, placing of reinforcement 3 protruded lengths are 230mm down; Then in the lagging pile center each side 100mm make 2 centers, position, 4 reinforced hole holes; The utilization machinery of punchinging carries out small-bore boring, aperture φ 42, hole depth 220mm; Perfusion M20 cement mortar is laid φ 25 reinforcing bars 3; Guarantee that according to the anchor cable inclination angle pre-buried steel backing plate 4 planes and horizontal plane angle are 75 °, the pre-buried steel back plate sizes is 400mm * 300mm * 12mm, the planarization of pre-buried steel backing plate 4 when guaranteeing with 3 welding of two rows reinforcing bar; Install the template of cast-in-situ concrete 5, cast C30 concrete reaches intensity 75% back stripping, form the concrete mats wedge, after being welded to connect steel plate 7 on the pre-buried steel backing plate 4, connecting steel plate 7 and be of a size of 300mm * 400mm * 20mm, weld stiffening rib 6 again, formed syndeton of the present invention.
Carry out anchor cable 8 then stretching constructions are installed, carry out second row's anchor cable construction after finishing first row's anchor cable construction, can finish whole base pit engineering support works.
Claims (3)
1. one kind is used for pile-anchor supporting system syndeton and implementation method thereof, it is characterized in that syndeton comprises three parts: first mainly is made up of with cement mortar boring (2), anchor bar (3), in the boring (2) on reinforcing bar (3) the insertion lagging pile, the cement injection mortar carries out anchoring; Second portion mainly is made up of concrete (5) and pre-buried steel backing plate (4), billet (4) welds together after locating with anchor bar (3), the concrete of pouring into a mould behind the formwork (5), reinforcing bar (3) and billet (4) shape pad-forming wedge become one with lagging pile (1); Third part is to connect steel plate (7) and stiffening rib (6), connects steel plate (7) and is welded on the pre-buried steel pad (4) that fills up on the wedge.
2. according to the described a kind of pile-anchor supporting system syndeton that is used for of claim 1, it is characterized in that also comprising the steel plate that connects steel plate (a 7) vertical steel plate of employing or two obliques.
3. a kind of its implementation method of pile-anchor supporting system syndeton that is used for according to claim 1 is characterized in that comprising following each step:
Step 1 is (bar) projected depth along the lagging pile excavation pit to anchor cable; Draw a logical line in that anchor cable (bar) position along continuous straight runs is elongated, and be set on the lagging pile as anchor cable (bar) position, hole baseline; Then on lagging pile apart from baseline each determining deviation 100mm ~ 200mm up and down, carry out location, reinforced hole position; Carry out behind the location punchinging with hammer drill according to design aperture and the degree of depth, hole depth should have surplus, and the cement injection mortar is implanted the two rows reinforcing bar, and the design size of mat wedge and angle adjustment two rows reinforcing bar are exposed at lagging pile length outward;
Step 2 is cut a hole hair to the concrete of the lagging pile pile body in the pad wedge scope and is handled, treat that cement mortar reaches design strength after, with billet and reinforcing bar firm welding; Prop up template then and carry out concrete building under the billet, treat that concrete reaches form removal after the design strength, has formed the concrete mats wedge;
Step 3 is welded to connect steel plate and stiffening rib on the pre-buried steel backing plate of pad wedge;
Step 4 is passed anchor cable from the preformed hole that connects steel plate, ground tackle is installed, and the stretch-draw anchor cable has been finished the connection construction of pile-anchor supporting system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102006830A CN100473787C (en) | 2006-07-13 | 2006-07-13 | Connecting structure for use in piled anchor supporting system and construction method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNB2006102006830A CN100473787C (en) | 2006-07-13 | 2006-07-13 | Connecting structure for use in piled anchor supporting system and construction method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1970893A true CN1970893A (en) | 2007-05-30 |
CN100473787C CN100473787C (en) | 2009-04-01 |
Family
ID=38111905
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB2006102006830A Expired - Fee Related CN100473787C (en) | 2006-07-13 | 2006-07-13 | Connecting structure for use in piled anchor supporting system and construction method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN100473787C (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102409685A (en) * | 2011-09-14 | 2012-04-11 | 中铁四局集团第一工程有限公司 | Positioning mold and positioning method of railway bed mortar flag stone arch-shaped framework protective slope |
CN102505698A (en) * | 2011-10-12 | 2012-06-20 | 李宪奎 | Soil mass supporting structure and construction method thereof |
CN103015416A (en) * | 2012-12-11 | 2013-04-03 | 中铁西北科学研究院有限公司勘察设计分公司 | Anchor cable-pretensioned reaction force device and implementation method of same |
CN103174151A (en) * | 2013-03-16 | 2013-06-26 | 中铁二院工程集团有限责任公司 | Retaining reinforced structure for excavation of foundation pit adjacent to existing construction |
CN106498950A (en) * | 2016-12-21 | 2017-03-15 | 大连交通大学 | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body |
CN110725203A (en) * | 2019-11-18 | 2020-01-24 | 深圳市市政设计研究院有限公司 | Fork ear formula jib anchor structure |
-
2006
- 2006-07-13 CN CNB2006102006830A patent/CN100473787C/en not_active Expired - Fee Related
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102409685A (en) * | 2011-09-14 | 2012-04-11 | 中铁四局集团第一工程有限公司 | Positioning mold and positioning method of railway bed mortar flag stone arch-shaped framework protective slope |
CN102409685B (en) * | 2011-09-14 | 2013-09-25 | 中铁四局集团第一工程有限公司 | Positioning mold and positioning method of railway bed mortar flag stone arch-shaped framework protective slope |
CN102505698A (en) * | 2011-10-12 | 2012-06-20 | 李宪奎 | Soil mass supporting structure and construction method thereof |
CN103015416A (en) * | 2012-12-11 | 2013-04-03 | 中铁西北科学研究院有限公司勘察设计分公司 | Anchor cable-pretensioned reaction force device and implementation method of same |
CN103174151A (en) * | 2013-03-16 | 2013-06-26 | 中铁二院工程集团有限责任公司 | Retaining reinforced structure for excavation of foundation pit adjacent to existing construction |
CN106498950A (en) * | 2016-12-21 | 2017-03-15 | 大连交通大学 | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system and its implementation of pile body |
CN106498950B (en) * | 2016-12-21 | 2018-11-30 | 大连交通大学 | Anchor head is placed in the implementation method of the Pile-Anchor Supporting for Deep Excavation system of pile body |
CN110725203A (en) * | 2019-11-18 | 2020-01-24 | 深圳市市政设计研究院有限公司 | Fork ear formula jib anchor structure |
Also Published As
Publication number | Publication date |
---|---|
CN100473787C (en) | 2009-04-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924711B (en) | The construction technology of assembling grillage shear wall structural system | |
CN104060629B (en) | The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo | |
CN207017275U (en) | Recyclable system of deep foundation pit support can be assembled | |
CN106930271A (en) | It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground and its construction method without fertile groove | |
CN103306289A (en) | Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof | |
CN100473787C (en) | Connecting structure for use in piled anchor supporting system and construction method thereof | |
CN107700366B (en) | Deep water high-block bridge degree the bridge construction naked rock river bed trestle of hard stone and construction method | |
CN102587924A (en) | Construction method for shallow-buried high-water-content clayed soil tunnel | |
CN104727318A (en) | Foundation ditch composite concrete nail supporting structure and method | |
CN204626396U (en) | A kind of foundation ditch composite soil nailed wall | |
CN106988333B (en) | Prefabricated bearing platform with dowel bar filling core and construction process thereof | |
CN206408630U (en) | Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body | |
CN201801843U (en) | Overwater gravity type earth-retaining structure with anchoring structure | |
CN206800370U (en) | It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove | |
CN100429354C (en) | Concrete combined cushion wedge for supporting waist beam for pile anchoring system, and its constrection method | |
CN210106749U (en) | Counter-force structure of soft soil foundation super large section push pipe jacking operation | |
CN208907228U (en) | A kind of prestressing force modular retaining wall | |
CN203373753U (en) | Pile anchor retaining wall concrete anchor cable top beam structure of foundation ditches | |
CN217204165U (en) | Assembled anchor rod frame beam | |
CN110952563A (en) | Temporary anti-floating structure for excavation of foundation pit above existing subway tunnel | |
CN201232189Y (en) | Composite soil nail wall supporting construction for adding piers | |
CN209854763U (en) | Road shoulder retaining wall | |
CN207659988U (en) | Crane beam on rock wall for underground power house present situation foundation reinforcing structure | |
CN207062956U (en) | A kind of deep basal pit waist rail construction typified form system | |
CN112012761A (en) | Construction method of anti-disturbance double-arch tunnel structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090401 Termination date: 20210713 |
|
CF01 | Termination of patent right due to non-payment of annual fee |