CN210106749U - Counter-force structure of soft soil foundation super large section push pipe jacking operation - Google Patents

Counter-force structure of soft soil foundation super large section push pipe jacking operation Download PDF

Info

Publication number
CN210106749U
CN210106749U CN201920887481.0U CN201920887481U CN210106749U CN 210106749 U CN210106749 U CN 210106749U CN 201920887481 U CN201920887481 U CN 201920887481U CN 210106749 U CN210106749 U CN 210106749U
Authority
CN
China
Prior art keywords
bottom plate
steel
base
counter
force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920887481.0U
Other languages
Chinese (zh)
Inventor
黄建华
鲍锋
李宏
钱海波
夏昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian University of Technology
Original Assignee
Fujian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian University of Technology filed Critical Fujian University of Technology
Priority to CN201920887481.0U priority Critical patent/CN210106749U/en
Application granted granted Critical
Publication of CN210106749U publication Critical patent/CN210106749U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a weak soil foundation super large section push pipe jacking operation's counter-force structure, including the basement of bottom plate and reinforcement bottom plate, the basement is for setting up the stirring stake under the bottom plate or spouting the stake soon, be equipped with the base of installation jack on the bottom plate, still be equipped with the rectangle steel member on the bottom plate, the equidistant butt of reaction end of each jack is at the preceding terminal surface of rectangle steel member, apply the counter-force to the rectangle steel member, rectangle steel member rear end face is equipped with the steel corbel that corresponds with jack, steel corbel and pre-buried reinforcing bar fixed connection in the basement, provide the counter-force to the rectangle steel member and support. The utility model discloses utilize stirring stake or spout soon the stake and replace conventional back wall way in the past with the basic anchor structure of prestressed anchorage pole combination, carry out the ground reinforcement through stirring stake or spout soon the stake on the one hand, on the other hand passes through embedded steel bar and transmits the effort to the soil layer in, makes anchor structure remain stable, can bear the jacking force that advances equipment production in the big section push pipe work progress of weak soil ground.

Description

Counter-force structure of soft soil foundation super large section push pipe jacking operation
Technical Field
The utility model relates to a field especially relates to a weak soil foundation super large section push pipe pushes up counter-force structure of advancing operation.
Background
The pipe jacking construction is that a jacking device such as a hydraulic jack is adopted, a tool pipe or a heading machine is lowered down from a starting well according to a designed gradient and is excavated to penetrate through a soil layer to be jacked into a receiving well for hoisting, and a prefabricated pipe joint is continuously extended and buried between two working wells after being tightly followed by the tool pipe or the heading machine under the jacking action of the jack, so that the non-excavation laying of underground pipelines is realized.
In underground pipe jacking construction, a back wall is a wall body used for resisting jacking counterforce in a working well and mainly provides enough supporting force for jacking equipment. In the whole construction process, all the pressure generated by the jacking pipes is concentrated on the back wall, so that the stability and the bearing capacity of the back rest have very important effects on the construction of the whole underground jacking pipe.
The conventional method of the front and rear back walls is a thick reinforced concrete wall, steel bars are bound with a lining wall during construction, and concrete is integrally poured. However, under the condition of penetrating through a shallow soil covered soft soil stratum, the jacking force of the jacking pipe with the ultra-large section far exceeds the jacking force of a back wall structure and a soil body of a conventional working well, and the instability damage is easily generated by adopting the conventional working well and the back wall form thereof during construction.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a weak soil foundation super large section push pipe jacking operation's counter-force structure solves at present in the construction of the big section rectangle push pipe in weak soil area, and conventional back wall way can not satisfy the problem of push pipe jacking counter-force, provides the guarantee for safe construction.
In order to realize the purpose of the utility model, the technical proposal of the utility model is that: a counter-force structure for pushing-in operation of a soft soil foundation ultra-large section jacking pipe comprises a base plate and a base for reinforcing the base plate, wherein a plurality of jacks which are transversely arranged in parallel are arranged on the base plate, a base for mounting the jacks is arranged on the base, at least one hoop for fixing the jacks is arranged on the base, rectangular steel members are also arranged on the base plate, the counter-force ends of the jacks are abutted to the front end face of each rectangular steel member at equal intervals to apply counter-force to the rectangular steel members, steel brackets corresponding to the jacks are arranged on the rear end face of each rectangular steel member, the steel brackets are fixedly connected with reinforcing steel bars pre-embedded in the base, and counter-force support is provided for the rectangular steel members;
the base is a stirring pile or a jet grouting pile arranged below the bottom plate, the height of the stirring pile or the jet grouting pile is six meters, a vertical prestressed anchor rod is pre-embedded in the stirring pile or the jet grouting pile, and the upper end of the prestressed anchor rod is embedded in the bottom plate to reinforce the bottom plate;
the steel bracket is right trapezoid steel member, and the right angle waist butt of steel bracket is equipped with a plurality of bolt holes on the rear end face of rectangle steel member, the terminal surface under the steel bracket, is equipped with high strength bolt in the bolt hole, pre-buried reinforcing bar is the HRB400 reinforcing bar of vertical setting in the basement, and HRB400 reinforcing bar upper end is buried the bottom plate and is connected with high strength bolt muffjoint, fixes the steel bracket.
Further, the bottom plate is formed by pouring C40 concrete.
Further, a plain concrete cushion layer is arranged between the bottom plate and the substrate, and the plain concrete cushion layer is C20 concrete with the thickness of 200 mm.
Furthermore, a steel box is embedded in the bottom plate and sleeved outside the HRB400 steel bars.
The utility model has the advantages that: the utility model discloses utilize stirring stake or spout stake soon and add the basic anchor structure of prestressed anchorage pole combination and replace conventional back wall way in the past, on the one hand carry out the ground reinforcement through stirring stake or spout stake soon, on the other hand transmits the effort to the soil layer through embedded bar in, make anchor structure remain stable, can bear the jacking force that advances equipment production in the big section push pipe work progress of weak soil ground, it is firm to ensure steel corbel support from aspects such as rigidity and intensity, transmission and the whole atress of assurance power, it can not provide effectual support or control for big section push pipe jacking to advance to have solved traditional back wall way and can not live the deformation scheduling problem, ensure the safety of push pipe engineering and go on smoothly.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a cross-sectional view of the bottom plate and base of the present invention;
FIG. 3 is a bottom view of the steel corbel of the present invention;
fig. 4 is an installation schematic diagram of the steel corbel of the present invention.
Detailed Description
The technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings.
As shown in fig. 1-4, a counter-force structure for a soft soil foundation ultra-large section pipe jacking operation includes a bottom plate 1 and a base 2 for reinforcing the bottom plate 1, wherein the bottom plate 1 is provided with a plurality of jacks 3 (not shown) arranged in parallel in a transverse direction and a base 4 for mounting the jacks 3, the base 4 is provided with at least one hoop 5 for fixing the jacks 3, the bottom plate 4 is further provided with a rectangular steel member 6, the counter-force ends of the jacks 3 are abutted against the front end face of the rectangular steel member 6 at equal intervals to apply counter-force to the rectangular steel member 6, the rear end face of the rectangular steel member 6 is provided with a steel corbel 7 corresponding to the jack 3, the steel corbel 7 is fixedly connected with a steel bar 11 pre-embedded in the base 2 to provide counter-force support for the rectangular steel member 6;
as shown in fig. 2, the substrate 2 is a mixing pile or a jet grouting pile arranged below the bottom plate 1, the height of the mixing pile or the jet grouting pile is six meters, a vertical prestressed anchor 8 is embedded in the mixing pile or the jet grouting pile, and the upper end of the prestressed anchor 8 is embedded in the bottom plate to reinforce the bottom plate;
the steel corbel 7 is right trapezoid steel member, and the right angle waist butt of steel corbel 7 is equipped with a plurality of bolt holes 9 on the rear end face of rectangle steel member 6, and the terminal surface is equipped with high strength bolt 10 in the bolt hole 9 under the steel corbel 7, as shown in fig. 3, pre-buried reinforcing bar 11 is the HRB400 reinforcing bar of vertical setting in the basement 2, and HRB400 reinforcing bar upper end is buried bottom plate 1 and with high strength bolt 10 muffjoint, as shown in fig. 4, fixes steel corbel 7, transmits the reaction force of steel corbel 7 transmission to the soil layer in the while.
The bottom plate 1 is formed by pouring C40 concrete.
A plain concrete cushion layer 12 is arranged between the bottom plate 1 and the substrate 2, and the plain concrete cushion layer is C20 concrete with the thickness of 200 mm.
A steel box 13 is embedded in the bottom plate 1, and the HRB400 steel bars are sleeved with the steel box 13.
The utility model discloses utilize stirring stake or spout stake soon and add the basic anchor structure of prestressed anchorage pole combination and replace conventional back wall way in the past, on the one hand carry out the ground reinforcement through stirring stake or spout stake soon, on the other hand transmits the effort to the soil layer through embedded bar in, make anchor structure remain stable, can bear the jacking force that advances equipment production in the big section push pipe work progress of weak soil ground, it is firm to ensure steel corbel support from aspects such as rigidity and intensity, transmission and the whole atress of assurance power, it can not provide effectual support or control for big section push pipe jacking to advance to have solved traditional back wall way and can not live the deformation scheduling problem, ensure the safety of push pipe engineering and go on smoothly.
The described embodiments are only some, but not all embodiments of the invention. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the scope of the present invention.

Claims (4)

1. A counter-force structure for pushing-in operation of a soft soil foundation ultra-large section jacking pipe is characterized by comprising a base plate and a base for reinforcing the base plate, wherein a plurality of jacks which are transversely arranged in parallel are arranged on the base plate, a base for mounting the jacks is arranged on the base, at least one hoop for fixing the jacks is arranged on the base, rectangular steel members are also arranged on the base plate, the counter-force ends of the jacks are abutted against the front end face of each rectangular steel member at equal intervals to apply counter-force to the rectangular steel members, steel brackets corresponding to the jacks are arranged on the rear end face of each rectangular steel member, the steel brackets are fixedly connected with reinforcing steel bars pre-embedded in the base, and counter-force support is provided for the rectangular steel members;
the base is a stirring pile or a jet grouting pile arranged below the bottom plate, the height of the stirring pile or the jet grouting pile is determined according to a soil layer of a field, a vertical prestressed anchor rod is pre-embedded in the stirring pile or the jet grouting pile, and the upper end of the prestressed anchor rod is embedded in the bottom plate to reinforce the bottom plate;
the steel bracket is right trapezoid steel member, and the right angle waist butt of steel bracket is equipped with a plurality of bolt holes on the rear end face of rectangle steel member, the terminal surface under the steel bracket, is equipped with high strength bolt in the bolt hole, pre-buried reinforcing bar is the HRB400 reinforcing bar of vertical setting in the basement, and HRB400 reinforcing bar upper end is buried the bottom plate and is connected with high strength bolt muffjoint, fixes the steel bracket.
2. The counterforce structure of claim 1, wherein said bottom plate is cast of C40 concrete.
3. The counterforce structure of claim 1, wherein a plain concrete cushion layer is arranged between the bottom plate and the base, and the plain concrete cushion layer is 200mm thick C20 concrete.
4. The counterforce structure of claim 1, wherein a steel box is embedded in the bottom plate, and the steel box is sleeved outside the HRB400 steel bars.
CN201920887481.0U 2019-06-13 2019-06-13 Counter-force structure of soft soil foundation super large section push pipe jacking operation Expired - Fee Related CN210106749U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920887481.0U CN210106749U (en) 2019-06-13 2019-06-13 Counter-force structure of soft soil foundation super large section push pipe jacking operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920887481.0U CN210106749U (en) 2019-06-13 2019-06-13 Counter-force structure of soft soil foundation super large section push pipe jacking operation

Publications (1)

Publication Number Publication Date
CN210106749U true CN210106749U (en) 2020-02-21

Family

ID=69564208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920887481.0U Expired - Fee Related CN210106749U (en) 2019-06-13 2019-06-13 Counter-force structure of soft soil foundation super large section push pipe jacking operation

Country Status (1)

Country Link
CN (1) CN210106749U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110131479A (en) * 2019-06-13 2019-08-16 福建工程学院 A kind of counterforce structure of soft soil foundation large section push pipe jacking operation
CN111997089A (en) * 2020-08-24 2020-11-27 陕西铭捷交通工程有限公司 Construction method based on assembled self-balancing type pushing working pit system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110131479A (en) * 2019-06-13 2019-08-16 福建工程学院 A kind of counterforce structure of soft soil foundation large section push pipe jacking operation
CN110131479B (en) * 2019-06-13 2024-04-16 福建工程学院 Reaction structure for jacking operation of soft soil foundation super-large section jacking pipe
CN111997089A (en) * 2020-08-24 2020-11-27 陕西铭捷交通工程有限公司 Construction method based on assembled self-balancing type pushing working pit system

Similar Documents

Publication Publication Date Title
KR101410471B1 (en) Method for buttom-up removal of underground retaining wall by using h-piles remained in earth retaining work of existed building
CN106930271A (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground and its construction method without fertile groove
CN207017275U (en) Recyclable system of deep foundation pit support can be assembled
CN102864781A (en) Foundation pit supporting method utilizing inclined piles
CN102434717A (en) Construction method of joist steel pipe-jacking work pit
CN111560962A (en) Backfill area foundation pit supporting structure and construction method thereof
CN105839946A (en) Brick-concrete structure building lifting add-layer method
CN210106749U (en) Counter-force structure of soft soil foundation super large section push pipe jacking operation
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN100473787C (en) Connecting structure for use in piled anchor supporting system and construction method thereof
CN108385693B (en) Equal-generation anchor bolt supporting method and system for staged basement supporting
CN206800370U (en) It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground without fertile groove
CN203741848U (en) Steel tube plate type retaining structure
CN109440781B (en) Active inclined double-row pile foundation pit supporting method
CN100429354C (en) Concrete combined cushion wedge for supporting waist beam for pile anchoring system, and its constrection method
CN113585336B (en) Quick construction method of sinking type concrete mixing station in soft foundation environment
CN112627249B (en) Construction method for shallow foundation reinforcement
CN201232189Y (en) Composite soil nail wall supporting construction for adding piers
CN110863496B (en) Method for replacing, supporting, excavating and constructing arch center foundation by concrete supporting in stone-filled island building area
CN210049264U (en) Assembled foundation
CN109989415B (en) Construction method of fabricated foundation
CN110131479B (en) Reaction structure for jacking operation of soft soil foundation super-large section jacking pipe
CN207659988U (en) Crane beam on rock wall for underground power house present situation foundation reinforcing structure
JP4856737B2 (en) Foundation reinforcement method for existing houses
CN218933149U (en) SMW construction method pile structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200221