CN1963027A - Pavement digger - Google Patents
Pavement digger Download PDFInfo
- Publication number
- CN1963027A CN1963027A CN 200610098057 CN200610098057A CN1963027A CN 1963027 A CN1963027 A CN 1963027A CN 200610098057 CN200610098057 CN 200610098057 CN 200610098057 A CN200610098057 A CN 200610098057A CN 1963027 A CN1963027 A CN 1963027A
- Authority
- CN
- China
- Prior art keywords
- excavation
- pavement
- harden
- digger
- excavation machine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Road Repair (AREA)
Abstract
An excavation machine for harden ground solves the problems of the pace of progress of prior excavation machines is slow, it is difficult to raising efficiency, and the resulting problem of project cost is rising dramatically. The invention uses the upper domes structure which is preposed on the caterpillar bulldozer, size is from small to big along the front to rear and lateral section is triangle to comprising the pavement excavation machine, so the harden layer splits quickly and we get faster excavation speed. The excavation machine is widely used in large area ground reconditioning such as municipal road and airport.
Description
Technical field
The present invention relates to the backactor of harden ground such as a kind of road breaking machine, especially cement.
Background technology
Present road surface excavation is to adopt pneumatic hammer, throw hammer etc. and pulverize the back excavation, and tempo is slow like this, and efficient is difficult to improve, and causes construction costs to rise significantly thus, and this influences economic worth that road rebuilds and social benefit.
Summary of the invention
Task of the present invention is that to design speed fast, the economical pavement digger that efficient is high.
The present invention is that the ascending cross section in preposition front and back is that triangular form arch structure is formed pavement digger on the employing crawler type promotion machine.Because the structure that hardens that intensive treatment such as the pitch on ground or cement and reinforcing bar form, if destroy on the surface that tension force is big, need the too many energy of waste, our slave plate is forged the comparatively soft real layer of raising that does not harden of face and is started with, adopt comparatively big thrust to arch up from the real layer of raising, the piece that hardens on road surface will be started and be divided like this.
Arch structure in the employing can make the hardening layer on road surface divide rapidly, obtains to excavate faster speed.
The specific embodiment
During concrete enforcement, last arch structure can imitate twin wrest formula structure, and the piece that hardens that arches upward like this can be taken advantage of a situation and be routed up, and does not so just influence the pace of backactor.If the road surface is a two-way traffic, can arch up the easier like this realization block splitting that hardens when constructing simultaneously from middle position.
In the triangular form arch position, can adopt hollow structure, but can not influence intensity for the position.
If hardening layer is thicker can't divide the time, can use in conjunction with impacting pump truck, perhaps carry out the macroplate dividing processing in advance, and then advance arch, so just realization is turned over and is split relatively easily.
Claims (3)
1. the backactor of a harden ground is characterized in that adopting that the ascending cross section in preposition front and back is that triangular form arch structure is formed pavement digger on the crawler type promotion machine.
2. according to claim 1, it is characterized in that arch structure can imitate twin wrest formula structure.
3. according to claim 1, it is characterized in that triangular form arch position employing hollow structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610098057 CN1963027A (en) | 2006-11-29 | 2006-11-29 | Pavement digger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200610098057 CN1963027A (en) | 2006-11-29 | 2006-11-29 | Pavement digger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN1963027A true CN1963027A (en) | 2007-05-16 |
Family
ID=38082243
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200610098057 Pending CN1963027A (en) | 2006-11-29 | 2006-11-29 | Pavement digger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1963027A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109811610A (en) * | 2019-03-04 | 2019-05-28 | 中建路桥集团有限公司 | Road reconstruction method and apparatus for construction of the highway |
-
2006
- 2006-11-29 CN CN 200610098057 patent/CN1963027A/en active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109811610A (en) * | 2019-03-04 | 2019-05-28 | 中建路桥集团有限公司 | Road reconstruction method and apparatus for construction of the highway |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ATE532905T1 (en) | BUILDING CONSTRUCTION | |
CN1710205A (en) | Bituminous pavement top-crack or settlement treating method | |
CN207130634U (en) | A kind of structure for connecting existing T beams and newly-built T beams with reinforcing pull rod using steel plate | |
CN107964874A (en) | A kind of assembly concrete guardrail construction method | |
CN1963027A (en) | Pavement digger | |
RU2405081C1 (en) | Method of repair of road surfacing | |
CN106245542A (en) | Quickly cut bridge deck concrete construction technology | |
CN206706484U (en) | The recyclable prefabricated hard dress floor plate of modularization | |
JP2000199397A (en) | Method of enlarging tunnel for road, highway or expressway without blocking traffic | |
KR101133427B1 (en) | Constructing method of slim road pavement with high elasticity and strength using eco friendly water-tightness mega-polymer concrete | |
CN205146302U (en) | Bionical quartering hammer drill rod | |
RU159936U1 (en) | ROAD PLATE | |
CN104894942B (en) | The recyclable combination construction sidewalk of drainage type | |
JP3276143B2 (en) | Demolition method and apparatus for asphalt pavement plate | |
DE10348077A1 (en) | Road or rail construction method, by driving sheet piles or infill supports into ground, placing support structure on top and excavating soil underneath | |
CN108049272A (en) | A kind of construction method on road surface | |
CN102337750B (en) | Flattening device of excavator | |
CN215976783U (en) | Defective clearing device of slag asphalt concrete pavement | |
CN218880719U (en) | Embankment protection structure made of waste solid concrete | |
CN206328799U (en) | A kind of anti-sticking glutinous excavator bucket hook | |
CN202577095U (en) | Sidewalk brick | |
CN108661061A (en) | Hinged joint opposite supporting type anchors pilework | |
JP2001089210A (en) | Shape of aggregate for concrete | |
WO2016090516A1 (en) | Breaker | |
CN106759609A (en) | A kind of excavator new structure for phosphorus ore mine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Open date: 20070516 |