CN1904308A - 煤层气井***式洞穴完井工艺方法 - Google Patents

煤层气井***式洞穴完井工艺方法 Download PDF

Info

Publication number
CN1904308A
CN1904308A CN 200610047360 CN200610047360A CN1904308A CN 1904308 A CN1904308 A CN 1904308A CN 200610047360 CN200610047360 CN 200610047360 CN 200610047360 A CN200610047360 A CN 200610047360A CN 1904308 A CN1904308 A CN 1904308A
Authority
CN
China
Prior art keywords
cave
bits
well
explosion
explosive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200610047360
Other languages
English (en)
Other versions
CN100434653C (zh
Inventor
王柱军
门孟东
梁振民
梁红义
夏艳东
程林峰
纪宏博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaohe Petroleum Exploration Bureau
Original Assignee
Liaohe Petroleum Exploration Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaohe Petroleum Exploration Bureau filed Critical Liaohe Petroleum Exploration Bureau
Priority to CNB2006100473602A priority Critical patent/CN100434653C/zh
Publication of CN1904308A publication Critical patent/CN1904308A/zh
Application granted granted Critical
Publication of CN100434653C publication Critical patent/CN100434653C/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

本发明涉及一种用于煤层气勘探开发的煤层气井***式洞穴完井工艺方法,该工艺方法包括洞穴***成形、洞穴形态检测、捞屑三大部分,其实施步骤包括:资料准备、材料准备、制定施工风险消减措施、施工准备、***造穴施工、捞屑、在井筒保持畅通的情况下进行后续***造穴施工,***造穴、测试、捞屑等施工反复进行多次,直至达到设计要求为止。此种完井工艺方法造穴规模可控,速度快,并具有显著的造缝功能,利用此种工艺方法造穴施工周期短,成本大大降低,有利于提高单井产量和采收率,确保煤层气开采整体效果。

Description

煤层气井***式洞穴完井工艺方法
技术领域:
本发明涉及一种用于煤层气勘探开发的完井技术。
背景技术:
随着国内外石油、天然气产量和储采比增长的严重失调,石油能源危机日趋加剧。近年来,作为油气替代资源之一的煤层气的勘探开发工作不断加强。煤层气井通常采用裸眼洞穴技术完井,亦即在裸眼完井后,人为地在裸眼段煤层部位,通过工具扩眼方式或者负压方式,形成一个稳定的煤层大洞穴,同时消除可能已发生的煤层地层损害和在井眼周围形成很大面积含有大量张性裂缝的卸载区,提高井眼周围割理裂缝的渗透性,增大地层的导流能力,使井眼与地层之间实现天然裂隙有效连通而达到增产的目的。目前,根据与天然裂缝连通采用的方法不同,国内外煤层气井裸眼洞穴完井方式主要分为三种类型:第一种类型是动态注入/排放。动态注入/排放过程能够充分清洗储层,产生新的裂缝,并扩大已有的裂缝,提高储层与井筒的连通性。根据国内经验,一次典型完整的动态注入/排放操作过程一般需要10~15天,实施20~30次注入作业。第二种类型是动态排放。关地面阀,使地面压力增加到预定值(通常为5~7MPa,低于储层压力)。关闭的时间长短取决于储层压力及渗透率,达到所需压力时,迅速开启阀门放喷,采出气、水、煤及岩屑。由于没有注入阶段,所以动态排放过程对储层的清洗不充分。一次普通的动态排放操作过程一般需要12天左右,实施6个多作业循环。第三种类型是动态水静力负压循环。用压缩空气或混气水做循环介质清洗煤层,使井底压力低于储层压力,煤层受负压产生剪切裂缝。在煤层井段往复循环的过程中,掉落在井筒中的煤屑被循环至地面。确认负压循环法洞穴作业完成后,进行泡沫洗井,从造穴到该项结束,整个过程一般历时10天左右。
综上所述,现有的三种煤层气裸眼洞穴完井方式存在着造穴作业周期长、费用高、对煤层侵害污染大以及地面高压部分存在不安全因素等缺点。
发明内容:
本发明目的在于提供一种可以减少侵入污染、保护煤层并可大大缩短造穴周期的煤层气井***式洞穴完井工艺方法。
本发明的目的是这样实现的。此种完井工艺方法包括洞穴***成形、洞穴形态检测、捞屑三大部分,各部分的工艺方法技术要点如下:
1、洞穴***成形:包括***选择、药柱用量确定、药柱成型、药柱连接、传输方式、药柱定位、校深和起爆。
①***选择,根据***造穴理论和煤区煤层气井具体地质特点,选择液体或固体***;
②药柱用量确定,根据井径和煤层厚度设计,药卷直径和药柱长度,计算出第一次***装药量,第二次扩孔装药量一般为第一次的两倍,依此类推,直至达到要求的洞穴为止;
③药柱成型,装药结构采用密实结构,避免间断或不耦合装药,以有利于增大压缩直径;药卷采用压制成型柱,以有利于运输、下井、安装等作业,而且可以提高***的装填密度;药柱压装时,中间为Φ20mm孔,穿在特制拉杆上;
④药柱连接方式,采用薄壁(δ=1mm)塑料管或是橡胶皮对导爆索和***柱进行整体包覆,起到防水、防摩擦、药柱定位的作用,中间的铁棒(直径φ3mm~φ12mm)起到承载重量、与***连接及构成导线回路作用;选用外径φ40mm的***,上方接0.45m硬电极,再上方接电缆头,下部与中心铁棒螺纹连接,旁边引出一条点火/传感线,该线分成两个线头,一条通过一个电容与***连接,另一条与中心导线连接,一直连接到***柱底部安装的遇阻传感器;从仪器的安全角度考虑,一般取零长LO=5m较合适。地面完成防喷管、0.45m电极系、***、传感器点火下接头延长电缆的连接;
⑤药柱传输方式,可采用电缆传输或油管传输,通常大多采用电缆传输。油管输送药柱时,可考虑在***上端一根油管处加封隔器,调整后先座封,再投棒起爆,这样可减小***威力对井口方向的破坏。起管柱时,选用的封隔器应有良好的解封性能;
⑥***定位方法,***和***采用硬连接,通过测磁***曲线可准确知道***的深度位置,并用0.45电极梯度曲线与其校深;
⑦起爆方式,起爆***采用磁电***或投棒引爆药柱。
2、洞穴形态检测:采用声幅测井等检测洞穴形态。
3、捞屑:捞屑方法有电缆捞屑、动态泡沫液循环、清洗煤屑、钻杆或油管下加捞屑筒捞屑和部分捞屑,部分下推残留井底等多种,通常采用钻具划眼循环除屑和捞筒机械捞屑、清理井底煤屑。
此种完井工艺方法的实施步骤如下:
1、资料准备:收集录取各种必要的测井资料,详细了解施工井的各方面情况,根据***造穴通知单设计装药***校深方式,完成***造穴设计;
2、材料准备:包括①药柱形状设计和加工;②***附着棒的加工;③井口专用防喷管的加工;④***及井下仪器连接材料的加工;⑤准备一定数量和安全级别的防水电磁***、防水导爆索;
3、制定施工风险消减措施,包括井筒与井场瓦斯防爆、施工过程防喷、施工程序规范化等,保证施工全过程安全环保;
4、施工准备:①按要求安装天滑轮、地滑轮、***和电缆;②关闭井场所有电源;③地面配接***和药柱,准确测量点火零长;④井口深度对零;
5、***造穴施工:①按常规射孔施工要求完成测量、定位、校深;②将药柱中心对准煤层预定***深度位置,电磁***点火,实施***;
6、捞屑:每次煤层***后均须捞屑,根据实际情况决定采用何种捞屑方式,首选方式为钻具划眼循环除屑和捞筒机械捞屑;
7、在井筒保持畅通的情况下,进行后续***造穴施工;
8、***造穴、测试、捞屑等施工反复进行多次,直至达到设计要求为止。
本发明提供的煤层气井***式洞穴完井工艺方法造穴规模可控,速度快,并具有显著的造缝功能,利用此种工艺方法造穴施工周期短,成本大大降低,有利于提高单井产量和采收率,确保煤层气开采整体效果。
附图说明:
图1为本发明***式洞穴完井工艺原理示意图。图2为***成型和连接方式示意图。
具体实施方式:
本发明由以下实施例给出,下面结合附图对本发明作进一步描述。
如图1所示,本发明完井施工过程中,采用测井绞车1、大钩2将电缆6通过井口防喷管3、采油树4和防喷器5下入井内;井下电缆6连接有0.45电极系7和***8,下端连接有***药柱9和遇阻传感器10。图1中,标号“11”为煤层气井水泥环,“12”为短套管,“13”为套管鞋,“14”为裸眼筒,“15”为煤层,“16”为井底。图2为图1井下部分放大图,显示电缆6、0.45电极系7、***8、***药柱9和遇阻传感器10的形状和连接方式,并给出点火零长Lo测量点的位置。

Claims (2)

1、一种煤层气井***式洞穴完井工艺方法,其特征在于:该工艺方法包括洞穴***成形、洞穴形态检测、捞屑三大部分,各部分的工艺方法技术要点如下:
(1)、洞穴***成形:包括***选择、药柱用量确定、药柱成型、药柱连接、传输方式、药柱定位、校深和起爆:
①***选择,根据***造穴理论和煤区煤层气井具体地质特点,选择液体或固体***;
②药柱用量确定,根据井径和煤层厚度设计药卷直径和药柱长度,计算出第一次***装药量,第二次扩孔装药量一般为第一次的两倍,依此类推,直至达到要求的洞穴为止;
③药柱成型,装药结构采用密实结构,避免间断或不耦合装药,以有利于增大压缩直径;药卷采用压制成型柱,以有利于运输、下井、安装等作业,而且可以提高***的装填密度;药柱压装时,中间为Φ20mm孔,穿在特制拉杆上;
④药柱连接方式,采用薄壁塑料管或是橡胶皮对导爆索和***柱进行整体包覆,起到防水、防摩擦、药柱定位的作用,中间的铁棒起到承载重量、与***连接及构成导线回路作用;选用外径φ40mm的***,上方接0.45m硬电极,再上方接电缆头,下部与中心铁棒螺纹连接,旁边引出一条点火/传感线,该线分成两个线头,一条通过一个电容与***连接,另一条与中心导线连接,一直连接到***柱底部安装的遇阻传感器;从仪器的安全角度考虑,一般取零长LO=5m,地面完成防喷管、0.45m电极系、***、传感器点火下接头延长电缆的连接;
⑤药柱传输方式,可采用电缆传输或油管传输,通常大多采用电缆传输;油管输送药柱时,可考虑在***上端一根油管处加封隔器,调整后先座封,再投棒起爆,这样可减小***威力对井口方向的破坏,起管柱时,选用的封隔器应有良好的解封性能;
⑥***定位方法,***和***采用硬连接,通过测磁***曲线可准确知道***的深度位置,并用0.45电极梯度曲线与其校深;
⑦起爆方式,起爆***采用磁电***或投棒引爆药柱;
(2)、洞穴形态检测:采用声幅测井等检测洞穴形态;
(3)、捞屑:捞屑方法有电缆捞屑、动态泡沫液循环、清洗煤屑、钻杆或油管下加捞屑筒捞屑和部分捞屑,部分下推残留井底等多种,通常采用钻具划眼循环除屑和捞筒机械捞屑、清理井底煤屑。
2、根据权利要求1所述的煤层气井***式洞穴完井工艺方法,其特征在于:该工艺方法的实施步骤如下:
(1)、资料准备:收集录取各种必要的测井资料,详细了解施工井的各方面情况,根据***造穴通知单设计装药***校深方式,完成***造穴设计;
(2)、材料准备:包括①药柱形状设计和加工;②***附着棒的加工;③井口专用防喷管的加工;④***及井下仪器连接材料的加工;⑤准备一定数量和安全级别的防水电磁***、防水导爆索;
(3)、制定施工风险消减措施,包括井筒与井场瓦斯防爆、施工过程防喷、施工程序规范化等,保证施工全过程安全环保;
(4)、施工准备:①按要求安装天滑轮、地滑轮、***和电缆;②关闭井场所有电源;③地面配接***和药柱,准确测量点火零长;④井口深度对零;
(5)、***造穴施工:①按常规射孔施工要求完成测量、定位校深;②将药柱中心对准煤层预定***深度位置,电磁***点火,实施***;
(6)、捞屑:每次煤层***后均须捞屑,根据实际情况决定采用何种捞屑方式,首选方式为钻具划眼循环除屑和捞筒机械捞屑;
(7)、在井筒保持畅通的情况下,进行后续***造穴施工;
(8)、***造穴、测试、捞屑等施工反复进行多次,直至达到设计要求为止。
CNB2006100473602A 2006-07-28 2006-07-28 煤层气井***式洞穴完井工艺方法 Expired - Fee Related CN100434653C (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2006100473602A CN100434653C (zh) 2006-07-28 2006-07-28 煤层气井***式洞穴完井工艺方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2006100473602A CN100434653C (zh) 2006-07-28 2006-07-28 煤层气井***式洞穴完井工艺方法

Publications (2)

Publication Number Publication Date
CN1904308A true CN1904308A (zh) 2007-01-31
CN100434653C CN100434653C (zh) 2008-11-19

Family

ID=37673650

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2006100473602A Expired - Fee Related CN100434653C (zh) 2006-07-28 2006-07-28 煤层气井***式洞穴完井工艺方法

Country Status (1)

Country Link
CN (1) CN100434653C (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080529A (zh) * 2010-12-17 2011-06-01 中国石油集团长城钻探工程有限公司 煤层气洞穴热力完井方法
CN102155174A (zh) * 2011-03-10 2011-08-17 贵州铸安矿山科技股份有限公司 钻孔泡沫排渣法
CN101586469B (zh) * 2009-07-07 2011-10-12 天地科技股份有限公司 用于深孔超前欲松动***的封孔方法
CN102220853A (zh) * 2010-04-13 2011-10-19 河南长江石油机械有限公司 一种非对称运行的无游梁式煤层气抽采方法及其装置
CN102373919A (zh) * 2010-08-27 2012-03-14 中国石油大学(北京) 煤层气洞穴完井评价实验装置
CN102646360A (zh) * 2012-02-28 2012-08-22 吉林大学 测井过程实验教学演示装置及演示方法
CN103061734A (zh) * 2013-01-06 2013-04-24 河南理工大学 一种煤层气井裸眼化学造穴方法
CN108471667A (zh) * 2012-07-27 2018-08-31 诺瓦斯能源集团有限公司 用于使用等离子体源激发井、沉积物和钻孔的***和方法
CN108979707A (zh) * 2018-08-15 2018-12-11 河南铁福来装备制造股份有限公司 一种适用于煤矿底抽巷定向钻进造穴瓦斯治理的方法
CN113863897A (zh) * 2020-06-12 2021-12-31 中国石油天然气股份有限公司 洞穴完井方法及***
CN113883977A (zh) * 2019-12-10 2022-01-04 四川中鼎***工程有限公司 一种***施工中的孔洞探测装置及测量方法

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5540282A (en) * 1994-10-21 1996-07-30 Dallas; L. Murray Apparatus and method for completing/recompleting production wells
US6109832A (en) * 1998-04-02 2000-08-29 Lincoln; David A. Ram burster and method for installing tubular casing underground
US6561269B1 (en) * 1999-04-30 2003-05-13 The Regents Of The University Of California Canister, sealing method and composition for sealing a borehole
CN1324979A (zh) * 1999-12-17 2001-12-05 中国科学院力学研究所 油田层内***处理方法
CN1434191A (zh) * 2002-01-25 2003-08-06 中国人民解放军工程兵第四十一旅 深井***成井施工方法

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101586469B (zh) * 2009-07-07 2011-10-12 天地科技股份有限公司 用于深孔超前欲松动***的封孔方法
CN102220853A (zh) * 2010-04-13 2011-10-19 河南长江石油机械有限公司 一种非对称运行的无游梁式煤层气抽采方法及其装置
CN102373919A (zh) * 2010-08-27 2012-03-14 中国石油大学(北京) 煤层气洞穴完井评价实验装置
CN102373919B (zh) * 2010-08-27 2014-03-26 中国石油大学(北京) 煤层气洞穴完井评价实验装置
CN102080529A (zh) * 2010-12-17 2011-06-01 中国石油集团长城钻探工程有限公司 煤层气洞穴热力完井方法
CN102155174A (zh) * 2011-03-10 2011-08-17 贵州铸安矿山科技股份有限公司 钻孔泡沫排渣法
CN102646360A (zh) * 2012-02-28 2012-08-22 吉林大学 测井过程实验教学演示装置及演示方法
CN108471667A (zh) * 2012-07-27 2018-08-31 诺瓦斯能源集团有限公司 用于使用等离子体源激发井、沉积物和钻孔的***和方法
CN103061734A (zh) * 2013-01-06 2013-04-24 河南理工大学 一种煤层气井裸眼化学造穴方法
CN108979707A (zh) * 2018-08-15 2018-12-11 河南铁福来装备制造股份有限公司 一种适用于煤矿底抽巷定向钻进造穴瓦斯治理的方法
CN113883977A (zh) * 2019-12-10 2022-01-04 四川中鼎***工程有限公司 一种***施工中的孔洞探测装置及测量方法
CN113883977B (zh) * 2019-12-10 2023-03-21 四川中鼎***工程有限公司 一种***施工中的孔洞探测装置及测量方法
CN113863897A (zh) * 2020-06-12 2021-12-31 中国石油天然气股份有限公司 洞穴完井方法及***

Also Published As

Publication number Publication date
CN100434653C (zh) 2008-11-19

Similar Documents

Publication Publication Date Title
CN100434653C (zh) 煤层气井***式洞穴完井工艺方法
WO2022252591A1 (zh) 一种水力压裂与甲烷原位燃爆协同致裂增透方法
CN104533288B (zh) 一种钻鱼刺状多级分支水平井页岩气储层钻完井和增产的方法
CN104533287B (zh) 一种钻鱼刺状多级分支水平井页岩气储层钻完井和增产***
He et al. Oil well perforation technology: Status and prospects
CN101338999B (zh) 低渗透砂岩型铀矿床***增渗的方法
CN101440704B (zh) 可地浸矿层连续高能气体压裂增渗方法及专用高能气体发生器
CN102889077B (zh) 检测模拟实际工况水力喷射压裂孔内压力分布的实验装置
CN103939077A (zh) 一种高应力低孔隙率煤层射孔压裂增透方法
CN108151596A (zh) 引水隧洞***开挖超欠挖控制施工方法
CN107120137B (zh) 一种煤巷掘进沿煤层底板深孔预裂***抽采方法
CN104005415A (zh) 微风化花岗岩中地下连续墙的高效成槽施工方法
WO2016078627A1 (zh) 一种利用钻井机器人钻多分枝鱼骨径向微小井眼的页岩气储层钻完井和增产***及方法
CN107620581B (zh) 一井两用煤矿井筒检查孔的施工方法
CN105952378A (zh) 一种树状结构井的钻完井和增产方法
CN115749713A (zh) 岩层变频脉冲缝网压裂方法与装备
CN106088125A (zh) 沉井的刃脚正下方土体水下***取土装置及其方法
WO2014168699A2 (en) Controlling pressure during perforating operations
CN114135265B (zh) 一种海上油田低渗储层低成本高效改造工艺方法
CN106499384A (zh) 煤层气定向井注入/压降试井测试装置及其方法
CN102434192A (zh) 增加煤层致裂效果的装置及增加煤层致裂效果的方法
CN203856456U (zh) 一种试油测试管柱
CN115522905A (zh) 一种页岩气储层甲烷燃爆压裂装置及其控制方法
CN102296945A (zh) 石油采油井低渗透油气层的***压裂增产方法
Miao et al. Development status and prospect of staged fracturing technology in horizontal wells

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081119

Termination date: 20100728