CN1631610A - Manufacturing device for high strength bailing band - Google Patents

Manufacturing device for high strength bailing band Download PDF

Info

Publication number
CN1631610A
CN1631610A CN 200510002016 CN200510002016A CN1631610A CN 1631610 A CN1631610 A CN 1631610A CN 200510002016 CN200510002016 CN 200510002016 CN 200510002016 A CN200510002016 A CN 200510002016A CN 1631610 A CN1631610 A CN 1631610A
Authority
CN
China
Prior art keywords
machine
tempering
furnace
production line
process units
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 200510002016
Other languages
Chinese (zh)
Other versions
CN100348363C (en
Inventor
孙本荣
范玫光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Central Iron and Steel Research Institute
Original Assignee
Central Iron and Steel Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Iron and Steel Research Institute filed Critical Central Iron and Steel Research Institute
Priority to CNB2005100020167A priority Critical patent/CN100348363C/en
Publication of CN1631610A publication Critical patent/CN1631610A/en
Application granted granted Critical
Publication of CN100348363C publication Critical patent/CN100348363C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Heat Treatment Of Articles (AREA)
  • Heat Treatment Of Strip Materials And Filament Materials (AREA)

Abstract

The invention belongs to iron and steel field relates to packing steel belt production device. The invention high intensity steel packing belt producing device consists of unrolling machine, square joint machine, butt-welding machine, tractor, entrance loop machine, flat edge trimmer, quenching furnace, quenching water tank, tempering furnace, tempering water tank, leach drying stand, exit loop machine, tension machine, paraffin slot and rolling machine. The production device is adopted with an integral production line which has got on one line from unrolling machine, square joint machine, butt-linking machine, flat edge trimmer, to tempering insulation furnace, tempering water tank, quenching furnace, quenching water tank, paraffin slot and rolling machine all the devices all at the same level dragged by tractor and the production steel belt. The whole production line includes 1 to 10 production line unit namely installing 1 to 10 production line unit on the same line which means 1 to 10 high intensity steel packing belt can be producing at the same time on the same production line. The invention is of high efficiency, small area, low investment and non-polluting.

Description

Manufacturing device for high strength bailing band
Technical field
The invention belongs to iron and steel domain, relate to the process units of bailing band.
Background technology
Bailing band has been widely used in the packing bundling of nonmetallic materials such as steel, non-ferrous metal material, building materials, glass, paper roll (plate), light textile fabric products etc.Requirement along with scientific technological advance, the monomer weight of packing bundling and volume are tending towards maximizing, require bailing band not only to have higher intensity, but also have good plasticity and toughness and corrosion resistance, make the product that the is tied volume that in transportation, can not loose, in addition in the brute force carrying, also be unlikely the volume that looses when lifting and beating.Usually bailing band is to be raw material with the thick cold-rolled strip of 0.25~1.0mm, enters the production process of bailing band.
In the prior art, high strength bailing band production adopts two production lines to finish, and one is tempering product line, comprises uncoiling, welding, entry loop, heat treatment, outlet kink, batches and unload volume; Another is that slitting sends out line blue, comprise uncoiling, welding, entry loop, shearing, limit portion handle, send out blue, paint, dry, wax, export kink, batch and pack.In above-mentioned quenching-and-tempering process, it quenches and tempering all adopts lead bath groove or plumbous bismuth bath as quenching back-fire arrangement.
According to above-mentioned bailing band production line of the prior art, though the bailing band of being produced its comprehensively can satisfy instructions for use, but still have following defective: 1. adopt two production lines, investment is big, and floor space is big, complex production process, efficient is low.2. lead bath of being adopted or plumbous bismuth are bathed and are handled, and produce lead contamination, and workers ' health and environment are all produced injurious effects.
In the prior art, the producer that has carries out cold rolling work hardening with steel band in bailing band production, improves intensity, reaches recovery plasticity by lead tempering then.The major defect of this method is that the intensity raising is limited, and its tensile strength is only limited to below the 800Mpa, and percentage elongation is low, about 3%, so the scope of application is restricted.
Summary of the invention
The object of the present invention is to provide a kind of small investment, floor space is little, production efficiency is high, technical process is simple, and free of contamination manufacturing device for high strength bailing band.
At above-mentioned purpose, manufacturing device for high strength bailing band of the present invention is made up of uncoiler, chamfering machine, butt welding machine, hauling machine, entry loop machine, trimmer, glowing furnace, quenching tank, tempering furnace, tempering holding furnace, tempering tank, dripper, outlet kink machine, tensioning machine, wax pan and winder.This process units adopts streamlined production line, from uncoiler, chamfering machine, butt welding machine, entry loop machine, trimmer, all process equipments to glowing furnace, quenching tank, tempering furnace, tempering holding furnace, tempering tank, outlet kink machine, wax pan, winder are installed on same the production line, and pass through the bailing band produced and the traction of hauling machine and tensioning machine is linked in sequence on same production line.Whole production line comprises all process equipments of 1~10 unit production line, the unit production line of 1~10 high strength bailing band promptly is installed on same production line simultaneously, is that is to say on same production line and can carry out the production of 1~10 high strength bailing band simultaneously.
The heater of above-mentioned glowing furnace is a high frequency induction heater, and the heater of tempering furnace is a medium frequency induction heater, and the heater of tempering holding furnace (10) is resistance wire (24).
The length of glowing furnace and tempering furnace and tempering holding furnace is variable, and the length of glowing furnace and tempering furnace and tempering holding furnace is respectively 2~10 meters.
Process units of the present invention is applicable to that producing thickness is that 0.25~1.0mm, width are the bailing band of 12.0~32.0mm.The tensile strength б of the bailing band of described production bCan reach more than the 1000Mpa, percentage elongation is greater than 12%.
Compared with prior art, the present invention has following advantage:
(1) because this process units adopts streamlined production line, and required process equipment all is installed on the same production line, and whole production line comprises 1~10 unit production line, and not only production efficiency improves greatly, and floor space is little, and investment also significantly reduces.
(2) because the glowing furnace in the process units of the present invention and the heater of tempering furnace all adopt induction heater, firing rate is fast, can improve the Trace speed of bailing band in the whole production line greatly, thereby enhance productivity.
(3) glowing furnace in the process units and tempering furnace all adopt corresponding quenching tank and tempering tank, do not produce harmful substance, help surrounding environment and health.
Now the invention will be further described with reference to the accompanying drawings.
Description of drawings
Accompanying drawing 1 is the structural representation of manufacturing device for high strength bailing band of the present invention.
The specific embodiment
As can be seen from Figure 1, manufacturing device for high strength bailing band of the present invention is made up of uncoiler 1, chamfering machine 2, butt welding machine 3, hauling machine (41,42,43,44,45), entry loop machine 5, trimmer 6, glowing furnace 7, quenching tank 8, tempering furnace 9, tempering holding furnace 10, tempering tank 11, dripper 12, outlet kink machine 13, tensioning machine 14, wax pan 15 and admission machine 16.This process units adopts streamlined production line, from paying out machine 1, chamfering machine 2, butt welding machine 3, entry loop machine 5, trimmer 6, all process equipments to glowing furnace 7, quenching tank 8, tempering furnace 9, tempering holding furnace 10, tempering tank 11, outlet kink machine 13, wax pan 15 and admission machine 16 are installed on same the production line, and pass through the bailing band produced and the traction of hauling machine and tensioning machine sequentially is connected it on same production line.Whole production line comprises 1~10 unit production line, all process equipments of the unit production line of 1~10 high strength bailing band promptly are installed on same production line simultaneously, are that is to say on same production line and can carry out the production of 1~10 high strength bailing band simultaneously.
The heater of above-mentioned glowing furnace 7 is a high frequency induction heater 22, and the heater of tempering furnace is a medium frequency induction heater 23.The heater of tempering holding furnace 10 is a resistance wire 24.
20 is processed steel band among the figure, and 21 is tension disk.
The production process of manufacturing device for high strength bailing band of the present invention is as follows:
At first the steel coil strip of cold-rolled strip behind slitting packed in the uncoiler 1, and startup uncoiler 1, the beginning unwrapping wire, enter chamfering machine 2, steel band 20 is behind chamfering machine 2 tack, enter butt welding machine 3, afterbody at this and preceding coil band is integrally welded, move on, enter hauling machine 41, steel band 20 enters entry loop 5 after the hauling machine tensioning, behind the gateway kink 5, steel band 20 enters trimmer 6 once more after hauling machine 42 tensionings, 20 dual-side portions repair to steel band, remove burr etc., steel band 20 enters glowing furnace 7 after the deburring after hauling machine 43 tensionings, steel band 20 is heated to hardening heat at this rapidly by high frequency induction heater 22, after steel band 20 comes out from glowing furnace 7, and then enter and carry out shrend in the quenching tank 8, steel band 20 enters in the tempering furnace 9 through hauling machine 44 tensionings after the shrend, is heated to temperature at this rapidly by medium frequency induction heater 23, enters tempering holding furnace 10 afterwards again and is incubated, enter 11 coolings of tempering tank after the steel band 20 tempered insulations, then dry,, come out from outlet kink 13 again through the laggard inlet/outlet kink 13 of hauling machine 45 tensionings through dripper 12, after 14 tensionings of tensioning machine, enter wax pan 15 and wax, enter winder 16 after the steel band waxing and carry out rolling, coil into undercarriage after the steel coil strip, through packing, promptly become high strength bailing band of the present invention again.

Claims (8)

1. manufacturing device for high strength bailing band is characterized in that this process units is made up of uncoiler (1), chamfering machine (2), butt welding machine (3), hauling machine (41,42,43,44,45), entry loop machine (5), trimmer (6), glowing furnace (7), quenching tank (8), tempering furnace (9), tempering holding furnace (10), tempering tank (11), dripper (12), outlet kink machine (13), tensioning machine (14), wax pan (15) and winder (16); This process units adopts streamlined production line, from uncoiler (1), chamfering machine (2), butt welding machine (3), entry loop machine (5), trimmer (6), above-mentioned all devices to glowing furnace (7), quenching tank (8), tempering furnace (9), tempering holding furnace (10), tempering tank (11), wax pan (15) and winder (16) is installed on same the production line, and passes through the bailing band (20) produced and hauling machine (41,42,43,44,45) and tensioning machine (14) it sequentially is connected on the same production line.
2. process units according to claim 1 is characterized in that whole production line comprises 1~10 unit production line, and the process equipment of the unit production line of 1~10 high strength bailing band promptly is installed on same production line simultaneously.
3. process units according to claim 1, the heater that it is characterized in that glowing furnace (7) are high frequency induction heater (22).
4. process units according to claim 1 is characterized in that the hot charging that adds of tempering furnace (9)
Be changed to medium frequency induction heater (23).
5. process units according to claim 1, the heater that it is characterized in that tempering holding furnace (10) are resistance wire (24).
6. process units according to claim 1 is characterized in that trimmer is by two opposite rollers and two pairs of universal frames that horizontal roller is formed.
7. according to claim 1,3,4,5 described process units, it is characterized in that the length of glowing furnace and tempering furnace and tempering holding furnace is variable, the length of glowing furnace and tempering furnace and tempering holding furnace is respectively 2~10 meters.
8. process units according to claim 1 is characterized in that tempering furnace (9) and tempering holding furnace (10) simultaneously also are that steel band sends out device blue.
CNB2005100020167A 2005-01-12 2005-01-12 Manufacturing device for high strength bailing band Expired - Fee Related CN100348363C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100020167A CN100348363C (en) 2005-01-12 2005-01-12 Manufacturing device for high strength bailing band

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100020167A CN100348363C (en) 2005-01-12 2005-01-12 Manufacturing device for high strength bailing band

Publications (2)

Publication Number Publication Date
CN1631610A true CN1631610A (en) 2005-06-29
CN100348363C CN100348363C (en) 2007-11-14

Family

ID=34852918

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100020167A Expired - Fee Related CN100348363C (en) 2005-01-12 2005-01-12 Manufacturing device for high strength bailing band

Country Status (1)

Country Link
CN (1) CN100348363C (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007090326A1 (en) * 2006-02-11 2007-08-16 Anshan Falan Steel Strip Co., Ltd. Automatic production line for producing high-strength color coated packing steel strip by utilizing non-quenching process
CN102174671A (en) * 2011-01-31 2011-09-07 中国钢研科技集团有限公司 Thermal treatment production line of high-strength stirrup
CN102234712A (en) * 2010-05-07 2011-11-09 郑州科创电子有限公司 Thin wire inductive heating heat treatment system
CN102259267A (en) * 2011-04-08 2011-11-30 罗忠权 Steel bar processing device capable of finishing production at one time
CN104625752A (en) * 2015-02-13 2015-05-20 青岛美嘉隆包装机械有限公司 Double-side chamfering and dotting integrated machine
CN111185770A (en) * 2020-01-11 2020-05-22 周海英 Steel belt and processing device and processing method thereof

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0829328B2 (en) * 1990-07-30 1996-03-27 川崎製鉄株式会社 Manufacturing method of hot rolled steel sheet with packaging material
JP2750096B2 (en) * 1995-05-08 1998-05-13 新日本製鐵株式会社 Strip continuous casting hot rolling heat treatment pickling equipment and method for producing pickling coil
NL1007739C2 (en) * 1997-12-08 1999-06-09 Hoogovens Staal Bv Method and device for manufacturing a high strength steel strip.
US6109336A (en) * 1996-06-28 2000-08-29 Hoogovens Staal Bv Method of manufacturing a deep-drawing steel strip or sheet
FR2775205B1 (en) * 1998-02-25 2000-03-24 Usinor INSTALLATION FOR MANUFACTURING COLD ROLLED STAINLESS STEEL STRIPS
CN1144629C (en) * 1999-11-29 2004-04-07 川崎制铁株式会社 Reversible cold rolling equipment

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007090326A1 (en) * 2006-02-11 2007-08-16 Anshan Falan Steel Strip Co., Ltd. Automatic production line for producing high-strength color coated packing steel strip by utilizing non-quenching process
CN100431776C (en) * 2006-02-11 2008-11-12 鞍山市发蓝钢带有限责任公司 Automatic production line for producing high-strength color coated package steel strip by utilizing non-tempering process
CN102234712A (en) * 2010-05-07 2011-11-09 郑州科创电子有限公司 Thin wire inductive heating heat treatment system
CN102234712B (en) * 2010-05-07 2013-05-01 郑州科创电子有限公司 Thin wire inductive heating heat treatment system
CN102174671A (en) * 2011-01-31 2011-09-07 中国钢研科技集团有限公司 Thermal treatment production line of high-strength stirrup
CN102259267A (en) * 2011-04-08 2011-11-30 罗忠权 Steel bar processing device capable of finishing production at one time
CN102259267B (en) * 2011-04-08 2013-01-09 罗忠权 Steel bar processing device capable of finishing production at one time
CN104625752A (en) * 2015-02-13 2015-05-20 青岛美嘉隆包装机械有限公司 Double-side chamfering and dotting integrated machine
CN111185770A (en) * 2020-01-11 2020-05-22 周海英 Steel belt and processing device and processing method thereof

Also Published As

Publication number Publication date
CN100348363C (en) 2007-11-14

Similar Documents

Publication Publication Date Title
CN205011821U (en) High -quality ultra -thin hot -galvanize belted steel continuous production line
CN100348363C (en) Manufacturing device for high strength bailing band
CN103161086B (en) Production method of minuteness steel wire rope
CN101935750B (en) Production process for high-performance steel plate thermal treatment unit
CN102181797B (en) Method for processing steel strand for prestressed concrete
CN103352381A (en) Production method of high-strength steel rope
CN202047124U (en) Hot rolling pickling strip steel continuous hot galvanizing production line
EP1558779B1 (en) Method and device for descaling and/or cleaning a metal casting
CN103643155B (en) A kind of working method of fast quench prestress wire
CN101125380B (en) Strip steel continuous pickling edge processing device
CN106636581A (en) Salt bath treatment method and equipment for wire rod for 1960 MPa and above bridge cable zinc-coated steel wire
CN106756698A (en) A kind of hot dip galvanizing production process
CN101972798B (en) Roll center heating type roll bending forming method and device thereof
CN110359001A (en) A kind of process and its equipment for producing think gauge hot substrate and having colored galvanizing production
CN104726765A (en) 1000MPa-grade high-strength cold-rolled packed steel strip and production method thereof
CN100423857C (en) Production facility and method for high-intensity packing steel belt
CN100344406C (en) Manufacturing method for high strength bailing band
CN203695649U (en) Multi-station pay-off rack with brake device
CN105779753A (en) Device for realizing aging of hard wire coiled rod by applying pulse current and treatment method
CN205275729U (en) Integral unit of belted steel electrotinplate and electrodeposited chromium
CN201817540U (en) Plant for continuously galvanizing tubes by heat
CN106671563B (en) A kind of metal coiled material color coating production method and process units
DE102016011047A1 (en) Flexible heat treatment plant for metallic strip in horizontal construction
DE102015001438A1 (en) Flexible heat treatment plant for metallic strip
CN112626435A (en) Method for switching pickling production and galvanizing production of same unit

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Beijing Gangyan Xinye Engineering Design Co. Ltd.

Assignor: Central Iron & Steel Research Institute

Contract fulfillment period: 2007.12.15 to 2013.12.15 contract change

Contract record no.: 2008990000615

Denomination of invention: Manufacturing device for high strength bailing band

Granted publication date: 20071114

License type: Exclusive license

Record date: 2008.10.8

LIC Patent licence contract for exploitation submitted for record

Free format text: EXCLUSIVE LICENSE; TIME LIMIT OF IMPLEMENTING CONTACT: 2007.12.15 TO 2013.12.15; CHANGE OF CONTRACT

Name of requester: BEIJING GANGYAN XINYE ENGINEERING DESIGN CO., LTD.

Effective date: 20081008

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071114

Termination date: 20170112

CF01 Termination of patent right due to non-payment of annual fee