CN201817540U - Plant for continuously galvanizing tubes by heat - Google Patents
Plant for continuously galvanizing tubes by heat Download PDFInfo
- Publication number
- CN201817540U CN201817540U CN2009202932147U CN200920293214U CN201817540U CN 201817540 U CN201817540 U CN 201817540U CN 2009202932147 U CN2009202932147 U CN 2009202932147U CN 200920293214 U CN200920293214 U CN 200920293214U CN 201817540 U CN201817540 U CN 201817540U
- Authority
- CN
- China
- Prior art keywords
- pinch roll
- continuously
- steel
- equipment
- cut
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Coating With Molten Metal (AREA)
Abstract
The utility model provides a plant for continuously galvanizing tubes by heat. The utility model adopts the continuous production line plant to overcome the problem that galvanized steel tubes cannot be continuously produced in the prior art. Along the direction of the production line and close to steel tubes are sequentially connected an uncoiler (1), a crop shear (2), a first pinch roll (3), a steel plate welder (4), a pinch roll (5), a disc type repeater (6), a second pinch roll (7), a straightener (8), a roll forming machine (9), a straight seam welder (10), a preheating cleaner (11), a zinc bath (12), a circular air knife (13), a cold air sweeper (14), a steel tube pinch roll (15), a cut-to-length following shear (16) and a stacking machine. The stacking machine is provided with two stackers, one of the stackers is in use, the other stacker is spare, the production efficiency is increased, and the cost is saved.
Description
Technical field
The utility model belongs to and is coated with zinc-plated field in the metallurgy industry, relates in particular to the production field of pot galvanize.
Background technology
The employing that the production of domestic original galvanized pipe now has is electroplated, and the employing galvanized sheet that has is welded, and adopts the method galvanized pipe of electro-galvanizing, thickness of coating is difficult to control, and coating is thinner, and production rate is slow, the cost height, and pot galvanize adopts cage to soak zinc-plate process mostly, and steel pipe is cut into the length that needs, and is placed on to immerse the zinc pot in the cage, galvanizing in this way, the zinc layer that is plated is the two sides, and practical application just outer surface of steel tube need zinc-platedly, the double side zinc coating waste is serious; Technology with the galvanized sheet welding is roll-forming on heat zinc coating plate in addition, is welded, and postwelding is mended zinc coating then in the reconditioning of steel pipe seam place in the commissure.Zinc-plated on steel pipe, low with these several mode production efficiencys, can not continuous production, complex procedures, production cost is big, and labour intensity is big.
Summary of the invention
Low in order to overcome domestic original galvanized pipe production efficiency of equipment, the production cost height, can not continuous production, labour intensity is big, the mode that the utility model adopts the production unit of working continuously is zinc-plated and shear that all processes is all online to be finished to being welded into steel pipe from uncoiling, collection uncoiling, leveling, roll-forming, welding, cleaning, cold wind purging, cutting to length, buttress material equipment are one, be used for the full continuous automatic production of hot dip galvanizing pipe, can continuous production, thereby improved production efficiency, filled up domestic blank.
The technical scheme in the invention for solving the technical problem is: adopt a kind of equipment of continuously and thermally galvanizing pipe, along the production line direction by steel band connect successively that Abrollhaspel 1, crop end cut that 2, first pinch roll 3, steel plate welding machine 4, pinch roll 5, disc type kink 6, second pinch roll 7, equipment for straightening 8, roller pressing forming machine 9, Straight seam welding machine 10, pre-warm wash 11, zinc groove 12, the air knife 13 that goes in ring, cold wind purge 14, steel pipe pinches 15, fixed length cuts 16 subsequently, stacking apparatus.
In the described zinc groove 12 zinc pump and nozzle are arranged.
Described fixed length is cut the parts that have the cut-to-length parts in 16 and move with steel pipe subsequently.
Described stacking apparatus has two stackers, the using and the reserved.
The beneficial effects of the utility model are: the configuration of this continuously and thermally galvanizing pipe apparatus for production line can be finished from uncoiling zinc-plated and shear that all processes is all online to be finished to being welded into steel pipe, collection uncoiling, leveling, roll-forming, welding, cleaning, cold wind purging, cutting to length, buttress material are one, realize the online full continuous production of whole process of production; Reduced middle-chain, saved manpower, the method with the continuous zinc coating pipe has reduced zinc consumption, has reduced production cost, has improved production efficiency, has improved the level of automation of producing, and has saved manpower and materials, has improved quality of coating.
Description of drawings
Fig. 1: the exploded view of pipe is plated in pot galvanize continuously
Among Fig. 1: 1. Abrollhaspel, 2. crop end cut, 3. first pinch roll, 4. the steel plate welding machine, 5. pinch roll, 6. the disc type kink, 7. second pinch roll, 8. equipment for straightening, 9. roller pressing forming machine, 10. Straight seam welding machine, 11. pre-warm wash, 12. zinc grooves, 13. go in ring air knives, 14, cold wind purge, 15, steel pipe pinches, 16. fixed length are cut subsequently, 17. pairs of stackings
Embodiment
Entrance: earlier coil of strip is placed on the Abrollhaspel 1 with the coil of strip car, wrench is cut 2 with crop end and is cut wrench, flatten by steel plate welding machine 4 through first pinch roll 3, cutting 2 with last coil of strip through crop end, to cut the steel plate afterbody of irregular magnetic tape trailer welded together, change the locality of steel band by pinch roll 5, make steel band become vertical direction and enter disc type kink 6 by horizontal direction, steel band enters disc type kink 6, during normal uncoiling, disc type kink 6 storings, when change of lap welds, disc type kink 6 blowings satisfy the requirement of unit quantity-produced;
Process section: steel band comes out to turn to through second pinch roll 7 from disc type kink 6, make steel band become horizontal direction by vertical direction, through equipment for straightening 8, steel band is carried out straightening processing, eliminate the defective of steel strip surface, help next step soldering of steel band, enter roll-forming machine equipment 9, behind roll-forming, be rolled into steel pipe, be welded into steel pipe through Straight seam welding machine 10, the steel pipe seam place of postwelding is polished flat with sander, enter pre-warm wash 11, with cleaning through the tank liquor after the preheating, wash the iron scale of steel tube surface, steel band enters rinse stage then, washes the remaining tank liquor of steel tube surface off, then steel pipe enters the oven dry section, and hot-air seasoning is removed the moisture of steel tube surface.Steel pipe behind hot-air seasoning is through pinching, enter zinc groove 12, the zinc pump is arranged in the zinc groove 12, zinc liquid sprays to steel tube surface to zinc liquid through the zinc pump by the nozzle that goes in ring, unnecessary zinc liquid flows back in the zinc groove 12, zinc pipe after the spraying is through the air knife 13 that goes in ring, blow unnecessary zinc liquid off, thus the thickness and the uniformity coefficient of the air knife air output of gate ring promoting the circulation of qi cutter 13 control zinc coating, the quality of control zinc coating.The key of decision steel pipe finished product.
Outlet section: the steel pipe after zinc-plated purges 14 postcooling through behind the annular air knife through cold wind, pinching 15 through cooled steel pipe through steel pipe enters fixed length and cuts 16 subsequently, fixed length is cut 16 subsequently and is followed the steel plate walking, the length that requires according to required steel pipe customizes, shear steel pipe, the steel pipe scale is become fixed length, to reach the production needs, steel pipe after the fixed length enters two stackings 17, this equipment is used for carrying the finished product to length steel pipe, and shared two, the using and the reserved, when a stacking apparatus reaches the stacking height discharging of regulation, by handling equipment fished pipe is delivered to another stacking apparatus, continue stacking, satisfy unit quantity-produced needs, save the production time, improved production cost.
Claims (4)
1. the equipment of a continuously and thermally galvanizing pipe is characterized in that: connect Abrollhaspel (1), crop end along the production line direction successively by steel band and cut (2), first pinch roll (3), steel plate welding machine (4), pinch roll (5), disc type kink (6), second pinch roll (7), equipment for straightening (8), roller pressing forming machine (9), Straight seam welding machine (10), pre-warm wash (11), zinc groove (12), the air knife (13) that goes in ring, cold wind and purge that (14), steel pipe pinch (15), fixed length is cut (16), stacking apparatus subsequently.
2. the equipment of a kind of continuously and thermally galvanizing pipe as claimed in claim 1 is characterized in that: in the described zinc groove (12) zinc pump and nozzle are arranged.
3. the equipment of a kind of continuously and thermally galvanizing pipe as claimed in claim 1, it is characterized in that: described fixed length is cut the parts that (16) have the cut-to-length parts and move with steel pipe subsequently.
4. the equipment of a kind of continuously and thermally galvanizing pipe as claimed in claim 1, it is characterized in that: described stacking apparatus has two stackers, the using and the reserved.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202932147U CN201817540U (en) | 2009-12-11 | 2009-12-11 | Plant for continuously galvanizing tubes by heat |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2009202932147U CN201817540U (en) | 2009-12-11 | 2009-12-11 | Plant for continuously galvanizing tubes by heat |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201817540U true CN201817540U (en) | 2011-05-04 |
Family
ID=43915503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2009202932147U Expired - Fee Related CN201817540U (en) | 2009-12-11 | 2009-12-11 | Plant for continuously galvanizing tubes by heat |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201817540U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103173708A (en) * | 2013-03-21 | 2013-06-26 | 浙江普泰克金属制品有限公司 | Automatic anchor rod hot-galvanizing system and using technology thereof |
WO2015109868A1 (en) * | 2014-01-24 | 2015-07-30 | 厦门新钢金属制品有限公司 | Galvanising and epoxy-coating production line |
CN110358995A (en) * | 2019-08-09 | 2019-10-22 | 刘德强 | A kind of technique for producing hot galvanizing steel pipe |
CN110802111A (en) * | 2018-08-04 | 2020-02-18 | 山西建龙实业有限公司 | Technological method for producing hard-rolled coil by simply and continuously rolling narrow band steel with acid |
CN110802111B (en) * | 2018-08-04 | 2024-06-04 | 山西建龙实业有限公司 | Technological method for producing hard coil by simple acid-matched continuous rolling of narrow strip steel |
-
2009
- 2009-12-11 CN CN2009202932147U patent/CN201817540U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103173708A (en) * | 2013-03-21 | 2013-06-26 | 浙江普泰克金属制品有限公司 | Automatic anchor rod hot-galvanizing system and using technology thereof |
CN103173708B (en) * | 2013-03-21 | 2014-12-17 | 浙江普泰克金属制品有限公司 | Automatic anchor rod hot-galvanizing system and using technology thereof |
WO2015109868A1 (en) * | 2014-01-24 | 2015-07-30 | 厦门新钢金属制品有限公司 | Galvanising and epoxy-coating production line |
CN110802111A (en) * | 2018-08-04 | 2020-02-18 | 山西建龙实业有限公司 | Technological method for producing hard-rolled coil by simply and continuously rolling narrow band steel with acid |
CN110802111B (en) * | 2018-08-04 | 2024-06-04 | 山西建龙实业有限公司 | Technological method for producing hard coil by simple acid-matched continuous rolling of narrow strip steel |
CN110358995A (en) * | 2019-08-09 | 2019-10-22 | 刘德强 | A kind of technique for producing hot galvanizing steel pipe |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205011821U (en) | High -quality ultra -thin hot -galvanize belted steel continuous production line | |
CN102764790B (en) | Completely continuous magnesium alloy strip coil finishing device and finishing method | |
CN101249606B (en) | Method and equipment for hot rolled plate colored forming continuous production | |
CN101249605B (en) | Method for continuous producing rust-inhibiting primer coating steel plate | |
CN201381372Y (en) | Strip steel electrogalvanizing unit | |
CN101463457B (en) | Method and equipment for hot dip of steel wire | |
CN106244967B (en) | Cold-rolling of steel plate coating integration produces unit and its production technology | |
CN101709445A (en) | Method for continuously and thermally galvanizing pipe | |
CN201817540U (en) | Plant for continuously galvanizing tubes by heat | |
US3845540A (en) | Hot galvanizing process and apparatus | |
CN101705463A (en) | Device for continuously hot dip galvanizing pipe | |
CN105458633B (en) | A kind of manufacture method of mild steel coiled tubing | |
CN101285525B (en) | Technological process for continuous production of sealing cushion raw material plate | |
CN109742171A (en) | A kind of the photovoltaic welding belt production system and its method of high optics utilization rate | |
CN108356083A (en) | A kind of coil of strip pickling skin pass mill group and coil of strip production method | |
US9266161B2 (en) | Production line of large diameter longitudinal welded pipe | |
CN105965171A (en) | Method and device for producing barreled seamless flux-cored wire used for high-strength steel | |
CN202779250U (en) | Full-continuous magnesium alloy strip coil finishing device | |
CN102581734A (en) | Zinc coating machine and zinc coating method for hot-dip coating of aluminum and zinc | |
CN205275729U (en) | Integral unit of belted steel electrotinplate and electrodeposited chromium | |
US3908593A (en) | Continuous galvanizing manifold for tube and the like | |
CN201596691U (en) | Equipment for producing aluminum covered copper tubes | |
CN215251102U (en) | Ultrathin hot-base non-spangle hot-galvanized sheet production unit | |
CN202462175U (en) | Zinc sheet brushing machine for hot-dip aluminum zinc | |
CN209380275U (en) | The continuous clod wash production line of integrated injection unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110504 Termination date: 20181211 |