CN1540109A - Cellulated or half cellulated self natant jacket - Google Patents

Cellulated or half cellulated self natant jacket Download PDF

Info

Publication number
CN1540109A
CN1540109A CNA2003101083658A CN200310108365A CN1540109A CN 1540109 A CN1540109 A CN 1540109A CN A2003101083658 A CNA2003101083658 A CN A2003101083658A CN 200310108365 A CN200310108365 A CN 200310108365A CN 1540109 A CN1540109 A CN 1540109A
Authority
CN
China
Prior art keywords
cellular
case
steel
casing
unichassis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CNA2003101083658A
Other languages
Chinese (zh)
Other versions
CN1318703C (en
Inventor
云 陆
陆云
高振锋
曹闻杰
李增辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Co Ltd filed Critical Shanghai Construction Group Co Ltd
Priority to CNB2003101083658A priority Critical patent/CN1318703C/en
Publication of CN1540109A publication Critical patent/CN1540109A/en
Application granted granted Critical
Publication of CN1318703C publication Critical patent/CN1318703C/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

A cellular or semi-cellular self-floating sleeved case is composed of a case body consisting of operating deck layers and having internal reinforcing rib plates for forming the cellular or semi-cellular self-floating sleeved case and self-floating learing sleeved case, the guide pipes for the protecting steel piles, the guide pipes and supporting fame of auxiliary piles, the anchor system, pneumatic water-stopping system for said guide pipe of steel pile, a water level difference regulating system, and a case-fixing force converting system.

Description

Honeycomb half is cellular from the empty boasting case
Technical field
The invention belongs to bridge tower pier shaft foundation construction facility, especially for the supporting facility of the tower of the highrise pile cap type of the large bridge in sea, the great river, structure, pier, foundation platform construction.
Background technology
At present in the river, basis, the cushion cap of the Sarasota pier shaft of marine construction large bridge, structure, institute's employing method mainly contains suspension box-cofferdam platform construction method, several temporary platform construction methods such as island construction method, drop shaft sinking construction are built in the cofferdam.Suspension box-cofferdam platform construction method: promptly in advance set the temporory structure stake, at the last operating platform that sets up, set the stake of engineering steel casing then, carry out drilled pile construction, after Construction of Engineering Pile is finished, remove the odd-job platform in foundation platform zone, carry out the cushion cap cofferdam construction again, the assembly unit of casing, the cover caisson sinking is in place, after a series of operations such as fixing and sealing back cover, just can carry out the concrete casting and constructing of platform big volume.Adopt suspension box-cofferdam platform construction method, the whole construction course engineering phase is long, complex procedures, and construction ancillary facility input repeats the construction cost height.In addition, great river, big marine tower, pier foundation be generally all away from the bank, a large amount of members, and loose mail needs marine transportation and not only construction cost height is installed, and the construction period is long, and the hidden danger on safe is arranged.The method that another is commonly used: the island construction method is built in the cofferdam, and this clock job practices generally is used for more shallow waters.This construction method is promptly in the bearing platform construction regional extent.Make a big cofferdam and be sink at the bottom of the river or the seabed, fill sandy soil then, form the artificial island platform of cushion cap foundation construction, in the last construction of carrying out pile foundation, after pile foundation construction was intact, excavation cushion cap foundation ditch carried out the construction of foundation platform again.Therefore, island method construction is built in the cofferdam, and the shared duration is longer, construction cost is also high.So general at present only in the offshore phytal zone, adopt in tower, the pier foundation construction, in off-lying sea and the great river, be difficult to use.
Summary of the invention
The objective of the invention is to solve at present in the river, basis, the cushion cap of the Sarasota pier shaft of marine construction large bridge, structure, the problem that exists in job practices that is adopted and the construction installation, provide a kind of honeycomb half cellular from the empty boasting case, it can setting up interim operation platform; The guide and limit of steel fender pile; The assembly unit of cushion cap casing, sink, in place, fix and three very big construction sections of sealing back cover equal time span, ten multiple working procedures, organically be combined on the multi-functional combination casing, and can concentrate in the factory processing and fabricating to the marine installation work of a large amount of dispersions and finish, the change offshore construction is land processing.
For achieving the above object, the technical solution used in the present invention is: a kind of honeycomb half is cellular from the empty boasting case, comprises double-walled or single wall leg, bilayer or unichassis, deck operation layer.Be provided with in the casing of forming by double-walled or single wall leg, bilayer or unichassis, deck operation layer and form honeycomb or the half cellular branch storehouse floor of putting more energy into, steel fender pile conduit from empty boasting case and floating certainly cushion cap cofferdam casing; Be provided with auxiliary pile conduit and support below the deck operation layer, the limit is provided with positioning anchor oceangoing ship system; Be provided with the catheter air bag water-stopping system in steel fender pile conduit bottom; Be provided with the water-head regulating system at double-walled or single wall leg and bilayer or unichassis junction; Be respectively equipped with casing bed knife system in steel fender pile conduit and bilayer or unichassis, steel fender pile conduit and deck operation layer junction and change system.
Air bag in the catheter air bag water-stopping system is made by membrane structure material.Rounded, rectangle strip is around layout; The water-head regulating system by advance, drainage valve, suction pump, miscellaneous equipment constitute; Cellularly make by steel from floating box; Less when pier shaft cushion cap volume, when wave and hydraulic pressure difference are little, can adopt steel and concrete combined structure.
The present invention is owing to adopted above-mentioned technical scheme, and therefore the beneficial effect that has is: it can setting up interim operation platform; The guide and limit of steel fender pile; The assembly unit of cushion cap casing, sink, in place, fix and three very big construction sections of sealing back cover equal time span, ten multiple working procedures, organically be combined on the multi-functional combination casing, and a large amount of marine installation works that disperse are concentrated in the factory processing and fabricating finish, the change offshore construction is land processing.Whole then transportation by driving is to river, the marine site built; Locate, fix the back, just can carry out the construction of pile foundation and cushion cap continuously, thereby can shorten the construction period on basis greatly, reduce construction cost, the degree of safety that raising is constructed.At the air bag water-stopping system that steel casing conduit bottom is arranged, can save a large amount of cushion cap back cover concretes, thereby reduce construction costs.
Description of drawings
Fig. 1 is the cellular top plan view from the empty boasting case of the present invention;
Fig. 2 is the 1-1 sectional drawing of Fig. 1;
Fig. 3 is the 2-2 sectional drawing of Fig. 1;
To be that the present invention half is cellular partly cut open plan view from the empty boasting case to Fig. 4;
Fig. 5 is the 3-3 half-sectional view of Fig. 4.
The specific embodiment
The invention will be further described below in conjunction with drawings and Examples.
Shown in Fig. 1 to 5, a kind of honeycomb half is cellular from the empty boasting case, form the various casings that need shape by double-walled or single wall leg 1, bilayer or unichassis 2, deck operation layer 3 etc., be provided with branch storehouse put more energy into floor 6 and steel fender pile conduit 5 in the casing, form honeycomb or half cellular from empty boasting case and floating certainly cushion cap cofferdam casing.Auxiliary pile conduit and support 4 are housed below deck operation layer 3, positioning anchor oceangoing ship system 10 is housed on the limit; Catheter air bag water-stopping system 8 is housed around steel fender pile conduit 5 bottoms, wherein air bag is made by membrane structure material, and rounded, rectangle strip is around layout.With bilayer or unichassis 2 junctions water-head regulating system 7 is housed at double-walled or single wall leg 1.With bilayer or unichassis 2, steel fender pile conduit 5 and deck operation layer 3 junction casing bed knife system is housed respectively at steel fender pile conduit 5 and changes system 9.
Water-head regulating system 7 by advance, drainage valve, suction pump, miscellaneous equipment constitute; Cellularly make by steel from floating box; Less when pier shaft cushion cap volume, when wave and hydraulic pressure difference are little, can adopt steel and concrete combined structure.

Claims (4)

1. a honeycomb half is cellular from the empty boasting case, comprise double-walled or single wall leg (1), bilayer or unichassis (2), deck operation layer (3), it is characterized in that, be provided with in the casing of forming by double-walled or single wall leg (1), bilayer or unichassis (2), deck operation layer (3) and form honeycomb or the half cellular branch storehouse floor (6) of putting more energy into, steel casing pile leader (5) from empty boasting case and floating certainly cushion cap cofferdam casing; Be provided with auxiliary pile conduit and support (4) below deck operation layer (3), the limit is provided with positioning anchor oceangoing ship system (10); Be provided with catheter air bag water-stopping system (8) in steel casing pile leader (5) bottom; Be provided with water-head regulating system (7) at double-walled or single wall leg (1) with bilayer or unichassis (2) junction; Being respectively equipped with the casing bed knife at steel fender pile conduit (5) with bilayer or unichassis (2), steel fender pile conduit (5) and deck operation layer (3) junction is converting system (9).
2. honeycomb according to claim 1 half is cellular to is characterized in that from the empty boasting case air bag in the described catheter air bag water-stopping system (8) is made by membrane structure material, and rounded, rectangle strip is around layout.
3. honeycomb according to claim 1 half is cellular to be is characterized in that from the empty boasting case, described water-head regulating system (7) by advance, drainage valve, suction pump, miscellaneous equipment constitute.
4. honeycomb according to claim 1 half is cellular to be is characterized in that from the empty boasting case, described cellularly made by steel from floating box; Less when pier shaft cushion cap volume, when wave and hydraulic pressure difference are little, can adopt steel and concrete combined structure.
CNB2003101083658A 2003-10-31 2003-10-31 Cellulated or half cellulated self natant jacket Expired - Lifetime CN1318703C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2003101083658A CN1318703C (en) 2003-10-31 2003-10-31 Cellulated or half cellulated self natant jacket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2003101083658A CN1318703C (en) 2003-10-31 2003-10-31 Cellulated or half cellulated self natant jacket

Publications (2)

Publication Number Publication Date
CN1540109A true CN1540109A (en) 2004-10-27
CN1318703C CN1318703C (en) 2007-05-30

Family

ID=34334628

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2003101083658A Expired - Lifetime CN1318703C (en) 2003-10-31 2003-10-31 Cellulated or half cellulated self natant jacket

Country Status (1)

Country Link
CN (1) CN1318703C (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101469543B (en) * 2007-12-28 2010-09-29 上海市基础工程有限公司 Steel boxed cofferdam construction technique for steel-concrete combined bottom board
CN102182149A (en) * 2011-04-06 2011-09-14 中铁大桥局集团有限公司 Method for entering river of parallel edges-free cofferdam with air bags
CN102828521A (en) * 2012-08-16 2012-12-19 中交第二航务工程局有限公司 Underwater water-stopping method for precast pile caps
CN103015364A (en) * 2012-12-18 2013-04-03 刘张雄 Fully-assembled steel-structure wading basic platform
CN103015441A (en) * 2012-12-06 2013-04-03 上海市基础工程有限公司 Floating water stop device for bridge bearing platform or construction platform
CN103332270A (en) * 2012-12-18 2013-10-02 刘张雄 Wading foundation platform
CN107988924A (en) * 2017-12-11 2018-05-04 兰州理工大学 A kind of steel based on re-building of old bridge-mixed composite beam bridge system transform system and conversion method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8902752A (en) * 1989-11-07 1991-06-03 Darya Paye Jetty Co Ltd METHOD FOR MAKING AN ARTIFICIAL CONSTRUCTION ON A WATER SOIL, SUCH AS AN ARTIFICIAL ISLAND, APPARATUS FOR CARRYING OUT THE METHOD ACCORDING TO THE INVENTION AND CONSTRUCTION BY PREPARATION IN PROPERTY.
CN1039503C (en) * 1990-10-12 1998-08-12 中国船舶工业总公司第九设计研究院 Multi-wall shell body for open caisson and open caisson
JP2514902B2 (en) * 1993-07-12 1996-07-10 大豊建設株式会社 Cason launching method and work pontoons
CN1107148C (en) * 1995-04-04 2003-04-30 冯毅 Construction technology of underwater cast in-situ with steel formwork

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101469543B (en) * 2007-12-28 2010-09-29 上海市基础工程有限公司 Steel boxed cofferdam construction technique for steel-concrete combined bottom board
CN102182149A (en) * 2011-04-06 2011-09-14 中铁大桥局集团有限公司 Method for entering river of parallel edges-free cofferdam with air bags
CN102828521A (en) * 2012-08-16 2012-12-19 中交第二航务工程局有限公司 Underwater water-stopping method for precast pile caps
CN102828521B (en) * 2012-08-16 2014-09-10 中交第二航务工程局有限公司 Underwater water-stopping method for precast pile caps
CN103015441A (en) * 2012-12-06 2013-04-03 上海市基础工程有限公司 Floating water stop device for bridge bearing platform or construction platform
CN103015364A (en) * 2012-12-18 2013-04-03 刘张雄 Fully-assembled steel-structure wading basic platform
CN103332270A (en) * 2012-12-18 2013-10-02 刘张雄 Wading foundation platform
CN103332270B (en) * 2012-12-18 2016-06-15 刘张雄 Paddle basic platform
CN107988924A (en) * 2017-12-11 2018-05-04 兰州理工大学 A kind of steel based on re-building of old bridge-mixed composite beam bridge system transform system and conversion method
CN107988924B (en) * 2017-12-11 2024-04-26 兰州理工大学 Steel-concrete composite girder bridge system conversion system and conversion method based on old bridge reconstruction

Also Published As

Publication number Publication date
CN1318703C (en) 2007-05-30

Similar Documents

Publication Publication Date Title
CN102686879A (en) System for underwater compressed fluid energy storage and method of deploying same
JP2010112163A (en) Earthquake-resisting water-storage levee and installation construction method for the same
CN111502725B (en) Artificial island type middle well structure of submarine tunneling tunnel
CN102839681A (en) Combined steel pipe pile cofferdam used under condition of no cover layer in deep water and construction method thereof
CN111350201A (en) Construction method of steel sheet pile cofferdam of deep-water low-pile cap of thick pebble bed riverbed
CN115581212A (en) Offshore aquaculture system and design method thereof
CN1318703C (en) Cellulated or half cellulated self natant jacket
KR20020033595A (en) Artificial island, artificial island support and method for building an artificial island
CA1058893A (en) Underwater structure
RU2386755C1 (en) Method for arrangement of shallow subway at water area bottom
US5938374A (en) Soft landing structure and method setting the same
CN2661776Y (en) Honeycombed or semi-honeycombed auto-floating jacket
CN109356186B (en) Bridge tower composite foundation applicable to deep water soft soil areas and construction method
CN104762942A (en) Soft soil foundation seabed fixed mounting construction method of water building ocean fixed platform
CN203268295U (en) High-stability floating platform floating with water level
JP7389893B2 (en) Offshore structures and construction methods
KR20140092217A (en) Construction method of the pier with the working bardge
CN209798657U (en) movable caisson breakwater structure
CN106120958A (en) Combined steel case pedestal water intake structure
Antonina et al. Construction of low-rise buildings in the coastland and water areas
RU2382142C2 (en) Method for formation of closed section of water area bottom with possibility of its drying and system, which realises it
CN212128811U (en) Main tower artificial island structure of deep open sea suspension bridge
JP2000265450A (en) Artificial ground consisting of porous housing and construction method therefor
CN217438613U (en) Shallow foundation sinking plank road and structure
JPH05311627A (en) Foundation structure for large-scale artificial island

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20070530