CN1464149A - Novel villa style house construction and process of building - Google Patents

Novel villa style house construction and process of building Download PDF

Info

Publication number
CN1464149A
CN1464149A CN 02109809 CN02109809A CN1464149A CN 1464149 A CN1464149 A CN 1464149A CN 02109809 CN02109809 CN 02109809 CN 02109809 A CN02109809 A CN 02109809A CN 1464149 A CN1464149 A CN 1464149A
Authority
CN
China
Prior art keywords
light
clay
wallboard
light trabs
villa
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 02109809
Other languages
Chinese (zh)
Inventor
俞鲲鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 02109809 priority Critical patent/CN1464149A/en
Publication of CN1464149A publication Critical patent/CN1464149A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Building Environments (AREA)

Abstract

The present invention is villa structure and constructing process for building villa with simple construction process and excellent heat insulating effect. The villa structure has welded steel frames connected with screws or via welding, light wall boards connected via matching longitudinal embossed groove pairs, foamed polystyrene boards as heat insulating layer and various decorating facing layer. The wall boards are provided with openings for windows and doors. The present invention is especially suitable for building villa.

Description

A kind of novel villa style house construction and build process
Technical field:
The present invention relates to construction engineering technical field, exactly it is a kind of novel villa style house construction and build process.
Background technology:
Along with the progress and the development of society, people improve constantly the requirement of quality of life.After people had solved problem of food and clothing, maximum pursuit was exactly how to live comfortable.Basic live when having satisfied, after the row demand, people pursue better again.In recent years, in some big and medium-sized cities development architecture a lot of villa dwelling houses, but the construction method in common house, the i.e. mixing structure of tower structure and brick are also still adopted in the construction in villa house at present.Though in recent years, constructional materials has had very big progress, has particularly developed some energy-conservation and environment-friendly type building materials, and generally speaking, construction method does not also change.Chinese patent application number 00103951 discloses the patent of invention that a kind of name is called " with reinforcing bar skeleton sandwich wall ", it has just increased the intensity and the stiffness of wallboard, Chinese patent application number 00117964 discloses the patent of invention that a kind of name by the application of Japanese Yi Nai Co., Ltd. is called " Building material and house ", it can only increase the aesthetic property of ground floor, China Patent No. 97223446 discloses the utility model patent that a kind of name is called " plastic-steel combined moving house ", it only is fit to simple and easy dwelling house, China Patent No. 00252731 discloses a kind of title: the utility model patent of " novel house wallboard ", it is a kind of good heat-insulation wall plate, American National gypsum Asset Co., Ltd has applied for that a kind of name is called: the patent of invention of " composite structural member and wall assembly method ", number of patent application is 97198483, it is a kind of method of assembling of body of wall, China Patent No. 00212697 discloses a kind of " angle steel connector assembling prefabricated house ", its only suitable building site and tourist district use with the room temporarily, are not suitable for using as long-term dwelling house.
Summary of the invention:
The purpose of this invention is to provide a kind of novel villa style house construction and build process, it is simple that it has a construction process, construction rapidly, convenient, and have good heat insulation effect.The framework that in villa building construction below three layers, adopts shaped steel to be welded, available bolt connects or is welded to connect between the framework, adopt the wallboard of Light trabs as the house, there is the convex-concave cannelure junction between wallboard and the wallboard, two convex-concave cannelures form to cooperate to be paid, Light trabs has polystyrol plastic foam plate (EPS) outward as the house insulation layer, can install various decorations additional in its outside and carry out incrustation.Have the position, hole of window and door on the wallboard.In the middle of the Light trabs vertical lightening core is arranged along its length, can be used as the installing hole of electric wire and hot-water heating pipeline.Be placed with reinforcing bar and fluid concrete in the vertical lightening core of the part of Light trabs or in the hole, put into steel pipe.In the axis of villa plan view every 1800-2400mm apart from processing diameter 800-1000mm, be the cylindrical recess of 800-1800mm deeply, in the hole, put the pre-buried steel part of connection grade beam well, and fill with concrete; Adjust the wallboard flatness when for convenience wallboard being installed, on cylinder ground foundation pier, will put the footing beam that has the inverted ladder type groove, pre-buried steel part on the footing beam; Earlier four corner posts (shaped steel) are connected with pre-buried steel part on the round ground foundation pier with the method for welding, after the installation of four corner posts, with supporting frame with welding or other method links into an integrated entity; The novel light wallboard is installed in the supporting frame, and the bottom of Light trabs is installed in the inverted ladder type groove of ground crossbeam, so as to utilize the major part wedge align the Light trabs position verticality and make all installing plates all in a horizontal plane; When Light trabs is installed, the two sides emboss pit of plate is coated clay, and make the emboss pit of two installing plates cooperate pair applying closely, and, carry out the surfacing of Light trabs again, make all Light trabses become integral body through certain hour health drying; The floating dust of Light trabs external surface is removed, spray clear water, Light trabs after moistening is pasted certain thickness polystyrol plastic foam plate (EPS) on demand again, on polystyrol plastic foam plate, smear the clay of one deck 1-3 millimeters thick again, in clay upper berth layer of glass grid cloth, and compacting, make following clay see through the glass fiber mesh, on the fiberglass gridding cloth after the compacting, spread the clay of one deck 1-3 millimeter again, repave one deck alkali resistant glass fiber grid cloth at second layer clay again, and compacting, make following clay see through the mesh of fiberglass gridding cloth, on the fiberglass gridding cloth after the compacting, spread the clay of one deck 1-3 millimeter again, floating at last; After first floor installs, the large roof slab that processes is installed on one deck light steel frame, connection between large roof slab and the light steel frame is finished by pre-buried steel part, same manner is carried out three layers of installation, in the end on the light steel frame of one deck the room frame is installed again, the wooden wingceltis bar of mating formation on the room frame is installed insulation roof slab again or other roofing net is installed on wooden wingceltis bar.
Advantage of the present invention is: component such as the Light trabs in villa house and light steel frame all can mechanization streamline processing in factory, workshop; the production efficiency height; product size is accurate; on-the-spot installation rate is fast, has reduced the situ wet operation, has protected environment; and the villa housing energy saving of building; high insulating effect is compared with the brick mix structure of identical building area, and usable floor area increases 15%.
Description of drawings:
Fig. 1 is the structural representation of Light trabs among the present invention.
Fig. 2 is the left view of Fig. 1.
Fig. 3 is placed on the structural representation that has the footing beam of V groove on the cylinder ground foundation pier among the present invention.
Fig. 4 is the left view of Fig. 3.
Fig. 5 is the schematic diagram of deadlight of the present invention on the ground foundation pier time.
Fig. 6 is the left view of Fig. 5.
The specific embodiment:
Embodiment:
The present invention is particularly suitable for building the villa house below three layers, the highlyest be no more than four layers, during construction, in the axis of villa plan view every 1800-2400mm apart from processing diameter 800-1000mm, dark is the cylindrical recess of 800-1800mm, in the hole, put the pre-buried steel part of connection grade beam well, and fill with concrete; Adjust the wallboard flatness when for convenience wallboard being installed, on cylinder ground foundation pier, will put the footing beam that has the inverted ladder type groove, pre-buried steel part on the footing beam; Earlier four corner posts (shaped steel) are connected with pre-buried steel part on the round ground foundation pier with the method for welding, after the installation of four corner posts, with supporting frame with welding or other method links into an integrated entity; The novel light wallboard is installed in the supporting frame, and the bottom of Light trabs is installed in the inverted ladder type groove of ground crossbeam, so as to utilize the major part wedge align the Light trabs position verticality and make all installing plates all in a horizontal plane; Light trabs Mechanized Processing in factory is produced, size is very accurate, and window and doorway have been reserved, the elongatedness direction has vertical lightening core in the middle of the Light trabs, lightening core can be as the installing hole of electric wire and hot-water heating pipeline, put into reinforcing bar in the part lightening core, fluid concrete again, or in the hole, put into steel pipe, to increase the intensity and the stiffness of Light trabs, when Light trabs is installed, the two sides emboss pit of plate is coated clay, and make the emboss pit of two installing plates cooperate pair applying closely, and through certain hour health drying, carry out the surfacing of Light trabs again, make all Light trabses become integral body; The floating dust of Light trabs external surface is removed, spray clear water, Light trabs after moistening is pasted certain thickness polystyrol plastic foam plate (EPS) on demand again, on polystyrol plastic foam plate, smear the clay of one deck 1-3 millimeters thick again, in clay upper berth layer of glass grid cloth, and compacting, make following clay see through the glass fiber mesh, on the fiberglass gridding cloth after the compacting, spread the clay of one deck 1-3 millimeter again, repave one deck alkali resistant glass fiber grid cloth at second layer clay again, and compacting, make following clay see through the mesh of fiberglass gridding cloth, on the fiberglass gridding cloth after the compacting, spread the clay of one deck 1-3 millimeter again, floating at last; After first floor installs, the large roof slab that processes is installed on one deck light steel frame, connection between large roof slab and the light steel frame is finished by pre-buried steel part, same manner is carried out three layers of installation, in the end on the light steel frame of one deck the room frame is installed again, the wooden wingceltis bar of mating formation on the room frame is installed insulation roof slab again or other roofing net is installed on wooden wingceltis bar.The cover in house can glue obedient various ornament materials and carry out the outward appearance processing.

Claims (5)

1, a kind of novel villa style house construction and build process, it is characterized in that: the framework that in villa building construction below three layers, adopts shaped steel to be welded, available bolt connects or is welded to connect between the framework, adopt the wallboard of Light trabs as the house, there is the convex-concave cannelure junction between wallboard and the wallboard, two convex-concave cannelures form to cooperate to be paid, and Light trabs has polystyrol plastic foam plate (EPS) outward as the house insulation layer, can install various decorations additional in its outside and carry out incrustation.
2, a kind of novel villa style house construction according to claim 1 and build process is characterized in that: the position, hole that has window and door on the wallboard.
3, a kind of novel villa style house construction according to claim 1 and build process is characterized in that: in the middle of the Light trabs vertical lightening core is arranged along its length, can be used as the installing hole of electric wire and hot-water heating pipeline.
4, a kind of novel villa style house construction according to claim 1 and build process is characterized in that: can put into reinforcing bar and fluid concrete in the vertical lightening core of the part of Light trabs or put into steel pipe in the hole.
5, a kind of build process of a kind of novel villa style house construction as claimed in claim 1, it is characterized in that: in the axis of villa plan view every 1800-2400mm apart from processing diameter 800-1000mm, dark is the cylindrical recess of 800-1800mm, in the hole, put the pre-buried steel part of connection grade beam well, and fill with concrete; Adjust the wallboard flatness when for convenience wallboard being installed, on cylinder ground foundation pier, will put the footing beam that has the inverted ladder type groove, pre-buried steel part on the footing beam; Earlier four corner posts (shaped steel) are connected with pre-buried steel part on the round ground foundation pier with the method for welding, after the installation of four corner posts, with supporting frame with welding or other method links into an integrated entity; The novel light wallboard is installed in the supporting frame, and the bottom of Light trabs is installed in the inverted ladder type groove of ground crossbeam, so as to utilize the major part wedge align the Light trabs position verticality and make all installing plates all in a horizontal plane; When Light trabs is installed, the two sides emboss pit of plate is coated clay, and make the emboss pit of two installing plates cooperate pair applying closely, and, carry out the surfacing of Light trabs again, make all Light trabses become integral body through certain hour health drying; The floating dust of Light trabs external surface is removed, spray clear water, Light trabs after moistening is pasted certain thickness polystyrol plastic foam plate (EPS) on demand again, on polystyrol plastic foam plate, smear the clay of one deck 1-3 millimeters thick again, in clay upper berth layer of glass grid cloth, and compacting, make following clay see through the glass fiber mesh, on the fiberglass gridding cloth after the compacting, spread the clay of one deck 1-3 millimeter again, repave one deck alkali resistant glass fiber grid cloth at second layer clay again, and compacting, make following clay see through the mesh of fiberglass gridding cloth, on the fiberglass gridding cloth after the compacting, spread the clay of one deck 1-3 millimeter again, floating at last; After first floor installs, the large roof slab that processes is installed on one deck light steel frame, connection between large roof slab and the light steel frame is finished by pre-buried steel part, same manner is carried out three layers of installation, in the end on the light steel frame of one deck the room frame is installed again, the wooden wingceltis bar of mating formation on the room frame is installed insulation roof slab again or other roofing net is installed on wooden wingceltis bar.
CN 02109809 2002-06-10 2002-06-10 Novel villa style house construction and process of building Pending CN1464149A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02109809 CN1464149A (en) 2002-06-10 2002-06-10 Novel villa style house construction and process of building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02109809 CN1464149A (en) 2002-06-10 2002-06-10 Novel villa style house construction and process of building

Publications (1)

Publication Number Publication Date
CN1464149A true CN1464149A (en) 2003-12-31

Family

ID=29741870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02109809 Pending CN1464149A (en) 2002-06-10 2002-06-10 Novel villa style house construction and process of building

Country Status (1)

Country Link
CN (1) CN1464149A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332417A (en) * 2015-12-04 2016-02-17 武汉理工大学 Method for constructing prefabricated steel frame composite structure with concrete wrapped outside
CN106049707A (en) * 2016-06-08 2016-10-26 黄昆 Prefabricated wall body, prefabricated house building and construction method
CN106223497A (en) * 2016-08-18 2016-12-14 潮峰钢构集团有限公司 A kind of operational approach of Applying Steel Structures To A Villa integrated system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332417A (en) * 2015-12-04 2016-02-17 武汉理工大学 Method for constructing prefabricated steel frame composite structure with concrete wrapped outside
CN106049707A (en) * 2016-06-08 2016-10-26 黄昆 Prefabricated wall body, prefabricated house building and construction method
CN106049707B (en) * 2016-06-08 2018-08-10 黄昆 Prefabricated wall, prefabricated building construction and method of construction
CN106223497A (en) * 2016-08-18 2016-12-14 潮峰钢构集团有限公司 A kind of operational approach of Applying Steel Structures To A Villa integrated system

Similar Documents

Publication Publication Date Title
CN101748903B (en) Structural system of industrial low storied dwelling
WO2017076070A1 (en) Integrated-assembly steel structure building
CN205444458U (en) Integrated assembled steel construction building
CN101798846B (en) Modularization assembled house
CN105951998B (en) A kind of integrated assembled type dwelling house system and its construction method
CN205153114U (en) Lightweight steel structure modularized residential building
CN102561513A (en) Unit cabin type building system
CN101131002A (en) Mould-locking assembled water-proof heat-insulating slab and construction method thereof
CN104060853A (en) Lightweight steel structure modularized residential building
CN202324323U (en) Outer wall plate
CN1888344B (en) Composite thermal insulation concrete load-bearing wall
CN211286074U (en) Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall
CN201162284Y (en) Cement mortar surface sandwich foam heat preservation thermal shield
CN201850647U (en) Modular assembly house
CN214833751U (en) Double-layer composite inner wallboard and inner wall enclosure system
CN212641810U (en) Assembled building wall
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN2706537Y (en) Heat insulation decoration board
CN203412312U (en) Thermal-insulating integrated template wallboard construction building
CN203412143U (en) Wall body structure of integrally poured building house
CN1464149A (en) Novel villa style house construction and process of building
CN109779008B (en) Anti-seismic anti-cracking steel structure house and construction method thereof
CN104389346B (en) A kind of high-strength light shearing formula assembled building structural system and preparation method thereof
CN211499917U (en) Assembled steel construction house
CN206737125U (en) Low energy consumption prefabricated buildings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication