CN1313383C - Method for transporting and installing large distillation equipment for desalting seawater - Google Patents

Method for transporting and installing large distillation equipment for desalting seawater Download PDF

Info

Publication number
CN1313383C
CN1313383C CNB2005100134153A CN200510013415A CN1313383C CN 1313383 C CN1313383 C CN 1313383C CN B2005100134153 A CNB2005100134153 A CN B2005100134153A CN 200510013415 A CN200510013415 A CN 200510013415A CN 1313383 C CN1313383 C CN 1313383C
Authority
CN
China
Prior art keywords
towboat
desalting seawater
distillation equipment
desalting
seawater
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2005100134153A
Other languages
Chinese (zh)
Other versions
CN1686833A (en
Inventor
阮国岭
吕庆春
赵河立
胡宏伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin Institute of Seawater Desalination and Multipurpose Utilization SOA
Original Assignee
Tianjin Institute of Seawater Desalination and Multipurpose Utilization SOA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Institute of Seawater Desalination and Multipurpose Utilization SOA filed Critical Tianjin Institute of Seawater Desalination and Multipurpose Utilization SOA
Priority to CNB2005100134153A priority Critical patent/CN1313383C/en
Publication of CN1686833A publication Critical patent/CN1686833A/en
Application granted granted Critical
Publication of CN1313383C publication Critical patent/CN1313383C/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/124Water desalination

Landscapes

  • Vaporization, Distillation, Condensation, Sublimation, And Cold Traps (AREA)

Abstract

The present invention discloses a method for transporting and installing a large distillation device for desalting seawater, which comprises the following steps that: a pilotage navigation channel is dug between a seawater desalting factory zone and a coastline; a large distillation device for desalting seawater which is formed by assembly is suspended on a tugboat and is connected with the tugboat into a whole by making use of a supporting frame; the tugboat is driven to the specified position of the seawater desalting factory zone along the pilotage navigation channel; the pilotage navigation channel is filled with and buried by soil at the periphery of the roadstead of the tugboat to lead the tugboat which is connected with the distillation device for desalting seawater and the earth to be fixed into a whole; cement is poured in the tugboat body of the tugboat. The method of the present invention reduces the cost for desalting seawater and widens the application range and the application zone of the large distillation device for desalting seawater.

Description

Large distillation equipment for desalting seawater transportation and installation method
Technical field
The present invention relates to a kind of transportation and installation method of water treating equipment, refer more particularly to the transportation and the installation method that are used for large distillation equipment for desalting seawater.
Background technology
At present, the distillation desalination techniques not only is used for the water supply of uniting of firepower power station and thermoelectric enterprise, and be widely used in sea water desaltination and produce distilled water, a kind of novel technology and industry have worldwide been formed, the treatable raw water of distillation method institute is very extensive, therefore the application scenario of distillation method is wide, and prosperity does not wane though experience its application for many years and develop still.
Distillation method is one of main method of sea water desaltination, accounts for 86% of sea water desaltination ultimate production.In order to introduce raw material seawater easily, desalimtor all requires to build in the seashore usually, but because the addressing of plant area of desalimtor is had the requirement of geology and geomorphology aspect, so plant area and shoreline have certain distance; Especially to distillation seawater desalination factory, generally be large-scale and super-huge sea water desaltination engineering in conjunction with thermal power plant or nuclear power plant's back pressure turbine low level heat energy, i.e. water power coproduction engineering, because of the particular requirement of power plant, can be more farther apart from the shoreline.
Distillation equipment for desalting seawater adopts the transportation of which kind of method to be installed to required job site, often big or small different according to its equipment scale.
Method for small-sized distillation desalting plant generally adopts automobile or train to transport is transported to the required equipment job site.For the large distillation desalting plant, the general employing dismembered the large distillation desalting plant, and gradation is transported to the required equipment scene to the distillation plant parts with railway or highway, processing assembling at the scene then in batches.The used train number of this mode of transport is more, and hanging and hanging discharge is frequent, and trucking costs is higher.
For large-scale or superhuge distillation desalting plant, also can process on one side at the scene or near on-the-spot, install on one side.The equipment unit completion of processing, its equipment also just installs.This transportation installation method requires the on-the-spot business unit that the processing erectility must be arranged, and perhaps processing site is not far from engineering site, in exercisable distance range.If engineering site or near do not have the apparatus processing erectility, if be implemented in local install, completion large distillation equipment for desalting seawater and putting into operation, can only be by long-distance transport.In addition, for large-scale or ultra-large type distillation equipment for desalting seawater, the length of its every single-effect evaporator or diameter, exceeded train or automobile can carrying the size lowest limit, thereby make large-scale or the long-distance land route transportation of ultra-large type distillation desalting plant can not realize.If adopt the steamer water transport, even steamer load-carrying and size are all enough, after wheel is beached, how large-scale or ultra-large type distillation desalting plant are transported to plant area's specified location stably, how to waltz through this section land route distance, how successfully large-scale even ultra-large type distillation equipment for desalting seawater to be hung oneself from ship and unload, at present economy but also transport mounting means steadily not only also.
Summary of the invention
The invention provides a kind of large distillation equipment for desalting seawater transportation installation method.Thereby realize the strange land completion operation of large distillation equipment, whether large distillation equipment for desalting seawater transportation installation method of the present invention is not limited to the locality the processing erectility, this method has been widened scope and region that large distillation equipment for desalting seawater is used, large distillation sea water desaltination main equipment is installed in processing factory's processing, long-distance transport is to the strange land, and the economically feasible that becomes that puts into operation.This method has reduced processing simultaneously installs and trucking costs, and then has reduced the sea water desaltination cost, has tangible economic benefit in actual applications.
The technical scheme of large distillation equipment for desalting seawater transportation of the present invention and installation method is: said method comprising the steps of: in digging pilotage navigation channel between desalimtor district and shoreline, open the navigation or air flight smoothly to guarantee towboat; The large distillation equipment for desalting seawater that assembling is shaped lifts on the towboat, is provided with support between described large distillation equipment for desalting seawater and the described towboat, utilizes support that described large distillation equipment for desalting seawater and towboat are connected as one; Utilize the above-mentioned towboat that is connected with large distillation equipment for desalting seawater of power-driven vessel traction,, towboat is sailed the specified location to sea water desaltination plant area along described pilotage navigation channel; Around the towboat roadstead, go back to the described pilotage of native landfill navigation channel, the towboat and the earth that are connected with described large distillation equipment for desalting seawater are fixedly become one; Joints cement in described towboat hull strengthens the light equipment of described large distillation seawater that connects as one with described towboat.
Large distillation equipment for desalting seawater transportation of the present invention and installation method compared with prior art have following beneficial effect:
(1) large distillation equipment for desalting seawater transportation of the present invention and installation method, required train number is few in transportation, hanging and hanging discharge continually, reduced trucking costs widely, owing to adopted equipment and towboat integral structure, thereby also reduced the processing installation costs, and finally reduced Cost of seawater desalination, have tangible economic benefit in actual applications.
(2) large distillation equipment for desalting seawater transportation of the present invention and installation method, because the elder generation that adopts is transported to processing site with equipment body, then after equipment is assembled, form incorporate structural entity and be transported to the job site scheme with towboat, whether job site near have the limitation of processing erectility, can successfully described large distillation equipment for desalting seawater be transported to the job site and put into operation if not being subjected to.Thereby scope and region that large distillation equipment for desalting seawater is used have been widened.
Description of drawings
Accompanying drawing is the synoptic diagram of large distillation equipment for desalting seawater transportation of the present invention and installation method.
Be the explanation of Reference numeral in the Figure of description of the present invention below:
1---large distillation equipment for desalting seawater
2---fixed support
3---towboat
4---the pilotage navigation channel
5---the shoreline
Specific embodiments
Elaborate below in conjunction with the specific embodiments of accompanying drawing to large distillation equipment for desalting seawater transportation of the present invention and installation method.
Implement before the technical solution of the present invention, need to prepare an enough big towboat 3 of profile haul size, this towboat 3 does not require dynamic facility, for the newness degree of this towboat 3, whether damaged, super labour all can be without a moment's thought, its cost is low more good more, as long as weight-carrying ability is enough, in the time that requires, can get final product equipment delivery to the point of destination stably smoothly.
Then, dig or select for use pilotage navigation channel 4, promptly between desalimtor district and shoreline 5, digging pilotage navigation channel 4 or selecting existing pilotage navigation channel 4 for use.That is, it is nearest to be chosen in sea water desaltination plant area water front off sea 5, and is convenient to dig the place, river course, and digging pilotage navigation channel 4 guarantees that towboat 3 can open the navigation or air flight smoothly.Also can utilize existing navigation channel or flume etc.
Select coastal or riverine river to have the producer of processing erectility; such as shipyard etc.; the main body of large distillation equipment for desalting seawater 1 is processed; assembling is shaped; utilize the slideway in shipyard that large distillation equipment for desalting seawater 1 is lifted on the towboat 3; be provided with support 2 between described large distillation equipment for desalting seawater 1 and the described towboat 3; utilize support 2 that described large distillation equipment for desalting seawater 1 is fixed on the towboat 3; and guarantee that this large-scale desalting plant does not rock; indeformable; make this large-scale desalting equipment and towboat 3 permanent integrated, promptly integrated this large-scale desalting plant and towboat 3 implementation structures.
Transport the integral body of above-mentioned integral structure to plant area along the pilotage water route, promptly utilize the above-mentioned towboat 3 that is connected with large distillation equipment for desalting seawater 1 of power-driven vessel traction, along the coastline 5 or river, haul in the pilotage navigation channel of having dug to desalimtor 4, sail to the sea water desaltination plant area fixed position of middle finger.
Need not hang and unload described large distillation equipment for desalting seawater 1, around towboat 3 roadsteads, go back to the described pilotage of native landfill navigation channel 4, make this ground, place return to former landforms situation, the above-mentioned like this ship that is mounted with large distillation equipment for desalting seawater 1 just is fixed in the ground, and both are fixedly become one.
At last, joints cement in described towboat 3 hulls further strengthens the steadiness of above-mentioned integrated large distillation equipment for desalting seawater 1, makes it become real ground structures.
Large distillation equipment for desalting seawater 3 after transportation is installed according to the method described above can successfully have been realized long-distance transport, must be in the limitation of carrying out together and do not processed installation.With a low cost movably towboat 3 large distillation equipment for desalting seawater 1 mobile is transported to the point of destination, and use digging pilotage navigation channel 4 and return native landfill technology, integrated towboat 3 and large distillation equipment for desalting seawater 3 cleverly, and be fixed in the required scene of distillation desalting plant.
Method of the present invention can realize easily that the strange land of large distillation equipment for desalting seawater 3 agent sets processes installation, long-distance transport, cured in place etc., thereby scope and region that large distillation equipment for desalting seawater 1 is used have been expanded greatly, solved irrealizable technical problem in the prior art, even the large distillation equipment for desalting seawater main body is installed in processing factory's processing, long-distance transport puts into operation to the strange land and becomes not only feasible but also economical.Install and trucking costs thereby reduced processing, also indirect reduction Cost of seawater desalination, have tangible economic benefit in actual applications.In addition, the equipment that the inventive method is involved is not limited only to desalting plant, and this patent also can be applicable to the transportation of other large-scale production and operation equipment and installs.
Although in conjunction with the accompanying drawings the preferred embodiments of the present invention are described above; but the present invention is not limited to above-mentioned embodiment; above-mentioned embodiment only is schematic; rather than it is restrictive; those of ordinary skill in the art is under the enlightenment of this reality invention; not breaking away under the scope situation that aim of the present invention and claim protect, can also make a lot of forms, these all belong within the protection of the present invention.

Claims (1)

1. a large distillation equipment for desalting seawater transports and installation method, it is characterized in that, may further comprise the steps:
In digging pilotage navigation channel between desalimtor district and shoreline, open the navigation or air flight smoothly to guarantee towboat;
The large distillation equipment for desalting seawater that assembling is shaped lifts on the towboat, is provided with support between described large distillation equipment for desalting seawater and the described towboat, utilizes support that described large distillation equipment for desalting seawater and towboat are connected as one;
Utilize the above-mentioned towboat that is connected with large distillation equipment for desalting seawater of power-driven vessel traction,, towboat is sailed the specified location to sea water desaltination plant area along described pilotage navigation channel;
Around the towboat roadstead, go back to the described pilotage of native landfill navigation channel, the towboat and the earth that are connected with described large distillation equipment for desalting seawater are fixedly become one;
Joints cement in described towboat hull strengthens the described large distillation equipment for desalting seawater that connects as one with described towboat.
CNB2005100134153A 2005-05-09 2005-05-09 Method for transporting and installing large distillation equipment for desalting seawater Expired - Fee Related CN1313383C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2005100134153A CN1313383C (en) 2005-05-09 2005-05-09 Method for transporting and installing large distillation equipment for desalting seawater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2005100134153A CN1313383C (en) 2005-05-09 2005-05-09 Method for transporting and installing large distillation equipment for desalting seawater

Publications (2)

Publication Number Publication Date
CN1686833A CN1686833A (en) 2005-10-26
CN1313383C true CN1313383C (en) 2007-05-02

Family

ID=35304875

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2005100134153A Expired - Fee Related CN1313383C (en) 2005-05-09 2005-05-09 Method for transporting and installing large distillation equipment for desalting seawater

Country Status (1)

Country Link
CN (1) CN1313383C (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4356785A (en) * 1978-12-12 1982-11-02 Bailie Robert E Transportable process modules
CN86101732A (en) * 1985-06-19 1986-12-24 塞彭公司 Upper structure of offshore platform integral installation method and implement the equipment of this method
CN1067466A (en) * 1992-06-24 1992-12-30 马鸿春 Hollow man-made island construction method and monomer structure
CN2393816Y (en) * 1999-08-30 2000-08-30 上海交通大学 Special apparatus for moving heavy equipment on seabeach
CN1286665A (en) * 1997-12-18 2001-03-07 美国油田钻探公司 Offshore production and storage facility and method of installing same
CN1475630A (en) * 2003-04-11 2004-02-18 莹 王 Multifunction floating bridge for use on sea

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4356785A (en) * 1978-12-12 1982-11-02 Bailie Robert E Transportable process modules
CN86101732A (en) * 1985-06-19 1986-12-24 塞彭公司 Upper structure of offshore platform integral installation method and implement the equipment of this method
CN1067466A (en) * 1992-06-24 1992-12-30 马鸿春 Hollow man-made island construction method and monomer structure
CN1286665A (en) * 1997-12-18 2001-03-07 美国油田钻探公司 Offshore production and storage facility and method of installing same
CN2393816Y (en) * 1999-08-30 2000-08-30 上海交通大学 Special apparatus for moving heavy equipment on seabeach
CN1475630A (en) * 2003-04-11 2004-02-18 莹 王 Multifunction floating bridge for use on sea

Also Published As

Publication number Publication date
CN1686833A (en) 2005-10-26

Similar Documents

Publication Publication Date Title
Guo et al. Review of integrated installation technologies for offshore wind turbines: Current progress and future development trends
CA2702844C (en) River and tidal power harvester
AU2011269929B2 (en) Ocean wave energy system
CN1139516C (en) Working ship
WO2009131460A2 (en) Wind energy system
CN1354112A (en) Offshore platform
WO2006058400A1 (en) Hybrid positioning system for a floating structure
US11891768B2 (en) Auxiliary structure for floating and sinking a whole offshore wind turbine with suction bucket foundation(s)
KR20160113174A (en) Vessel-mounted ocean thermal energy conversion system
CN104503060B (en) The optical cable of vibration jet synergy buries underwater robot
CN104805821B (en) Marine oil field natural gas compressing processes jack-up unit
KR20160019034A (en) Mobile offshore wind turbine
CN103010413A (en) Working method for hoisting draught fan by barge
JPH11351120A (en) Tidal power generating method
CN101844606B (en) Shallow sea wind power construction system, shallow sea wind power platform and shallow sea wind power construction method
CN1313383C (en) Method for transporting and installing large distillation equipment for desalting seawater
CN204703144U (en) A kind of self lift type the Macadam Pile Construction platform
CN101157378A (en) Off land loading and unloading anchoring system and anchoring method for liquid bulk cargo carrier
Zhang et al. Microplastics
Korushova et al. Multifunctional mobile complex of transport-technological machines for the Arctic
CN102454169A (en) Solar photovoltaic power station foundation construction method
CN101210542A (en) Complete machine windward floating foundation oscillating wind motor
CN210684666U (en) Combined type driven pile for ocean engineering
CN104895043B (en) A kind of deep water long period that is applied to is surged the Macadam Pile Construction method in waters
CN101633395A (en) Methane collection ship

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070502

Termination date: 20150509

EXPY Termination of patent right or utility model