CN1262252A - Hard-core cement-earth compound pile and construction method thereof - Google Patents

Hard-core cement-earth compound pile and construction method thereof Download PDF

Info

Publication number
CN1262252A
CN1262252A CN99113455A CN99113455A CN1262252A CN 1262252 A CN1262252 A CN 1262252A CN 99113455 A CN99113455 A CN 99113455A CN 99113455 A CN99113455 A CN 99113455A CN 1262252 A CN1262252 A CN 1262252A
Authority
CN
China
Prior art keywords
pile
cement
hard
earth
core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN99113455A
Other languages
Chinese (zh)
Inventor
刘珍
邹荣
邹宗煊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN99113455A priority Critical patent/CN1262252A/en
Publication of CN1262252A publication Critical patent/CN1262252A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02WCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO WASTEWATER TREATMENT OR WASTE MANAGEMENT
    • Y02W30/00Technologies for solid waste management
    • Y02W30/50Reuse, recycling or recovery technologies
    • Y02W30/91Use of waste materials as fillers for mortars or concrete

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A compound cement-earth pile with hard core is made up by surrounding the prefabricated pile or tubular pile as hard core with the cement-earth mixture added with fly ash, early-strengthening agent, water reducing agent or sand aggregate. Its construction method includes mixing the cement-earth mixture with stirrer, constructing pile base of cement-earth mixture, and driving down pile as hard core with pile driver. It features high construction speed and is suitable for soft ground.

Description

Hard-core cement-earth compound pile and constructional method thereof
The present invention relates to the bearing pile that a kind of building foundation is used, relate in particular to a kind of hard-core cement-earth compound pile and constructional method thereof that is applied to soft clay area.
At present, the area, Shanghai begins to promote and has the hard-core cement-earth compound pile that is suitable for soft clay area, patent No. ZL972429115, cement-earth length of time of finding this compound pile in force is long partially, early strength is lower, can influence follow-up engineering construction, this compound pile preparation of construction is single column compound pile machine (Fig. 1) or two column compound pile machines (Fig. 2) because of whipping device and pile sinking equipment all are fixed on same the stake machine, can't construct simultaneously, has reduced work efficiency.
The object of the present invention is to provide and a kind ofly have obvious raising compound pile pile strength, utilize the three wastes, improve the hard-core cement-earth compound pile and the constructional method thereof of work efficiency.
In order to achieve the above object, the cement-earth that hard-core cement-earth compound pile of the present invention is made hard core and this hard core of outsourcing by premculded pile or pile tube is formed, it is characterized in that mixing in the cement-earth toughener, described toughener is flyash or hardening accelerator or water reducer or sandy aggregate, is a kind ofly made toughener to four kinds of combinations and infiltrates in cement and the water and stir pulping by above-mentioned, and high pressure sprays into soil layer and original soil stirs into the pulpous state cement soil body, again hard core is sunk to cement-earth central authorities, treat that cement-earth ties hard pile
Hard-core cement-earth compound pile constructional method of the present invention, construct in order by mixing pile machine and ram engine and to finish, it is characterized in that described mixing pile machine and ram engine can relatively move, construction simultaneously, mixing pile machine is preceding, carry out stirring concrete earth construction earlier, ram engine after, carry out piling construction finishing on the stake position of cement-earth construction.Described mixing pile machine and ram engine are for independent device or formation one and both relatively-movable devices are constructed respectively.Be convenient construction, mixing pile machine or ram engine are walked in same walking on pipe or the rail, and the pile sinking equipment of described ram engine is pile hammer or vibration hammer or weight or rope static pressure device.
The present invention compared with prior art has the advantage of utilizing the three wastes, raising pile strength, improving work efficiency.
The drawing of accompanying drawing is described as follows:
Fig. 1 is single column compound pile machine schematic perspective view.
Fig. 2 looks synoptic diagram (a) and front-view schematic diagram (b) for two column compound pile pusher sides.
Fig. 3 is embodiment of the invention hard-core cement-earth compound pile diagrammatic cross-section (a) and floor map (b).
Fig. 4 is embodiment of the invention mixing pile machine and ram engine construction horizontal distribution synoptic diagram, and 4,6 is column among the figure.
One embodiment of the present of invention are referring to Fig. 3, Fig. 4, earlier spray into the grout that is mixed with flyash and water reducer and stir into the cylindricality pulpous state cement soil body (2) at the soil layer mesohigh of stake position a and move mixing pile machine (3) along rail (7) to a stake b with original place soil by existing mixing pile machine (3), continue the stirring construction of the cement-earth of stake position b, move existing ram engine (5) to a of stake position along rail (7), with vibration hammer premculded pile (1) is sunk to cement-earth (2) central authorities by the electric welding of joint overlap joint, move ram engine (5) along rail (7) again and to the b of stake position, carry out piling construction, treat the cement-earth knot hard hard-core cement-earth compound pile of the present invention.

Claims (9)

1, a kind of hard-core cement-earth compound pile cement-earth of making hard core and this hard core of outsourcing by premculded pile or pile tube is formed, and it is characterized in that mixing in the cement-earth toughener.
2,, it is characterized in that described toughener is a flyash according to the described hard-core cement-earth compound pile of claim 1.
3,, it is characterized in that described toughener is a hardening accelerator according to the described hard-core cement-earth compound pile of claim 1.
4,, it is characterized in that described toughener is a water reducer according to the described hard-core cement-earth compound pile of claim 1.
5,, it is characterized in that described toughener is a sandy aggregate according to the described hard-core cement-earth compound pile of claim 1.
6,, it is characterized in that described toughener is two kinds to four kinds combination of flyash or hardening accelerator or water reducer or sandy aggregate according to the described hard-core cement-earth compound pile of claim 1.
7, a kind of constructional method of hard-core cement-earth compound pile according to claim 1, construct in order by mixing pile machine and ram engine and to finish, it is characterized in that described mixing pile machine and ram engine can relatively move, construction simultaneously, mixing pile machine is preceding, carry out stirring concrete earth construction earlier, ram engine after, carry out piling construction finishing on the stake position of cement-earth construction.
8,, it is characterized in that described mixing pile machine and ram engine construct for independent device respectively according to the described hard-core cement-earth compound pile constructional method of claim 7.
9,, it is characterized in that described mixing pile machine and ram engine are that formation one and both relatively-movable devices are constructed according to the described hard-core cement-earth compound pile constructional method of claim 7.
CN99113455A 1999-02-02 1999-02-02 Hard-core cement-earth compound pile and construction method thereof Pending CN1262252A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN99113455A CN1262252A (en) 1999-02-02 1999-02-02 Hard-core cement-earth compound pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN99113455A CN1262252A (en) 1999-02-02 1999-02-02 Hard-core cement-earth compound pile and construction method thereof

Publications (1)

Publication Number Publication Date
CN1262252A true CN1262252A (en) 2000-08-09

Family

ID=5276644

Family Applications (1)

Application Number Title Priority Date Filing Date
CN99113455A Pending CN1262252A (en) 1999-02-02 1999-02-02 Hard-core cement-earth compound pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN1262252A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251520A (en) * 2011-05-27 2011-11-23 岳建伟 Novel cement soil composite mixing pile and pile formation method thereof
CN104404947A (en) * 2014-11-20 2015-03-11 张红 Construction method for composite pile
CN105672329A (en) * 2016-02-29 2016-06-15 济南轨道交通集团有限公司 Deep foundation pit large-size prefabricated envelop enclosure and construction method
CN105969367A (en) * 2016-05-13 2016-09-28 王继忠 Pre-mixed high-strength cement soil

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102251520A (en) * 2011-05-27 2011-11-23 岳建伟 Novel cement soil composite mixing pile and pile formation method thereof
CN104404947A (en) * 2014-11-20 2015-03-11 张红 Construction method for composite pile
CN105672329A (en) * 2016-02-29 2016-06-15 济南轨道交通集团有限公司 Deep foundation pit large-size prefabricated envelop enclosure and construction method
CN105672329B (en) * 2016-02-29 2017-12-15 济南轨道交通集团有限公司 The large size prefabricated building enclosure of deep basal pit and construction method
CN105969367A (en) * 2016-05-13 2016-09-28 王继忠 Pre-mixed high-strength cement soil

Similar Documents

Publication Publication Date Title
AU2012315417B2 (en) Retaining wall construction using site compaction and excavation
CN201883438U (en) Pit-in-foundation-pit steel sheet pile foundation pit supporting structure
CN109914472B (en) Soft soil area assembled comprehensive pipe gallery and construction method thereof
JP2015183364A (en) Method for preventing soil structure from sliding at slope surface layer with geocell fixing operation auxiliary means
CN111636417A (en) Grouting type steel pipe pile and construction method thereof
US20020071725A1 (en) Earth support and permanent structural foundation wall
CN111676987A (en) Construction method for backfilling construction of construction fertilizer tank by vibrating, slurry-flushing and ramming method
CN105421446B (en) A kind of construction method of composite soil extruding solidification prefabricated pile for treatment of soft foundation
CN1262252A (en) Hard-core cement-earth compound pile and construction method thereof
JPS615125A (en) Foundation of building
CN101245601A (en) Horizontal cement mixing pile and construction method of pile shed thereof
KR20060099889A (en) Structure and construction method of cut-off wall using jet grouting
CN1046014C (en) Construction method for soil bulkhead structure
CN202672161U (en) Cement-soil mixing drum sheet-pile united slope structure with soil nails
JP3676441B2 (en) Pit and construction method of basement using it
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN105507338B (en) A kind of campshed grafting rubble formula supporting water blockoff diaphragm wall is molded engineering method
CN1514073A (en) Supporitng structure of breast wall
KR100629853B1 (en) Soil impruvement method
CN208455661U (en) The high barrier wall structure of the embedding rock T shape combined type column plate of overlength
Gispert Prefabricated foundations for housing applied to room modules
JP2814267B2 (en) Underground continuous wall method
Zhang et al. Researching the application of CFG pile treatment in soft foundation of expressway
CN104131568A (en) Novel mixed reinforcement H-shaped sheet pile and five (six)-shaft cement soil mixing wall combined building envelope and construction method thereof
CN217782015U (en) Soft overburden end-bearing rock-socketed pile forming system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Liu Zhen

Document name: Notice of publication of application for patent for invention

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Liu Zhen

Document name: payment instructions

C57 Notification of unclear or unknown address
DD01 Delivery of document by public notice

Addressee: Liu Ling

Document name: Deemed as a notice of withdrawal

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication