CN1252924A - Method for preparing soil in rice field - Google Patents

Method for preparing soil in rice field Download PDF

Info

Publication number
CN1252924A
CN1252924A CN 98122506 CN98122506A CN1252924A CN 1252924 A CN1252924 A CN 1252924A CN 98122506 CN98122506 CN 98122506 CN 98122506 A CN98122506 A CN 98122506A CN 1252924 A CN1252924 A CN 1252924A
Authority
CN
China
Prior art keywords
soil
contour
ridge
ridging
discrepancy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 98122506
Other languages
Chinese (zh)
Other versions
CN1075705C (en
Inventor
郑庭学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN98122506A priority Critical patent/CN1075705C/en
Publication of CN1252924A publication Critical patent/CN1252924A/en
Application granted granted Critical
Publication of CN1075705C publication Critical patent/CN1075705C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Soil Working Implements (AREA)

Abstract

A method for soil levelling in large area field includes such steps as ploughing field, planing and raking soil, ridging to form ridge-bordered beds and scraping level within every bed. For said ridging step, various contour lines are measured and marked at first, and then the soil is ridged on contour lines. The level difference between adjacent contour lines is 3-5 cm and the zoned area enclosed by adjacent contour lines is 500-100 sq.m. If water is poured in beds after mecanically levelled, water surface is used as level measuring. It features high effect on soil levelling.

Description

Method for preparing soil in rice field
The present invention relates to a kind of method of soil preparation, use when being used for large tracts of land plot rice cultivation.
Because the characteristic of paddy rice on cultivation is very high to the requirement of rice field flatness, the horizontality and the crop on ground are closely related in the same furrow, so seedbed preparation becomes the key link in the rice cropping operation.Traditional method for preparing soil in rice field is will plough good field piece earlier to carry out smooth, be divided into uniform rectangular grid field again, one lattice Tian Weiyi furrow, and make and reach smooth in the furrow, also sublateral canal will be set at last, this kind method is because operation is numerous and diverse, and labor intensive is many, land utilization rate is on the low side, does not especially fit into the large tracts of land plot of complicated topographical conditions.
The objective of the invention is to provides a cover to be suitable for the time saving and energy saving of large tracts of land plot, the method for preparing soil in rice field that land utilization rate is high at the deficiency of above traditional method of soil preparation.
Even rectangular grid field formula is in the past changed in the setting on the method for soil preparation furrow of the present invention ridge, and the contour setting in strict accordance with the field piece is generally irregular curve, and its step is as follows:
1, plow: routine work;
2, dig rake: select suitable plane rake facility and operating type at landform, eliminate extreme de-luxe compartment and low hole, make ground tentatively smooth substantially;
3, survey line: find out the discrepancy in elevation with the spirit level of mapping usefulness and be not more than the rule contour of 5cm and give mark, the value of the discrepancy in elevation is relevant with the smooth situation in ground with the gradient in plot size, and value was big when gradient reached poor flatness more greatly;
4, ridging: become the ridge along the contour ridging;
5, wipe off: machinery flattens in the furrow, reaches the quality requirement of " discrepancy in elevation is only very little, and very little water does not reveal mud ";
If obvious de-luxe compartment and hollow are arranged, can going ahead of the rest, it is flat suitably to push away before plowing; And the discrepancy in elevation between adjacent contour is preferably 3-5cm, and makes region area that adjacent contour surrounds at 500-1000m 2For making whole ground effect even more ideal, can after strickling, carry out the whole ground of water in conjunction with preseeding irrigation, promptly in furrow, discharge water, with the water lining, the people walks further smooth furrow face with water.
Adopt this kind method of soil preparation, have following significant advantage:
1., the mechanical work level is few.Compare with conventional method, lacked and beaten the straight ridge and plough sublateral canal two links, alleviated machinery rolling topsoil;
2., save the labour.Reduced the required amounts of labour such as connecing ridge head, finishing sublateral canal and artificial level land;
3., improve land utilization rate.Because the embanked field enlarged areas has shortened the sub-total length in the ridge in the whole plot, and has not established sublateral canal, and land utilization rate is brought up to about 95% by original 70-80%;
4., reduce cost.Though increased survey contour link, the machine power of unit are input and manpower work all greatly reduce generally.
It below is a specific embodiments of the present invention.
The part plot landform schematic diagram that Fig. 1 intercepts for virtual certain the large tracts of land bar Tanaka after finishing of present embodiment wholely.Rectangle AEFL shown in it by the edge in intercepting plot, AK, BC, DH, EG are contour (ridge).Present embodiment comprises the steps:
1, plow: the conventional means topsoil that loosens;
2, planing: do the machinery planing according to topographic features, in order to eliminate extreme low hole and de-luxe compartment, so that ground is tentatively smooth;
3, survey line: the spirit level with mapping usefulness is found out the contour that the discrepancy in elevation is 3cm, and makes region area that adjacent contour surrounds at 500-1000m 2
4, ridging: adopt with the adaptive clean-up scraper of small tractor to become the ridge along every contour ridging, ridge bottom width 30cm, the high 15-20cm in the ridge for the adjustable soil scrapper of " eight " font and two wing plate subtended angles;
5, wipe off: utilize the clean-up scraper of small tractor traction between the ridge, to wipe off in the furrow, angle between clean-up scraper and the hitch frame can be adjusted according to topographic features, it is smooth to reach the groove that ridging is formed, and make the interior flatness of whole furrow reach the quality requirement of " discrepancy in elevation is only very little, and very little water does not reveal mud ";
6, the whole ground of water: in conjunction with preseeding irrigation, the people walks with water, and with the water lining, the artificial elimination wipeed in the operation clean-up scraper seam and limit, the ridge off and omitted, further smooth consolidation furrow face, and leak sealing is filled a vacancy and is repaiied the kind furrow ridge.
Intercepting part A EFL shown in the present embodiment also can be the part in non-field piece of certain large tracts of land, so that this method of soil preparation further is adapted to the different shape plot except that the bar field, thereby further embody the superiority of this method with respect to the rectangular grid field formula method of soil preparation of routine, and its isocontour distribution not only is confined to the form that simulates in the foregoing description, should be to show as various shape according to actual topographic features.
Method involved in the present invention can also extend in any crop genetics that the plot flatness is had higher requirements of except that the rice field other.

Claims (4)

1, a kind of method for preparing soil in rice field, its flow chart comprises and plows, digs rake, ridges into furrow, scrapes the equality link in the furrow, it is characterized in that described ridging is each bar contour of measuring earlier and identify in the plot, and making the discrepancy in elevation between adjacent contour be not more than 5cm, ridging becomes the ridge on contour then.
2, method of soil preparation as claimed in claim 1 is characterized in that the ridge, ridge of getting is irregular curve.
3, method of soil preparation as claimed in claim 1 or 2 is characterized in that the discrepancy in elevation between described adjacent contour is decided according to digging ground gradient degree behind the rake and smooth situation, is generally 3-5cm, and makes region area that adjacent contour surrounds at 500-1000m 2Be the best.
4, method of soil preparation as claimed in claim 3 is characterized in that the discrepancy in elevation between described adjacent contour is definite value.
CN98122506A 1998-11-11 1998-11-11 Method for preparing soil in rice field Expired - Fee Related CN1075705C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN98122506A CN1075705C (en) 1998-11-11 1998-11-11 Method for preparing soil in rice field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN98122506A CN1075705C (en) 1998-11-11 1998-11-11 Method for preparing soil in rice field

Publications (2)

Publication Number Publication Date
CN1252924A true CN1252924A (en) 2000-05-17
CN1075705C CN1075705C (en) 2001-12-05

Family

ID=5227787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN98122506A Expired - Fee Related CN1075705C (en) 1998-11-11 1998-11-11 Method for preparing soil in rice field

Country Status (1)

Country Link
CN (1) CN1075705C (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109496731A (en) * 2018-12-27 2019-03-22 袁米农业科技有限公司 A kind of method of cereal volume increase
CN109633542A (en) * 2018-11-30 2019-04-16 中交遥感农业科技江苏有限公司 A kind of method for arranging of the locality map network for unmanned plane

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1491361A1 (en) * 1987-12-22 1989-07-07 Всесоюзный Научно-Исследовательский Институт Риса Method of treating soil
CN1100586A (en) * 1993-09-21 1995-03-29 王文昶 Method for reform of low yield cultivated land

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109633542A (en) * 2018-11-30 2019-04-16 中交遥感农业科技江苏有限公司 A kind of method for arranging of the locality map network for unmanned plane
CN109496731A (en) * 2018-12-27 2019-03-22 袁米农业科技有限公司 A kind of method of cereal volume increase

Also Published As

Publication number Publication date
CN1075705C (en) 2001-12-05

Similar Documents

Publication Publication Date Title
CN104472049B (en) A kind of heavy salinized wasteland, inland quick improvement method
CN101779537B (en) Method for planting dryland crops by crashing soil
CN205408439U (en) Layer depth pine soil preparation combined operation is divided machine to autovibration formula
CN110366883A (en) The combine plowing machine of nonirrigated farmland stalk plough rotation returning to the field
Abdukhamidovich et al. Strip Till Age of Soil for Deuteric Sowing (Second Crop)
Zhou et al. Design and test of laser-controlled paddy field levelling-beater
JP4909661B2 (en) Display device and farm work method for clearly indicating travel position along farm work line created based on contour lines
Boardman Soil erosion at Albourne, West Sussex, England
CN103081590B (en) Associating subsoiler
CN1075705C (en) Method for preparing soil in rice field
CN106817943B (en) A kind of farming combined method of sloping upland water and soil conservation
CN110178474A (en) Hilly area field building method
CN107592998B (en) Plough and revolve combined type ditching ridging device
CN2855027Y (en) Combiner for cultivating and fertilizing
CN205082138U (en) Rape ridge culture ditching ridger
CN2688045Y (en) Adjustable grounding film laying machines
CN217564088U (en) Desert shuttle planting frame
CN212753132U (en) Green asparagus fertilization ridging flattening all-in-one
Owino et al. Performance of narrow strips of Vetiver grass (Vetiveria zizanioides) and Napier grass (Pennisetum purpureum) as barriers against runoff, soil and nutrient loss in Kenya
CN220733409U (en) Levelling machine suitable for dry land paddy field
CN2349744Y (en) Uneven ridges ridging soil-working sower
FUJII et al. A Comparison of Tractor Wheel But Ditch and Traditional Ditch Methods of Field Drainage in Wet Seeding Rice Culture
CN212000843U (en) Snow remover with level land function
CN219205166U (en) Detachable three-point connection soil loosening and land leveling combined tiller
RU191574U1 (en) Ridge plow with a full turn of layers

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee