- Prior art keywords
- power
- generator
- adjustment module
- steam
- outlet
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
- F01K13/02—Controlling, e.g. stopping or starting
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/14—Combined heat and power generation [CHP]
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Control Of Turbines (AREA)
- Control Of Eletrric Generators (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Abstract
一种用于快速调节电厂设备功率的方法,该电厂设备具有一个包括汽轮机(2、4、6)和发电机(8)的汽轮机发电机组。为了调整发电机的过剩功率(PS),起动在设备流程中存在的蓄能器。为了达到特别高效的调整,按本发明除发电机功率(PS,PI)外还至少利用另一个表示当前工作状态特征的过程参数(PWL,PFW,MPD,DFD,KL,TB,P)来确定一些位置额定值(Y,DFD)。用于实施此方法的装置包括一调节装置(60),调节装置的入口(a至i)包含发电机(8)的功率值(PS,PI)和至少另一个过程参数(PWL,PFW,MPD,DFD,KL,TB,P),以及它的出口(n至u)输出用于与汽轮机(2、4、6)连接的调整机构(10、12、18、22、24、28、32、34、36、42、46、48、50)的位置额定值(Y、DFD)。
Description
本发明涉及一种快速调节电厂设备功率的方法,该电厂设备具有一个包括汽轮机和发电机的汽轮机发电机组,其中,为了调整发电机的过剩功率,起动在设备流程中存在的蓄能器。本发明还涉及一种实施此方法的装置。
除了对供电***内部的频率偏差进行控制外,还尤其应遵守在通往一些分网的连接点处预定的传输功率,这些分网可组成一个配电网(联合电网或岛式电网)。因此存在一个要求,即,能在几秒内迅速提高成套电厂设备的功率。
在印刷品“VGB发电厂技术(VGB Kraftwerkstechnik)”1980年1月第一册第18至23页中介绍了快速调整功率和保持频率的可能性。在数秒范围内(秒储备量)迅速调整功率存在多种可同时实施或交替实施的控制可能性,而为了使电厂设备功率保留变化要求改变燃料供应量。因此在燃烧矿物燃料的电厂设备中,由于存在跨接滞后时间,应在前几秒钟时间内打开汽轮机的事先保持在节流位置的调节阀,并因而实际上无延迟地起动和排放可使用的蓄汽箱汽包或蓄能器。
除了通过取消汽轮机调节阀的节流作用来提高功率外,还切断设在汽轮机的水汽循环中借助于来自汽轮机的抽汽加热的预热器。与此同时通过低压加热器流动的凝结水流可以在几秒钟内停止和重新提高。例如在德国专利文件DE-PS 3304292中也说明了这一通过切断预热器和停止凝结水来快速调整燃烧矿物燃料的电厂设备功率的措施作为起动留有储备量的蓄能器的另一种可能性。
因此通常使用一调节装置,用于调整和/或控制电厂设备汽轮机水汽循环中的快速秒储备,亦即经调节的流往再生式预热器和/或加热式凝汽器的蒸汽流量负荷,以及工业用汽和凝结水。此调节装置用于快速调整功率,亦即在数秒钟内起动蓄能器、使流往预热器的供汽节流、工业用汽节流和/或凝结水节流。其中,形成用于汽轮机抽汽处的调节阀和用于调整凝结水的调整机构的位置额定值,以达到所要求的发电机过剩功率。但是与此同时带来的缺点是,不仅在汽轮机抽汽处的调节元件或调整机构而且凝结水和辅助凝结水调节装置的相互协调极为困难。此外,也没有考虑用于功率快速调整的各项措施的使用优先权。而且由于调节对象通常为非线性的,所以至今调节质量不是很高。
因此本发明的目的是提供一种在电厂设备中快速提供功率的方法,采用这种方法可达到特别高效的调整。此目的应在一种对于实施此方法特别适用的设备中借助于简单的手段来实现。
为达到有关方法方面的目的按本发明采取的措施是,除发电机功率外,至少还引用或使用一个尤其是由电厂设备的蒸汽发生器调节装置制备的热功率值,作为另一个表示当前工作状态特征用于确定一定数量位置额定值的过程参数。在这里,发电机功率指的是实际或额定功率、过剩功率额定值或实际值、或发电机最大可能功率。
本发明思路的出发点是,在考虑到当前运行状态的情况下确定起动蓄能器的措施组合和运行策略,在此要计算出设备运行过程中的许多过程量或过程参数。为此应根据求得的过剩功率需要值,调节供使用的蓄能器的排放和充注,在这种情况下为了起动各蓄能器可以采用以技术和经济观点为基础的运行策略。
为了确定全部设备或各电厂设备当前的运行状态,作为附加的另一些过程参数,最好还使用设备的遥测热功率以及输出的工业用汽流量和/或汽轮机的尤其是与汽轮机入流侧连接的新汽调节阀的调整机构节流度。此外,考虑其他适宜的有关限制蓄能器的值或数据,例如涉及设备的负荷能力。还有,应考虑有关各蓄能器技术备用状态或可起动性的数据,它们的内容取决于汽轮机水汽循环中的新汽、抽汽、排汽流量和/或凝结水流量。
为达到上述有关装置方面的目的,按本发明采用一调节装置,该调节装置的入口包含发电机的额定功率(过剩功率额定值)和实际功率(过剩功率实际值)以及至少一个热功率值作为另一个过程参数,调节装置的出口(为起动各蓄能器)输出用于与汽轮机连接的调整机构的位置额定值。这些调整机构可以是新汽、抽汽或排汽调节阀或气流调节器以及主凝结水或辅助凝结水输送泵。
在合乎目的的设计中,调节装置包括第一调节模块,它的入口包含发电机的额定功率和实际功率以及另一些过程参数或工作参数,它的出口输出一种措施组合的份额数据,这种措施的组合用于提供储备功率。此第一调节模块最好还有一个入口,用于至少一个与汽轮机入流侧连接的调整机构的节流度。
调节装置最好还包括一个第二调节模块,它的入口与第一调节模块输出措施组合的出口连接,它的出口输出用于蒸汽调整机构的位置额定值。一个出口侧与此调节模块连接的作为校正调节器工作的第三调节模块,作为入口最好包含发电机的功率值。
调节装置最好还包括一个第四调节模块,它的入口分别与第一和第二调节模块的一个出口连接,它的出口输出用于凝结水调节机构的位置额定值。调节装置的一个与第一调节模块连接的第五调节模块用于校正或适配至少一个调整机构的实际节流度。
采用本发明获得的优点主要在于,通过在顾及设备一些重要过程参数的情况下确定汽轮机组内起动蓄能器的措施组合,可以获得一种对于激活过剩功率往往互相矛盾的要求和条件的最有利的解决方案。其中,通过使用一种适合于起动蓄能器的运用策略,保证有最好的总效果。在制订运行策略时可以考虑到一些约束条件,这些约束条件不仅由于预先规定提供的调节裕度,而且来自于有关电流供应、工业用汽和/或加热用汽供应的规章以及基于技术的原因。
下面借助于附图详细说明本发明的实施例,附图中:
图1为作为成套电厂设备流程段的汽轮机组的线路框图;以及
图2为用于图1所示流程段的调节装置的线路框图。
图1表示电厂设备流程段的原理框图,其中有一个汽轮机组,它由高压汽轮机段2、中压汽轮机段4和低压汽轮机段6以及发电机8组成。在汽轮机组运行时,新蒸汽FD经新汽调节阀10引入高压汽轮机段2。可借助于调节阀12(气流调节器KL)调整的分流FD1从高压汽轮机段2抽取,用于高压给水预热***14。从高压汽轮机段2出口的排汽FD2经中间过热器16供入中压汽轮机段4。
由中压汽轮机段4进行另一次抽汽。为此借助于调节阀18(气流调节器KL)抽取可调整的第一分流MD1去给水箱20。通过一个借助于调节阀22(工业用汽气流调节器PDKL)可调节的第二分流MD2实施作为工业用汽的另一次抽汽。此外,通过一个借助于调节阀24(气流调节器KL)可调节的第三分流MD3进行抽汽,用于低压给水预热***26。中压汽轮机段4的排汽中借助于调节阀28(热凝结水气流调节器HKKL)可调节的第一分量MD4供入加热凝汽器30。中压汽轮机段4的排汽中同样可调节的第二分量MD5,经溢流气流调节器32(UKL)输入低压汽轮机段6。
从低压汽轮机段6同样进行用于低压给水预热***26和用于加热凝汽器30的抽汽。为此,第一分流ND1直接地和第二分流ND2经由一调节阀34(气流调节器KL)供入低压给水预热***26。同样地,第三分流ND3直接地和第四分流ND4经由调节阀36(热凝结水气流调节器HKKL)供入加热凝汽器30。从低压汽轮机段6出口的排汽ND5在一凝汽器38中冷凝。
主凝结水K从凝汽器38的热井40借助于一凝结水泵42经低压给水预热***26输入给水箱20。从给水箱20借助于给水泵44将给水经高压给水预热***14输送。辅助凝结水NK1从高压给水预热***14通过一辅助凝结水泵46输入给水箱20。同样,辅助凝结水NK2从低压给水预热***26通过一辅助凝结水泵48输入凝汽器38,亦即输入它的热井40。此外,辅助凝结水NK3从加热凝汽器30借助于一辅助凝结水泵50输入凝汽器38的热井40中。
主凝结水K和给水S的输送通过水位调节装置LK/LSWB进行,而辅助凝结水NK1、2、3的输送通过单独的水位调节装置NKR1、NKR2或NKR3调整。后者被输入一个公共的位置额定值YNKR。
图2表示了快速调节功率的设备。它包括一个有五个调节模块62、64、66、68和70的调节装置60。调节装置60作为输入参数a和b获得功率需求PS和功率或过剩功率实际值PI。过剩功率实际值PI借助于在发电机8处的测量装置72(图1)测定。作为另一个输入参数C,调节装置60得到热功率额定值PWL,它以图中没有进一步表示的方式取自电厂设备的蒸汽发生器调整装置。此外,作为输入参数d至h调节装置60还得到有关电厂设备运行状态的信息。它们是遥测热功率PFW作为输入参数d;工业用汽抽汽量或工业用汽质量流量MPD作为输入参数e;新汽调节阀10的节流度DFD作为输入参数f;电厂设备的负荷能力KL作为输入参数g;以及,可使用的蓄能器的技术备用状态TB作为输入参数h。另一些运行参数P可通过入口i输入调节装置60。
入口a至i属于调节装置60的第一调节模块62。它们考虑应用于要调整的流程段的过程参数PS、PI、PWL、PFW、MPD、DFD、KL、TB和P。借助于一种以关于各项措施的储备功率潜力的工艺认识为基础的计算方法,在第一调节模块62中建立措施组合的判定准则。为此确定表征发电机功率PS和遥测热功率PFW以及工业用汽质量流量MPD和节流度DFD的当前运行状态。与此同时针对每一个当前运行状态,确定为满足瞬间所要求的储备功率的一种最佳的措施组合L1....n。在这里还要考虑由于负荷能力KL造成的限制以及各项措施Ln的技术备用状态TB。接着,针对确定的措施Ln计算功率份额PSRM(1...n),并形成用于有关措施Ln的释放信号作为输出参数L。此外,确定用于蒸汽发生器调节装置(图中未表示)的附加热功率ΔPWL作为另一个输出参数k。
输出参数j和l以及遥测热功率PFW构成调节模块64的输入参数。在调节模块64中构成用于新汽调节阀10、溢流气流调节器32、调节阀28和36、调节阀22或调节阀12、18、24和34的位置额定值YFD、YUKL、YHKKL、YPDKL和YKL,作为输出参数n至r。算出的位置额定值Y借助于与调节模块64连接的调节模块66修正,功率额定值PS和过剩功率实际值PI作为输入参数输入调节模块66。
在调节模块68中,作为输出参数s和t,根据采取的措施Ln、气流调节器或调节阀10、12、18、22、24、28、30、32、34和/或36的位置以及它们的位置改变速度,构成凝结水或辅助凝结水调节装置NKR1、2、3位置额定值YKP、YNKP的修正值。此外向调节模块68输入调节模块62和64的输出参数j和r作为输入参数,亦即位置额定值YKL和措施组合L1...n。
调节模块70包含有用于确定新汽调节阀10必要的节流度的算法规则。为此向此调节模块70输入来自调节模块62的输出参数j和另一个描述电厂设备当前运行状态的输出参数V作为输入参数。所计算出的新汽调节阀10的节流度与预选的节流度比较,并输出一个自动匹配的节流度DFD作为输出参数u。
因此,调整输入高压汽轮机段2的新汽质量流量的新汽调节阀或新汽调整机构10的节流,建立了一个经调节可起动的蓄能器,此蓄能器可通过已确定的位置额定值YFD和通过节流度DFD有控制地充注,或可为了准备好储备功率有控制地排放。为了起动另一些蓄能器,抽汽分流和排汽分流FD1.2、MD1...5、ND1...5以及凝结水K和辅助凝结水NK的输送,可以逐个地或共同地以及部分地或全部地借助于相应的调整机构(调节阀、泵)12、18、22、24、28、32、34、36、42、46、48、50节流。因此,给水预热***14、26的供水暂时减少或受调整。此控制同样通过调节装置60借助于相应的位置额定值Y实施。
工艺技术方面的知识和尤其在供应工业用汽和加热用汽时对措施Ln的选择可能有特殊影响的合同规定相结合,既保证经济地尽可能充分利用现有的蓄能器,又保证电厂设备受保护的运行方式,这种结合是设计调节装置60的基础。
Claims (11)
1.一种用于快速调节电厂设备功率的方法,该电厂设备具有一个包括汽轮机和发电机的汽轮机组,其中,为了调节发电机的过剩功率,起动在设备流程中存在的蓄能器,在这种情况下除发电机功率(PS、PI)外,至少还利用另一个表示当前运行状态特征的过程参数(PS、PI、PWL、PWF、MPD、DFD、KL、TB、P)来确定一定数量的位置额定值(Y、DFD),其特征在于:使用从设备流程输出的热功率(PFW)作为用于确定位置额定值(Y、DFD)的第一个另外的过程参数(PS、PI、PWL、PWF、MPD、DFD、KL、TB、P)。
2.按照权利要求1所述的方法,其特征在于:作为附加的另一个过程参数使用至少一个与汽轮机(2、4、6)连接的调整机构(10)的节流度(DFD)。
3.按照权利要求1或2所述的方法,其特征在于:作为附加的另一个过程参数使用从设备流程抽取的蒸汽质量流量(MPD)。
4.按照权利要求1至3中任一项所述的方法,其特征在于:作为附加的另一个过程参数使用设备流程的热功率实际值(PWL)。
5.按照权利要求1至4中任一项所述的方法,其特征在于:所述过程参数还包括有关蓄能器可起动性的信息。
6.一种用于快速调节电厂设备功率的装置,该电厂设备具有一个包括汽轮机(2、4、6)和发电机的汽轮机发电机组以及有一些用于起动在设备流程中存在的蓄能器以调整发电机过剩功率的装置,后者包括一个调节装置(60),该调节装置的入口(a至i)包含发电机(8)的功率值(PS、PI)以及至少另一个过程参数(PS、PI、PWL、PWF、MPD、DFD、KL、TB、P),以及调节装置的出口(n至u)输出用于与汽轮机(2、4、6)连接的一些调整机构(10、12、18、22、24、28、32、34、36、42、46、48、50)的位置额定值(Y),其特征在于:入口(a至i)之一输入一个从设备流程输出的热功率(PFW)。
7.按照权利要求6所述的装置,其特征在于:调节装置(60)包括一第一调节模块(62),它的入口(a至i)包含一些过程参数(PS、PI、PWL、PWF、MPD、DFD、KL、TB、P),以及它的出口(j)输出用于准备好待用的储备功率的措施组合(Ln)的份额数据。
8.按照权利要求7所述的装置,其特征在于一第二调节模块(64),它的入口与第一模块(62)的出口(j)连接,它的出口(n至r)输出用于蒸汽调整机构(10、12、18、24、28、32、34、36)的位置额定值(Y)。
9.按照权利要求8所述的装置,其特征在于一个其出口侧与第二调节模块(64)连接的第三调节模块(66),它的入口(a、b)包含发电机(8)的功率值(PS、PI)。
10.按照权利要求8或9所述的装置,其特征在于一第四调节模块(68),它的入口与第二调节模块(64)的至少一个出口(r)和与第一调节模块(62)的一个出口(j)连接,它的出口(s、t)输出用于凝结水调整机构(42、46、48、50)的位置额定值(YKP、YNKR)。
11.按照权利要求6至10中任一项所述的装置,其特征在于一第五调节模块(70),用于校正至少一个调整机构(10)的当前节流度(DFD)。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19608873 | 1996-03-07 | ||
DE19608873.9 | 1996-03-07 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN1212039A CN1212039A (zh) | 1999-03-24 |
CN1239812C true CN1239812C (zh) | 2006-02-01 |
Family
ID=7787535
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNB971925968A Expired - Lifetime CN1239812C (zh) | 1996-03-07 | 1997-02-24 | 快速调节电厂设备功率的方法和装置 |
Country Status (11)
Country | Link |
---|---|
US (1) | US6134891A (zh) |
EP (1) | EP0885348B1 (zh) |
JP (1) | JP3963479B2 (zh) |
KR (1) | KR100474182B1 (zh) |
CN (1) | CN1239812C (zh) |
DE (1) | DE59710692D1 (zh) |
ES (1) | ES2206697T3 (zh) |
IN (1) | IN192326B (zh) |
RU (1) | RU2169272C2 (zh) |
UA (1) | UA47459C2 (zh) |
WO (1) | WO1997033074A1 (zh) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19750125A1 (de) * | 1997-11-13 | 1999-03-11 | Siemens Ag | Verfahren und Vorrichtung zur Primärregelung eines Dampfkraftwerkblocks |
US6705086B1 (en) * | 2002-12-06 | 2004-03-16 | General Electric Company | Active thrust control system for combined cycle steam turbines with large steam extraction |
DE10260409B3 (de) * | 2002-12-18 | 2004-06-24 | Vattenfall Europe Generation Ag & Co. Kg | Verfahren zur Primärregelung für ein Netz |
DE10321651B4 (de) * | 2003-05-13 | 2005-08-04 | Klaus Rasche | Anlage zur Erzeugung von Regelenergie |
EP1764486A1 (de) * | 2005-09-16 | 2007-03-21 | Siemens Aktiengesellschaft | Verfahren zum Ermitteln der aktuellen Maximalleistung einer Kraftwerksanlage und Regelvorrichtung |
EP2136037A3 (de) * | 2008-06-20 | 2011-01-05 | Siemens Aktiengesellschaft | Verfahren und Vorrichtung zum Betreiben einer Dampfkraftwerksanlage mit Dampfturbine und Prozessdampfverbraucher |
EP2204553A1 (de) * | 2008-06-23 | 2010-07-07 | Siemens Aktiengesellschaft | Dampfkraftanlage |
CH699228A1 (de) * | 2008-07-21 | 2010-01-29 | Alstom Technology Ltd | Verfahren zur Primärregelung einer kombinierten Gas- und Dampfturbinenanlage. |
EP2450535A1 (de) | 2008-06-27 | 2012-05-09 | Alstom Technology Ltd | Verfahren zur Primärregelung einer kombinierten Gas- und Dampfturbinenanlage |
EP2208867A1 (de) * | 2008-08-25 | 2010-07-21 | Siemens Aktiengesellschaft | Verfahren und Vorrichtung zum Regeln eines Dampfkraftwerks |
TW201134386A (en) * | 2010-04-09 | 2011-10-16 | Tung-Teh Lee | Automatic water-supply control device |
DE102010019718A1 (de) | 2010-05-07 | 2011-11-10 | Orcan Energy Gmbh | Regelung eines thermischen Kreisprozesses |
GB201010760D0 (en) * | 2010-06-28 | 2010-08-11 | Doosan Power Systems Ltd | Operation of steam turbine and steam generator apparatus with post-combustion carbon capture |
DE102011078205A1 (de) * | 2011-06-28 | 2013-01-03 | Siemens Aktiengesellschaft | Hilfsdampferzeuger als zusätzliche Frequenz- bzw. Primär- und/oder Sekundärregelmaßnahme bei einem Dampfkraftwerk |
FR2977916B1 (fr) * | 2011-07-12 | 2019-12-27 | Electricite De France | Procede de commande d'une centrale electrique |
DE102014202846A1 (de) | 2014-02-17 | 2015-08-20 | Siemens Aktiengesellschaft | Verfahren und Vorrichtung zum Entladen eines thermischen Schichtspeichers |
EP3759321A1 (en) | 2018-02-28 | 2021-01-06 | ENEXIO Hungary Zrt. | Power plant and method for its operation |
CN109854313B (zh) * | 2019-03-11 | 2020-03-24 | 西安交通大学 | 一种灵活燃煤发电***及运行方法 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3931714A (en) * | 1974-06-06 | 1976-01-13 | Westinghouse Electric Corporation | Electrohydraulic emergency trip system and method for a turbine power plate |
US4015430A (en) * | 1975-09-30 | 1977-04-05 | Westinghouse Electric Corporation | Electric power plant and turbine acceleration control system for use therein |
US4372125A (en) * | 1980-12-22 | 1983-02-08 | General Electric Company | Turbine bypass desuperheater control system |
DE3304292A1 (de) * | 1982-10-11 | 1984-04-12 | Brown, Boveri & Cie Ag, 6800 Mannheim | Verfahren und vorrichtung zum ausregeln von netzfrequenzeinbruechen bei einem gleitdruckbetriebenen dampfkraftwerkblock |
US5751604A (en) * | 1992-02-03 | 1998-05-12 | Terasaki Denki Sangyo Kabushiki Kaisha | Cogeneration system |
US5181381A (en) * | 1992-07-08 | 1993-01-26 | Ahlstrom Pyropower Corporation | Power plant with dual pressure reheat system for process steam supply flexibility |
DE4344118C2 (de) * | 1993-12-23 | 1997-04-30 | Abb Patent Gmbh | Verfahren und Einrichtung zur Steuerung und Regelung der Dampfkraftwerksleistung unter Einsatz von Kondensatstopp |
-
1997
- 1997-02-24 WO PCT/DE1997/000328 patent/WO1997033074A1/de active IP Right Grant
- 1997-02-24 KR KR10-1998-0707019A patent/KR100474182B1/ko not_active IP Right Cessation
- 1997-02-24 UA UA98094723A patent/UA47459C2/uk unknown
- 1997-02-24 CN CNB971925968A patent/CN1239812C/zh not_active Expired - Lifetime
- 1997-02-24 RU RU98118461/06A patent/RU2169272C2/ru active
- 1997-02-24 ES ES97915299T patent/ES2206697T3/es not_active Expired - Lifetime
- 1997-02-24 EP EP97915299A patent/EP0885348B1/de not_active Expired - Lifetime
- 1997-02-24 IN IN335CA1997 patent/IN192326B/en unknown
- 1997-02-24 DE DE59710692T patent/DE59710692D1/de not_active Expired - Lifetime
- 1997-02-24 JP JP53132297A patent/JP3963479B2/ja not_active Expired - Lifetime
-
1998
- 1998-09-08 US US09/149,816 patent/US6134891A/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JP3963479B2 (ja) | 2007-08-22 |
US6134891A (en) | 2000-10-24 |
EP0885348B1 (de) | 2003-09-03 |
CN1212039A (zh) | 1999-03-24 |
RU2169272C2 (ru) | 2001-06-20 |
UA47459C2 (uk) | 2002-07-15 |
EP0885348A1 (de) | 1998-12-23 |
JP2000506241A (ja) | 2000-05-23 |
WO1997033074A1 (de) | 1997-09-12 |
DE59710692D1 (de) | 2003-10-09 |
ES2206697T3 (es) | 2004-05-16 |
IN192326B (zh) | 2004-04-10 |
KR100474182B1 (ko) | 2005-03-16 |
KR19990087579A (ko) | 1999-12-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN1239812C (zh) | 快速调节电厂设备功率的方法和装置 | |
US4628462A (en) | Multiplane optimization method and apparatus for cogeneration of steam and power | |
CN102822451B (zh) | 发电厂设备及其运转方法 | |
CN103885433B (zh) | 电厂生产及管理控制*** | |
CN104865830B (zh) | 一种机组负荷双重智能优化控制方法 | |
US4549401A (en) | Method and apparatus for reducing the initial start-up and subsequent stabilization period losses, for increasing the usable power and for improving the controllability of a thermal power plant | |
CN107420874B (zh) | 一种超超临界火力发电机组协调控制*** | |
CA1188732A (en) | Control system and method for a steam turbine having a steam bypass arrangement | |
CN111852597A (zh) | 火电供热机组变参数多元梯级热电解耦***及调整方法 | |
CN202230373U (zh) | 燃气蒸汽联合循环机组的一键启停控制*** | |
CN102393688A (zh) | 燃气蒸汽联合循环机组的一键启停控制*** | |
CN87101723A (zh) | 起动热电厂的方法 | |
DE102010042458A1 (de) | Verfahren zum Betreiben einer kombinierten Gas- und Dampfturbinenanlage sowie zur Durchführung des Verfahrens hergerichtete Gas- und Dampfturbinenanlage und entsprechende Regelvorrichtung | |
CN102946224B (zh) | 保障送端电网安全稳定的火电机组功率预测控制*** | |
CN205503201U (zh) | 一种提升机组agc和一次调频品质的装置 | |
CN212296519U (zh) | 火电供热机组变参数多元梯级热电解耦*** | |
CN204086850U (zh) | 协调控制***的阶跃设定值形成回路 | |
CN113405088A (zh) | 一种三冲量变频自动调节方法 | |
CN1203246C (zh) | 用于对发电厂设备进行快速功率调节的方法和装置 | |
JPS62325B2 (zh) | ||
CH698282B1 (de) | Kombikraftwerkssystem. | |
EP2098691B1 (en) | Method for controlling a combined-cycle plant, and combined-cycle plant | |
US5914537A (en) | Method and apparatus for quickly controlling the output of a power plant | |
RU2269012C1 (ru) | Способ автоматизированного управления паротурбинным энергоблоком | |
KR101638296B1 (ko) | 증기터빈 발전설비의 출력 제어장치 및 제어방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20060201 |