CN1202370C - Automatic regulation method for comprehensive combustion in circular fluidized bed boiler - Google Patents

Automatic regulation method for comprehensive combustion in circular fluidized bed boiler Download PDF

Info

Publication number
CN1202370C
CN1202370C CN 02123473 CN02123473A CN1202370C CN 1202370 C CN1202370 C CN 1202370C CN 02123473 CN02123473 CN 02123473 CN 02123473 A CN02123473 A CN 02123473A CN 1202370 C CN1202370 C CN 1202370C
Authority
CN
China
Prior art keywords
control module
pid control
oxygen content
bed temperature
fluidized bed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02123473
Other languages
Chinese (zh)
Other versions
CN1441193A (en
Inventor
张小辉
郭敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Hollysys Co Ltd
Original Assignee
Beijing Hollysys Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Hollysys Co Ltd filed Critical Beijing Hollysys Co Ltd
Priority to CN 02123473 priority Critical patent/CN1202370C/en
Publication of CN1441193A publication Critical patent/CN1441193A/en
Application granted granted Critical
Publication of CN1202370C publication Critical patent/CN1202370C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Fluidized-Bed Combustion And Resonant Combustion (AREA)

Abstract

The present invention relates to a method for automatically regulating comprehensive combustion in a circulating fluidized bed boiler, which is mainly characterized in that a load is rapidly regulated in the way of air quantity; the load is stabilized and bed temperature is regulated in the way of coal feed quantity; the economic performance is rapidly regulated in the way of the air-coal ratio and ensured in the way of the oxygen content; negative pressure is regulated in the way of air induction. The present invention comprises the regulation mode that hearth negative pressure is regulated by a single loop; the boiler load and the bed temperature are regulated by a compound cascade loop; the oxygen content of flue gas is regulated by a cascade loop. Compared with the traditional technology, the present invention can greatly improve the stability, can also rapidly eliminate disturbance, and can also increase the economic benefits.

Description

The self-regulating method of comprehensive combustion in circular fluidized bed boiler
Technical field
The invention belongs to the method for controlling automatically, regulating for the industrial process of solid fuel and air reaction burning.
Background technology
Combustion system of circulating fluidized bed boiler be a large time delay, close coupling, the time nonlinear system that becomes, a controlled variable is subjected to the common influence of several adjusting parameters simultaneously, will be subjected to a plurality of parameter controls such as coal-supplying amount, lime stone quantity delivered, primary air flow, returning charge amount and bed drain purge as bed temperature; An adjusting parameter influences a plurality of controlled variables again simultaneously, not only influences main vapour pressure as coal-supplying amount, also influences bed temperature, fire box temperature, excess air system and SO 2Parameters such as content.For Load Regulation, when using under different coals, the different load its stove internal combustion and heat transfer process, CFBB distinguishes to some extent, and corresponding first and second air quantity distributes also different; And the ratio of same coal its primary and secondary air under different load also can be different.In addition, burning in the CFBB and heat exchange link all are to lag behind and nonlinear element.
The design of tradition burning in circulating fluid bed boiler control be " with coal-supplying amount adjust load, with to air quantity adjustment bed temperature ", its control strategy adopts one to regulate controlled variable of parameter control, or unilateral method such as controlled variable of two adjusting parameter control controls to adjust.Like this, cause automatic adjusting under subrange, stable environment, to move, if when load or coal have bigger variations, regulates just overproof, cause automatic adjusting can not be for a long time, stablize input.
Summary of the invention
The present invention will overcome the shortcoming that above-mentioned prior art exists, provide a kind of comprehensive combustion in circular fluidized bed boiler self-regulating method, this method is coordinated a plurality of subsystems of comprehensive combustion in circular fluidized bed boiler system to connect together, interact and limit mutually again, improved its stability greatly.
Technical scheme of the present invention is as follows:
The present invention has adopted the design of " with air quantity rapid adjustment load, come steady load with coal-supplying amount, adjust bed temperature with coal-supplying amount, guarantee economy with the coal-air ratio rapid adjustment with oxygen content, adjust negative pressure with air inducing ".
The concrete grammar step is as follows:
(1) combustion chamber draft is regulated and is adopted the single loop regulative mode, to the outer fixed value mode of giving of combustion chamber draft set-point, combustion chamber draft process measurement value is got one or three with two get one and filtering or one order inertia processing method, carry out combustion chamber draft proportional integral derivative controller (hereinafter to be referred as PID) control module parameter, air-supply feedforward initial setting during debugging earlier, look object process performance graph on this basis and change, above-mentioned parameter is adjusted accordingly;
(2) boiler load is regulated and is adopted compound tandem loop regulative mode, boiler load (main vapour pressure) set-point adopts the outer fixed value mode of giving, to boiler load (main vapour pressure), the recirculating fluidized bed bed temperature, the ash concentration measured value is got one or three with two and is got one and filtering or one order inertia processing method, carry out boiler load pid control module parameter during debugging earlier, bed temperature pid correction module parameter, ash concentration pid correction module parameter, boiler load is paid pid control module parameter initial setting, look object process performance graph on this basis and change, above-mentioned parameter is adjusted accordingly;
(3) the recirculating fluidized bed bed temperature is regulated and is adopted compound tandem loop regulative mode, to recirculating fluidized bed bed temperature set-point servo-actuated set-point mode, adopt two to get one or three and get one and filtering or one order inertia processing method to recirculating fluidized bed bed temperature, main vapour pressure, oxygen content of smoke gas measured value, carry out bed temperature pid control module parameter, main vapour pressure pid correction module parameter, oxygen content pid correction module parameter during debugging earlier, pay pid control module parameter initial setting, look object process performance graph on this basis and change, above-mentioned parameter is adjusted accordingly;
(4) flue gas oxygen content of CFBB is regulated and is adopted tandem loop regulative mode, to flue gas oxygen content set-point servo-actuated set-point mode, adopt two to get one or three and get one and filtering or one order inertia processing method to flue gas oxygen content process measurement value, carry out oxygen content master pid control module parameter, oxygen content during debugging earlier and pay pid control module parameter, coal-supplying amount feedforward initial setting, look object process performance graph on this basis and change, above-mentioned parameter is adjusted accordingly;
Combustion chamber draft regulating loop, boiler load regulating loop, recirculating fluidized bed bed temperature regulating loop, flue gas oxygen content regulating loop are carried out classifying alarm respectively to realize monitor loop.
Major advantage of the present invention is: owing to the multivariable at CFBB, close coupling, the characteristics that inertia is big, adopted and used intermediate variable to participate in the technical scheme of the middle correction link of regulating system, and according to the difference of the inertia constant of its different variablees, the appropriate proportional integral derivative controller of adjusting (PID) is regulated parameter and is reasonably selected intermediate variable, comprehensive combustion in circular fluidized bed boiler system subsystem is coordinated together, restriction mutually again interacts, thereby improved stability greatly, and can eliminate disturbance fast, its economic benefit also obviously improves.
Description of drawings
Fig. 1 is combustion chamber draft regulating loop control flow schematic diagram of the present invention (SAMA figure, as follows), and dotted line is depicted as classifying alarm among the figure;
Fig. 2 is a boiler load regulating loop control flow schematic diagram of the present invention;
Fig. 3 is a recirculating fluidized bed bed temperature regulating loop control flow schematic diagram of the present invention;
Fig. 4 is a flue gas oxygen content regulating loop control flow schematic diagram of the present invention;
Classifying alarm and hand/automatic switchover be same as shown in Figure 1 among Fig. 2~Fig. 4, omits among these 3 figure.
Table 1 is an one embodiment of the invention---the 75T/h CFBB adopts the parameters table of the inventive method.
The specific embodiment:
Referring to Fig. 1, in the step (1) of technology case:
Described combustion chamber draft is regulated the mode that adopts single loop to regulate, combustion chamber draft set-point signal, combustion chamber draft process measurement value signal input combustion chamber draft pid control module, pid control module is exported to soft manual operation device module, soft manual operation device module is exported to outside executing agency---air-introduced machine outlet damper or frequency converter, and air output is as feedforward;
Described combustion chamber draft pid control module parameter is set at: proportional band P=120%~180%, and the time of integration, Ti=40~80s exported rate of change=0.3%~1%; Air output feedforward is set at: differential coefficient Kd2=1~2, derivative time Td2=10~20s.
During described combustion chamber draft single loop is regulated, when actuator is two, adopt the balance module of two actuators; Described air output is to be converted and obtained by the air-supply throttle opening of measuring, air-supply pressure reduction, perhaps directly adopts the air flow rate of measuring.
As stated above, the result of combustion chamber draft adjusting debugging is: combustion chamber draft dynamic process characteristic changes in the positive and negative 25 handkerchief scopes of set-point; For the variation of (MCR) 5% at full capacity, overshoot 30 handkerchiefs, dynamic time are 2 process cycles.
Referring to Fig. 2, in technical scheme steps (2):
Described boiler load is regulated and is adopted compound tandem loop regulative mode to be, boiler load (main vapour pressure) set-point signal, boiler load (main vapour pressure) measured value signal input main vapour pressure pid control module, if recirculating fluidized bed bed temperature point position adopts bed temperature pid correction module when higher, recirculating fluidized bed bed temperature set-point signal, bed temperature measured value signal input bed temperature pid correction module, while recirculating fluidized bed ash concentration set-point signal, ash concentration calculated value signal input ash concentration pid correction module, when being no more than 4000J/kg, the variation of coal caloric value adopts ash concentration pid correction module, when the coal caloric value changes above 4000J/kg,, ash concentration pid correction module realizes by being multiply by the heat correction coefficient; The output of main vapour pressure pid control module, the output of bed temperature pid correction module, ash concentration correction module output weighting summation are paid pid control module set-point signal as boiler load, primary air flow or blast are paid pid control module as boiler load measured value signal, boiler load is paid pid control module and is exported to soft manual operation device module, and soft manual operation device module is exported to outside executing agency---primary air fan outlet damper or frequency converter;
Described boiler load (main vapour pressure) pid control module parameter is set at: proportional band P1=20%~40%, and the time of integration, Ti1=10~30s exported rate of change=15%~25%; Bed temperature pid correction module parameter is set at: proportional band P2=40%~80%, the time of integration Ti2=20~52s, differential coefficient Kd2=1~2, derivative time Td2=10~20s, output rate of change=3%~7%, dead band=0.3%~0.5%; Ash concentration pid correction module parameter is set at proportional band P3=40%~80%, and the time of integration, Ti3=20~52s exported rate of change=3%~7%; Boiler load is paid the pid control module parameter and is set at: proportional band P4=40%~80%, the time of integration, Ti4=20~52s exported rate of change=0.1%~0.3%.
Described bed temperature set-point, ash concentration set-point are respectively the polygronal functions of boiler master vapour amount, ash concentration calculated value=burner hearth bottom pressure-furnace outlet pressure, heat correction coefficient=actual calorific value of coal/design calorific value of coal;
Described boiler load is regulated in the compound tandem loop, when actuator is two, adopts the balance module of two actuators; For the adjusting that wind once divides air door, be to divide a wind air door manual adjustments to the fixed position earlier, regulate the total air door of wind more automatically one time, realize that with this wind regulates automatically.
According to described method, boiler load (main vapour pressure) is regulated debug results: boiler load (main vapour pressure) dynamic process characteristic changes in the positive and negative 0.06 MPa scope of set-point, for the variation of (MCR) 5% at full capacity, overshoot 0.15 MPa, dynamic time is two process cycles.
Referring to Fig. 3, in technical scheme steps (3):
Described recirculating fluidized bed bed temperature is regulated and is adopted compound tandem loop regulative mode to be, recirculating fluidized bed bed temperature set-point signal, bed temperature measured value signal input bed temperature pid control module, boiler load set-point signal, boiler load measured value signal input main vapour pressure pid correction module, oxygen content of smoke gas set-point signal, oxygen content of smoke gas measured value signal input oxygen content pid correction module, the output of bed temperature pid control module, the output of main vapour pressure pid correction module, oxygen content pid correction module weighting summation is as paying pid control module set-point signal, coal-supplying amount or feeder revolution are as the measured value signal of paying pid control module, pay pid control module and export to soft manual operation device module, soft manual operation device module is exported to outside executing agency---feeder frequency converter or slip electric motor;
Being set at of described bed temperature pid control module parameter: proportional band P1=40~80%, the time of integration Ti1=20~52s, differential coefficient Kd1=1~2, derivative time Td1=10~20s, output rate of change=3%~7%; Being set at of main vapour pressure pid correction module parameter: proportional band P2=40~80%, the time of integration Ti2=20~52s, differential coefficient Kd2=3~7, derivative time Td2=10~20s, output rate of change=8%~12%, dead band=0.3%~0.5%; Oxygen content pid correction module parameter is set at: proportional band P3=80%~120%, and the time of integration, Ti3=40~80s exported rate of change=8%~12%; Paying the pid control module parameter is set at: proportional band P4=20%~40%, the time of integration, Ti4=10~30s exported rate of change=1%~5%.
Described bed temperature set-point, oxygen content of smoke gas set-point are respectively the polygronal functions of main steam flow amount;
Described bed temperature is regulated in the compound tandem loop, when actuator when being two or more, adopts balance module or a plurality of actuator distribution module (principle is seen Fig. 3) of two actuators.
According to described method, recirculating fluidized bed is regulated debug results and is: recirculating fluidized bed bed temperature dynamic process characteristic changes in the positive and negative 6 degree scopes of set-point, for the variation of (MCR) 5% at full capacity, and overshoot 16 degree, dynamic time is two process cycles.
With reference to Fig. 4, in technical scheme steps (4):
Described oxygen content is regulated and is adopted the tandem circuit type to be, flue gas oxygen content set-point signal, flue gas oxygen content measured value signal are imported main pid control module, pid control module is paid in main pid control module output, secondary air flow or the input of secondary wind pressure signal, pay pid control module and export to soft manual operation device module, soft manual operation device module is exported to outside executing agency---overfire air fan outlet damper or frequency converter, and coal-supplying amount feedovers;
Described oxygen content master's pid control module parameter is set at: proportional band P1=40%~80%, and the time of integration, Ti1=20~40s exported rate of change=3%~8%; Oxygen content is paid the pid control module parameter and is set at: proportional band P2=40%~80%, and the time of integration, Ti2=20~40s exported rate of change=0.2%~0.4%; Coal-supplying amount feedforward is set at: differential coefficient Kd3=10~30, derivative time Td3=20~40s.
Described oxygen content is regulated in the tandem loop, when actuator is two, adopts the balance module of two actuators; For the adjusting that the secondary air separating air door is arranged be, earlier secondary air separating air door manual adjustments arrived the fixed position, regulate the total air door of secondary wind more automatically, realize that with this secondary wind regulates automatically.
According to described method, flue gas oxygen content is regulated debug results and is: flue gas oxygen content dynamic process characteristic changes in positive and negative 0.8% scope of set-point, and for the variation of (MCR) 5% at full capacity, overshoot 1.4% handkerchief, dynamic time are two process cycles.
Described method to each monitor loop implementation classifying alarm is:
When mediation process surpasses common alarm limit, produce common acousto-optic hint and report to the police; Prescribe a time limit when mediation process surpasses emergency alarm, produce urgent sound and light alarm, require operating personnel to take corresponding measure (prompting operation), avoid occurring accident; When mediation process breaks down, produce emergency alarm, require regulating system to take to force automatically to be cut to manually, or press the broken line override action (automatic switchover) of design in advance, avoid the accident extension.

Claims (10)

1. self-regulating method of comprehensive combustion in circular fluidized bed boiler, comprise combustion chamber draft regulating loop, boiler load regulating loop, recirculating fluidized bed bed temperature regulating loop and flue gas oxygen content regulating loop, it is characterized in that: load with the air quantity rapid adjustment, come steady load with coal-supplying amount, adjust bed temperature with coal-supplying amount, guarantee economy with the coal-air ratio rapid adjustment with oxygen content, adjust negative pressure with air inducing; The concrete grammar step is as follows:
(1) combustion chamber draft is regulated and is adopted the single loop regulative mode, to the outer fixed value mode of giving of combustion chamber draft set-point, combustion chamber draft process measurement value is got one or three with two get one and filtering or one order inertia processing method, carry out combustion chamber draft proportional integral derivative controller pid control module parameter, air-supply feedforward initial setting during debugging earlier, look object process performance graph on this basis and change, above-mentioned parameter is adjusted accordingly;
(2) boiler load is regulated and is adopted compound tandem loop regulative mode, the boiler load set-point adopts the outer fixed value mode of giving, boiler load, recirculating fluidized bed bed temperature, ash concentration measured value are got one or three with two get one and filtering or one order inertia processing method, carry out boiler load pid control module parameter, bed temperature pid correction module parameter, ash concentration pid correction module parameter, boiler load during debugging earlier and pay pid control module parameter initial setting, look object process performance graph on this basis and change, above-mentioned parameter is adjusted accordingly;
(3) the recirculating fluidized bed bed temperature is regulated and is adopted compound tandem loop regulative mode, to recirculating fluidized bed bed temperature set-point servo-actuated set-point mode, adopt two to get one or three and get one and filtering or one order inertia processing method to recirculating fluidized bed bed temperature, main vapour pressure, oxygen content of smoke gas measured value, carry out bed temperature pid control module parameter, main vapour pressure pid correction module parameter, oxygen content pid correction module parameter during debugging earlier, pay pid control module parameter initial setting, look object process performance graph on this basis and change, above-mentioned parameter is adjusted accordingly;
(4) flue gas oxygen content of CFBB is regulated and is adopted tandem loop regulative mode, to flue gas oxygen content set-point servo-actuated set-point mode, adopt two to get one or three and get one and filtering or one order inertia processing method to flue gas oxygen content process measurement value, carry out oxygen content master pid control module parameter, oxygen content during debugging earlier and pay pid control module parameter, coal-supplying amount feedforward initial setting, look object process performance graph on this basis and change, above-mentioned parameter is adjusted accordingly;
Combustion chamber draft regulating loop, boiler load regulating loop, recirculating fluidized bed bed temperature regulating loop, flue gas oxygen content regulating loop are carried out classifying alarm respectively to realize monitor loop.
2. the self-regulating method of comprehensive combustion in circular fluidized bed boiler according to claim 1 is characterized in that: in step (1),
Described combustion chamber draft is regulated the mode that adopts single loop to regulate, combustion chamber draft set-point signal, combustion chamber draft process measurement value signal input combustion chamber draft pid control module, pid control module is exported to soft manual operation device module, soft manual operation device module is exported to outside executing agency---air-introduced machine outlet damper or frequency converter, and air output is as feedforward;
Described combustion chamber draft pid control module parameter is set at: proportional band P=120%~180%, and the time of integration, Ti=40~80s exported rate of change=0.3~1%; Air output feedforward is set at: differential coefficient Kd2=1~2, derivative time Td2=10~20s.
3. the self-regulating method of comprehensive combustion in circular fluidized bed boiler according to claim 1 and 2 is characterized in that: during described combustion chamber draft single loop is regulated, when actuator is two, adopt the balance module of two actuators; Described air output is to be converted and obtained by the air-supply throttle opening of measuring, air-supply differential pressure, perhaps directly adopts the air flow rate of measuring.
4. the self-regulating method of comprehensive combustion in circular fluidized bed boiler according to claim 1 is characterized in that: in step (2),
Described boiler load is regulated and is adopted compound tandem loop regulative mode to be, boiler load set-point signal, boiler load measured value signal input main vapour pressure pid control module, if recirculating fluidized bed bed temperature point position adopts bed temperature pid correction module when higher, recirculating fluidized bed bed temperature set-point signal, bed temperature measured value signal input bed temperature pid correction module, while recirculating fluidized bed ash concentration set-point signal, ash concentration calculated value signal input ash concentration pid correction module, when being no more than 4000J/kg, the variation of coal caloric value adopts ash concentration pid correction module, when the coal caloric value changes above 4000J/kg,, ash concentration pid correction module realizes by being multiply by the heat correction coefficient; The output of main vapour pressure pid control module, the output of bed temperature pid correction module, ash concentration correction module output weighting summation are paid pid control module set-point signal as boiler load, primary air flow or blast are paid pid control module as boiler load measured value signal, boiler load is paid pid control module and is exported to soft manual operation device module, and soft manual operation device module is exported to outside executing agency---primary air fan outlet damper or frequency converter;
Described boiler load pid control module parameter is set at: proportional band P1=20%~40%, and the time of integration, Ti1=10~30s exported rate of change=15%~25%; Bed temperature pid correction module parameter is set at: proportional band P2=40%~80%, the time of integration Ti2=20~52s, differential coefficient Kd2=1~2, derivative time Td2=10~20s, output rate of change=3%~7%, dead band=0.3%~0.5%; Ash concentration pid correction module parameter is set at: proportional band P3=40%~80%, and the time of integration, Ti3=20~52s exported rate of change=3%~7%; Boiler load is paid the pid control module parameter and is set at: proportional band P4=40%~80%, the time of integration, Ti4=20~52s exported rate of change=0.1%~0.3%.
5. according to claim 1 or the self-regulating method of 4 described comprehensive combustion in circular fluidized bed boiler, it is characterized in that: described bed temperature set-point, ash concentration set-point are respectively the polygronal functions of boiler master vapour amount, ash concentration calculated value=burner hearth bottom pressure-furnace outlet pressure, heat correction coefficient=actual calorific value of coal/design calorific value of coal;
Described boiler load is regulated in the compound tandem loop, when actuator is two, adopts the balance module of two actuators; For the adjusting that wind once divides air door, be to divide a wind air door behaviour manually far away to be adjusted to the fixed position earlier, regulate the total air door of wind more automatically one time, realize that with this wind regulates automatically.
6. the self-regulating method of comprehensive combustion in circular fluidized bed boiler according to claim 1 is characterized in that: in step (3),
Described recirculating fluidized bed bed temperature is regulated and is adopted compound tandem loop regulative mode to be, recirculating fluidized bed bed temperature set-point signal, bed temperature measured value signal input bed temperature pid control module, boiler load set-point signal, boiler load measured value signal input main vapour pressure pid correction module, oxygen content of smoke gas set-point signal, oxygen content of smoke gas measured value signal input oxygen content pid correction module, the output of bed temperature pid control module, the output of main vapour pressure pid correction module, oxygen content pid correction module weighting summation is as paying pid control module set-point signal, coal-supplying amount or feeder revolution are as the measured value signal of paying pid control module, pay pid control module and export to soft manual operation device module, soft manual operation device module is exported to outside executing agency---feeder frequency converter or slip electric motor;
Being set at of described bed temperature pid control module parameter: proportional band P1=40~80%, the time of integration Ti1=20~52s, differential coefficient Kd1=1~2, derivative time Td1=10~20s, output rate of change=3%~7%; Being set at of main vapour pressure pid correction module parameter: proportional band P2=40~80%, the time of integration Ti2=20~52s, differential coefficient Kd2=3~7, derivative time Td2=10~20s, output rate of change=8%~12%, dead band=0.3%~0.5%; Oxygen content pid correction module parameter is set at: proportional band P3=80%~120%, and the time of integration, Ti3=40~80s exported rate of change=8%~12%; Paying the pid control module parameter is set at: proportional band P4=20%~40%, the time of integration, Ti4=10~30s exported rate of change=1%~5%.
7. according to claim 1 or the self-regulating method of 6 described comprehensive combustion in circular fluidized bed boiler, it is characterized in that:
Described bed temperature set-point, oxygen content of smoke gas set-point are respectively the polygronal functions of main steam flow amount;
Described bed temperature is regulated in the compound tandem loop, when actuator when being two or more, adopts balance module or a plurality of actuator distribution module of two actuators.
8. the self-regulating method of comprehensive combustion in circular fluidized bed boiler according to claim 1 is characterized in that: in step (4),
Described oxygen content is regulated and is adopted the tandem circuit type to be, flue gas oxygen content set-point signal, flue gas oxygen content measured value signal are imported main pid control module, pid control module is paid in main pid control module output, secondary air flow or the input of secondary wind pressure signal, pay pid control module and export to soft manual operation device module, soft manual operation device module is exported to outside executing agency---overfire air fan outlet damper or frequency converter, and coal-supplying amount feedovers;
Described oxygen content master's pid control module parameter is set at: proportional band P1=40%%~80%, and the time of integration, Ti1=20~40s exported rate of change=3%~8%; Oxygen content is paid the pid control module parameter and is set at: proportional band P2=40%~80%, and the time of integration, Ti2=20~40s exported rate of change=0.2%~0.4%; Coal-supplying amount feedforward is set at: differential coefficient Kd3=10~30, derivative time Td3=20~40s.
9. according to claim 1 or the self-regulating method of 8 described comprehensive combustion in circular fluidized bed boiler, it is characterized in that:
Described oxygen content is regulated in the tandem loop, when actuator is two, adopts the balance module of two actuators; For the adjusting that the secondary air separating air door is arranged be, earlier secondary air separating air door manual adjustments arrived the fixed position, regulate the total air door of secondary wind more automatically, realize that with this secondary wind regulates automatically.
10. the self-regulating method of comprehensive combustion in circular fluidized bed boiler according to claim 1 is characterized in that:
Described method to each monitor loop implementation classifying alarm is when mediation process surpasses common alarm limit, to produce common acousto-optic hint and report to the police; Prescribe a time limit when mediation process surpasses emergency alarm, produce urgent sound and light alarm, require operating personnel to take corresponding measure, avoid occurring accident; When mediation process breaks down, produce emergency alarm, require regulating system to take to force automatically to be cut to manually, or press the broken line override action of design in advance, avoid accident to enlarge.
CN 02123473 2002-07-01 2002-07-01 Automatic regulation method for comprehensive combustion in circular fluidized bed boiler Expired - Fee Related CN1202370C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02123473 CN1202370C (en) 2002-07-01 2002-07-01 Automatic regulation method for comprehensive combustion in circular fluidized bed boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02123473 CN1202370C (en) 2002-07-01 2002-07-01 Automatic regulation method for comprehensive combustion in circular fluidized bed boiler

Publications (2)

Publication Number Publication Date
CN1441193A CN1441193A (en) 2003-09-10
CN1202370C true CN1202370C (en) 2005-05-18

Family

ID=27768590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02123473 Expired - Fee Related CN1202370C (en) 2002-07-01 2002-07-01 Automatic regulation method for comprehensive combustion in circular fluidized bed boiler

Country Status (1)

Country Link
CN (1) CN1202370C (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101311629B (en) * 2007-05-25 2010-06-02 王泽章 On-line detection method for controlling station boiler combustion extinguishment
CN101949536A (en) * 2010-09-14 2011-01-19 广东电网公司电力科学研究院 Balanced coal supply control device of large circulating fluidized bed boiler
CN103018279A (en) * 2012-11-27 2013-04-03 华北电力大学 Method for improving measurement accuracy of oxygen content in boiler flue gas

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100596325C (en) * 2006-04-11 2010-03-31 中控科技集团有限公司 Serial combustion system and method for load control of circulating fluidized bed boiler
CN100428089C (en) * 2006-07-07 2008-10-22 清华大学 Combined-running double-PID parallel control regulators for series of power stations
CN100557041C (en) * 2007-06-08 2009-11-04 武汉钢铁(集团)公司 The high-temperature ring annealing furnace protective gas proportioning cascade feedback control method
CN101655245B (en) * 2009-09-04 2011-03-16 江苏焱鑫科技股份有限公司 Multiparameter automatic control method of industrial furnace burner
CN101713536B (en) * 2009-12-03 2011-06-29 太原理工大学 Control method of combustion system of circulating fluidized bed boiler
CN102788349B (en) * 2012-04-25 2014-12-10 广东电网公司电力科学研究院 Large-sized biomass direct-fired circulating fluidized bed boiler furnace negative pressure control device
CN103216811B (en) * 2013-04-09 2014-08-20 国家电网公司 Control system for furnace pressure of large-scale boiler
CN105276577B (en) * 2014-06-03 2017-09-29 国网山西省电力公司电力科学研究院 Large-size circulating fluidized bed unit boiler master control optimization of pressure set-point system
CN104807003B (en) * 2015-04-22 2017-06-20 大唐武安发电有限公司 The system and method for the Circulating Fluidized Bed Temperature control based on fuel self-balancing
CN107795982B (en) * 2017-10-29 2020-07-17 农业部规划设计研究院 Biomass pyrolysis oil and pyrolysis gas mixed combustion process
CN108332424B (en) * 2018-01-03 2020-08-21 大唐东北电力试验研究所有限公司 Automatic control method for hot water boiler
CN110260356B (en) * 2019-07-15 2020-08-18 白海波 Energy-saving control method of fluidized bed boiler
CN114673981B (en) * 2022-04-25 2024-04-30 四川泸天化创新研究院有限公司 Advanced control system and control method for boiler device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101311629B (en) * 2007-05-25 2010-06-02 王泽章 On-line detection method for controlling station boiler combustion extinguishment
CN101949536A (en) * 2010-09-14 2011-01-19 广东电网公司电力科学研究院 Balanced coal supply control device of large circulating fluidized bed boiler
CN101949536B (en) * 2010-09-14 2013-04-10 广东电网公司电力科学研究院 Balanced coal supply control device of large circulating fluidized bed boiler
CN103018279A (en) * 2012-11-27 2013-04-03 华北电力大学 Method for improving measurement accuracy of oxygen content in boiler flue gas
CN103018279B (en) * 2012-11-27 2015-04-15 华北电力大学 Method for improving measurement accuracy of oxygen content in boiler flue gas

Also Published As

Publication number Publication date
CN1441193A (en) 2003-09-10

Similar Documents

Publication Publication Date Title
CN1202370C (en) Automatic regulation method for comprehensive combustion in circular fluidized bed boiler
CN1202371C (en) Automatic regulating system for combustion process of circulating fluid bed in boiler
CN2711539Y (en) Automatic combustion adjusting system for circulating fluidized bed boiler
CN101876449B (en) Method of controlling oxygen air-flowing environment in heating furnace
CN1081738C (en) Process and device for controlling an I. C. engine
CN109084324B (en) The burning air quantity control system and control method of biomass boiler
CN1208576C (en) Control method of burning process of garbage incinerator
WO2002103241A1 (en) Combustion optimization with inferential sensor
CN101551103A (en) Automatic boiler combustion control system of circulating fluid bed
CN104676638B (en) A kind of low nitrogen burning control method for air door during boiler load down
CN110260356A (en) A kind of energy-saving control method of fluidized-bed combustion boiler
CN115419478A (en) Optimized control method for steel mill gas power generation
CA2060882C (en) Method of operating a refuse incineration plant
CN112212322B (en) Intelligent control method for optimizing combustion of thermodynamic circulating fluidized bed boiler
CN1203274C (en) Optimizing control system for combustion process of circulating fluid bed in boiler
JPS59139913A (en) Control of dust collecting plant
CN106016347B (en) The implementation method of industrial coal powder boiler multichannel combustion process ratio control system
CN108592043A (en) A kind of control system of garbage disposal
CN111765776B (en) System and method for controlling comprehensive parameters in flue gas hood of sintering machine
CN202040809U (en) Control device for coal water slurry burner
CN205402657U (en) Biomass gasification steam boiler control system
CN109579044A (en) A kind of walking beam furnace air-fuel ratio dynamic Feedforward method for controlling combustion
CN116951424B (en) Self-adaptive adjustment method for valve of incineration boiler based on data driving
CN212132513U (en) Unit unit control system based on real-time online analysis of coal quality
CN1096092A (en) Coal gas mixed thermal value and pressure decoupling and controlling system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: BEIJING HELISHI SYSTEM ENGINEERING CORPORATION

Free format text: FORMER NAME OR ADDRESS: BEIJING HELISHI SYSTEM ENGINEERING CO., LTD.

CP03 Change of name, title or address

Address after: Beijing Haidian District Xisanqi building materials City Road

Patentee after: Beijing HollySys System Engineering Co., Ltd.

Address before: Beijing Haidian District Xisanqi building materials City Road

Patentee before: Beijing HollySys System Engineering Co., Ltd.

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20050518