CN116379926B - 一种圆形盾构隧道接触网无轨测量方法、***及电子设备 - Google Patents
一种圆形盾构隧道接触网无轨测量方法、***及电子设备 Download PDFInfo
- Publication number
- CN116379926B CN116379926B CN202310630371.7A CN202310630371A CN116379926B CN 116379926 B CN116379926 B CN 116379926B CN 202310630371 A CN202310630371 A CN 202310630371A CN 116379926 B CN116379926 B CN 116379926B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- circular
- line
- circular tunnel
- measurement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000691 measurement method Methods 0.000 title claims abstract description 23
- 238000005259 measurement Methods 0.000 claims abstract description 102
- 238000010276 construction Methods 0.000 claims abstract description 51
- 238000013461 design Methods 0.000 claims abstract description 38
- 238000000034 method Methods 0.000 claims abstract description 25
- 229910000831 Steel Inorganic materials 0.000 claims description 16
- 239000010959 steel Substances 0.000 claims description 16
- 238000013507 mapping Methods 0.000 claims description 9
- 238000004080 punching Methods 0.000 claims description 5
- 239000013256 coordination polymer Substances 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 11
- 238000004590 computer program Methods 0.000 description 5
- 230000006870 function Effects 0.000 description 5
- 239000000725 suspension Substances 0.000 description 5
- 238000004891 communication Methods 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 238000004088 simulation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008094 contradictory effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B11/00—Measuring arrangements characterised by the use of optical techniques
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01B—MEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
- G01B11/00—Measuring arrangements characterised by the use of optical techniques
- G01B11/002—Measuring arrangements characterised by the use of optical techniques for measuring two or more coordinates
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Testing Or Calibration Of Command Recording Devices (AREA)
Abstract
本发明公开一种圆形盾构隧道接触网无轨测量方法、***及电子设备,涉及隧道施工测量技术领域,包括获取圆形隧道的基础信息;其中,所述圆形隧道的基础信息包括:圆形隧道的施工类型、圆形隧道的隧道中心线、圆形隧道轨道施工信息;根据圆形隧道的基础信息,获取圆形隧道的设计截面信息;根据圆形隧道的设计截面信息,进行构建测量对照位,利用测量对照位中与圆形隧道的隧道中心线、圆形隧道轨道施工信息的设计关系。本发明在实施例中通过根据圆形隧道轨道的各设计要点的位置关系,计算设计出接触网在隧道内的悬挂中心点,不受基桩控制网CPⅢ数据影响,整体适用性强、精度高、且测量速度快,有效的解决了现有技术中的技术问题。
Description
技术领域
本发明涉及隧道施工测量技术领域,尤其涉及一种圆形盾构隧道接触网无轨测量方法、***及电子设备。
背景技术
在传统的有轨电车***中,接触网是由钢轨和电缆组成的。为了确保电车运行的平稳和安全,接触网必须安装在正确的位置和高度,并且与铁轨的距离也必须符合规定的标准。除此之外,还需要测量网格线的张力、线缆的直线和水平度等关键参数。
为了有效克服地铁接触网施工中工期紧张、施工交叉干扰大影响施工效率等问题,通常会采用无轨测量施工,相比较于有轨施工,能大大减少施工周期,降低各个专业交叉施工干扰,使接触网架设与铺轨铺设同步推进。在这种情况下,无轨测量技术的应用变得十分必要。常见无轨测量方法主要为全站仪或模拟钢轨方法进行测量,但采用全站仪或模拟钢轨方法进行测量,容易受基桩控制网CPⅢ数据影响,导致测量步骤繁琐、整体工程施工测量进度缓慢。
发明内容
本发明的目的是为了解决上述现有技术中存在的技术问题,而提出的一种圆形盾构隧道接触网无轨测量方法、***及电子设备。
为了实现上述目的,本发明采用了如下技术方案:本发明第一方面提供了一种圆形盾构隧道接触网无轨测量方法,
包括:
获取圆形隧道的基础信息;
其中,所述圆形隧道的基础信息包括:圆形隧道的施工类型、圆形隧道的隧道中心线、圆形隧道轨道施工信息;
根据圆形隧道的基础信息,获取圆形隧道的设计截面信息;
根据圆形隧道的设计截面信息,进行构建测量对照位,利用测量对照位中与圆形隧道的隧道中心线、圆形隧道轨道施工信息的设计关系,进行确定接触网悬挂中心点;
根据确定接触网悬挂中心点,进行打孔预埋无轨架设接触网。
在一种可行的实施例中,所述进行确定接触网悬挂中心点的方法包括:
确定圆形隧道的施工类型为单洞单线,且圆形隧道施工区段为直线区段处;
获取直线区段圆形隧道的设计截面信息,根据直线区段圆形隧道垂直隧道中心线与施工轨道的垂直中心线重合的设计特点,在直线区段圆形隧道的设计截面信息中进行选取测量对照位;
根据圆形隧道轨道施工信息、直线区段圆形隧道水平中心线,对测量对照位位置进行调平映射,获得测量对照点;
将测量对照点和测量对照位之间进行连线,获得第一基准线;
根据第一基准线与直线区段圆形隧道中心线之间的水平拉出值,对测量对照点的位置移动调整后,获得直线区段圆形隧道接触网悬挂中心点。
在一种可行的实施例中,所述获得测量对照点的方法包括:
采用激光映射。
在一种可行的实施例中,所述进行确定接触网悬挂中心点的方法包括:
确定圆形隧道的施工类型为单洞单线,且圆形隧道施工区段为曲线区段处;
获取曲线区段圆形隧道的设计截面信息,根据曲线区段圆形隧道轨道施工信息,获得轨道线路中心线和轨道受电弓中心线;
根据曲线区段圆形隧道的设计截面信息,计算获得曲线区段圆形隧道隧道中心线与轨道线路中心线之间的偏移值;
在曲线区段圆形隧道的设计截面信息中进行选取测量对照位,根据圆形隧道轨道施工信息、曲线区段圆形隧道隧道中心线,对测量对照位位置进行调平映射,获得测量对照点;
将测量对照点和测量对照位之间进行连线,获得第二基准线,并根据轨道线路中心线计算出测量对照点与线路中心线的距离;
根据曲线区段圆形隧道隧道中心线与轨道线路中心线之间的偏移值和测量对照点与线路中心线的距离,计算出测量对照点的应偏移值;
根据测量对照点的应偏移值对测量对照点处的设置位置进行调节,获得曲线区段圆形隧道接触网悬挂中心点。
在一种可行的实施例中,所述曲线区段圆形隧道的隧道圆心处于受电弓中心线上。
在一种可行的实施例中,计算获得曲线区段圆形隧道隧道中心线与轨道线路中心线之间的偏移值的方法包括:
设在曲线区段圆形隧道隧道中心线和轨道线路中心线存在偏移值为E,则:(式1)
式1中:B——圆形隧道圆心与钢轨平面的距离(mm);
h——轨道超高值(mm);
L——钢轨中心间距(mm)。
在一种可行的实施例中,所述计算出测量对照点的应偏移值的方法包括:
设测量对照点与线路中心线的距离为C: (式2)
式2中:H——测量对照点与钢轨连线之间的净空高(mm);
h——轨道超高值(mm);
L——钢轨中心间距(mm);
则根据式1和式2,测量对照点的应偏移值为Y:(式3)。
本发明第二方面提供了一种圆形盾构隧道接触网无轨测量***,采用了上述第一方面中任一项所述的一种圆形盾构隧道接触网无轨测量方法,所述测量***还包括:
激光测量设备,所述激光测量设备用于设置于测量对照位进行映射测量点。
在一种可行的实施例中,所述测量***还包括:
所述激光测量设备在无轨测量时采用接触网激光测量仪。
本发明第三方面提供了一种电子设备,包括:一个或多个处理器;存储装置,其上存储有一个或多个程序;当所述一个或多个程序被所述一个或多个处理器执行,使得所述一个或多个处理器实现如第一方面中任一项所述的一种圆形盾构隧道接触网无轨测量方法。
本发明的有益效果为:
本发明在实施例中通过根据圆形隧道轨道的各设计要点的位置关系,计算设计出接触网在隧道内的悬挂中心点,不受基桩控制网CPⅢ数据影响,整体适用性强、精度高、且测量速度快,有效的解决了现有技术中的技术问题。具有很大的推广价值。
附图说明
图1为本发明实施例中提供的一种圆形盾构隧道接触网无轨测量方法的整体结构示意图(直线区段圆形隧道截面);
图2为本发明实施例中提供的一种圆形盾构隧道接触网无轨测量方法的整体结构示意图(直线区段采用接触网激光测量仪);
图3为本发明实施例中提供的一种圆形盾构隧道接触网无轨测量方法的整体结构示意图(曲线区段圆形隧道截面);
图4为本发明实施例中提供的一种圆形盾构隧道接触网无轨测量方法的整体结构示意图(曲线区段采用接触网激光测量仪)。
图中附图标记为:
1、轨道道床;11、受电弓中心线;
2、钢轨连线;21、线路中心线;
3、隧道中心线;31、隧道圆心;
4、测量对照位;41、第一基准线;42、测量对照点;43、悬挂中心点;431、第一激光发射线;432、接触网激光测量仪;4321、调平气泡;44、第二基准线;441、第二激光发射线。
实施方式
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
需要说明,本发明实施例中所有方向性指示(诸如上、下、左、右、前、后……)仅用于解释在某一特定姿态(如附图所示)下各部件之间的相对位置关系、运动情况等,如果该特定姿态发生改变时,则该方向性指示也相应地随之改变。
在本发明中,除非另有明确的规定和限定,术语“连接”、“固定”等应做广义理解,例如,“固定”可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。
另外,若本发明实施例中有涉及“第一”、“第二”等的描述,则该“第一”、“第二”等的描述仅用于描述目的,而不能理解为指示或暗示其相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括至少一个该特征。另外,全文中出现的“和/或”的含义,包括三个并列的方案,以“A和/或B”为例,包括A方案、或B方案、或A和B同时满足的方案。另外,各个实施例之间的技术方案可以相互结合,但是必须是以本领域普通技术人员能够实现为基础,当技术方案的结合出现相互矛盾或无法实现时应当认为这种技术方案的结合不存在,也不在本发明要求的保护范围之内。
实施例一:参照图1-图4,本发明为了实现解决上述现有技术中的技术问题,而提出了一种圆形盾构隧道接触网无轨测量方法,所述测量方法通过根据圆形隧道轨道的各设计要点的位置关系,计算设计出接触网在隧道内的悬挂中心点43,不受基桩控制网CPⅢ数据影响,整体适用性强、精度高、且测量速度快,有效的解决了现有技术中的技术问题。具有很大的推广价值。
具体的,本发明第一方面提供了一种圆形盾构隧道接触网无轨测量方法,包括:
获取圆形隧道的基础信息;
其中,所述圆形隧道的基础信息包括:圆形隧道的施工类型、圆形隧道的隧道中心线3、圆形隧道轨道施工信息(包括但不限于:轨道道床1和钢轨连线2);
根据圆形隧道的基础信息,获取圆形隧道的设计截面信息(即隧道轮廓为圆形的直线区段圆形隧道设计信息参照图1和图2里面的隧道轮廓图);
根据圆形隧道的设计截面信息,进行构建测量对照位4,利用测量对照位4中与圆形隧道的隧道中心线3、圆形隧道轨道施工信息的设计关系,进行确定接触网悬挂中心点43;
根据确定接触网悬挂中心点43,进行打孔预埋无轨架设接触网。
在本实施例中,为了便于理解,在圆形隧道施工区段为直线区段处时,所述进行确定接触网悬挂中心点43的方法包括:
确定圆形隧道的施工类型为单洞单线,且圆形隧道施工区段为直线区段处;
获取直线区段圆形隧道的设计截面信息,根据直线区段圆形隧道垂直隧道中心线3与施工轨道的垂直中心线重合的设计特点,在直线区段圆形隧道的设计截面信息中进行选取测量对照位4;
根据圆形隧道轨道施工信息、直线区段圆形隧道水平中心线,对测量对照位4位置进行调平映射(即调平根据直线区段圆形隧道水平中心线、测量对照位4位置、钢轨连线2三者之间相互平行),获得测量对照点42;
将测量对照点42和测量对照位4之间进行连线,获得第一基准线41;
根据第一基准线41与直线区段圆形隧道中心线3之间的水平拉出值a,对测量对照点42的位置移动调整后,获得直线区段圆形隧道接触网悬挂中心点43。
参照图1和图2,在本实施例中,为了便于理解,在圆形隧道施工区段为直线区段处时,如何测量得到接触网的悬挂中心点43的,在此进行如下举例:
根据隧道设计要求,圆形隧道一般为单洞单线隧道,其设计要求直线区段隧道垂直中心线与轨道垂直中心线重合,此时可在测量对照位4处采用接触网激光测量仪432(DJJ-7)进行无轨测量,利用圆形隧道垂直中心线与轨道垂直中心线重合特点,如图1和图2所示将接触网激光测量仪432(DJJ-7)横向放置在圆形隧道的断面隧道轮廓图中的测量对照位4(优选的在图2中隧道轮廓图中的底部),首先利用调平气泡4321将接触网激光测量仪432(DJJ-7)调平,调平后的接触网激光测量仪432(DJJ-7)与圆形隧道水平中心线、两钢轨连线2均为平行关系。根据接触网激光测量仪432(DJJ-7)照射出来的激光线,在隧道轮廓图上照射定位到测量对照点42(激光点),而后计算出第一激光发射线431(即第一基准线41)与直线区段圆形隧道的隧道中心线3之间的水平距离(即为拉出值a),再根据拉出值a调节接触网激光测量仪432(DJJ-7)仪器头的架设位置,使其调节后的激光点所处位置即为接触网悬挂中心点43,并用测杆做该点进行标记。施工时按照测量所标记的悬挂点定位进行打孔预埋即可。也即在本实施例中,所述获得测量对照点42的方法包括:采用激光映射。即在本实施例中,所述测量对照点42可通过在测量对照位4进行架设激光测量设备,通过激光测量设备进行激光照射在隧道顶面处,以作为测量对照点42,而后根据测量对照点42设置位置进行调整接触网悬挂中心点43。
参照图3和图4,在本实施例中,为了便于理解,在圆形隧道施工区段为曲线区段处时,所述进行确定接触网悬挂中心点43的方法包括:
确定圆形隧道的施工类型为单洞单线,且圆形隧道施工区段为曲线区段处;
获取曲线区段圆形隧道的设计截面信息(即隧道轮廓为圆形的曲线区段圆形隧道设计信息参照图3和图4里面的隧道轮廓图),根据曲线区段圆形隧道轨道施工信息(包括但不限于:轨道道床1和钢轨连线2),获得轨道线路中心线21和轨道受电弓中心线11;
根据曲线区段圆形隧道的设计截面信息,计算获得曲线区段圆形隧道隧道中心线3与轨道线路中心线21之间的偏移值;即将钢轨连线2中心为起点竖直作线作为轨道线路中心线21,而后求出曲线区段圆形隧道隧道中心线3与轨道线路中心线21之间之间的偏移值。所述偏移值根据圆形隧道圆心31与钢轨连线2平面的距离、轨道连线的超过水平面的超高值、以及两个钢轨中心间距进行计算求出(可通过隧道轨道施工信息求出)。
在曲线区段圆形隧道的设计截面信息中进行选取测量对照位4,根据圆形隧道轨道施工信息、曲线区段圆形隧道隧道中心线3,对测量对照位4位置进行调平映射,获得测量对照点42;
将测量对照点42和测量对照位4之间进行连线,获得第二基准线44,并根据轨道线路中心线21计算出测量对照点42与线路中心线21的距离,所述测量对照点42与线路中心线21的距离可根据测量对照点42与钢轨连线2之间的净空高、轨道连线的超过水平面的超高值、以及两个钢轨中心间距进行计算求出;
根据曲线区段圆形隧道隧道中心线3与轨道线路中心线21之间的偏移值和测量对照点42与线路中心线21的距离,计算出测量对照点42的应偏移值;
根据测量对照点42的应偏移值对测量对照点42处的设置位置进行调节,获得曲线区段圆形隧道接触网悬挂中心点43。
在本实施例中,所述曲线区段圆形隧道的隧道圆心31处于受电弓中心线11上。
在一种可行的实施例中,计算获得曲线区段圆形隧道隧道中心线3与轨道线路中心线21之间的偏移值的方法包括:
设在曲线区段圆形隧道隧道中心线3和轨道线路中心线21存在偏移值为E: (式1)
式1中:B——圆形隧道圆心31与钢轨平面的距离(mm);
h——轨道超高值(mm);
L——钢轨中心间距(mm)。
在一种可行的实施例中,所述计算出测量对照点42的应偏移值的方法包括:
设测量对照点42与线路中心线21的距离为C: (式2)
式2中:H——测量对照点42与钢轨连线2之间的净空高(mm);
h——轨道超高值(mm);
L——钢轨中心间距(mm);
则根据式1和式2,测量对照点42的应偏移值为Y: (式3)。
参照图3和图4,在本实施例中,为了便于理解,在圆形隧道施工区段为曲线区段处时,如何测量得到接触网的悬挂中心点43的,在此进行如下举例:
参照图4,在圆形盾构隧道为曲线情况下,受圆形隧道中轨道超高影响,轨道设计的钢轨连线2的垂直线路中心线21与圆形隧道垂直的隧道中心线3并不重合,此时采用上述方法接触网激光测量仪432(DJJ-7)激光所定位的位置与接触网悬挂点存在一定偏移值,因此需要根据圆形隧道基础参数,钢轨连线2参数,轨道道床1参数进行调整,具体的如下:
根据曲线区段圆形隧道的设计截面信息(具体参照图4中隧道轮廓图),获得获得曲线区段圆形隧道隧道中心线3与轨道线路中心线21(即位于轨道道床1上的钢轨连线2的垂直中心线)之间的偏移值E;
如图4所示,将接触网激光测量仪432(DJJ-7)横向放置在圆形隧道的断面隧道轮廓图中的测量对照位4(优选的在图3中隧道轮廓图中的底部),首先利用调平气泡4321将接触网激光测量仪432(DJJ-7)调平,根据接触网激光测量仪432(DJJ-7)照射出来的激光线,在隧道轮廓图上照射定位到测量对照点42(激光点),而后根据测量对照点42与钢轨连线2之间的净空高、轨道连线的超过水平面的超高值、以及两个钢轨中心间距进行计算求出第二激光发射线441(即第二基准线44)与曲线区段圆形隧道的轨道线路中心线21的距离(即为图中C),同时根据圆形隧道圆心31与钢轨连线2平面的距离、轨道连线的超过水平面的超高值、以及两个钢轨中心间距进行计算求出曲线区段圆形隧道隧道中心线3与轨道线路中心线21之间的偏移值E,继而根据曲线区段圆形隧道隧道中心线3与轨道线路中心线21之间的偏移值E、第二激光发射线441(即第二基准线44)与曲线区段圆形隧道的轨道线路中心线21的距离求出计算出测量对照点42的应偏移值。再根据偏移值调节接触网激光测量仪432(DJJ-7)仪器头的架设位置,使其调节后的激光点所处位置即为接触网悬挂中心点43,并用测杆做该点进行标记。施工时按照测量所标记的悬挂点定位进行打孔预埋即可。也即在本实施例中,所述获得测量对照点42的方法包括:采用激光映射。即在本实施例中,所述测量对照点42可通过在测量对照位4进行架设激光测量设备,通过激光测量设备进行激光照射在隧道顶面处,以作为测量对照点42,而后根据测量对照点42设置位置进行调整接触网悬挂中心点43。
另外,需要注意的是,接触网参数计算出不同轨道超高条件下,接触网激光测量仪432(DJJ-7)激光所定位的位置与接触网悬挂点偏移值数据大小,通过偏移值确定接触网施工所需要确认的悬挂中心点43。同时圆心隧道在曲线超高区段,受隧道净空较低影响,为确保车辆在曲线区段限界满足设计要求,应采用线路中心线21向隧道中心线3曲外侧偏移的方法,同时需要保证隧道圆心31始终在受电弓中心线11上。
在本实施例中,为了更进一步理解如何通过上述的无轨测量方法得出曲线区段的圆形隧道中测量对位点的应偏移量的,在此以某地区轨道交通6号线一二期接触网工程为例,圆形盾构隧道直径为5200mm,普通整体道床从隧道底部到轨面740mm,可推算出圆形隧道圆心31与钢轨平面的距离B为1860mm;钢轨中心间距L为1506mm;测量对照点42与钢轨连线2之间的净空高H取4600mm;计算结果如下表1:
表1 圆形隧道曲线区段不同超高时偏移值Y(mm)
序号 | h | 拉出值a | H | L | C | B | E | Y | 备注 |
1 | 10 | 0 | 4578 | 1506 | 31.8 | 1860 | 12.4 | 19.4 | |
2 | 20 | 0 | 4578 | 1506 | 63.6 | 1860 | 24.7 | 38.9 | |
3 | 30 | 0 | 4578 | 1506 | 95.4 | 1860 | 37.1 | 58.3 | |
4 | 40 | 0 | 4578 | 1506 | 127.2 | 1860 | 49.4 | 77.8 | |
5 | 50 | 0 | 4578 | 1506 | 159 | 1860 | 61.8 | 97.2 | |
6 | 60 | 0 | 4578 | 1506 | 190.8 | 1860 | 74.1 | 116.6 | |
7 | 70 | 0 | 4578 | 1506 | 222.5 | 1860 | 86.5 | 136.1 | |
8 | 80 | 0 | 4578 | 1506 | 254.3 | 1860 | 98.8 | 155.5 | |
9 | 90 | 0 | 4578 | 1506 | 286.1 | 1860 | 111.2 | 175 | |
10 | 100 | 0 | 4578 | 1506 | 317.9 | 1860 | 123.5 | 194.4 | |
11 | 110 | 0 | 4578 | 1506 | 349.7 | 1860 | 135.9 | 213.9 | |
12 | 120 | 0 | 4578 | 1506 | 383.3 | 1860 | 148.2 | 235.1 |
根据计算数据结果,可推算出偏移值Y与超高h之间的关系为:
公式4
其中,需要注意的是,公式4未考虑拉出值a大小,实际计算应将拉出值a考虑在内。
本发明第二方面提供了一种圆形盾构隧道接触网无轨测量***,采用了上述第一方面中任一项所述的一种圆形盾构隧道接触网无轨测量方法,所述测量***还包括:
激光测量设备,所述激光测量设备用于设置于测量对照位4进行映射测量点。
在本实施例中,所述测量***还包括:无轨测量时接触网激光测量仪432。优选的,在进行无轨测量时的接触网激光测量仪432的型号为(DJJ-7)。
本发明第三方面提供了一种电子设备,包括:一个或多个处理器;存储装置,其上存储有一个或多个程序;当所述一个或多个程序被所述一个或多个处理器执行,使得所述一个或多个处理器实现如第一方面中任一项所述的一种圆形盾构隧道接触网无轨测量方法
在一些实施方式中,所述测量***可以利用诸如HTTP(Hyper Text TransferProtocol,超文本传输协议)之类的任何当前已知或未来研发的网络协议进行通信,并且可以与任意形式或介质的数字数据通信(例如,通信网络)互连。通信网络的示例包括局域网(“LAN”),广域网(“WAN”),网际网(例如,互联网)以及端对端网络(例如,ad hoc端对端网络),以及任何当前已知或未来研发的网络。
上述计算机可读介质可以是上述电子设备中所包含的;也可以是单独存在,而未装配入该电子设备中。上述计算机可读介质承载有一个或者多个程序,当上述一个或者多个程序被该电子设备执行时,使得该电子设备。
可以以一种或多种程序设计语言或其组合来编写用于执行本公开的一些实施例的操作的计算机程序代码,上述程序设计语言包括面向对象的程序设计语言—诸如Java、Smalltalk、C++,还包括常规的过程式程序设计语言—诸如“C”语言或类似的程序设计语言。程序代码可以完全地在用户计算机上执行、部分地在用户计算机上执行、作为一个独立的软件包执行、部分在用户计算机上部分在远程计算机上执行、或者完全在远程计算机或服务器上执行。在涉及远程计算机的情形中,远程计算机可以通过任意种类的网络——包括局域网(LAN)或广域网(WAN)——连接到用户计算机,或者,可以连接到外部计算机(例如利用因特网服务提供商来通过因特网连接)。
附图中的流程图和框图,图示了按照本公开各种实施例的***、方法和计算机程序产品的可能实现的体系架构、功能和操作。在这点上,流程图或框图中的每个方框可以代表一个模块、程序段、或代码的一部分,该模块、程序段、或代码的一部分包含一个或多个用于实现规定的逻辑功能的可执行指令。也应当注意,在有些作为替换的实现中,方框中所标注的功能也可以以不同于附图中所标注的顺序发生。例如,两个接连地表示的方框实际上可以基本并行地执行,它们有时也可以按相反的顺序执行,这依所涉及的功能而定。也要注意的是,框图和/或流程图中的每个方框、以及框图和/或流程图中的方框的组合,可以用执行规定的功能或操作的专用的基于硬件的***来实现,或者可以用专用硬件与计算机指令的组合来实现。
本文中以上描述的功能可以至少部分地由一个或多个硬件逻辑部件来执行。例如,非限制性地,可以使用的示范类型的硬件逻辑部件包括:现场可编程门阵列(FPGA)、专用集成电路(ASIC)、专用标准产品(ASSP)、片上***(SOC)、复杂可编程逻辑设备(CPLD)等等。即本发明第四方面提供了一种计算机可读介质,其上存储有计算机程序,其中,所述程序被处理器执行时实现如第一方面所述的一种圆形盾构隧道接触网无轨测量方法。
本发明第五方面提供了一种计算机程序产品,包括计算机程序,所述计算机程序在被处理器执行时实现如第一方面所述的一种圆形盾构隧道接触网无轨测量方法。
以上描述仅为本公开的一些较佳实施例以及对所运用技术原理的说明。本领域技术人员应当理解,本公开的实施例中所涉及的发明范围,并不限于上述技术特征的特定组合而成的技术方案,同时也应涵盖在不脱离上述发明构思的情况下,由上述技术特征或其等同特征进行任意组合而形成的其它技术方案。例如上述特征与本公开的实施例中公开的(但不限于)具有类似功能的技术特征进行互相替换而形成的技术方案。
Claims (5)
1.一种圆形盾构隧道接触网无轨测量方法,其特征在于,包括:
获取圆形隧道的基础信息;
其中,所述圆形隧道的基础信息包括:圆形隧道的施工类型、圆形隧道的隧道中心线、圆形隧道轨道施工信息;
根据圆形隧道的基础信息,获取圆形隧道的设计截面信息;
根据圆形隧道的设计截面信息,进行构建测量对照位,利用测量对照位中与圆形隧道的隧道中心线、圆形隧道轨道施工信息的设计关系,进行确定接触网悬挂中心点;
根据确定接触网悬挂中心点,进行打孔预埋无轨架设接触网;
其中,所述进行确定接触网悬挂中心点的方法包括:
确定圆形隧道的施工类型为单洞单线,且圆形隧道施工区段为曲线区段处;
获取曲线区段圆形隧道的设计截面信息,根据曲线区段圆形隧道轨道施工信息,获得轨道线路中心线和轨道受电弓中心线;
根据曲线区段圆形隧道的设计截面信息,计算获得曲线区段圆形隧道隧道中心线与轨道线路中心线之间的偏移值;
在曲线区段圆形隧道的设计截面信息中进行选取测量对照位,根据圆形隧道轨道施工信息、曲线区段圆形隧道隧道中心线,对测量对照位位置进行调平映射,获得测量对照点;
将测量对照点和测量对照位之间进行连线,获得第二基准线,并根据轨道线路中心线计算出测量对照点与线路中心线的距离;
根据曲线区段圆形隧道隧道中心线与轨道线路中心线之间的偏移值和测量对照点与线路中心线的距离,计算出测量对照点的应偏移值;
根据测量对照点的应偏移值对测量对照点处的设置位置进行调节,获得曲线区段圆形隧道接触网悬挂中心点;
具体的,所述计算获得曲线区段圆形隧道隧道中心线与轨道线路中心线之间的偏移值的方法包括:
设在曲线区段圆形隧道隧道中心线和轨道线路中心线存在偏移值为E,则: 式1
式1中:B——圆形隧道圆心与钢轨平面的距离mm;
h——轨道超高值mm;
L——钢轨中心间距mm;
其中,所述计算出测量对照点的应偏移值的方法包括:
设测量对照点与线路中心线的距离为C: 式2
式2中:H——测量对照点与钢轨连线之间的净空高mm;
h——轨道超高值mm;
L——钢轨中心间距mm;
则根据式1和式2,测量对照点的应偏移值为Y: 式3。
2.根据权利要求1所述的一种圆形盾构隧道接触网无轨测量方法,其特征在于,所述曲线区段圆形隧道的隧道圆心处于受电弓中心线上。
3.一种圆形盾构隧道接触网无轨测量***,其特征在于,采用了上述权利要求1-2中任一项所述的一种圆形盾构隧道接触网无轨测量方法,所述测量***还包括:
激光测量设备,所述激光测量设备用于设置于测量对照位进行映射测量点。
4.根据权利要求3所述的一种圆形盾构隧道接触网无轨测量***,其特征在于,所述测量***还包括:
所述激光测量设备在无轨测量时采用接触网激光测量仪。
5.一种电子设备,其特征在于,包括:一个或多个处理器;存储装置,其上存储有一个或多个程序;当所述一个或多个程序被所述一个或多个处理器执行,使得所述一个或多个处理器实现如权利要求1-2中任一项所述的一种圆形盾构隧道接触网无轨测量方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310630371.7A CN116379926B (zh) | 2023-05-31 | 2023-05-31 | 一种圆形盾构隧道接触网无轨测量方法、***及电子设备 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310630371.7A CN116379926B (zh) | 2023-05-31 | 2023-05-31 | 一种圆形盾构隧道接触网无轨测量方法、***及电子设备 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN116379926A CN116379926A (zh) | 2023-07-04 |
CN116379926B true CN116379926B (zh) | 2023-08-25 |
Family
ID=86966008
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310630371.7A Active CN116379926B (zh) | 2023-05-31 | 2023-05-31 | 一种圆形盾构隧道接触网无轨测量方法、***及电子设备 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116379926B (zh) |
Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1176994A (en) * | 1967-04-10 | 1970-01-07 | Railway Transport Inst | Catenary Suspension for the Contact Wires of Electric Railways or the like |
US5331745A (en) * | 1991-09-26 | 1994-07-26 | J. Muller Ag | Process and apparatus for surveying a railway track for any deviation from a track survey plan |
US5617645A (en) * | 1995-05-02 | 1997-04-08 | William R. W. Wick | Non-contact precision measurement system |
US5930904A (en) * | 1997-06-17 | 1999-08-03 | Mualem; Charles | Catenary system measurement apparatus and method |
JP2006284406A (ja) * | 2005-04-01 | 2006-10-19 | Seiko Epson Corp | ドットずれ検出方法、ドットずれ検出プログラムおよび基準直線取得方法、並びにドットずれ検出装置および液滴吐出装置 |
JP2009208706A (ja) * | 2008-03-06 | 2009-09-17 | Hitachi High-Technologies Corp | トロリ線の支持点検出装置 |
WO2014136976A1 (ja) * | 2013-03-04 | 2014-09-12 | 公益財団法人鉄道総合技術研究所 | 架線位置計測装置及び方法 |
CN203869661U (zh) * | 2014-05-31 | 2014-10-08 | 中铁二十局集团电气化工程有限公司 | 隧道内接触网施工用吊柱中心位置定位装置 |
CN106585427A (zh) * | 2016-11-11 | 2017-04-26 | 中铁十二局集团有限公司 | 一种地铁刚性接触网无轨施工方法 |
CN109515252A (zh) * | 2018-11-20 | 2019-03-26 | 中铁十二局集团有限公司 | 一种地铁接触网无轨测量施工方法 |
CN109696131A (zh) * | 2018-12-11 | 2019-04-30 | 中铁二局集团电务工程有限公司 | 城市轨道交通悬挂接触网悬挂定位点无轨测量工法 |
JP2020187016A (ja) * | 2019-05-15 | 2020-11-19 | トヨタ自動車株式会社 | 位置ずれ検出方法 |
CN112013818A (zh) * | 2020-09-02 | 2020-12-01 | 中国铁建电气化局集团第五工程有限公司 | 一种单线隧道内接触网y型吊柱倾角测量计算的方法 |
CN112363178A (zh) * | 2020-11-02 | 2021-02-12 | 广东中科如铁技术有限公司 | 一种接触网隧道吊柱的动态测量方法 |
CN212692878U (zh) * | 2020-07-07 | 2021-03-12 | 中铁七局集团电务工程有限公司 | 一种城市轨道交通接触网无轨测量设备 |
CN112528386A (zh) * | 2020-12-31 | 2021-03-19 | 中铁建电气化局集团第三工程有限公司 | 地铁隧内接触网悬挂点位置无轨化精测方法 |
CN112668130A (zh) * | 2020-12-30 | 2021-04-16 | 广州轨道交通建设监理有限公司 | 一种用于地铁区间隧道供电专业中的接触网建模方法 |
CN112697093A (zh) * | 2020-12-22 | 2021-04-23 | 中铁十二局集团电气化工程有限公司 | 一种盾构隧道内无轨测量吊柱长度及角度的计算方法 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITUA20162698A1 (it) * | 2016-04-19 | 2017-10-19 | Mer Mec S P A | Sistema ottico per la misura della forza di contatto tra il pantografo e la catenaria |
-
2023
- 2023-05-31 CN CN202310630371.7A patent/CN116379926B/zh active Active
Patent Citations (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1176994A (en) * | 1967-04-10 | 1970-01-07 | Railway Transport Inst | Catenary Suspension for the Contact Wires of Electric Railways or the like |
US5331745A (en) * | 1991-09-26 | 1994-07-26 | J. Muller Ag | Process and apparatus for surveying a railway track for any deviation from a track survey plan |
US5617645A (en) * | 1995-05-02 | 1997-04-08 | William R. W. Wick | Non-contact precision measurement system |
US5930904A (en) * | 1997-06-17 | 1999-08-03 | Mualem; Charles | Catenary system measurement apparatus and method |
JP2006284406A (ja) * | 2005-04-01 | 2006-10-19 | Seiko Epson Corp | ドットずれ検出方法、ドットずれ検出プログラムおよび基準直線取得方法、並びにドットずれ検出装置および液滴吐出装置 |
JP2009208706A (ja) * | 2008-03-06 | 2009-09-17 | Hitachi High-Technologies Corp | トロリ線の支持点検出装置 |
WO2014136976A1 (ja) * | 2013-03-04 | 2014-09-12 | 公益財団法人鉄道総合技術研究所 | 架線位置計測装置及び方法 |
CN203869661U (zh) * | 2014-05-31 | 2014-10-08 | 中铁二十局集团电气化工程有限公司 | 隧道内接触网施工用吊柱中心位置定位装置 |
CN106585427A (zh) * | 2016-11-11 | 2017-04-26 | 中铁十二局集团有限公司 | 一种地铁刚性接触网无轨施工方法 |
CN109515252A (zh) * | 2018-11-20 | 2019-03-26 | 中铁十二局集团有限公司 | 一种地铁接触网无轨测量施工方法 |
CN109696131A (zh) * | 2018-12-11 | 2019-04-30 | 中铁二局集团电务工程有限公司 | 城市轨道交通悬挂接触网悬挂定位点无轨测量工法 |
JP2020187016A (ja) * | 2019-05-15 | 2020-11-19 | トヨタ自動車株式会社 | 位置ずれ検出方法 |
CN212692878U (zh) * | 2020-07-07 | 2021-03-12 | 中铁七局集团电务工程有限公司 | 一种城市轨道交通接触网无轨测量设备 |
CN112013818A (zh) * | 2020-09-02 | 2020-12-01 | 中国铁建电气化局集团第五工程有限公司 | 一种单线隧道内接触网y型吊柱倾角测量计算的方法 |
CN112363178A (zh) * | 2020-11-02 | 2021-02-12 | 广东中科如铁技术有限公司 | 一种接触网隧道吊柱的动态测量方法 |
CN112697093A (zh) * | 2020-12-22 | 2021-04-23 | 中铁十二局集团电气化工程有限公司 | 一种盾构隧道内无轨测量吊柱长度及角度的计算方法 |
CN112668130A (zh) * | 2020-12-30 | 2021-04-16 | 广州轨道交通建设监理有限公司 | 一种用于地铁区间隧道供电专业中的接触网建模方法 |
CN112528386A (zh) * | 2020-12-31 | 2021-03-19 | 中铁建电气化局集团第三工程有限公司 | 地铁隧内接触网悬挂点位置无轨化精测方法 |
Non-Patent Citations (1)
Title |
---|
联邦德国铁路接触网的接触线位置的容许偏差;吴成三;铁道工程学报(第02期);118-123 * |
Also Published As
Publication number | Publication date |
---|---|
CN116379926A (zh) | 2023-07-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108280969B (zh) | 一种高边坡表面变形监测预警***及其预警方法 | |
CN111597509B (zh) | 一种基于参考椭球面的铁路中线测设方法 | |
CN206876125U (zh) | 一种用于地铁工程的限界测量装置 | |
CN107907100B (zh) | 一种对轨道交通不均匀沉降进行监测的***及方法 | |
KR101884018B1 (ko) | 라이다 데이터를 이용한 도로의 곡선반경, 종단 및 횡단 경사도 산출 방법 | |
CN108507452B (zh) | 一种客运专线接触网支柱侧面限界的测定方法 | |
CN112233233B (zh) | 一种隧道相对点云数据的三维线形恢复方法 | |
CN112528386B (zh) | 地铁隧内接触网悬挂点位置无轨化精测方法 | |
CN115638777B (zh) | 一种隧道轨道交通全***无轨测量方法 | |
CN113884077A (zh) | 一种运营期普速铁路控制网及其测设方法 | |
CN103727920A (zh) | 基于大地水准面模型测量水准高差的方法 | |
CN109459765A (zh) | 基于已有gnss控制网的高精度隧道独立控制网建立方法 | |
CN116379926B (zh) | 一种圆形盾构隧道接触网无轨测量方法、***及电子设备 | |
CN114444177B (zh) | 基于傅里叶级数拟合的铁路桥梁桥上铺轨线形优化方法 | |
CN113916179B (zh) | 一种公路铁路两用桥梁线形自动测量***及方法 | |
CN116793216B (zh) | 一种圆形盾构曲线区段隧道接触网无轨测量方法及*** | |
CN111811466B (zh) | 一种既有线有砟铁路线路参数及养护的测量方法 | |
CN212692878U (zh) | 一种城市轨道交通接触网无轨测量设备 | |
CN106197378A (zh) | 一种采用无人机测量的路基 | |
CN105672070A (zh) | 一种既有线车站站内单排轨道控制网建网方法 | |
CN109696131B (zh) | 城市轨道交通悬挂接触网悬挂定位点无轨测量工法 | |
CN116834616A (zh) | 一种基于无轨测量的圆形盾构隧道接触网架设方法及*** | |
CN206876177U (zh) | 地铁隧道工程线路测点点位的快速定位装置 | |
CN114543699B (zh) | 基于无人机高精度三维建模的输电线路弧垂测量方法 | |
CN112161613B (zh) | 公路工程控制测量方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |