CN116043906A - Anchoring construction method for steel pipe pile in underwater bare rock area - Google Patents

Anchoring construction method for steel pipe pile in underwater bare rock area Download PDF

Info

Publication number
CN116043906A
CN116043906A CN202211563230.XA CN202211563230A CN116043906A CN 116043906 A CN116043906 A CN 116043906A CN 202211563230 A CN202211563230 A CN 202211563230A CN 116043906 A CN116043906 A CN 116043906A
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
pile
underwater
rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211563230.XA
Other languages
Chinese (zh)
Inventor
刘志峰
王辉
魏楚凯
史志恺
刘水周
郭子学
付浩兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Poly Changda Engineering Co Ltd
Original Assignee
Poly Changda Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Poly Changda Engineering Co Ltd filed Critical Poly Changda Engineering Co Ltd
Priority to CN202211563230.XA priority Critical patent/CN116043906A/en
Publication of CN116043906A publication Critical patent/CN116043906A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/52Submerged foundations, i.e. submerged in open water
    • E02D27/525Submerged foundations, i.e. submerged in open water using elements penetrating the underwater ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/10Deep foundations
    • E02D27/12Pile foundations
    • E02D27/14Pile framings, i.e. piles assembled to form the substructure
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/40Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds in open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/66Mould-pipes or other moulds
    • E02D5/665Mould-pipes or other moulds for making piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0026Metals
    • E02D2300/0029Steel; Iron

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses an underwater bare rock area steel pipe pile anchoring construction method, which comprises the following steps: firstly, punching a hole on an exposed rock surface through a floating box on water, then, placing a steel pipe pile into the hole through a crane, temporarily stabilizing the steel pipe pile, welding a parallel connection to connect the steel pipe pile into a whole, and erecting a platform of a geological drilling machine on the top of the steel pipe pile; installing a geological core pulling machine on a pile top platform, then penetrating a guide pipe into a riverbed rock surface in a steel pipe pile, and drilling into the rock layer by geological drilling for 3m; after core pulling is completed, a 4m long seamless concrete core steel pipe rod is inserted into the hole bottom through a guide pipe, and then the guide pipe is pulled out; installing a guide pipe for pile foundation pouring, and pouring 3m high C30 underwater concrete in the steel pipe pile according to an underwater pile foundation pouring process; after the concrete in the steel pipe pile is equal in strength, the steel pipe pile and the rock stratum form an anchoring structure through the concrete and the seamless steel pipe, the construction of the anchored steel pipe pile is completed, a geological drilling rig construction platform is removed, and the upper structure of the trestle is continuously erected.

Description

Anchoring construction method for steel pipe pile in underwater bare rock area
Technical Field
The invention relates to the technical field of steel pipe pile anchoring, in particular to an underwater bare rock area steel pipe pile anchoring construction method.
Background
The geological conditions in water in each region have great difference, which also leads to different geological conditions aiming at different water area environments, and different water construction platform erection methods are needed. The common trestle is erected with the steel pipe pile by adopting a construction mode of inserting and driving a vibrating hammer, so that the steel pipe pile shakes into a covering layer, the load of construction equipment is supported by using the friction resistance between the covering layer and the steel pipe pile, and in certain water areas, the geological condition of the bottom of a river bed is exposed rock. Aiming at the geological condition of the bare rock riverbed, the traditional method is to firstly adopt underwater blasting, then carry out punching treatment and finally embed the steel pipe pile, but the construction method has higher construction risk, and has the defects of long construction period, high input cost and the like.
Disclosure of Invention
The invention aims to solve the problems of the background technology and provides an underwater bare rock area steel pipe pile anchoring construction method.
The aim of the invention can be achieved by the following technical scheme:
an underwater bare rock area steel pipe pile anchoring construction method comprises the following steps:
step 1: firstly, punching a drilling platform through an overhead buoyancy tank, guiding holes to the exposed uneven rock surface at the bottom, then hoisting and lowering the steel pipe pile, temporarily stabilizing and installing a pile top geological drilling platform; a guide pipe is used for penetrating into a rock surface at the bottom of the steel pipe pile, and the steel pipe pile is drilled into the rock stratum by geological drilling equipment for 3m;
step 2: after core pulling by using a geological drilling machine is completed, inserting a 4m long concrete core seamless steel pipe into the hole bottom by using a guide pipe, reserving 1m inside a steel pipe pile when 3m of the seamless steel pipe is positioned in the hole, and then pulling out the guide pipe of the geological drilling machine;
step 3: pouring 3m high C30 underwater concrete in the steel pipe pile by adopting an underwater pile foundation pouring process;
step 4: after the concrete at the bottom of the steel pipe pile is equal in strength, the steel pipe pile and the rock stratum form an anchoring structure through the concrete and the seamless steel pipe, the construction of the anchored steel pipe pile is completed, a geological drilling rig construction platform is removed, and the upper structure of the trestle is continuously erected.
As a further scheme of the invention: in the step 1, the parallel connection structure is a parallel connection pipe, and the steel pipe pile is additionally provided with a horizontal scissor-supporting parallel connection pipe except for the common parallel and transverse bridge parallel connection.
As a further scheme of the invention: in step 1, the diameter of the geological drill pipe is 15cm.
As a further scheme of the invention: in the step 2, the diameter of the seamless steel pipe is 12cm, the number of the seamless steel pipes arranged in each steel pipe pile is three, the length of the seamless steel pipe is 4m, and C30 concrete is poured into the seamless steel pipe.
As a further scheme of the invention: in the step 2, the seamless steel pipe is inserted into a rock hole for 3m, and 1m is reserved outside the rock hole and inside the steel pipe pile.
As a further scheme of the invention: in the step 3, an underwater pile foundation pouring process is adopted, firstly, the air tightness and the bearing capacity of a pile foundation conduit are checked, then, the first-disc concrete meeting the minimum buried pipe depth is prepared, and the distance between the bottom of the pile foundation conduit and the river bed surface is controlled to be 30cm.
The invention has the beneficial effects that:
the invention uses the buoyancy tank to impact the platform to draw holes, the steel pipe pile is stably lowered, the drilling machine drills into the rock stratum, the core is pulled out, the seamless steel pipe is inserted as the anchor rod, the underwater concrete is poured, the concrete is combined with the anchor rod and the rock stratum to form an anchoring structure, therefore, the underwater bare rock area steel pipe pile anchoring construction method has the advantages of convenient construction and high anchoring stability
The problem of the steel-pipe pile of standing on the uncovered bare rock of first has been solved, further makes steel-pipe pile bottom and rock concretion become wholly through stock structural design, avoids the steel-pipe pile to receive rivers to influence and takes place to slide, and the concrete and the stock structure of bottom are effectual with steel-pipe pile upper portion load transfer to the stratum.
Drawings
The invention is further described below with reference to the accompanying drawings.
Fig. 1 is a schematic flow chart of step 1 and step 2 in the steel pipe pile anchoring construction method of the present invention;
fig. 2 is a schematic flow chart of step 3 and step 4 in the steel pipe pile anchoring construction method of the present invention;
FIG. 3 is a schematic view of a water buoyancy tank impact drilling platform in step 1 in the steel pipe pile anchoring construction method of the present invention
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-3, the invention discloses an underwater bare rock area steel pipe pile anchoring construction method, which comprises the following steps:
step 1: firstly, punching a drilling platform through a floating box on water, guiding holes on a rock surface with exposed bottom, then hoisting and lowering steel pipe piles, and installing a pile top geological drilling platform after welding a flat connection structure; three phi 15cm guide pipes are used for penetrating into the rock surface at the bottom of the steel pipe pile, and the steel pipe pile is drilled into the rock stratum for 3m through geological drilling equipment;
step 2: after core pulling is completed, three seamless steel pipes with the length of 4m and the length of phi 12cm are inserted into the hole bottom through the guide pipe, the seamless steel pipes are inserted into the rock holes for 3m, 1m of the outside of the rock holes is reserved in the steel pipe pile, and then the guide pipe with the length of phi 15cm is pulled out;
step 3: pouring 3m high C30 underwater concrete in the steel pipe pile by utilizing a conduit poured by the pile foundation;
step 4: after the bottom concrete of the steel pipe pile is equal in strength, the steel pipe pile and the rock face form an anchoring structure through the concrete and the seamless steel pipe, the construction of the anchoring steel pipe pile is completed, the anchor rod construction platform is removed, and the upper structure of the trestle is continuously erected.
In the step 1, the parallel connection structure is a parallel connection pipe, and the steel pipe pile is additionally provided with a horizontal scissor-supporting parallel connection pipe except for the common parallel and transverse bridge parallel connection.
In step 1, the diameter of the geological drill pipe is 15cm.
In the step 2, the diameter of the seamless steel pipe is 12cm, the number of the seamless steel pipes arranged in each steel pipe pile is three, the length of the seamless steel pipe is 4m, and C30 concrete is poured into the seamless steel pipe.
In the step 2, the seamless steel pipe is inserted into a rock hole for 3m, and 1m is reserved outside the rock hole and inside the steel pipe pile.
In the step 3, an underwater pile foundation pouring process is adopted, firstly, the air tightness and the bearing capacity of a pile foundation conduit are checked, then, the first-disc concrete meeting the minimum buried pipe depth is prepared, and the distance between the bottom of the pile foundation conduit and the river bed surface is controlled to be 30cm.
The foregoing describes one embodiment of the present invention in detail, but the description is only a preferred embodiment of the present invention and should not be construed as limiting the scope of the invention. All equivalent changes and modifications within the scope of the present invention are intended to be covered by the present invention.

Claims (6)

1. The anchoring construction method of the steel pipe pile in the underwater bare rock area is characterized by comprising the following steps of:
step 1: firstly, punching a drilling platform through an overhead buoyancy tank, guiding holes to the exposed uneven rock surface at the bottom, then hoisting and lowering the steel pipe pile, temporarily stabilizing and installing a pile top geological drilling platform; a guide pipe is used for penetrating into a rock surface at the bottom of the steel pipe pile, and the steel pipe pile is drilled into the rock stratum by geological drilling equipment for 3m;
step 2: after core pulling by using a geological drilling machine is completed, inserting a 4m long concrete core seamless steel pipe into the hole bottom by using a guide pipe, reserving 1m inside a steel pipe pile when 3m of the seamless steel pipe is positioned in the hole, and then pulling out the guide pipe of the geological drilling machine;
step 3: pouring 3m high C30 underwater concrete in the steel pipe pile by adopting an underwater pile foundation pouring process;
step 4: after the concrete at the bottom of the steel pipe pile is equal in strength, the steel pipe pile and the rock stratum form an anchoring structure through the concrete and the seamless steel pipe, the construction of the anchored steel pipe pile is completed, a geological drilling rig construction platform is removed, and the upper structure of the trestle is continuously erected.
2. The anchoring construction method for the steel pipe pile in the underwater bare rock area according to claim 1, wherein in the step 1, the parallel connection structure is a parallel connection pipe, and the steel pipe pile is additionally provided with a horizontal scissor-supporting parallel connection pipe except for a common parallel bridge and a transverse bridge.
3. The method for anchoring and constructing the steel pipe pile in the underwater bare rock area according to claim 1, wherein in the step 1, the diameter of the geological drilling rig pipe is 15cm.
4. The method according to claim 1, wherein in the step 2, the diameter of the seamless steel pipe is 12cm, the number of the seamless steel pipes arranged in each steel pipe pile is three, the length of the seamless steel pipe is 4m, and the inside of the seamless steel pipe is filled with C30 concrete.
5. The method for anchoring and constructing the steel pipe pile in the underwater bare rock area according to claim 1, wherein in the step 2, the seamless steel pipe is inserted into a rock hole for 3m, and 1m is reserved outside the rock hole in the steel pipe pile.
6. The method for anchoring and constructing the steel pipe pile in the underwater bare rock area according to claim 1, wherein in the step 3, an underwater pile foundation pouring process is adopted, firstly, the air tightness and the bearing capacity of a pile foundation guide pipe are checked, then, a head plate concrete meeting the minimum buried pipe depth is prepared, and the distance between the bottom of the pile foundation guide pipe and the river bed surface is controlled to be 30cm.
CN202211563230.XA 2022-12-07 2022-12-07 Anchoring construction method for steel pipe pile in underwater bare rock area Pending CN116043906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211563230.XA CN116043906A (en) 2022-12-07 2022-12-07 Anchoring construction method for steel pipe pile in underwater bare rock area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211563230.XA CN116043906A (en) 2022-12-07 2022-12-07 Anchoring construction method for steel pipe pile in underwater bare rock area

Publications (1)

Publication Number Publication Date
CN116043906A true CN116043906A (en) 2023-05-02

Family

ID=86120751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211563230.XA Pending CN116043906A (en) 2022-12-07 2022-12-07 Anchoring construction method for steel pipe pile in underwater bare rock area

Country Status (1)

Country Link
CN (1) CN116043906A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102312442A (en) * 2011-07-01 2012-01-11 中铁大桥局股份有限公司 Construction method of trestle steel pipe pile foundation
CN103898910A (en) * 2014-03-10 2014-07-02 中交一航局第三工程有限公司 Method for anchoring trestle steel pipe piles on seabed rock bare landform
CN105239573A (en) * 2015-10-28 2016-01-13 浙江省交通工程建设集团有限公司第二分公司 Rock anchoring construction method for implanted pipe of structural steel trestle
CN106758759A (en) * 2017-02-20 2017-05-31 中铁十九局集团第七工程有限公司 A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN107386285A (en) * 2017-08-03 2017-11-24 中铁六局集团有限公司 A kind of novel steel tube pile foundation rock borehole anchorage method
CN108103939A (en) * 2017-12-08 2018-06-01 中交路桥北方工程有限公司 Oblique section steel trestle construction composite reinforcement mode and construction technology
CN113309132A (en) * 2021-05-07 2021-08-27 中铁十一局集团第一工程有限公司 Construction method based on steel trestle bridge anchoring pile

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102312442A (en) * 2011-07-01 2012-01-11 中铁大桥局股份有限公司 Construction method of trestle steel pipe pile foundation
CN103898910A (en) * 2014-03-10 2014-07-02 中交一航局第三工程有限公司 Method for anchoring trestle steel pipe piles on seabed rock bare landform
CN105239573A (en) * 2015-10-28 2016-01-13 浙江省交通工程建设集团有限公司第二分公司 Rock anchoring construction method for implanted pipe of structural steel trestle
CN106758759A (en) * 2017-02-20 2017-05-31 中铁十九局集团第七工程有限公司 A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN107386285A (en) * 2017-08-03 2017-11-24 中铁六局集团有限公司 A kind of novel steel tube pile foundation rock borehole anchorage method
CN108103939A (en) * 2017-12-08 2018-06-01 中交路桥北方工程有限公司 Oblique section steel trestle construction composite reinforcement mode and construction technology
CN113309132A (en) * 2021-05-07 2021-08-27 中铁十一局集团第一工程有限公司 Construction method based on steel trestle bridge anchoring pile

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
伍锦时: "《跨江钢栈桥及钢平台搭设技术探讨》", 《中国公路》, no. 16, pages 95 - 97 *
吕建伟: "《钱塘江强涌潮抛石区钢管桩冲击引孔沉桩施工技术》", 《中国公路》, no. 21, pages 230 - 231 *
王德明: "《谈急流及岩层裸露地区深水钢栈桥施工技术》", 《山西建筑》, vol. 43, no. 4, pages 185 - 186 *

Similar Documents

Publication Publication Date Title
JP2016182957A (en) Undersea anchoring system and method
CN109024651B (en) Steel pipe concrete mixed pile foundation and construction method
CN102953362B (en) A kind of drilled pile platform be arranged in deep water torrent intectate steep bare rock
CN105275381A (en) Drilling construction method for water-rich cobble stratum by utilizing impact drill
CN110924307A (en) Trestle construction method for bare rock geology
CN112663600A (en) Construction method of cast-in-situ bored pile for water-rich sandy stratum
CN108166483A (en) Bored pile construction method
CN105569560A (en) Full casing long-spiral bored pile machine and method of using same for construction
CN107642041A (en) The hollow clump of piles anchorage of super-large diameter
CN105064328A (en) Construction device and method for pile foundation
CN112392400A (en) Hole forming construction process for slope protection pile in complex geological environment
CN105672314A (en) Method for constructing steel pipe upright pile through semi-reversed-construction method
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN109853531A (en) A kind of pile foundation construction process of cast-in-situ bored pile
CN114215049A (en) Construction method for main steel casing of bored pile under deep water foundation and bare rock environment
CN107642040A (en) The construction method heavy stone used as an anchor of the hollow clump of piles anchorage of super-large diameter
CN112281880A (en) Construction method of complex stratum long spiral hole-leading inserting-driving locking opening steel pipe pile cofferdam
CN210263062U (en) Anti construction structures that floats of shallow earthing subway tunnel foundation ditch earthwork excavation in pit bottom
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN110241731A (en) A method of forming rock-socketed pile foundation in seabed
CN106758759A (en) A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN201459749U (en) Stable structure for construction platform of deep water steel pipe pile
CN116043906A (en) Anchoring construction method for steel pipe pile in underwater bare rock area
CN216640561U (en) Novel combined type enclosure structure
CN110273413A (en) A kind of efficient construction method of prefabricated pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20230502