CN102312442A - Construction method of trestle steel pipe pile foundation - Google Patents

Construction method of trestle steel pipe pile foundation Download PDF

Info

Publication number
CN102312442A
CN102312442A CN201110182549A CN201110182549A CN102312442A CN 102312442 A CN102312442 A CN 102312442A CN 201110182549 A CN201110182549 A CN 201110182549A CN 201110182549 A CN201110182549 A CN 201110182549A CN 102312442 A CN102312442 A CN 102312442A
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
trestle
trestle steel
scar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201110182549A
Other languages
Chinese (zh)
Inventor
金红岩
彭建萍
范万祥
官军
陈长柏
金源晶
朱祥炬
叶绍其
赵则锋
王湘桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Co Ltd
China Railway Major Bridge Engineering Group Co Ltd MBEC
5th Engineering Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Co Ltd
China Railway Major Bridge Engineering Group Co Ltd MBEC
5th Engineering Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Co Ltd, China Railway Major Bridge Engineering Group Co Ltd MBEC, 5th Engineering Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Co Ltd
Priority to CN201110182549A priority Critical patent/CN102312442A/en
Publication of CN102312442A publication Critical patent/CN102312442A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a construction method of a trestle steel pipe pile foundation. The construction method is used for performing anchoring construction for the trestle steel pipe pile foundation on a slope bare rock surface and a shallow covered slope rock surface of the river, lake or ocean. The construction method comprises the following steps: A10) after utilizing an anchoring system to accurately position a floating pilot hole platform, respectively guiding each trestle steel pipe pile to fall onto a river bed rock surface but not perform a rock anchoring, through each reserved hole position on the floating pilot hole platform; A20) after impacting a hole to a designed depth on a foundational bed rock surface in the trestle steel pipe pile by using an impacting drill with the diameter less than the inner diameter of the trestle steel pipe pile, vibrating the trestle steel pipe pile so as to guide the trestle steel pipe pile to sink to the bottom of the hole, pouring reinforced concrete and firmly connecting the trestle steel pipe pile to the foundational rock; and A30) welding a trestle steel pipe pile connecting system, thereby finishing the construction for the trestle steel pipe pile foundation. According to the construction method, the operation of drilling the pile and steel pipe pile is adopted for construction, thereby efficiently resisting the influences of water flow, wind wave and air load and ensuring the stability and structural safety of the trestle.

Description

The job practices on trestle steel pipe pile basis
Technical field
The present invention relates to method for bridge construction, be specifically related to the job practices on trestle steel pipe pile basis, be used for carrying out trestle steel pipe pile basis anchoring construction at rivers, lake or the naked scar of deepwater inclination or shallow covering layer inclination scar.
Background technology
Along with the development of society, all kinds of bridge construction engineerings are more and more.Trestle is in the past generally all built on the thicker rivers and lake of covering layer, and under this geological conditions, the trestle foundation construction of leading to major project is general adopts traditional " halieutics " to carry out.But; There are a lot of rivers, lake and Marine Geology situation to be naked scar and the shallow covering layer inclination scar of tilting; As adopt conventional method to construct; Because the role and influence of current, stormy waves and wind load, the anchoring of mouth can't be guaranteed at the bottom of the stable and steel pipe pile on trestle basis, thereby influences the security performance of trestle and the construction speed of major project.
Because on rivers, lake and deepwater oblique scar tabula rasa rock or shallow covering layer, the foundation construction of trestle steel pipe pile can't adopt traditional inserting to beat the steel pipe pile job practices, therefore, presses for and seeks a kind of new job practices, addresses the above problem.
Summary of the invention
Technical problem to be solved by this invention is to solve the problem of how under tilt naked scar and shallow covering layer inclination scar geological conditions, to carry out trestle steel pipe pile basis anchoring construction.
In order to solve the problems of the technologies described above; The technical scheme that the present invention adopted provides the job practices on a kind of trestle steel pipe pile basis; Be used for carrying out the foundation construction of trestle steel pipe pile at rivers, lake or the naked scar of deepwater inclination or shallow covering layer inclination scar, this method may further comprise the steps:
A10, utilize anchorage system that floating pilot hole platform accurately behind the location, is fallen to the riverbed scar through each position, predetermined hole on the floating pilot hole platform with every trestle steel pipe pile respectively, but do not go into the rock anchoring;
A20, use drill hammer that diameter is slightly less than trestle steel pipe pile internal diameter in the trestle steel pipe pile to bedding scar impact holing to projected depth, at the bottom of trestle steel pipe pile vibration-sunk follow-up to hole, perfusion steel concrete makes trestle steel pipe pile and basement rock fixed;
A30, welding trestle steel pipe pile connect system and accomplish the steel pipe pile foundation construction.
In said method; In steps A 10; Said floating pilot hole platform is made up of barge and operation platform, is respectively equipped with the position, predetermined hole of a plurality of trestle steel pipe piles on the said operation platform, before the every trestle steel pipe pile that sinks; On said operation platform, leading truck is set, utilizes the verticality of leading truck control trestle steel pipe pile sinking process.
In said method, in the steps A 10, after the trestle steel pipe pile falls to the riverbed scar, remove corresponding said leading truck.
In said method, in steps A 20, after inspection trestle steel pipe pile verticality and steel pipe pile centre coordinate suitable for reading meet design requirement, pour into the anchor bar concrete again.
The present invention; According to the tilt construction characteristic of naked scar or shallow covering layer inclination scar of rivers, lake or ocean; Adopt the job practices of " drilled pile+steel pipe pile "; Can effectively resist the effect of current, stormy waves and wind load, guarantee the stable and structural safety of trestle, guarantee that oblique scar tabula rasa rock, the foundation construction of shallow covering layer trestle steel pipe pile meet the requirements.
Description of drawings
Fig. 1 floating pilot hole of the present invention platform plane arrangement diagram;
Fig. 2 floating pilot hole of the present invention platform facade arrangement diagram;
Fig. 3 floating pilot hole of the present invention platform location elevational schematic view;
Fig. 4 trestle steel pipe pile of the present invention mounting vertical plane sketch map;
Fig. 5 trestle steel pipe pile of the present invention is gone into rock follow-up elevational schematic view;
Fig. 6 trestle steel pipe pile of the present invention anchoring elevational schematic view;
It is scheme of installation that Fig. 7 trestle steel pipe pile of the present invention basis connects.
Among the figure: the 1-barge, the 2-leading truck, the 3-operation platform, the 4-anchorage system, 5-trestle steel pipe pile, the 6-crane gear, the 7-diameter is slightly less than the drill hammer of trestle steel pipe pile internal diameter, 8-anchor bar concrete, 9-trestle steel pipe pile connects system.
The specific embodiment
The invention provides the job practices on a kind of trestle steel pipe pile basis; Adopt the job practices of " drilled pile+steel pipe pile "; Can effectively resist the effect of current, stormy waves and wind load; Guarantee the stable and structural safety of trestle, guarantee that oblique scar tabula rasa rock, the foundation construction of shallow covering layer trestle steel pipe pile meet the requirements.
Below in conjunction with the specific embodiment and Figure of description the present invention is at length explained.This specific embodiment is an example with the naked scar riverbed construction of tilting.
Job practices provided by the invention may further comprise the steps:
A10, like Fig. 3, shown in Figure 4, utilize 4 pairs of floating pilot holes of anchorage system platform accurately behind the location, through each position, predetermined hole on the floating pilot hole platform every trestle steel pipe pile is fallen to the riverbed scar respectively, but does not go into the rock anchoring.
Like Fig. 1, shown in Figure 2; Floating pilot hole platform is made up of barge 1 and operation platform 3, is respectively equipped with a plurality of positions, predetermined hole that are used to install the trestle steel pipe pile on the operation platform 3, and leading truck 2 is set on operation platform 3; Use crane gear 6 that trestle steel pipe pile 5 is sling; As guiding device, 5 deadweights of trestle steel pipe pile are installed trestle steel pipe pile 5 end mouth to scar as power and are promptly stopped, and do not carry out vibration-sunk with leading truck 2; Prevent that scar from tilting to cause trestle steel pipe pile 5 along scar slippage or inclination, causes off normal.After trestle steel pipe pile 5 falls to the riverbed scar, remove corresponding leading truck 2.
A20, like Fig. 5, shown in Figure 6; Use drill hammer 7 that diameter is slightly less than trestle steel pipe pile 5 internal diameters in the trestle steel pipe pile to bedding scar impact holing to projected depth; At the bottom of trestle steel pipe pile 5 vibration-sunks follow-up to hole, perfusion steel concrete 8 makes trestle steel pipe pile 5 and basement rock fixed.Before the perfusion anchor bar concrete, need inspection trestle steel pipe pile verticality and steel pipe pile centre coordinate suitable for reading to meet design requirement.
A30, as shown in Figure 7 moves floating pilot hole platform and constructs a little to next, connects high trestle steel pipe pile 5 to design elevation and to be welded to connect be 9, accomplishes the foundation construction of trestle steel pipe pile.
The present invention is not limited to above-mentioned preferred forms, and anyone should learn the structural change of under enlightenment of the present invention, making, and every have identical or close technical scheme with the present invention, all falls within protection scope of the present invention.

Claims (4)

1. the job practices on trestle steel pipe pile basis is used for the anchoring construction on the naked scar of the inclination of rivers, lake or ocean, the enterprising broker's storehouse of shallow covering layer inclination scar bridge steel pipe pile basis, and its characteristic may further comprise the steps:
A10, utilize anchorage system that floating pilot hole platform accurately behind the location, is fallen to the riverbed scar through each position, predetermined hole on the floating pilot hole platform with every trestle steel pipe pile respectively, but do not go into the rock anchoring;
A20, use drill hammer that diameter is slightly less than trestle steel pipe pile internal diameter in the trestle steel pipe pile to bedding scar impact holing to projected depth, at the bottom of trestle steel pipe pile vibration-sunk follow-up to hole, perfusion steel concrete makes trestle steel pipe pile and basement rock fixed;
A30, welding trestle steel pipe pile connect system and accomplish the steel pipe pile foundation construction.
2. the job practices on trestle steel pipe pile as claimed in claim 1 basis; It is characterized in that in steps A 10, said floating pilot hole platform is made up of barge and operation platform; Be respectively equipped with the position, predetermined hole of a plurality of trestle steel pipe piles on the said operation platform; Before the every trestle steel pipe pile that sinks, on said operation platform, leading truck is set, utilize the verticality of leading truck control trestle steel pipe pile sinking process.
3. the job practices on trestle steel pipe pile as claimed in claim 2 basis is characterized in that, in the steps A 10, after the trestle steel pipe pile falls to the riverbed scar, removes corresponding said leading truck.
4. like the job practices on claim 1 to 3 each described trestle steel pipe pile basis, it is characterized in that, in steps A 20, after inspection trestle steel pipe pile verticality and steel pipe pile centre coordinate suitable for reading meet design requirement, pour into the anchor bar concrete again.
CN201110182549A 2011-07-01 2011-07-01 Construction method of trestle steel pipe pile foundation Pending CN102312442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201110182549A CN102312442A (en) 2011-07-01 2011-07-01 Construction method of trestle steel pipe pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110182549A CN102312442A (en) 2011-07-01 2011-07-01 Construction method of trestle steel pipe pile foundation

Publications (1)

Publication Number Publication Date
CN102312442A true CN102312442A (en) 2012-01-11

Family

ID=45425980

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110182549A Pending CN102312442A (en) 2011-07-01 2011-07-01 Construction method of trestle steel pipe pile foundation

Country Status (1)

Country Link
CN (1) CN102312442A (en)

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619206A (en) * 2012-04-06 2012-08-01 中铁二十二局集团第三工程有限公司 Foundation platform structure of bare rock and karst pile in deep water
CN102817373A (en) * 2012-08-27 2012-12-12 中铁九桥工程有限公司 Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle
CN102839681A (en) * 2012-08-31 2012-12-26 中铁三局集团有限公司 Combined steel pipe pile cofferdam used under condition of no cover layer in deep water and construction method thereof
CN102966111A (en) * 2012-12-13 2013-03-13 中铁上海工程局第二工程有限公司 Construction method for anchoring steel pipe pile on steep bare rock without covering layer in deep water and rapids
CN102979069A (en) * 2012-12-13 2013-03-20 中铁上海工程局第二工程有限公司 Bored pile platform construction method on covering-free steep bare rock in deepwater and rapid stream
CN103410098A (en) * 2013-08-20 2013-11-27 中铁二局股份有限公司 Step-by-step follow-up building method of offshore underwater steel pipe pile construction platforms
CN103898908A (en) * 2014-03-10 2014-07-02 中交一航局第三工程有限公司 Method for planting piles in seabed bare rock or shallow overburden area through balancing weights
CN104372743A (en) * 2014-10-31 2015-02-25 中铁四局集团第二工程有限公司 Rapid construction method for trestle
CN104404861A (en) * 2014-11-05 2015-03-11 中交第二航务工程局有限公司 Steel trestle provided with steel anchor pile and construction method of steel trestle
CN105297764A (en) * 2015-10-30 2016-02-03 上海勘测设计研究院有限公司 Offshore wind plant fan single pile foundation and construction method thereof
CN105544375A (en) * 2016-01-18 2016-05-04 中国铁建大桥工程局集团有限公司 Trestle anchoring structure and erecting construction method
CN105951837A (en) * 2016-05-31 2016-09-21 中铁大桥局集团第五工程有限公司 Floating guide positioning device suitable for mounting water pipe pile and application method thereof
CN106758759A (en) * 2017-02-20 2017-05-31 中铁十九局集团第七工程有限公司 A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN107034931A (en) * 2017-05-05 2017-08-11 中国葛洲坝集团第五工程有限公司 Steel-pipe pile testing apparatus for verticality and deep water steel pipe pile construction method
CN108625365A (en) * 2018-06-20 2018-10-09 湖南建工交通建设有限公司 Improve prestress and cultivation stake composite structure and the construction method of steel trestle antidumping
CN109056710A (en) * 2018-08-24 2018-12-21 中国建筑局(集团)有限公司 Hard stratum steel pipe pile and construction method thereof
CN109505245A (en) * 2018-09-28 2019-03-22 中交二航局第二工程有限公司 Ocean deepwater area shallow overburden anchoring pile form construction channel construction method
CN110241812A (en) * 2019-06-03 2019-09-17 中铁大桥局集团有限公司 A kind of drilling platform steel-pipe pile inserting piling method and leading truck component
CN110700252A (en) * 2019-10-31 2020-01-17 花王生态工程股份有限公司 Trestle structure for lake of easy construction
CN110847047A (en) * 2019-11-21 2020-02-28 中交第二航务工程局有限公司 Open sea bare rock trestle construction method
CN111305195A (en) * 2019-09-30 2020-06-19 四川公路桥梁建设集团有限公司 Construction method of trestle steel pipe pile foundation in sand gravel
CN111794115A (en) * 2020-07-22 2020-10-20 上海同罡建筑工程有限公司 Construction method of temporary buttress in water
CN112681295A (en) * 2020-12-25 2021-04-20 中铁大桥局武汉桥梁特种技术有限公司 Construction method of concrete-filled steel tube pile foundation and concrete-filled steel tube pile foundation
CN113202118A (en) * 2021-05-14 2021-08-03 山东中铁路桥工程有限公司 Double-wall steel cofferdam anchoring facility under torrent bare rock condition and preparation method
CN114045819A (en) * 2021-11-23 2022-02-15 中国十七冶集团有限公司 Construction method for steel pipe pile of threaded connection trestle
CN114370234A (en) * 2021-12-17 2022-04-19 中铁九桥工程有限公司 Bare rock riverbed steel pipe pile construction equipment and construction method
CN115652792A (en) * 2022-10-28 2023-01-31 中铁四局集团第二工程有限公司 Construction method of steel trestle bench method
CN116043906A (en) * 2022-12-07 2023-05-02 保利长大工程有限公司 Anchoring construction method for steel pipe pile in underwater bare rock area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3169911B2 (en) * 1998-11-20 2001-05-28 利根地下技術株式会社 Heavy weight type steel pipe digging and driving method using the same
CN101078211A (en) * 2007-04-23 2007-11-28 中铁大桥局集团第二工程有限公司 Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof
CN101173515A (en) * 2007-11-29 2008-05-07 中铁大桥局股份有限公司 Steel pipe pile foundation built by planting steel stick and building method thereof
CN102086754A (en) * 2010-12-31 2011-06-08 中铁港航工程局有限公司 Deepwater drilling method
CN201857618U (en) * 2010-11-11 2011-06-08 四川路桥桥梁工程有限责任公司 Floating guide platform and steel casing supported drilling platform deepwater pile foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3169911B2 (en) * 1998-11-20 2001-05-28 利根地下技術株式会社 Heavy weight type steel pipe digging and driving method using the same
CN101078211A (en) * 2007-04-23 2007-11-28 中铁大桥局集团第二工程有限公司 Underwater anchorage system auxiliary wooden stool structure platform and construction method thereof
CN101173515A (en) * 2007-11-29 2008-05-07 中铁大桥局股份有限公司 Steel pipe pile foundation built by planting steel stick and building method thereof
CN201857618U (en) * 2010-11-11 2011-06-08 四川路桥桥梁工程有限责任公司 Floating guide platform and steel casing supported drilling platform deepwater pile foundation
CN102086754A (en) * 2010-12-31 2011-06-08 中铁港航工程局有限公司 Deepwater drilling method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李成钢: "裸岩地质钢栈桥施工技术", 《中国房地产业》, no. 2, 28 February 2011 (2011-02-28) *

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619206A (en) * 2012-04-06 2012-08-01 中铁二十二局集团第三工程有限公司 Foundation platform structure of bare rock and karst pile in deep water
CN102817373A (en) * 2012-08-27 2012-12-12 中铁九桥工程有限公司 Construction process for blasting artificial cover layer of steel tube pile foundation of high trestle
CN102839681A (en) * 2012-08-31 2012-12-26 中铁三局集团有限公司 Combined steel pipe pile cofferdam used under condition of no cover layer in deep water and construction method thereof
CN102966111A (en) * 2012-12-13 2013-03-13 中铁上海工程局第二工程有限公司 Construction method for anchoring steel pipe pile on steep bare rock without covering layer in deep water and rapids
CN102979069A (en) * 2012-12-13 2013-03-20 中铁上海工程局第二工程有限公司 Bored pile platform construction method on covering-free steep bare rock in deepwater and rapid stream
CN102966111B (en) * 2012-12-13 2016-01-27 中铁上海工程局集团第二工程有限公司 A kind of steel pipe pile anchoring construction method in deep water torrent intectate steep bare rock
CN103410098A (en) * 2013-08-20 2013-11-27 中铁二局股份有限公司 Step-by-step follow-up building method of offshore underwater steel pipe pile construction platforms
CN103410098B (en) * 2013-08-20 2015-08-05 中铁二局股份有限公司 The substep follow-up building method of steel pipe pile operation platform in offshore water
CN103898908A (en) * 2014-03-10 2014-07-02 中交一航局第三工程有限公司 Method for planting piles in seabed bare rock or shallow overburden area through balancing weights
CN104372743B (en) * 2014-10-31 2016-05-18 中铁四局集团第二工程有限公司 Trestle rapid constructing method
CN104372743A (en) * 2014-10-31 2015-02-25 中铁四局集团第二工程有限公司 Rapid construction method for trestle
CN104404861A (en) * 2014-11-05 2015-03-11 中交第二航务工程局有限公司 Steel trestle provided with steel anchor pile and construction method of steel trestle
CN105297764A (en) * 2015-10-30 2016-02-03 上海勘测设计研究院有限公司 Offshore wind plant fan single pile foundation and construction method thereof
CN105297764B (en) * 2015-10-30 2017-09-22 上海勘测设计研究院有限公司 Marine wind electric field fan single-pile foundation and its construction method
CN105544375A (en) * 2016-01-18 2016-05-04 中国铁建大桥工程局集团有限公司 Trestle anchoring structure and erecting construction method
CN105951837A (en) * 2016-05-31 2016-09-21 中铁大桥局集团第五工程有限公司 Floating guide positioning device suitable for mounting water pipe pile and application method thereof
CN106758759A (en) * 2017-02-20 2017-05-31 中铁十九局集团第七工程有限公司 A kind of trestle pile foundation and its anchoring process for deep water drift net riverbed
CN107034931A (en) * 2017-05-05 2017-08-11 中国葛洲坝集团第五工程有限公司 Steel-pipe pile testing apparatus for verticality and deep water steel pipe pile construction method
CN108625365A (en) * 2018-06-20 2018-10-09 湖南建工交通建设有限公司 Improve prestress and cultivation stake composite structure and the construction method of steel trestle antidumping
CN109056710A (en) * 2018-08-24 2018-12-21 中国建筑局(集团)有限公司 Hard stratum steel pipe pile and construction method thereof
CN109505245A (en) * 2018-09-28 2019-03-22 中交二航局第二工程有限公司 Ocean deepwater area shallow overburden anchoring pile form construction channel construction method
CN110241812A (en) * 2019-06-03 2019-09-17 中铁大桥局集团有限公司 A kind of drilling platform steel-pipe pile inserting piling method and leading truck component
CN111305195A (en) * 2019-09-30 2020-06-19 四川公路桥梁建设集团有限公司 Construction method of trestle steel pipe pile foundation in sand gravel
CN110700252A (en) * 2019-10-31 2020-01-17 花王生态工程股份有限公司 Trestle structure for lake of easy construction
CN110847047B (en) * 2019-11-21 2021-11-26 中交二航局第一工程有限公司 Open sea bare rock trestle construction method
CN110847047A (en) * 2019-11-21 2020-02-28 中交第二航务工程局有限公司 Open sea bare rock trestle construction method
CN111794115A (en) * 2020-07-22 2020-10-20 上海同罡建筑工程有限公司 Construction method of temporary buttress in water
CN112681295A (en) * 2020-12-25 2021-04-20 中铁大桥局武汉桥梁特种技术有限公司 Construction method of concrete-filled steel tube pile foundation and concrete-filled steel tube pile foundation
CN113202118A (en) * 2021-05-14 2021-08-03 山东中铁路桥工程有限公司 Double-wall steel cofferdam anchoring facility under torrent bare rock condition and preparation method
CN114045819A (en) * 2021-11-23 2022-02-15 中国十七冶集团有限公司 Construction method for steel pipe pile of threaded connection trestle
CN114370234A (en) * 2021-12-17 2022-04-19 中铁九桥工程有限公司 Bare rock riverbed steel pipe pile construction equipment and construction method
CN115652792A (en) * 2022-10-28 2023-01-31 中铁四局集团第二工程有限公司 Construction method of steel trestle bench method
CN115652792B (en) * 2022-10-28 2023-12-22 中铁四局集团有限公司 Construction method of steel trestle bench method
CN116043906A (en) * 2022-12-07 2023-05-02 保利长大工程有限公司 Anchoring construction method for steel pipe pile in underwater bare rock area

Similar Documents

Publication Publication Date Title
CN102312442A (en) Construction method of trestle steel pipe pile foundation
US10267008B2 (en) Offshore non-driven-in large-diameter monopile foundation structure and construction method
CN102953341B (en) A kind of high-order trestle work structure be arranged in deep water torrent intectate steep bare rock
CN102071690B (en) Offshore self-elevating drilling platform pile pitching and pile pulling automatic control device and method
CN103362113B (en) Offshore wind farm, bridge and marine works local buoyancy ocean platform and construction method
CN102979069A (en) Bored pile platform construction method on covering-free steep bare rock in deepwater and rapid stream
CN102966111B (en) A kind of steel pipe pile anchoring construction method in deep water torrent intectate steep bare rock
CN102979039B (en) Elevated trestle bridge construction method on covering-free steep bare rock in deepwater and rapid stream
CN102383436B (en) Accurate positioning construction method of double-wall steel cofferdam
CN102953362A (en) Bored pile platform built on non-covering steep bare rocks in deep rapids
CN101200898A (en) Construction method of drilling pile base for bare rock and shallow overburden
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN102995651B (en) Gravity-type onshore/offshore wind turbine foundation with anchor rod
CN201865111U (en) Automatic pile inserting and pulling control device of seaborne self-elevating type drilling platform
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN114855865A (en) Tensioning type fan foundation anchored on rock-based seabed and arrangement method
CN106759432A (en) A kind of construction method of offshore wind farm super-large diameter piling bar
CN110241731A (en) A method of forming rock-socketed pile foundation in seabed
CN200958209Y (en) Base construction equipment at deep-water torrent
CN104912093A (en) Deepwater pile foundation positioning and guiding structure and construction method
CN104153366B (en) The method of a kind of marine high wind wave high strength naked rock steel pipe pile foundation
CN202989949U (en) Steel casing fixing structure on steep bare rock without covering layer in deep water and rapids
CN217870596U (en) Tensioning type fan foundation anchored on foundation seabed
CN102979090A (en) Construction method for fixing steel casing on covering-free steep bare rock in deepwater and rapid stream
CN212715000U (en) Steel cofferdam positioning system in deep water

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120111