CN115929040A - Side wall construction method for improving horizontal construction joint - Google Patents

Side wall construction method for improving horizontal construction joint Download PDF

Info

Publication number
CN115929040A
CN115929040A CN202211633759.4A CN202211633759A CN115929040A CN 115929040 A CN115929040 A CN 115929040A CN 202211633759 A CN202211633759 A CN 202211633759A CN 115929040 A CN115929040 A CN 115929040A
Authority
CN
China
Prior art keywords
side wall
pouring
middle plate
steel bars
construction joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211633759.4A
Other languages
Chinese (zh)
Inventor
张�杰
赵钟旺
高正强
王祥庆
张鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Third Construction Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Third Construction Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN202211633759.4A priority Critical patent/CN115929040A/en
Publication of CN115929040A publication Critical patent/CN115929040A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a side wall construction method for improving a horizontal construction joint, which comprises the following steps: step one, installing side wall reinforcing steel bars at the position of a side wall; step two, after the side wall reinforcing steel bars are installed, installing a middle plate template, and synchronously pouring a middle plate and a side wall foundation, wherein the bottom ends of the side wall reinforcing steel bars are embedded in the side wall foundation; thirdly, after the middle plate is cast and molded, erecting a side wall template system on the middle plate, wherein the bottom of the inner side of the side wall template system is in contact with the middle plate, and the thickness of a wall protection layer is reserved between the side wall template system and the side wall foundation; and fourthly, after the side wall template system is erected, starting to pour the side wall body, finishing pouring of the side wall body at one time, and dismantling the side wall template system after pouring forming. Under the condition of not changing the stress of the structure, the invention greatly improves the aesthetic degree, avoids the phenomenon of chromatic aberration of the wall body, and avoids the problem of easy water leakage of the position of the construction joint because the construction joint is coated inside the side wall, thereby ensuring the construction quality.

Description

Side wall construction method for improving horizontal construction joint
Technical Field
The invention belongs to the technical field of building construction, and particularly relates to a side wall construction method for improving a horizontal construction joint.
Background
The construction joint refers to a joint formed between the concrete poured before and after the concrete is poured in sections due to design requirements or construction requirements in the concrete pouring process. The construction joint is not a real existing joint, and only because the initial setting time of the first poured concrete is longer than the initial setting time, a joint surface exists between the first poured concrete and the later poured concrete, and the joint surface is called as the construction joint. In the existing subway side wall construction method, in order to ensure the structural stress, a side wall foundation is synchronously cast when a bottom plate or a middle plate is cast, the height is about 300-500mm, then a side wall body is cast on the side wall foundation, and the bottom of a side wall template is aligned and fixed with a construction joint during casting.
The existing construction method has the following technical problems: 1. the hidden danger of water leakage is easily generated at the position of the construction joint, and the construction quality is influenced; 2. after the side wall foundation is poured for a period of time, the wall body is poured, and the concrete of the foundation part and the wall body is easy to generate color difference and has poor attractiveness; 3. when the wall body is poured, an integral large steel mould is adopted, the bottom of the template is difficult to be tightly jointed with the side surface of the side wall foundation, the construction difficulty is high, deviation is easy to generate, the problems of slurry leakage and the like are caused during pouring, and the phenomena of slab staggering, pitted surface and the like are caused at the position of a construction joint; 4. the traditional construction mode needs to carry out manual cooperation machinery joint cutting earlier to side wall basis chisel hair, and the work progress is loaded down with trivial details complicacy.
Disclosure of Invention
The invention provides a side wall construction method for improving a horizontal construction joint, which aims to solve the problems in the prior art.
The invention provides a construction method for improving a side wall construction joint, which comprises the following steps:
step one, installing side wall reinforcing steel bars
Installing side wall reinforcing steel bars at the positions of the side walls;
step two, pouring the middle plate
After the side wall reinforcing steel bars are installed, installing a middle plate template, and synchronously pouring a middle plate and a side wall foundation, wherein the bottom ends of the side wall reinforcing steel bars are embedded in the side wall foundation;
step three, erecting a side wall template system
After the middle plate is cast and molded, erecting a side wall template system on the middle plate, wherein the bottom of the inner side of the side wall template system is in contact with the middle plate, and the thickness of a wall protection layer is reserved between the side wall template system and the side wall foundation;
step four, pouring the side wall body
And after the side wall template system is erected, starting to pour the side wall body, finishing pouring the side wall body at one time, removing the side wall template system after pouring and forming, and finishing construction.
Furthermore, in the third step, the side wall formwork system comprises a triangular support and a pouring formwork, the pouring formwork is fixed on the inner side of the triangular support, and a main keel and a secondary keel for reinforcement are fixedly arranged between the triangular support and the pouring formwork;
and the bottom end surface of the pouring template is in contact with the middle plate, and the thickness of the wall body protective layer is reserved between the inner side surface and the side wall foundation.
Furthermore, the triangular support is fixed on the middle plate through foundation bolts.
Furthermore, in the second step, a water stop belt is buried at the position of the construction joint during pouring.
Further, the waterstop is a steel-edged rubber waterstop.
Further, in the third step, after the pouring of the middle plate and the side wall foundation is completed, roughening is performed on the position of the construction joint, and floating slurry on the top and the side of the side wall foundation is removed at one time.
Furthermore, in the second step, horizontal positioning steel bars are welded on the side wall steel bars, and the positioning steel bars are used for positioning the side wall formwork system.
The invention has the advantages and positive effects that:
1. according to the side wall construction method for improving the horizontal construction joint, the bottom of the pouring template is in contact with the middle plate during pouring, the poured wall body covers the construction joint, the inner side of the side wall is a flat end face, under the condition that the structural stress is not changed, the attractiveness is greatly improved, the phenomenon of chromatic aberration of the wall body is avoided, the construction joint is coated inside the side wall, the problem that the position of the construction joint is easy to leak water is avoided, and great guarantee is brought to the construction quality.
2. According to the side wall construction method for improving the horizontal construction joint, the pouring template is directly fixed on the middle plate during pouring, the top of the wall root foundation does not need to be aligned, the construction difficulty is small, deviation of the template does not occur, the problem of slurry leakage in the pouring process is solved, the phenomena of slab staggering and pitted surface are avoided, and the smoothness and the attractiveness of the wall surface are ensured.
3. According to the side wall construction method for improving the horizontal construction joint, secondary manual line snapping and joint cutting are not needed after the side wall foundation is poured, so that the linear shape of the construction joint and the installation precision of a side wall template are guaranteed, the construction steps are greatly simplified, the construction efficiency is improved, and the construction cost is saved.
4. According to the side wall construction method for improving the horizontal construction joint, the casting template is quickly and accurately positioned by arranging the positioning steel bars, and construction is facilitated.
Drawings
FIG. 1 is a flow chart of the steps of the present invention;
FIG. 2 is a schematic view of the construction of the present invention.
In the figure, 1 is a side wall body, 2 is a pouring template, 3 is a triangular support, 4 is a side wall foundation, and 5 is a middle plate.
Detailed Description
The present invention will be described in more detail with reference to the accompanying drawings.
The invention provides a side wall construction method for improving a horizontal construction joint, which comprises the following steps:
step one, installing side wall reinforcing steel bars
Installing side wall steel bars at the position of the side wall;
step two, pouring the middle plate 5
After the side wall steel bars are installed, installing a middle plate 5 template, and synchronously pouring a middle plate 5 and a side wall foundation 4, wherein the bottom ends of the side wall steel bars are embedded in the side wall foundation 4;
embedding a water stop belt at the position of a construction joint during pouring; the water stop is a steel-edged rubber water stop, and the width of the water stop is 35cm;
welding horizontal positioning steel bars on the side wall steel bars, wherein the positioning steel bars are used for positioning the side wall template system; the outer end of the positioning steel bar is abutted against the inner side of the pouring template 2 and used for limiting the thickness of the wall protective layer;
step three, erecting a side wall template system
After the middle plate 5 is cast and molded, erecting a side wall template system on the middle plate 5, wherein the bottom of the inner side of the side wall template system is in contact with the middle plate 5, and the thickness of a wall protection layer is reserved between the side wall template system and the side wall foundation 4; after the middle plate 5 is poured, roughening the positions of the construction joints, and chiseling out floating slurry on the top and the side surfaces of the side wall foundation 4 without manual secondary joint cutting; when pouring, the pouring template 2 is directly abutted against the middle plate 5, alignment with the top of the side wall foundation 4 is not needed, construction difficulty is small, deviation does not occur in template installation, the problem of slurry leakage in the pouring process is solved, slab staggering and pitted surface phenomena are avoided, and the smooth and attractive wall surface is ensured;
the side wall template system comprises a triangular support 3 and a pouring template 2, the pouring template 2 is fixed on the inner side of the triangular support 3, and a main keel and a secondary keel for reinforcement are fixedly arranged between the triangular support 3 and the pouring template 2; two 8 multiplied by 10 multiplied by 20cm square timbers are adopted as a pouring template 2; the bottom end face of the pouring template 2 is in contact with the middle plate 5, and the thickness of a wall body protection layer is reserved between the inner side face of the pouring template and the side wall foundation 4. The triangular bracket 3 is fixed on the middle plate 5 through foundation bolts, and the foundation bolts are installed at positions 125cm away from the side wall body; when the wall body protective layer is installed, the inner side of the pouring template 2 abuts against the outer end of the positioning steel bar and is used for limiting the thickness of the wall body protective layer;
step four, pouring the side wall body 1
After the side wall formwork system is erected, the side wall body 1 begins to be poured, the side wall body 1 is poured at one time, the side wall formwork system is dismantled after pouring forming, and construction is finished.
According to the invention, the bottom of the pouring template is in contact with the middle plate during pouring, the construction joint is covered by the poured wall body, the inner side of the side wall is a flat end surface, under the condition of not changing the structural stress, the attractiveness is greatly improved, the phenomenon of chromatic aberration of the wall body is avoided, the construction joint is covered in the side wall, the problem of easy water leakage of the construction joint position is avoided, and the construction quality is greatly guaranteed.
It should be understood that the above examples are only for clarity of illustration and are not intended to limit the embodiments. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. This need not be, nor should it be exhaustive of all embodiments. And obvious variations or modifications of the invention may be made without departing from the spirit or scope of the invention.

Claims (7)

1. A side wall construction method for improving a horizontal construction joint is characterized by comprising the following steps:
step one, installing side wall steel bars
Installing side wall reinforcing steel bars at the positions of the side walls;
step two, pouring the middle plate (5)
After the side wall steel bars are installed, installing a middle plate (5) template, and synchronously pouring a middle plate (5) and a side wall foundation (4), wherein the bottom ends of the side wall steel bars are embedded in the side wall foundation (4);
step three, erecting a side wall template system
After the middle plate (5) is poured and molded, erecting a side wall template system on the middle plate (5), wherein the bottom of the inner side of the side wall template system is in contact with the middle plate (5), and the thickness of a wall protection layer is reserved between the side wall template system and the side wall foundation (4);
step four, pouring side wall body (1)
After the side wall formwork system is erected, the side wall body (1) begins to be poured, the side wall body (1) is poured at one time, the side wall formwork system is detached after pouring forming, and construction is finished.
2. The side wall construction method for improving the horizontal construction joint according to claim 1, wherein in the third step, the side wall formwork system comprises a triangular support (3) and a pouring formwork (2), the pouring formwork (2) is fixed on the inner side of the triangular support (3), and a main keel and a secondary keel for reinforcement are fixedly arranged between the triangular support (3) and the pouring formwork (2);
the bottom end face of the pouring template (2) is in contact with the middle plate (5), and the thickness of a wall body protective layer is reserved between the inner side face of the pouring template and the side wall foundation (4).
3. The side wall construction method for improving a horizontal construction joint according to claim 2, wherein the triangular bracket (3) is fixed on the middle plate (5) by anchor bolts.
4. The method for constructing the side wall for improving the horizontal construction joint according to claim 1, wherein in the second step, a water stop is buried at the construction joint during pouring.
5. The side wall construction method for improving the horizontal construction joint according to claim 4, wherein the water stop is a steel-edged rubber water stop.
6. The side wall construction method for improving the horizontal construction joint according to claim 1, wherein in the third step, after the middle plate (5) and the side wall foundation (4) are poured, the construction joint is roughened, and the laitance on the top and the side of the side wall foundation (4) is removed once.
7. The method for constructing the side wall for improving the horizontal construction joint according to claim 1, wherein in the second step, horizontal positioning steel bars are welded on the side wall steel bars, and the positioning steel bars are used for positioning the side wall formwork system.
CN202211633759.4A 2022-12-19 2022-12-19 Side wall construction method for improving horizontal construction joint Pending CN115929040A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211633759.4A CN115929040A (en) 2022-12-19 2022-12-19 Side wall construction method for improving horizontal construction joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211633759.4A CN115929040A (en) 2022-12-19 2022-12-19 Side wall construction method for improving horizontal construction joint

Publications (1)

Publication Number Publication Date
CN115929040A true CN115929040A (en) 2023-04-07

Family

ID=86697585

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211633759.4A Pending CN115929040A (en) 2022-12-19 2022-12-19 Side wall construction method for improving horizontal construction joint

Country Status (1)

Country Link
CN (1) CN115929040A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101265704A (en) * 2008-04-28 2008-09-17 天津市建工工程总承包有限公司 Underground cast-in-place concrete structure outer wall neck construction method
CN102912984A (en) * 2012-10-31 2013-02-06 中冶天工上海十三冶建设有限公司 Construction method of invisible construction joint of concrete external wall
CN110607805A (en) * 2019-08-15 2019-12-24 国网江苏省电力工程咨询有限公司 Cable tunnel construction method
CN112411627A (en) * 2020-11-11 2021-02-26 上海宝冶集团有限公司 Construction method for eliminating construction joint stubbles on inner side of outer wall of underground structure
CN114059585A (en) * 2021-12-01 2022-02-18 中建八局深圳科创发展有限公司 Construction method of unilateral aluminum mould of subway side wall tripod

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101265704A (en) * 2008-04-28 2008-09-17 天津市建工工程总承包有限公司 Underground cast-in-place concrete structure outer wall neck construction method
CN102912984A (en) * 2012-10-31 2013-02-06 中冶天工上海十三冶建设有限公司 Construction method of invisible construction joint of concrete external wall
CN110607805A (en) * 2019-08-15 2019-12-24 国网江苏省电力工程咨询有限公司 Cable tunnel construction method
CN112411627A (en) * 2020-11-11 2021-02-26 上海宝冶集团有限公司 Construction method for eliminating construction joint stubbles on inner side of outer wall of underground structure
CN114059585A (en) * 2021-12-01 2022-02-18 中建八局深圳科创发展有限公司 Construction method of unilateral aluminum mould of subway side wall tripod

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
石雷等: "轨道交通土建工程质量标准化管理实践", 31 January 2022, 北京:中国建材工业出版社, pages: 133 *

Similar Documents

Publication Publication Date Title
CN100469995C (en) Construction method for after-pouring band beam-slab template
CN110863507A (en) Integrated prefabricated base component additionally provided with elevator, forming die and using method
CN114263275B (en) Construction method for same-layer construction of high-rise assembled steel structure-core tube
CN113481944B (en) Construction method of dam surface hole connection girder supporting structure
CN112627034A (en) Synchronous construction method for turning over mold of high pier of bridge
CN116674079A (en) Construction method of prefabricated small box girder
CN210563437U (en) Structure for pouring concrete through opening in side wall of steel pipe column
CN115929040A (en) Side wall construction method for improving horizontal construction joint
CN109881699B (en) Method for molding and installing concrete tire of assembled tongue-and-groove Miller type universal raft foundation
CN115324249B (en) Full-prefabricated kitchen and bathroom floor slab and inverse sill integral pouring construction method
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN214220178U (en) Prefabricated disassembly-free side mold and adjustable supporting system for one-step molding of floor water retaining strip
CN112647469B (en) Construction method of self-waterproof water channel structure with complex section
CN214364434U (en) Assembled constructional column suitable for prefabricated wallboard of frame construction
CN210887323U (en) Connect and build engineering underground structure construction joint watertight fittings
CN112459474A (en) Method for supporting single post of post-cast strip PVC pipe mould plain concrete
CN110748221A (en) Prefabricated assembled pond guide wall
CN110185254A (en) A kind of Combined aluminum alloy template system and its application method
CN219450806U (en) Reinforced structure of retaining wall steel form
CN117127483B (en) Modularized construction bridge structure and construction process
CN215405915U (en) Dam surface hole connection girder supporting structure
CN214143331U (en) UHPC that concreting pier was used exempts from form removal template
CN115419190B (en) Construction method of cast-in-place concrete combined structure of superposed wall
CN216342177U (en) Assembled cover arch for tunnel reinforcement and tunnel reinforcement structure
CN216042609U (en) Superimposed sheet post-cast strip structure based on assembly of aluminum mould system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination