CN115370052A CN202211088482.1A CN202211088482A CN115370052A CN 115370052 A CN115370052 A CN 115370052A CN 202211088482 A CN202211088482 A CN 202211088482A CN 115370052 A CN115370052 A CN 115370052A
Authority
CN
China
Prior art keywords
installation
pipe
curtain wall
mounting
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211088482.1A
Other languages
Chinese (zh)
Other versions
CN115370052B (en
Inventor
吴锡良
任伟
张康
吴继华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Lingyun Hongda Curtain Wall Engineering Co ltd
Original Assignee
Beijing Lingyun Hongda Curtain Wall Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Lingyun Hongda Curtain Wall Engineering Co ltd filed Critical Beijing Lingyun Hongda Curtain Wall Engineering Co ltd
Priority to CN202211088482.1A priority Critical patent/CN115370052B/en
Publication of CN115370052A publication Critical patent/CN115370052A/en
Application granted granted Critical
Publication of CN115370052B publication Critical patent/CN115370052B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/967Details of the cross-section of the mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/02Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials
    • E04C2/04Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres
    • E04C2/041Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by specified materials of concrete or other stone-like material; of asbestos cement; of cement and other mineral fibres composed of a number of smaller elements, e.g. bricks, also combined with a slab of hardenable material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2002/001Mechanical features of panels
    • E04C2002/004Panels with profiled edges, e.g. stepped, serrated
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2002/005Appearance of panels
    • E04C2002/007Panels with the appearance of a brick wall

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Finishing Walls (AREA)

Abstract

The application relates to an aluminum pipe small ceramic brick curtain wall system and a construction method thereof, belonging to the technical field of ceramic brick curtain walls, wherein the aluminum pipe small ceramic brick curtain wall system comprises unit ceramic bricks and installation pipes, wherein the installation pipes are arranged on the outer side of a main body structure in an array manner along the vertical direction, and the unit ceramic brick array is arranged between adjacent installation pipes; connecting components are respectively arranged at two ends of the unit ceramic bricks; the connecting assembly comprises a clamping seat, mounting grooves are formed in two ends of each unit ceramic brick, and the clamping seat slides in the mounting grooves and is used for matching with the subsequent mounting of the unit ceramic bricks; the mode that unit ceramic brick was inserted through controlling the cover is installed on the installation pipe, and the adjacent cassette of messenger's installation pipe both sides is lock on the installation pipe to the slide adjusting cassette, and connects on the installation pipe through the bolt, and this application has when ceramic brick curtain wall unit appears damaging in the use, easily dismantles the effect of replacement to it.

Description

Aluminum pipe small ceramic brick curtain wall System and construction method thereof
Technical Field
The application relates to a ceramic brick the technical field of curtain walls is that, in particular to an aluminum pipe small ceramic brick curtain wall system and a construction method thereof.
Background
The ceramic brick curtain wall has the characteristics of difficult fading, smooth surface, strong natural smell, no pollution and the like, and is favored in building construction engineering.
At present, the ceramic brick curtain wall is mainly constructed by a construction method of dry hanging the curtain wall, and specifically, after a dry hanging connecting piece is pre-buried on an outer wall of a main body structure, an installation frame is arranged on the outer wall of the main body structure and comprises a plurality of vertical keels and a plurality of horizontal keels, the horizontal keels are connected on the vertical keels through bolts, and the vertical keels are connected on the dry hanging connecting piece through bolts. Then according to the construction sequence from top to bottom or from bottom to top, and ceramic brick curtain wall units are sequentially installed on the horizontal keels through bolts.
However, in the prior art, if the ceramic brick curtain wall unit is damaged during use, since the ceramic brick curtain wall unit is installed on the horizontal keel of the installation frame, and after the installation, the distance between the adjacent ceramic brick curtain wall units in the vertical direction is too small, so that the ceramic brick curtain wall units are not easy to disassemble and replace.
Disclosure of Invention
In order to easily disassemble and replace a ceramic brick curtain wall unit when the ceramic brick curtain wall unit is damaged in the using process, the application provides the aluminum pipe small ceramic brick curtain wall system and the construction method thereof.
In a first aspect, the present application provides an aluminum tube small ceramic tile curtain wall system, the following technical scheme is adopted:
an aluminum pipe small ceramic brick curtain wall system comprises unit ceramic bricks and installation pipes, the installation pipes are arranged on the outer side of the main body structure in an array mode along the vertical direction, and the unit ceramic tile arrays are arranged between the adjacent installation pipes; connecting components are respectively arranged at two ends of the unit ceramic bricks; the connecting assembly comprises a clamping seat, mounting grooves are formed in two ends of each unit ceramic brick, and the clamping seat slides in the mounting grooves and is used for matching with subsequent mounting of the unit ceramic bricks; the unit ceramic bricks are installed on the installation pipe in a mode of inserting the unit ceramic bricks through the left sleeve and the right sleeve, and the adjacent clamping seats on the two sides of the installation pipe are buckled on the installation pipe in a sliding adjusting mode and are connected on the installation pipe through bolts.
By adopting the technical scheme, the connecting assembly is moved on the mounting groove, and the unit ceramic bricks are mounted on the mounting pipe in a left-right sleeving and inserting mode, so that after the adjacent clamping seats on the two sides of the mounting pipe are buckled on the mounting pipe, the connecting assembly is connected on the mounting pipe through the bolts, and the unit ceramic bricks are mounted easily; meanwhile, when the unit ceramic bricks are damaged in the using process, because the unit ceramic bricks are not connected with the horizontal structure through bolts after being lapped on the horizontal structure, operators can dismantle the bolts on the installation pipes outdoors and indoors, through the opposite operation flow of inserting with controlling the cover, can realize the dismantlement of unit ceramic brick, when unit ceramic brick replaces, only need once more operate the installation flow can, easily dismantle the replacement to the unit ceramic brick of damage.
Optionally, the clamping seats are fixed with fasteners, the fasteners on the adjacent clamping seats at two sides of the mounting pipe are provided with C-shaped pieces at one side and clamping plate pieces at the other side, C type spare lock is on the installation pipe, and splint spare lock is on C type spare, and the bolt runs through splint spare and C type spare respectively after with installation pipe threaded connection.
Through adopting above-mentioned technical scheme, because the buckling piece on the adjacent cassette of installation pipe both sides is C type spare and splint piece respectively for C type spare lies in the installation pipe lock after, the splint piece can directly centre gripping C type spare outside, and through the bolt with buckling piece composite mounting on the installation pipe, make coupling assembling change in the installation of connecting on the installation pipe.
Optionally, the connecting assembly further comprises overlapping plates, and the overlapping plates are mounted at the upper end and the lower end of the clamping seat through bolts and respectively and slidably overlapped on the upper side and the lower side of the unit ceramic brick.
Through adopting above-mentioned technical scheme, the setting of overlap joint board can carry on spacingly to the cassette in the mounting groove in vertical direction, avoids the cassette to deviate from unit ceramic brick by vertical direction, simultaneously because the overlap joint board passes through the bolt to be connected with the cassette for the replacement can be dismantled on unit ceramic brick to overlap joint board and cassette.
Optionally, be fixed with the stopper on the unit ceramic brick, the stopper is located the notch department of mounting groove, and when the cassette slided to the mounting groove notch, cassette and stopper butt.
Through adopting above-mentioned technical scheme, the setting of stopper can be spacing along the gliding cassette of unit ceramic brick length trend in the mounting groove, avoids the cassette to deviate from the unit by the horizontal direction and has made pottery commentaries on classics.
Optionally, a first clamping groove is formed in the mounting pipe, the first clamping groove is arranged in the vertical direction, and the bolt penetrating through the buckling piece is in threaded connection with the mounting pipe through the first clamping groove.
Through adopting above-mentioned technical scheme, the setting of first draw-in groove for the bolt that runs through the buckling piece can receive the direction when carrying out threaded connection with the installation pipe, and the bolt of being convenient for is connected with the installation pipe.
Optionally, the buckling piece is provided with an installation bulge, the installation bulge is located on the inner side of the C-shaped piece, and when the C-shaped piece is buckled on the installation pipe, the installation bulge is clamped in the first clamping groove.
Through adopting above-mentioned technical scheme, because inboard installation arch is gone up to C type fastener when C type fastener lock is on the installation pipe, can inlay card in first draw-in groove for C type fastener can be more stable install on the installation pipe.
Optionally, a second clamping groove is arranged on the buckling piece, corresponds to the mounting protrusion and is arranged on the outer side of the C-shaped piece, after the bolt runs through the splint piece, run through C type spare and installation pipe threaded connection through the second draw-in groove.
Through adopting above-mentioned technical scheme, the setting of second draw-in groove for the bolt that runs through splint buckling piece can receive the direction when carrying out threaded connection with the installation pipe, and the bolt of being convenient for is connected with C type buckling piece.
Alternatively to this, the first and second parts may, the unit ceramic bricks are hollow ceramic bricks.
Through adopting above-mentioned technical scheme, because unit ceramic tile is fretwork ceramic tile, can reduce the whole dead weight of the little ceramic tile curtain wall system of aluminum pipe to reduce the load applied to major structure.
Optionally, the mounting pipe is an aluminum alloy pipe with a surface subjected to rust prevention treatment.
In a second aspect, the application provides a construction method of an aluminum pipe small ceramic brick curtain wall system, which adopts the following technical scheme:
a construction method of an aluminum pipe small ceramic brick curtain wall system comprises the following steps:
s1, arranging installation pipes on the outer side of a main body structure in an array manner;
s2, mounting a connecting assembly on the unit ceramic tile;
s3, installing the unit ceramic bricks between the adjacent installation pipes;
s4, mounting the connecting assembly on the mounting pipe through bolts;
and S5, repeating the steps S3 to S4 until the aluminum pipe small ceramic brick curtain wall system is completely installed on the main body structure.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the connecting assembly is moved on the mounting groove, the unit ceramic bricks are mounted on the mounting pipe in a left-right sleeving and inserting mode, after the adjacent clamping seats on the two sides of the mounting pipe are buckled on the mounting pipe, the connecting assembly is connected on the mounting pipe through bolts, and therefore the unit ceramic bricks are mounted easily; meanwhile, when the unit ceramic bricks are damaged in the using process, the unit ceramic bricks are connected with the horizontal structure through bolts after being not overlapped on the horizontal structure, so that an operator can detach the bolts on the mounting pipe outdoors and indoors and can detach the unit ceramic bricks through the operation flow opposite to the left and right sleeving and inserting, when the unit ceramic bricks are replaced, the dismounting and replacement of the damaged unit ceramic bricks can be easily carried out only by operating the mounting flow again;
2. the buckling pieces on the adjacent clamping seats on the two sides of the mounting pipe are respectively a C-shaped piece and a clamping plate piece, so that after the C-shaped piece is buckled on the mounting pipe, the clamping plate piece can directly clamp the outer side of the C-shaped piece, and the buckling pieces are combined and mounted on the mounting pipe through bolts, so that the connecting assembly is easier to connect and mount on the mounting pipe;
3. because the unit ceramic bricks are hollow ceramic bricks, the whole dead weight of the aluminum pipe small ceramic brick curtain wall system can be reduced, and the load applied to the main body structure is reduced.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is an exploded view highlighting the connection assembly;
FIG. 3 is a top cross-sectional view of the installation of the highlighted fastener on the installation tube;
FIG. 4 is an exploded view of the mating fastener of the highlighting connector assembly installed on the mounting tube.
Description of the reference numerals: 1. unit ceramic bricks; 11. mounting grooves; 12. a limiting block; 2. installing a pipe; 21. a first card slot; 3. a connection assembly; 31. a card holder; 32. a lap plate; 4. a fastener; 41. mounting a boss; 42. a second card slot.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses little earthenware brick curtain system of aluminum pipe.
Referring to fig. 1, the aluminum pipe small ceramic brick curtain wall system comprises a plurality of groups of unit ceramic bricks 1 and a plurality of installation pipes 2, wherein the installation pipes 2 are arranged in the vertical direction, and are arranged outside a main body structure in an array manner. Each group of unit ceramic bricks 1 are respectively arranged between the adjacent mounting pipes 2, the single unit ceramic bricks 1 are arranged along the horizontal direction and are attached to the outer wall of the main structure, and the unit ceramic bricks 1 in a single group are arranged in an array mode along the length direction of the mounting pipes 2.
Referring to fig. 2, in the embodiment, the unit ceramic tile 1 may be a hollow ceramic tile having a plurality of cavities arranged in an array along the length direction thereof, and the use of the hollow ceramic tile can reduce the overall self-weight of the aluminum pipe small ceramic tile curtain wall system, thereby reducing the load applied to the main structure. Mounting groove 11 has been seted up respectively at the both ends that unit ceramic brick 1 moved towards along its length, all be provided with coupling assembling 3 in the mounting groove 11, every coupling assembling 3 comprises 1 cassette 31 and 2 bridging plate 32, cassette 31 moves towards along the length of unit ceramic brick 1 and slides in mounting groove 11, bridging plate 32 is located the upper and lower both ends of cassette 31 respectively, bridging plate 32 is the middle part towards the sunken sheet metal piece of cassette 31, and the sunken lateral wall of bridging plate 32 passes through bolt threaded connection with the cassette 31 lateral wall that corresponds, after bridging plate 32 is connected with cassette 31, bridging plate 32 both ends overlap joint is on the notch of mounting groove 11 along vertical direction. The setting of bridging plate 32 can be spacing the cassette 31 in the mounting groove 11 on vertical direction, avoids the cassette 31 to deviate from unit ceramic brick 1 by vertical direction.
Referring to fig. 2 and 3, the mounting grooves 11 are fixed with stoppers 12 at the notches along the length of the unit ceramic tile 1, the limiting blocks 12 are arranged along the vertical direction and are symmetrically arranged on the notches of the installation grooves 11 by taking the axis of the unit ceramic tile 1 as a symmetry axis. The setting of stopper 12 can be spacing along the gliding cassette 31 of unit ceramic brick 1 length trend in mounting groove 11, when avoiding cassette 31 to slide regulation in mounting groove 11, is deviate from the unit by the horizontal direction and has made pottery commentaries on classics.
Referring to fig. 3 and 4, in the present embodiment, the installation pipe 2 may be a hollow aluminum alloy pipe, and is coated with an epoxy zinc-rich rust preventive layer. Seted up 4 first draw-in grooves 21 on the 2 outer walls of installation pipe, first draw-in groove 21 all sets up along the length direction of installation pipe 2, and on 2 cross sections of installation pipe, 4 first draw-in grooves 21 set up along 2 circumference equidistance of installation pipe. After the installation of installation pipe 2 outside the major structure is accomplished, in installation pipe 2 cross section, 2 among them first draw-in groove 21 sets up along the diameter of installation pipe 2 cross section, and the line is perpendicular to the major structure outer wall in the horizontal direction each other. Each clamping seat 31 is fixed with a fastening piece 4, and the fastening piece 4 is located on the side wall of the clamping seat 31 facing the limiting block 12. The buckling pieces 4 on the unit ceramic tiles 1 on one side of the same horizontal plane of the installation pipe 2 are C-shaped pieces, and the buckling pieces 4 on the unit ceramic tiles 1 on the other side are clamping pieces. C type buckling piece 4 lock is on installation pipe 2 outer wall, 4 outer walls of C type buckling piece of splint buckling piece 4 centre gripping, and the bolt is behind splint buckling piece 4, C type buckling piece 4 respectively run through, by the first draw-in groove 21 and the 2 threaded connection of installation pipe that are close to.
Referring to fig. 3 and 4, the inner wall of the C-shaped fastener 4 is fixed with an installation protrusion 41, the installation protrusion 41 is in one-to-one correspondence with the first slot 21, and the installation protrusion 41 is arranged along the length direction of the first slot 21, when the C-shaped fastener 4 is fastened on the installation tube 2, the installation protrusion 41 is connected with the first slot 21 in an embedded manner, so that the C-shaped fastener 4 can be more stably installed on the installation tube 2, the end of the unit ceramic tile 1 provided with the C-shaped fastener 4 can be stabilized, and when the adjacent unit ceramic tile 1 is installed on the installation tube 2, the clamping plate fastener 4 can be stably installed on the C-shaped fastener 4. The outer wall of the C-shaped fastener 4 is provided with second clamping grooves 42, the second clamping grooves 42 correspond to the mounting protrusions 41 one by one, and the second clamping grooves are arranged along the length direction of the first clamping grooves 21. After the splint fastener 4 is clamped on the C-shaped fastener 4, the bolt can be guided by the second engaging groove 42 to penetrate the C-shaped fastener 4 after penetrating the splint fastener 4.
The implementation principle of the small ceramic brick curtain wall system of the aluminum pipe is as follows: after finishing installing outside the major structure respectively with installation pipe 2, the coupling assembling 3 in the slide adjusting mounting groove 11 makes unit ceramic tile 1 set up back on installation pipe 2 through the mode that the cover was inserted about, and slide adjusting coupling assembling 3 makes buckling 4 on the 2 both sides coupling assembling 3 of installation pipe lock on installation pipe 2 to connect on installation pipe 2 through the bolt, thereby realize the installation of the little ceramic tile curtain of aluminum pipe outside the major structure. When unit ceramic brick 1 appears damaging in the use, operating personnel demolish the back through outdoor and indoor bolt on installing pipe 2, through control the cover insert opposite operation flow, can realize the dismantlement of unit ceramic brick 1, when unit ceramic brick 1 replaces, only need once more operate the installation flow can.
The embodiment of the application also discloses a construction method of the aluminum pipe small ceramic brick curtain wall system.
The method comprises the following steps:
s1, arranging installation pipes 2 on the outer side of a main body structure in an array mode;
the installation pipes 2 are respectively arranged on the outer wall surface of the main structure in an array mode, and the installation pipes 2 are connected with the dry hanging pieces preset on the outer wall surface of the main structure.
S2, mounting a connecting assembly 3 on the unit ceramic tile 1;
install cassette 31 in the mounting groove 11 at 1 both ends of unit ceramic brick respectively, and buckle 4 on the cassette 31 of one end is C type spare, and buckle 4 on the cassette 31 of the other end is splint spare, then installs lap joint plate 32 in both sides about cassette 31, makes lap joint plate 32 can drive cassette 31 and slides in mounting groove 11.
S3, installing the unit ceramic tile 1 between the adjacent installation pipes 2;
adjusting connecting assembly 3 along moving towards the inside direction of unit ceramic tile 1 in mounting groove 11, through the mode of left and right cover inserts, laying unit ceramic tile 1 between adjacent installation pipe 2, the connecting assembly 3 that has C type buckling piece 4 slides, makes its lock on the installation pipe 2 that is close to make installation arch 41 inlay card in early first draw-in groove 21. Then, unit ceramic tiles 1 are installed on the other side of the installation pipe 2 where the C-shaped fasteners 4 are located, and the connecting component 3 with the clamping plate fasteners 4 is slid to be clamped on the adjacent C-shaped fasteners 4.
S4, mounting the connecting assembly 3 on the mounting pipe 2 through bolts;
the bolt penetrates through the clamping plate fastener 4 and the C-shaped fastener 4 from the inside to the outside of the main body structure respectively and then is in threaded connection with the mounting pipe 2.
And S5, repeating the steps S3 to S4 until the aluminum pipe small ceramic brick curtain wall system is completely installed on the main body structure.
The embodiments of the present invention are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereby, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a little ceramic brick curtain wall system of aluminum pipe which characterized in that: the ceramic tile installation structure comprises unit ceramic tiles (1) and installation pipes (2), wherein the installation pipes (2) are installed on the outer side of a main structure in an array mode along the vertical direction, and the unit ceramic tiles (1) are arranged between the adjacent installation pipes (2) in an array mode;
the two ends of the unit ceramic brick (1) are respectively provided with a connecting component (3);
the connecting assembly (3) comprises a clamping seat (31), mounting grooves (11) are formed in two ends of the unit ceramic tile (1), and the clamping seat (31) slides in the mounting grooves (11) and is used for matching with subsequent mounting of the unit ceramic tile (1);
the unit ceramic tile (1) is installed on the installation pipe (2) in a left-right sleeving and inserting mode, the clamping seat (31) is adjusted in a sliding mode, the clamping seats (31) adjacent to the two sides of the installation pipe (2) are buckled on the installation pipe (2), and the installation pipe (2) is connected through bolts.
2. The aluminum tube small ceramic tile curtain wall system as recited in claim 1, wherein: the clamping seat (31) is fixedly provided with a buckling piece (4), the buckling piece (4) is positioned on the two sides of the installation pipe (2) and adjacent to the clamping seat (31), one side of the buckling piece (4) is a C-shaped piece, the other side of the buckling piece is a clamping plate piece, the C-shaped piece is buckled on the installation pipe (2), the clamping plate piece is buckled on the C-shaped piece, and a bolt penetrates through the clamping plate piece and the C-shaped piece respectively and then is in threaded connection with the installation pipe (2).
3. The aluminum tube small ceramic tile curtain wall system as recited in claim 2, wherein: the connecting assembly (3) further comprises lapping plates (32), wherein the lapping plates (32) are installed at the upper end and the lower end of the clamping seat (31) through bolts and are respectively in sliding lapping connection with the upper side and the lower side of the unit ceramic brick (1).
4. The aluminum tube small ceramic tile curtain wall system as recited in claim 3, wherein: a limiting block (12) is fixed on the unit ceramic brick (1), the limiting block (12) is located at a notch of the mounting groove (11), and when the clamping seat (31) slides to the notch of the mounting groove (11), the clamping seat (31) is abutted to the limiting block (12).
5. The aluminum tube small ceramic tile curtain wall system as recited in claim 4, wherein: the mounting pipe (2) is provided with a first clamping groove (21), the first clamping groove (21) is arranged in the vertical direction, and a bolt penetrating through the buckling piece (4) is in threaded connection with the mounting pipe (2) through the first clamping groove (21).
6. The aluminum tube small ceramic tile curtain wall system as recited in claim 5, wherein: the buckling piece (4) is provided with an installation bulge (41), the installation bulge (41) is located on the inner side of the C-shaped piece, and when the C-shaped piece is buckled on the installation pipe (2), the installation bulge (41) is clamped in the first clamping groove (21).
7. The aluminum tube small ceramic tile curtain wall system as recited in claim 6, wherein: and a second clamping groove (42) is formed in the buckling piece (4), the second clamping groove (42) corresponds to the mounting protrusion (41) in position and is arranged on the outer side of the C-shaped piece, and after the bolt penetrates through the clamping plate, the bolt penetrates through the C-shaped piece through the second clamping groove (42) and is in threaded connection with the mounting pipe (2).
8. The aluminum tube small ceramic brick curtain wall system as recited in claim 1, wherein: the unit ceramic tile (1) is a hollow ceramic tile.
9. The aluminum tube small ceramic brick curtain wall system as recited in claim 8, wherein: the mounting pipe (2) is an aluminum alloy pipe with the surface subjected to rust prevention treatment.
10. A construction method of an aluminum pipe small ceramic brick curtain wall system is characterized by comprising the following steps: the method comprises the following steps:
s1, arranging mounting pipes (2) on the outer side of a main body structure in an array manner;
s2, installing a connecting component (3) on the unit ceramic tile (1);
s3, installing the unit ceramic bricks (1) between the adjacent installation pipes (2);
s4, mounting the connecting assembly (3) on the mounting pipe (2) through bolts;
and S5, repeating the steps S3 to S4 until the aluminum pipe small ceramic brick curtain wall system is completely installed on the main body structure.
CN202211088482.1A 2022-09-07 2022-09-07 Aluminum pipe small ceramic brick curtain wall system and construction method thereof Active CN115370052B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211088482.1A CN115370052B (en) 2022-09-07 2022-09-07 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211088482.1A CN115370052B (en) 2022-09-07 2022-09-07 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Publications (2)

Publication Number Publication Date
CN115370052A true CN115370052A (en) 2022-11-22
CN115370052B CN115370052B (en) 2023-09-22

Family

ID=84072486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211088482.1A Active CN115370052B (en) 2022-09-07 2022-09-07 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Country Status (1)

Country Link
CN (1) CN115370052B (en)

Citations (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9000835U1 (en) * 1990-01-26 1990-04-05 Schueco International Gmbh & Co, 4800 Bielefeld, De
CN203385065U (en) * 2013-05-29 2014-01-08 福建省乐普陶板制造有限公司 Recycled constant temperature ceramic floor integrated system
CN104727466A (en) * 2014-05-16 2015-06-24 蒋卫国 Bolt type and steel bar type curtain wall brick outer wall
CN204609073U (en) * 2015-05-18 2015-09-02 东亚装饰股份有限公司 Vertical hanged type ceramic plate curtain wall mounting structure
WO2016082765A1 (en) * 2014-11-25 2016-06-02 应家荣 Base module, component, preparing mould, and construction method of earthenware brick stone wall
CN205577165U (en) * 2016-02-15 2016-09-14 黄佳财 Light compartment earthenware brick of green building materials
DE102015121728A1 (en) * 2015-12-14 2017-06-14 Hagemeister GmbH & Co. KG, Ziegelwerk Masonry Association for energy production
CN107882330A (en) * 2017-10-27 2018-04-06 上海市建筑装饰工程集团有限公司 The construction method of concrete brick curtain wall
KR101891092B1 (en) * 2018-03-13 2018-08-23 이명진 Truss Coupling Device for Curtain Wall
CN108756018A (en) * 2018-08-30 2018-11-06 刘晓峰 A kind of attachment device and building brick curtain wall of building brick
CN110130550A (en) * 2019-05-31 2019-08-16 中建东方装饰有限公司 The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall
CN110158864A (en) * 2019-07-02 2019-08-23 山东天元装饰工程有限公司 A kind of staged profile aluminium plate curtain wall system
CN211080720U (en) * 2019-08-22 2020-07-24 中建八局第二建设有限公司 Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure
CN111485651A (en) * 2020-06-02 2020-08-04 北京港源幕墙有限公司 Hollow trapezoidal glass brick dry-hanging curtain wall system
CN211229305U (en) * 2019-08-21 2020-08-11 浙江亚厦装饰股份有限公司 Penetrating type ceramic tile quick dry hanging component
CN211312985U (en) * 2019-11-06 2020-08-21 江阴市华德幕墙有限公司 Ceramic brick curtain wall with built-in aluminum alloy keels
CN212358753U (en) * 2020-02-26 2021-01-15 南京城镇建筑设计咨询有限公司 Curtain wall plate with pipeline framework
CN212405635U (en) * 2020-09-24 2021-01-26 中建八局装饰工程有限公司 Connecting structure for double-layer curved curtain wall
CN213572541U (en) * 2020-10-14 2021-06-29 北京德沅门窗幕墙工程有限公司 Three-dimensional adjustable curtain wall connecting piece
CN213979482U (en) * 2020-12-18 2021-08-17 贵州工业职业技术学院 Architectural decoration curtain wall
CN214006116U (en) * 2020-12-14 2021-08-20 湖北万泉建设工程有限公司 High-strength heat-insulating building block masonry wall
CN113293899A (en) * 2021-06-18 2021-08-24 浙江亚厦幕墙有限公司 Mounting structure and mounting method of artificial brick curtain wall
CN113431237A (en) * 2021-05-17 2021-09-24 中国建筑第七工程局有限公司 Green brick grid curtain wall system and construction method thereof
CN214329500U (en) * 2021-03-09 2021-10-01 中国中建设计集团有限公司 Outer decoration pottery rod and curtain wall connecting structure
CN214466598U (en) * 2021-03-23 2021-10-22 天保建设集团有限公司 Water pipe fixing frame used in engineering
CN215211744U (en) * 2021-03-23 2021-12-17 中建海峡建设发展有限公司 Clamp type glass curtain wall mounting structure
CN215368096U (en) * 2021-01-12 2021-12-31 中建铁路投资建设集团有限公司 Dry-hanging ceramic brick system bracket for decoration
CN113882565A (en) * 2021-11-08 2022-01-04 广州珠江装修工程有限公司 Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof
CN215716384U (en) * 2021-04-22 2022-02-01 浙江亚厦幕墙有限公司 Connecting structure of stay cable ceramic brick curtain wall
CN114197712A (en) * 2021-12-28 2022-03-18 上海世微智能科技有限公司 Integrated structure combining extrusion type hollow outer wall cement board and light steel wall
CN216075781U (en) * 2021-10-28 2022-03-18 北京城建设计发展集团股份有限公司 Improved structure of hollow ceramic brick curtain wall
CN114293694A (en) * 2021-12-02 2022-04-08 中建八局第二建设有限公司 Zigzag unit aluminum plate curtain wall mounting system
CN216405860U (en) * 2021-11-19 2022-04-29 中亿丰(苏州)绿色建筑发展有限公司 Dry-hanging type hollow ceramic brick curtain wall system
CN216475772U (en) * 2021-11-08 2022-05-10 广州珠江装修工程有限公司 Curtain is decorated to building outer wall
CN216840100U (en) * 2022-01-25 2022-06-28 南京亦川建设发展有限公司 Installation mosaic structure that engineering curtain was used
CN216892988U (en) * 2022-02-21 2022-07-05 江西娉林建筑工程有限公司 House building partition wall integrating prefabricated constructional columns
CN217150836U (en) * 2022-03-10 2022-08-09 中海建筑有限公司 Assembled aluminum plate curtain wall
CN217151026U (en) * 2022-03-18 2022-08-09 中建八局第三建设有限公司 Zipper component for decorating ceramic tiles outside curtain wall
CN217811831U (en) * 2022-08-04 2022-11-15 北京凌云宏达幕墙工程有限公司 Angle-adjustable ceramic brick curtain wall system
CN217924311U (en) * 2022-08-04 2022-11-29 北京凌云宏达幕墙工程有限公司 Aluminum pipe framework for ceramic brick installation

Patent Citations (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE9000835U1 (en) * 1990-01-26 1990-04-05 Schueco International Gmbh & Co, 4800 Bielefeld, De
CN203385065U (en) * 2013-05-29 2014-01-08 福建省乐普陶板制造有限公司 Recycled constant temperature ceramic floor integrated system
CN104727466A (en) * 2014-05-16 2015-06-24 蒋卫国 Bolt type and steel bar type curtain wall brick outer wall
WO2016082765A1 (en) * 2014-11-25 2016-06-02 应家荣 Base module, component, preparing mould, and construction method of earthenware brick stone wall
CN204609073U (en) * 2015-05-18 2015-09-02 东亚装饰股份有限公司 Vertical hanged type ceramic plate curtain wall mounting structure
DE102015121728A1 (en) * 2015-12-14 2017-06-14 Hagemeister GmbH & Co. KG, Ziegelwerk Masonry Association for energy production
CN205577165U (en) * 2016-02-15 2016-09-14 黄佳财 Light compartment earthenware brick of green building materials
CN107882330A (en) * 2017-10-27 2018-04-06 上海市建筑装饰工程集团有限公司 The construction method of concrete brick curtain wall
KR101891092B1 (en) * 2018-03-13 2018-08-23 이명진 Truss Coupling Device for Curtain Wall
CN108756018A (en) * 2018-08-30 2018-11-06 刘晓峰 A kind of attachment device and building brick curtain wall of building brick
CN110130550A (en) * 2019-05-31 2019-08-16 中建东方装饰有限公司 The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall
CN110158864A (en) * 2019-07-02 2019-08-23 山东天元装饰工程有限公司 A kind of staged profile aluminium plate curtain wall system
CN211229305U (en) * 2019-08-21 2020-08-11 浙江亚厦装饰股份有限公司 Penetrating type ceramic tile quick dry hanging component
CN211080720U (en) * 2019-08-22 2020-07-24 中建八局第二建设有限公司 Hyperbolic aluminum curtain wall fossil fragments installation device and hyperbolic aluminum keel structure
CN211312985U (en) * 2019-11-06 2020-08-21 江阴市华德幕墙有限公司 Ceramic brick curtain wall with built-in aluminum alloy keels
CN212358753U (en) * 2020-02-26 2021-01-15 南京城镇建筑设计咨询有限公司 Curtain wall plate with pipeline framework
CN111485651A (en) * 2020-06-02 2020-08-04 北京港源幕墙有限公司 Hollow trapezoidal glass brick dry-hanging curtain wall system
CN212405635U (en) * 2020-09-24 2021-01-26 中建八局装饰工程有限公司 Connecting structure for double-layer curved curtain wall
CN213572541U (en) * 2020-10-14 2021-06-29 北京德沅门窗幕墙工程有限公司 Three-dimensional adjustable curtain wall connecting piece
CN214006116U (en) * 2020-12-14 2021-08-20 湖北万泉建设工程有限公司 High-strength heat-insulating building block masonry wall
CN213979482U (en) * 2020-12-18 2021-08-17 贵州工业职业技术学院 Architectural decoration curtain wall
CN215368096U (en) * 2021-01-12 2021-12-31 中建铁路投资建设集团有限公司 Dry-hanging ceramic brick system bracket for decoration
CN214329500U (en) * 2021-03-09 2021-10-01 中国中建设计集团有限公司 Outer decoration pottery rod and curtain wall connecting structure
CN214466598U (en) * 2021-03-23 2021-10-22 天保建设集团有限公司 Water pipe fixing frame used in engineering
CN215211744U (en) * 2021-03-23 2021-12-17 中建海峡建设发展有限公司 Clamp type glass curtain wall mounting structure
CN215716384U (en) * 2021-04-22 2022-02-01 浙江亚厦幕墙有限公司 Connecting structure of stay cable ceramic brick curtain wall
CN113431237A (en) * 2021-05-17 2021-09-24 中国建筑第七工程局有限公司 Green brick grid curtain wall system and construction method thereof
CN113293899A (en) * 2021-06-18 2021-08-24 浙江亚厦幕墙有限公司 Mounting structure and mounting method of artificial brick curtain wall
CN216075781U (en) * 2021-10-28 2022-03-18 北京城建设计发展集团股份有限公司 Improved structure of hollow ceramic brick curtain wall
CN113882565A (en) * 2021-11-08 2022-01-04 广州珠江装修工程有限公司 Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof
CN216475772U (en) * 2021-11-08 2022-05-10 广州珠江装修工程有限公司 Curtain is decorated to building outer wall
CN216405860U (en) * 2021-11-19 2022-04-29 中亿丰(苏州)绿色建筑发展有限公司 Dry-hanging type hollow ceramic brick curtain wall system
CN114293694A (en) * 2021-12-02 2022-04-08 中建八局第二建设有限公司 Zigzag unit aluminum plate curtain wall mounting system
CN114197712A (en) * 2021-12-28 2022-03-18 上海世微智能科技有限公司 Integrated structure combining extrusion type hollow outer wall cement board and light steel wall
CN216840100U (en) * 2022-01-25 2022-06-28 南京亦川建设发展有限公司 Installation mosaic structure that engineering curtain was used
CN216892988U (en) * 2022-02-21 2022-07-05 江西娉林建筑工程有限公司 House building partition wall integrating prefabricated constructional columns
CN217150836U (en) * 2022-03-10 2022-08-09 中海建筑有限公司 Assembled aluminum plate curtain wall
CN217151026U (en) * 2022-03-18 2022-08-09 中建八局第三建设有限公司 Zipper component for decorating ceramic tiles outside curtain wall
CN217811831U (en) * 2022-08-04 2022-11-15 北京凌云宏达幕墙工程有限公司 Angle-adjustable ceramic brick curtain wall system
CN217924311U (en) * 2022-08-04 2022-11-29 北京凌云宏达幕墙工程有限公司 Aluminum pipe framework for ceramic brick installation

Also Published As

Publication number Publication date
CN115370052B (en) 2023-09-22

Similar Documents

Publication Publication Date Title
CN214941054U (en) Board house structure for house construction project
CN114341445B (en) Outer plate arrangement structure
CN115370052A (en) Aluminum pipe small ceramic brick curtain wall system and construction method thereof
CN108978975B (en) Integrated furred ceiling system of modularization quick assembly disassembly
CN209025277U (en) A kind of metal Roof outer panel curtain wall installation part
CN211690833U (en) Ground expansion joint structure
CN113502954B (en) Building facade installation structure and installation method thereof
CN112982864B (en) Decorative wall surface and manufacturing method thereof
CN210342331U (en) Assembled hard mounting wall structure
CN209991003U (en) Assembled concrete pump pipe fixing device that can have enough to meet need
CN108125535B (en) Modular curtain box and installation method
CN220058376U (en) Side deformation joint structure
CN215889107U (en) Bidirectional keel and keel adapter structure
CN216587150U (en) Assembled building wall component
CN218842888U (en) Splicing apparatus of steel construction for bridge construction
CN219909402U (en) Metal waterproof plate unit and waterproof curtain wall formed by splicing same
CN219411590U (en) Decorative panel for indoor wiring
CN218714511U (en) Modular assembly type ceramic tile wallboard structure
CN217630765U (en) Suspended ceiling board connecting structure
CN220775238U (en) Mounting fixture convenient to installation cable
CN115162643A (en) Flush joint structure and connecting method for assembled kitchen wall surface
CN220080387U (en) SPCS double-sided superimposed shear wall
CN219411478U (en) Ceiling component system of assembled building
CN210857800U (en) External corner wallboard assembly
CN211548238U (en) Assembled wallboard convenient to steel construction building construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant