CN113882565A - Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof - Google Patents

Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof Download PDF

Info

Publication number
CN113882565A
CN113882565A CN202111312005.4A CN202111312005A CN113882565A CN 113882565 A CN113882565 A CN 113882565A CN 202111312005 A CN202111312005 A CN 202111312005A CN 113882565 A CN113882565 A CN 113882565A
Authority
CN
China
Prior art keywords
stainless steel
ceramic
ceramic brick
steel support
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111312005.4A
Other languages
Chinese (zh)
Other versions
CN113882565B (en
Inventor
卜继斌
方宏强
陈舟
刘刚明
江幸莲
陈康荣
赵任
王小雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Pearl River Decoration Engineering Co ltd
Original Assignee
Guangzhou Pearl River Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Pearl River Decoration Engineering Co ltd filed Critical Guangzhou Pearl River Decoration Engineering Co ltd
Priority to CN202111312005.4A priority Critical patent/CN113882565B/en
Publication of CN113882565A publication Critical patent/CN113882565A/en
Application granted granted Critical
Publication of CN113882565B publication Critical patent/CN113882565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses an assembly type unit ceramic brick dry hanging curtain wall system and a construction method thereof, and relates to the technical field of building curtain walls. The invention has the advantages of dry construction in the whole process, no field wet operation, simple structure, convenient operation and capability of rapidly mounting and dismounting the curtain wall.

Description

Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof
Technical Field
The invention relates to the technical field of building curtain walls, in particular to an assembly type unit ceramic brick dry hanging curtain wall system and a construction method thereof.
Background
The curtain wall is an outer wall enclosure of a building, is a light wall with decorative effect commonly used by modern large and high-rise buildings, and can be composed of various materials such as glass, metal, ceramic brick and the like and a supporting structure behind the glass, metal, ceramic brick and the like according to the requirement of decorative design. But current curtain is when assembling, and the construction complicacy and the structure between the curtain all are fixed, difficult dismantlement, and the decorative effect of current curtain often lacks the visual effect of former design after the installation is accomplished.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide an assembly type unit ceramic brick dry hanging curtain wall system and a construction method thereof, so as to solve the problems in the prior art.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows: the curtain wall system comprises a fixed mounting structure, a curtain wall structure and a mounting and connecting structure, wherein the curtain wall structure is sleeved on the mounting and connecting structure, the curtain wall structure is in sliding fit with the mounting and connecting structure, the mounting and connecting structure is positioned on the fixed mounting structure, and the mounting and connecting structure is detachably connected with the fixed mounting structure.
Preferably, the fixed mounting structure includes two vertical keels and three crossbeams, two vertical keels are the symmetry and set up, and three crossbeams equidistant setting are on two vertical keels, the crossbeam is the level setting, the both ends of crossbeam are passed through the bolt and are connected with two vertical keels, the crossbeam is T type structure.
Preferably, the installation and connection structure comprises a plurality of stainless steel support rods, stainless steel sleeves in threaded connection with the stainless steel support rods are arranged at the tops and the bottoms of the stainless steel support rods, a plurality of mounting holes in sliding fit with the stainless steel support rods are formed in the cross beams, the stainless steel support rods are clamped in the mounting holes in the cross beams through the stainless steel sleeves, thread sections are arranged at the bottoms and the tops of the stainless steel support rods, and the tops and the bottoms of the stainless steel support rods are fixed among the three cross beams through the stainless steel sleeves.
Preferably, the curtain wall construction includes ceramic brick, first cushion ceramic brick and second cushion ceramic brick, be equipped with two joint holes on the ceramic brick, every the top in the joint hole of ceramic brick all is equipped with the nylon cushion, nylon cushion and ceramic brick sliding fit realize being connected through the joint mouth, and is a plurality of the ceramic brick is installed on a plurality of stainless steel bracing pieces through equidistant crisscross of a plurality of nylon cushion.
An assembly type unit ceramic brick dry-hanging curtain wall system and a construction method thereof are disclosed, wherein the construction method comprises the following steps:
the first step is as follows: fixing two vertical keels with the existing embedded parts through bolts to fix the positions of the two vertical keels, and horizontally connecting the cross beam positioned at the lower layer to the two vertical keels through the bolts;
the second step is that: after the crossbeam positioned at the lower layer is fixed, sleeving a stainless steel sleeve in a mounting hole on the crossbeam, mounting the stainless steel sleeve at the bottom of a stainless steel support rod and at the bottom of the crossbeam positioned at the lower layer, fixing the stainless steel support rod and the crossbeam positioned at the lower layer, and then sequentially mounting a plurality of stainless steel sleeves on the crossbeam positioned at the lower layer so that the stainless steel support rods and the crossbeam positioned at the lower layer are fixed together;
the third step: placing two nylon cushion blocks at the tops of two clamping holes of a ceramic brick, sequentially mounting the ceramic brick, a first cushion block ceramic brick and a second cushion block ceramic brick on a plurality of stainless steel support rods at equal intervals through the two nylon cushion blocks, connecting a cross beam at the middle position with two vertical keels through bolts after the ceramic brick, the first cushion block ceramic brick and the second cushion block ceramic brick are mounted to the middle position, fixing the cross beam at the middle position on the two vertical keels, and sequentially mounting the two ceramic bricks on the plurality of stainless steel support rods at equal intervals through the two nylon cushion blocks;
the fourth step: after the ceramic bricks are installed, the cross beam positioned on the upper layer is fixed on the two vertical keels through the bolts, and after the cross beam is installed, the stainless steel support rods are fixed on the cross beam positioned on the upper layer through the stainless steel sleeves, so that the assembly type unit ceramic brick dry-hanging curtain wall system is installed.
Compared with the prior art, the invention has the beneficial effects that:
when using, need not carry out the concrete, moreover, the steam generator is simple in structure, and convenient operation, can be quick install and dismantle the curtain, equidistant crisscross installation between a plurality of ceramic bricks for the front of curtain produces three-dimensional visual effect, the decorative effect of curtain has been increased, under the cooperation of follow-up light at night, realize the visual effect of curtain, can be according to the not co-altitude needs of curtain installation, install the stainless steel bracing piece of suitable height can, in order to realize the installation to the not co-altitude curtain, satisfy different user demands.
Drawings
FIG. 1 is a schematic perspective view of an assembled unit ceramic brick dry-hanging curtain wall system;
FIG. 2 is a schematic perspective view of a prefabricated unit ceramic tile dry-hanging curtain wall system;
FIG. 3 is a front view of an assembled unit ceramic tile dry-hang curtain wall system;
FIG. 4 is a top view of an assembled unit ceramic tile dry-hang curtain wall system;
FIG. 5 is a first perspective view of a curtain wall structure;
FIG. 6 is a schematic perspective view of a curtain wall structure;
FIG. 7 is a third schematic perspective view of a curtain wall structure;
FIG. 8 is a fourth schematic perspective view of a curtain wall structure;
FIG. 9 is a first perspective view of a ceramic tile;
FIG. 10 is a schematic perspective view of a second embodiment of the ceramic tile;
FIG. 11 is a perspective view of the mounting connection structure;
FIG. 12 is a schematic perspective view of a stainless steel sleeve;
FIG. 13 is a perspective view of a mounting structure
Fig. 14 is a schematic view of the alternative ceramic tile before and after installation.
In the figure: fixed mounting structure 1, vertical fossil fragments 11, crossbeam 12, curtain wall construction 2, ceramic brick 21, first cushion ceramic brick 22, second cushion ceramic brick 23, joint hole 24, installation connection structure 3, stainless steel bracing piece 31, stainless steel sleeve 32, installation section 33 on the stainless steel, lower installation section 34, mounting nut 35, nylon cushion 4, replacement ceramic brick 5, first replacement hole 51, second replacement hole 52.
Detailed Description
The invention will be further described with reference to the accompanying drawings, figures 1 to 14, and the detailed description of the invention: the utility model provides an assembled unit ceramic brick hangs curtain system futilely, includes fixed mounting structure 1, curtain structure 2 and erection joint structure 3, curtain structure 2 cover is on erection joint structure 3, curtain structure 2 and erection joint structure 3 sliding fit, erection joint structure 3 is located fixed mounting structure 1, erection joint structure 3 is connected with fixed mounting structure 1 detachable.
Specifically, fixed mounting structure 1 includes two vertical keel 11 and three crossbeams 12, two vertical keel 11 is the symmetry setting, and three crossbeams 12 equidistant setting is on two vertical keel 11, crossbeam 12 is the level setting, the both ends of crossbeam 12 are passed through the bolt and are connected with two vertical keel 11, crossbeam 12 is T type structure. The two vertical keels 11 can be fixed and installed with embedded parts in existing building equipment, and the three beams 12 are used for supporting and arranging a plurality of ceramic bricks 21, first cushion block ceramic bricks 22 and second cushion block ceramic bricks 23.
Specifically, the stainless steel support rod structure further comprises a plurality of stainless steel support rods 31, the stainless steel support rods 31 are arranged on the three cross beams 12 at equal intervals, stainless steel sleeves 32 in threaded connection with the stainless steel support rods 31 are arranged at the top, the bottom and the middle of each stainless steel support rod 31, threaded sections are arranged at the top, the bottom and the middle of each stainless steel support rod 31, and the stainless steel support rods 31 are fixed on the cross beams 12 through the stainless steel sleeves 32. The stainless steel support rods 31 are used to support the ceramic bricks 21, the first mat ceramic brick 22 and the second mat ceramic brick 23 by being installed through the nylon mat 4.
Specifically, an external thread section and an external thread section are respectively arranged on the outer side wall and the inner side wall of the stainless steel sleeve 32; the stainless steel sleeve 32 is in threaded connection with the mounting hole on the cross beam 12; the thread section on the stainless steel support rod 31 is in threaded connection with the inner thread section on the stainless steel sleeve 32; the stainless steel sleeve 32 is divided into an upper mounting section 33, a lower mounting section 34 and a mounting nut 35, and the length of the stainless steel upper mounting section 33 is larger than that of the lower mounting section 34. Use at stainless steel support rod 31, 34 threaded connection on crossbeam 12 of lower installation section through stainless steel sleeve 32, can drive stainless steel sleeve 32's rotation through rotatory installation nut 35, fix stainless steel support rod 31 on crossbeam 12, when assembling the curtain to co-altitude, only need to rotate stainless steel support rod 31's bottom to stainless steel sleeve 32 on the internal thread in installation section 33, make stainless steel support rod 31 vertically install on stainless steel sleeve 32, can be according to the not co-altitude needs of curtain installation, install suitable high stainless steel support rod 31 can, in order to realize the installation to co-altitude curtain, satisfy different user demands.
Specifically, curtain wall construction 2 includes ceramic tile 21, first cushion ceramic tile 22 and second cushion ceramic tile 23, ceramic tile 21, first cushion ceramic tile 22 and second cushion ceramic tile 23 all are equipped with a plurality ofly, and are a plurality of first cushion ceramic tile 22 equidistant setting is in the left side of a plurality of stainless steel support rods 31, and is a plurality of second cushion ceramic tile 23 equidistant setting is on the right side of a plurality of stainless steel support rods 31, and is a plurality of ceramic tile 21 equidistant setting is established crisscross on a plurality of stainless steel support rods 31, every ceramic tile 21, first cushion ceramic tile 22 and second cushion ceramic tile 23 all are equipped with nylon cushion block 4. The nylon mat 4 is used for protecting the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23, when the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 are installed, the clamping holes 24 on the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 are damaged due to the shaking of the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 on the stainless steel support rod 31, when the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 are installed, the nylon mat 4 can protect the clamping holes 24 on the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23, and also can limit the positions of the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 to prevent the ceramic tiles 21, the first mat ceramic tiles 22 and the second mat ceramic tiles 23 from being damaged after the installation, and the first and second ceramic tiles 22 and the second mat ceramic tiles 23 are arranged at equal intervals in a staggered manner, intermittent gaps are formed at the left end and the right end of the curtain wall, and the first cushion block ceramic tile 22 and the second cushion block ceramic tile 23 can be used for filling the intermittent gaps, so that the auxiliary installation of the ceramic tiles 21 is realized.
Specifically, the ceramic tile 21 is in a right trapezoid shape, the first cushion block ceramic tile 22 is in a rectangular shape, and the second cushion block ceramic tile 23 is in a square shape; the ceramic brick 21 is provided with two symmetrically arranged clamping holes 24, and the first cushion block ceramic brick 22 and the second cushion block ceramic brick are also provided with the clamping holes 24; the nylon cushion block 4 is sleeved above the clamping holes 24 on the ceramic bricks 21, the first cushion block ceramic brick 22 and the second cushion block ceramic brick 23; the nylon cushion block 4 is cylindrical, the outer diameter of the nylon cushion block 4 is larger than the diameter of the clamping hole 24, and the inner diameter of the nylon cushion block 4 is larger than the diameter of the stainless steel support rod 31; the two adjacent ceramic bricks 21 are arranged in a staggered manner, and the clamping hole 24 on the right side of the upper ceramic brick 21 and the nylon cushion block 4 on the clamping hole 24 on the left side of the lower ceramic brick 21 are connected to the same vertically-arranged stainless steel support rod 31; the first cushion block ceramic tile 22 is positioned between the two staggered ceramic tiles 21 on the upper layer and the lower layer on the left side, and the second cushion block ceramic tile 23 is positioned between the two staggered ceramic tiles 21 on the upper layer on the right side; when installing ceramic brick 21, install the right-angle side of right trapezoid's ceramic brick 21 at the back that is located whole curtain, install the hypotenuse of right trapezoid's ceramic brick 21 in the front that is located whole curtain, make the front of curtain produce three-dimensional visual effect after the installation is accomplished, increased the decorative effect of curtain, under the cooperation of follow-up night light, realize the visual effect of curtain.
The stainless steel support rod is characterized by further comprising a replacing ceramic brick 5, wherein the replacing ceramic brick 5 is in a right trapezoid shape, the replacing ceramic brick 5 is provided with a first replacing hole 51 and a second replacing hole 52, the first replacing hole 51 is located on the high length side of the right trapezoid, the second replacing hole 52 is located on the lower bottom side of the right trapezoid, and the distance between the first replacing hole 51 and the second replacing hole 52 is equal to the distance between two adjacent stainless steel support rods 31; the first replacing hole 51 is of a mirror-image L-shaped structure, the long side of the first replacing hole 51 is an open side, and the short side of the first replacing hole 51 is in a circular shape; the right-angle edge of the L-shaped structure is chamfered with a round angle; the round corners are beneficial to the subsequent installation of the replacement ceramic bricks 5 during replacement, and the second replacement holes 52 are U-shaped open; the first replacement hole 51 and the second replacement hole 52 have a diameter larger than the outer diameter of the nylon insert 4. If the overall ceramic brick 21 of the curtain wall is damaged and needs to be replaced, the straight edge of the right trapezoid-shaped replacement ceramic brick 5 is installed on the back face of the curtain wall, the bevel edge of the right trapezoid-shaped replacement ceramic brick 5 is installed on the front face of the curtain wall, the opening ends of the first replacement hole 51 and the second replacement hole 52 face the two nylon cushion blocks 4 on the two stainless steel support rods 31, the two nylon cushion blocks 4 are wrapped in the first replacement hole 51 and the second replacement hole 52, the replacement ceramic brick 5 is moved rightwards after placement is completed, the two nylon cushion blocks 4 are completely wrapped in the first replacement hole 51 and the second replacement hole 52, after the placement is correct, the gaps of the first replacement hole 51 and the second replacement hole 52 are plugged through the gluing material, the replacement ceramic brick 5 is completely fixed with the two nylon cushion blocks 4, and replacement of the damaged ceramic brick 21 is completed.
An assembly type unit ceramic brick dry-hanging curtain wall system and a construction method thereof are disclosed, wherein the construction method comprises the following steps:
the first step is as follows: fixing two vertical keels 11 with the existing embedded parts through bolts, so that the positions of the two vertical keels 11 are fixed, and horizontally connecting the cross beam 12 positioned at the lower layer to the two vertical keels 11 through the bolts;
the second step is that: after the beam 12 at the lower layer is fixed, sleeving a stainless steel sleeve in a mounting hole on the beam 12, mounting a stainless steel sleeve 32 at the bottom of a stainless steel support rod 31 and at the bottom of the beam 12 at the lower layer, fixing the stainless steel support rod 31 and the beam 12 at the lower layer, and then sequentially mounting a plurality of stainless steel sleeves 32 on the beam 12 at the lower layer, so that the stainless steel support rods 31 and the beam 12 at the lower layer are fixed together;
the third step: after two nylon cushion blocks 4 are placed at the tops of two clamping holes 24 of a ceramic brick 21, the ceramic brick 21, a first cushion block ceramic brick 22 and a second cushion block ceramic brick 23 are sequentially installed on a plurality of stainless steel support rods 31 at equal intervals through the two nylon cushion blocks 4, after the ceramic brick 21, the first cushion block ceramic brick 22 and the second cushion block ceramic brick 23 are installed at the middle position, a cross beam 12 at the middle position is connected with two vertical keels 11 through bolts, the cross beam 12 at the middle position is fixed on the two vertical keels 11, and then the two ceramic bricks 21 are sequentially installed on the plurality of stainless steel support rods 31 at equal intervals through the two nylon cushion blocks 4;
the fourth step: after the installation of the ceramic tiles 21 is completed, the cross beam 12 positioned on the upper layer is fixed on the two vertical keels 11 through bolts, and after the installation of the cross beam 12 is completed, the stainless steel support rods 31 are fixed on the cross beam 12 positioned on the upper layer through the stainless steel sleeves 32, so that the installation of the assembled unit ceramic tile dry-hanging curtain wall system is completed.
When using, need not carry out the concrete, moreover, the steam generator is simple in structure, high durability and convenient operation, can be quick install and dismantle the curtain, equidistant crisscross installation between a plurality of ceramic bricks 21 for the front of curtain produces three-dimensional visual effect, the decorative effect of curtain has been increased, under the cooperation of follow-up light at night, realize the visual effect of curtain, can be according to the not co-altitude needs of curtain installation, install the stainless steel bracing piece 31 of suitable height can, in order to realize the installation to the not co-altitude curtain, realize different user demands.
Various other modifications and changes may be made by those skilled in the art based on the above-described technical solutions and concepts, and all such modifications and changes should fall within the scope of the claims of the present invention.

Claims (5)

1. The utility model provides a curtain system is hung futilely to assembled unit ceramic brick which characterized in that: including fixed mounting structure (1), curtain structure (2) and erection joint structure (3), curtain structure (2) cover is on erection joint structure (3), curtain structure (2) and erection joint structure (3) sliding fit, erection joint structure (3) are located fixed mounting structure (1), erection joint structure (3) are connected with fixed mounting structure (1) detachable.
2. The fabricated unit ceramic tile dry-hanging curtain wall system according to claim 1, wherein: fixed mounting structure (1) includes two vertical fossil fragments (11) and three crossbeam (12), two vertical fossil fragments (11) are the symmetry and set up, and equidistant setting on two vertical fossil fragments (11) of three crossbeam (12), crossbeam (12) are the level setting, the both ends of crossbeam (12) are passed through the bolt and are connected with two vertical fossil fragments (11), crossbeam (12) are T type structure.
3. The fabricated unit ceramic tile dry-hanging curtain wall system according to claim 2, wherein: the installation and connection structure (3) comprises a plurality of stainless steel support rods (31), the top and the bottom of each stainless steel support rod (31) are respectively provided with a stainless steel sleeve (32) in threaded connection with the stainless steel support rods, a plurality of mounting holes in sliding fit with the stainless steel support rods (31) are formed in the cross beam (12), the stainless steel support rods (31) are clamped in the mounting holes formed in the cross beam (12) through the stainless steel sleeves (32), each stainless steel support rod (31) is provided with a threaded section at the bottom and the top, and the top and the bottom of each stainless steel support rod (31) are fixed between the three cross beams (12) through the stainless steel sleeves (32).
4. The fabricated unit ceramic tile dry-hanging curtain wall system according to claim 2, wherein: curtain wall construction (2) are including ceramic brick (21), first cushion ceramic brick (22) and second cushion ceramic brick (23), be equipped with two joint holes (24) on ceramic brick (21), every the top in joint hole (24) of ceramic brick (21) all is equipped with nylon cushion (4), nylon cushion (4) and ceramic brick (21) sliding fit, it is a plurality of ceramic brick (21) are installed on a plurality of stainless steel bracing pieces (31) through equidistant crisscross of a plurality of nylon cushion (4).
5. The fabricated unit ceramic tile dry-hanging curtain wall system and the construction method thereof as claimed in any one of claims 1 to 4, wherein: the construction method comprises the following steps:
the first step is as follows: fixing two vertical keels (11) with an existing embedded part through bolts to fix the positions of the two vertical keels (11), and horizontally connecting a cross beam (12) positioned on a lower layer to the two vertical keels (11) through the bolts;
the second step is that: after the crossbeam (12) positioned at the lower layer is fixed, sleeving a stainless steel cylinder in a mounting hole on the crossbeam (12), mounting a stainless steel cylinder (32) at the bottom of a stainless steel support rod (31) and at the bottom of the crossbeam (12) positioned at the lower layer, fixing the stainless steel support rod (31) and the crossbeam (12) positioned at the lower layer, and then sequentially mounting a plurality of stainless steel cylinders (32) on the crossbeam (12) positioned at the lower layer to fix the stainless steel support rods (31) and the crossbeam (12) positioned at the lower layer together;
the third step: placing two nylon cushion blocks (4) at the tops of two clamping holes (24) of a ceramic brick (21), sequentially installing the ceramic brick (21), a first cushion block ceramic brick (22) and a second cushion block ceramic brick (23) on a plurality of stainless steel support rods (31) at equal intervals through the two nylon cushion blocks (4), after the ceramic brick is installed to a middle position, connecting a cross beam (12) at the middle position with two vertical keels (11) through bolts, fixing the cross beam (12) at the middle position on the two vertical keels (11), and sequentially installing the two ceramic bricks (21) on the plurality of stainless steel support rods (31) at equal intervals through the two nylon cushion blocks (4);
the fourth step: after the ceramic bricks (21) are installed, the cross beam (12) on the upper layer is fixed on the two vertical keels (11) through bolts, after the cross beam (12) is installed, the stainless steel support rods (31) are fixed on the cross beam (12) on the upper layer through the stainless steel sleeves (32), and the assembly type unit ceramic brick dry-hanging curtain wall system is installed.
CN202111312005.4A 2021-11-08 2021-11-08 Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof Active CN113882565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111312005.4A CN113882565B (en) 2021-11-08 2021-11-08 Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111312005.4A CN113882565B (en) 2021-11-08 2021-11-08 Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof

Publications (2)

Publication Number Publication Date
CN113882565A true CN113882565A (en) 2022-01-04
CN113882565B CN113882565B (en) 2023-03-17

Family

ID=79016810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111312005.4A Active CN113882565B (en) 2021-11-08 2021-11-08 Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof

Country Status (1)

Country Link
CN (1) CN113882565B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006022509A (en) * 2004-07-06 2006-01-26 Ykk Ap Inc Curtain wall and its mounting method
CN110130550A (en) * 2019-05-31 2019-08-16 中建东方装饰有限公司 The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall
CN210105073U (en) * 2019-05-19 2020-02-21 湖南建工集团装饰工程有限公司 Hang argil brick curtain wall construction futilely
CN210439520U (en) * 2019-07-30 2020-05-01 江苏金科天宸房地产有限公司 Hollow curtain wall structure
CN210459693U (en) * 2019-07-09 2020-05-05 青岛北洋建筑设计有限公司 Dry-hanging ceramic brick curtain wall system
CN111287467A (en) * 2020-02-17 2020-06-16 上海市建筑装饰工程集团有限公司 Integral dry hanging process for ceramic brick curtain wall
CN210887886U (en) * 2019-09-12 2020-06-30 西安翔远装饰工程有限责任公司 Dry construction hollow ceramic brick wall

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006022509A (en) * 2004-07-06 2006-01-26 Ykk Ap Inc Curtain wall and its mounting method
CN210105073U (en) * 2019-05-19 2020-02-21 湖南建工集团装饰工程有限公司 Hang argil brick curtain wall construction futilely
CN110130550A (en) * 2019-05-31 2019-08-16 中建东方装饰有限公司 The dried hanging hang structure and its construction method of assembled hollow out earthenware brick curtain wall
CN210459693U (en) * 2019-07-09 2020-05-05 青岛北洋建筑设计有限公司 Dry-hanging ceramic brick curtain wall system
CN210439520U (en) * 2019-07-30 2020-05-01 江苏金科天宸房地产有限公司 Hollow curtain wall structure
CN210887886U (en) * 2019-09-12 2020-06-30 西安翔远装饰工程有限责任公司 Dry construction hollow ceramic brick wall
CN111287467A (en) * 2020-02-17 2020-06-16 上海市建筑装饰工程集团有限公司 Integral dry hanging process for ceramic brick curtain wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115370052A (en) * 2022-09-07 2022-11-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof
CN115370052B (en) * 2022-09-07 2023-09-22 北京凌云宏达幕墙工程有限公司 Aluminum pipe small ceramic brick curtain wall system and construction method thereof

Also Published As

Publication number Publication date
CN113882565B (en) 2023-03-17

Similar Documents

Publication Publication Date Title
CN110409811B (en) Non-dismantling forming column template containing reinforcement cage, template structure and building process
CN110409813B (en) Non-dismantling forming beam template containing reinforcement cage, template structure and building process
CN209924196U (en) Assembled infilled wall connected in rail clamping groove type and frame system thereof
CN113882565B (en) Assembly type unit ceramic brick dry-hanging curtain wall system and construction method thereof
CN216475772U (en) Curtain is decorated to building outer wall
CN110748194B (en) Building supporting device and construction method
CN210032203U (en) Prefabricated wallboard of casting type
CN216475797U (en) Connecting device for dry-hanging curtain wall
CN216475773U (en) Opening ceramic brick curtain wall structure suitable for dry construction
CN210597622U (en) Novel can dismantle simple and easy house structure
CN204920178U (en) Attaching scaffold main part
CN209637049U (en) A kind of glass curtain wall mounting structure
CN214116678U (en) Assembled fetal membrane
CN205875486U (en) Give a new lease of life to light -duty board curtain wall construction structure of stone architectural concrete
CN212129234U (en) Utility tunnel
CN113463801A (en) Gabion curtain wall structure and construction method thereof
CN109235709B (en) Full cast-in-place outer wall structure of building
CN107965145B (en) Horizontal convex concrete construction joint hanging die supporting device
CN206888511U (en) A kind of aluminum alloy formwork system for variable cross-section rectangular column
CN215825583U (en) Plugging device is fixed to grout pipe
CN219158051U (en) Waterproof outer wall of building
CN218375533U (en) Prefabricated floor bearing structure
CN210659245U (en) Non-dismantling forming column template containing reinforcement cage and template structure
CN219671965U (en) Back-hanging type building outer wall structure
CN203080762U (en) Installation system of argil board curtain wall veneers

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant