CN115354800A CN202211004446.2A CN202211004446A CN115354800A CN 115354800 A CN115354800 A CN 115354800A CN 202211004446 A CN202211004446 A CN 202211004446A CN 115354800 A CN115354800 A CN 115354800A
Authority
CN
China
Prior art keywords
concrete
poured
wall
wall column
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211004446.2A
Other languages
Chinese (zh)
Inventor
丁健华
洪清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202211004446.2A priority Critical patent/CN115354800A/en
Publication of CN115354800A publication Critical patent/CN115354800A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/02Reinforcing elements of metal, e.g. with non-structural coatings of low bending resistance
    • E04C5/04Mats
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a construction method of a multi-label concrete wall column, which is basically characterized in that in the construction process of the wall column, a plurality of vertical steel bars are inserted into a raft of a lower layer or a basement near the wall side of the adjacent wall column along the width direction of the wall, after the lower layer is poured, when the upper layer steel bars are bound, short steel bars and the inserted steel bars are welded well from bottom to top, a dense mesh steel wire net is wound, after the lower layer is poured, the wall edges, namely meshes on the two sides of the column, are pulled oppositely by open hoops, the open hoops on the two sides are butt welded and are spot-welded together with the blocking meshes to form an integral blocking system, when the concrete is poured, the high-label concrete of the column is poured firstly, then the concrete of the adjacent wall body on the two sides is poured, the concrete is poured to the height of 1/2 layer for pause for a period of time, and after the concrete is settled and then the concrete on the upper layer is poured. By adopting the technical treatment measure, the wall column concrete with different labels can be effectively intercepted, and the strength grade of the wall column concrete can meet the design requirement.

Description

Construction method of multi-label concrete wall column
Technical Field
The invention relates to the technical field of building construction, in particular to a construction method of a multi-grade concrete wall column.
Background
In order to meet the structural stress requirement and save the construction cost, the shear walls and the buttress columns of the basement and the overground part are designed by adopting concrete with different labels, which brings great inconvenience to the construction, and particularly the handling is more troublesome under the conditions of larger size and higher story height of the wall columns. The traditional construction treatment measures are that steel wire meshes are used for intercepting the positions, close to the wall, of the two sides of the column, and the construction quality is affected by the method that the concrete marks cannot be guaranteed due to the fact that the steel wire meshes are extruded and broken in the construction process. Therefore, the invention provides a reinforcing treatment measure for intercepting the steel wire mesh and a reasonable pouring method to ensure that the grade of the wall column concrete meets the design requirement.
Disclosure of Invention
The invention aims to provide a construction method of a multi-label concrete wall column, which aims to solve the problem that in the prior art, when the multi-label concrete wall column is subjected to mixed construction, the label of concrete cannot be guaranteed and the construction quality is influenced because a steel wire mesh is extruded and broken.
In order to achieve the purpose, the invention adopts the following technical scheme:
the invention relates to a construction method of a multi-label concrete wall column, in particular to a technical method for intercepting and treating concrete at a joint of the wall column when the labels of the concrete of the wall column are different, which comprises the following construction steps:
a. during the construction of a lower layer structure or a raft, inserting a plurality of vertical steel bars at the joint of wall columns close to the wall side;
b. welding short steel bar supports along vertical steel bars from bottom to top, and winding a high-strength dense-mesh steel wire mesh to form an interception net piece;
c. the two sides of the intercepting net piece are tied by using open hoops, the open hoops at the two sides are lapped and welded, and the space between the open hoops is less than or equal to 200mm;
d. when the wall column concrete is poured, the structural column height-labeled concrete is poured firstly, then the two side wall body concretes are poured, when the height of the 1/2 layer is poured, the upper layer concrete is continuously poured after the concrete is settled.
Preferably, before lower floor's roof or basic raft board concrete placement, insert vertical reinforcing bar, the inserted mode is the same with the wall post joint bar.
Preferably, the intercepting net piece is provided with an opening hoop, and the opening hoops on the two sides are welded in an overlapping mode to form an integral concrete intercepting system.
Preferably, when the wall column concrete is poured in the step d, the time for pouring the wall column concrete is 1/2 of the height of the layer, the time is 1-1.5 hours, and after the concrete is settled, the upper layer concrete is continuously poured.
Preferably, the open hoop spacing is 100-200mm.
Preferably, in the step a, 2-3 vertical steel bars with the diameter of more than or equal to 18mm are inserted into the joint of the wall columns close to the wall side during the construction of the understructure or raft.
The invention has the beneficial effects that: the invention adopts the modes of steel bar mesh isolation and butt welding reinforcement of the open hoops to intercept the concrete with different labels on the two sides of the wall column, and adopts a reasonable concrete pouring mode to effectively avoid the problems of incomplete concrete isolation measures on the two sides of the wall column and mutual leakage of the concrete of the wall column, thereby ensuring the engineering quality.
Drawings
FIG. 1 is a schematic structural diagram of a construction method of a multi-label concrete wall column according to the present invention;
fig. 2 is a schematic structural diagram of a part a of a construction method of a multi-label concrete wall column according to the present invention.
FIG. 3 is a schematic diagram showing the structure of the dense mesh steel wire gauze and the vertical butt welding open hoop in the construction method of the multi-label concrete wall column provided by the invention
In the figure: 1. structural column, 2, short steel bar support, 3, vertical butt welding opening hoop, 4, vertical steel bar, 5, concrete wall, 6, dense mesh steel wire net, 7, column rib, 8, wall body steel bar, 9, vertical interception net piece, 10, lower floor wall post.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "front", "rear", "left", "right", "top", "bottom", "inner", "outer", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the device or element being referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention.
Referring to fig. 1 to 3, a construction method of a multi-label concrete wall column specifically comprises the following steps:
the method comprises the following steps: during construction of the lower-layer wall column 10, vertical inserting bars 4 are inserted into one side of the adjacent concrete wall 5 and the structure column 1 by the column, the number of the inserting bars is 2-3, the vertical inserting bars are determined according to the thickness of the wall body, the diameter of each inserting bar is more than or equal to 18mm, the depth of each inserting bar is determined according to the height of the wall body, the anchoring length can be met, and concrete is poured after lower-layer steel bars are concealed and accepted.
Step two: when ligature wall body reinforcing bar 8 and post muscle 7, from upwards welding short steel bar support 2 down along vertical dowel steel 4, place by 1 one side of structural column, the interval is with concrete wall 5 horizontal muscle to with short steel bar support 2 and the ligature of the horizontal muscle of wall body firmly, then twine the dense mesh wire net 6 that excels in, form vertical interception net piece 9.
Step three: after the construction of the vertical interception net piece 9 is completed, in order to enable the vertical interception net pieces 9 on the two sides to form a whole, opening hoops are added at the vertical interception net piece 9 on the two sides, the opening hoops on the two sides are subjected to lap welding to form a vertical butt welding opening hoop 3, the distance is set to be smaller than or equal to 200mm, and the vertical butt welding opening hoop 3 is bound with the vertical interception net piece 9 or is in spot welding connection according to calculation determination.
Step four: in order to further ensure the interception effect of the interception system, after the acceptance of the steel bars is finished and before the concrete is poured, a reasonable pouring sequence is formulated, namely, the high-grade concrete in the structural column 1 is poured firstly, then the concrete wall 5 is poured, the time is stopped for 1 to 1.5 hours when the height of 1/2 layer is poured, the upper layer concrete is continuously poured after the concrete is settled, and the lateral pressure generated by the flowing of the concrete is reduced.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (6)

1. A construction method of a multi-label concrete wall column is characterized by comprising the following construction steps:
a. during the construction of a lower layer structure or a raft, inserting a plurality of vertical steel bars at the joint of wall columns close to the wall side;
b. welding short steel bar supports along vertical steel bars from bottom to top, and winding a high-strength dense-mesh steel wire mesh to form an interception net piece;
c. the two sides of the intercepting net piece are tied by using open hoops, the open hoops at the two sides are lapped and welded, and the space between the open hoops is less than or equal to 200mm;
d. when the wall column concrete is poured, the structural column height-labeled concrete is poured firstly, then the two side wall body concretes are poured, when the height of the 1/2 layer is poured, the upper layer concrete is continuously poured after the concrete is settled.
2. The method as claimed in claim 1, wherein the vertical reinforcing bars are inserted into the bottom deck or the raft slab before the concrete is poured into the bottom deck or raft slab in the same manner as the inserting bars of the wall column.
3. The construction method of the multi-label concrete wall column according to claim 1, wherein the position of the intercepting mesh is provided with an open hoop, and the open hoops on two sides are welded in an overlapping manner to form an integral concrete intercepting system.
4. The construction method for the multi-label concrete wall column according to claim 1, wherein in the step d, when the concrete is poured to the height of 1/2 layer, the time for pouring is 1-1.5 hours, and after the concrete is settled, the concrete on the upper layer is continuously poured.
5. The method as claimed in claim 1, wherein the space between the open hoops is 100-200mm.
6. The construction method of a multi-label concrete wall column according to claim 1, wherein 2-3 vertical steel bars with a diameter of 18mm or more are inserted into the wall side of the wall column junction at the time of constructing the substructure or the raft.
CN202211004446.2A 2022-08-22 2022-08-22 Construction method of multi-label concrete wall column Pending CN115354800A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211004446.2A CN115354800A (en) 2022-08-22 2022-08-22 Construction method of multi-label concrete wall column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211004446.2A CN115354800A (en) 2022-08-22 2022-08-22 Construction method of multi-label concrete wall column

Publications (1)

Publication Number Publication Date
CN115354800A true CN115354800A (en) 2022-11-18

Family

ID=84002711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211004446.2A Pending CN115354800A (en) 2022-08-22 2022-08-22 Construction method of multi-label concrete wall column

Country Status (1)

Country Link
CN (1) CN115354800A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009191568A (en) * 2008-02-18 2009-08-27 Taisei Corp Method of manufacturing column-beam joint member, method of manufacturing concrete member, and column-beam joint member
CN101761187A (en) * 2010-02-08 2010-06-30 龙元建设集团股份有限公司 Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN203285065U (en) * 2013-06-04 2013-11-13 中国建筑第六工程局有限公司 High and low grade concrete separation device
CN107724680A (en) * 2016-08-11 2018-02-23 五冶集团上海有限公司 A kind of high-storey building frame structure beam-column node construction method
CN207727797U (en) * 2017-12-11 2018-08-14 中国一冶集团有限公司 Wall column node different labels concrete separating device
CN209907616U (en) * 2019-04-28 2020-01-07 四川交通职业技术学院 Cast-in-place floor construction joint side keeps off structure
CN211007648U (en) * 2019-07-30 2020-07-14 淙创(上海)企业管理咨询中心 Cast-in-place reinforced concrete pond inflation post-cast reinforcing band formwork system
CN112627241A (en) * 2020-12-21 2021-04-09 上海宝冶集团有限公司 Quality control method for pouring concrete of different strength grades of basement wall column node
CN114482553A (en) * 2022-02-24 2022-05-13 中国十七冶集团有限公司 Concrete interception processing method for wall column when concrete labels are different
CN217106190U (en) * 2021-12-30 2022-08-02 珠海华发人居生活研究院有限公司 High-low grade beam column node concrete interception structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009191568A (en) * 2008-02-18 2009-08-27 Taisei Corp Method of manufacturing column-beam joint member, method of manufacturing concrete member, and column-beam joint member
CN101761187A (en) * 2010-02-08 2010-06-30 龙元建设集团股份有限公司 Construction separating device for concrete of vertical structure in same wall body with different labels as well as pouring and tamping method thereof
CN203285065U (en) * 2013-06-04 2013-11-13 中国建筑第六工程局有限公司 High and low grade concrete separation device
CN107724680A (en) * 2016-08-11 2018-02-23 五冶集团上海有限公司 A kind of high-storey building frame structure beam-column node construction method
CN207727797U (en) * 2017-12-11 2018-08-14 中国一冶集团有限公司 Wall column node different labels concrete separating device
CN209907616U (en) * 2019-04-28 2020-01-07 四川交通职业技术学院 Cast-in-place floor construction joint side keeps off structure
CN211007648U (en) * 2019-07-30 2020-07-14 淙创(上海)企业管理咨询中心 Cast-in-place reinforced concrete pond inflation post-cast reinforcing band formwork system
CN112627241A (en) * 2020-12-21 2021-04-09 上海宝冶集团有限公司 Quality control method for pouring concrete of different strength grades of basement wall column node
CN217106190U (en) * 2021-12-30 2022-08-02 珠海华发人居生活研究院有限公司 High-low grade beam column node concrete interception structure
CN114482553A (en) * 2022-02-24 2022-05-13 中国十七冶集团有限公司 Concrete interception processing method for wall column when concrete labels are different

Similar Documents

Publication Publication Date Title
TWI632272B (en) Three-dimensional light steel frame composed of two-way continuous double beams
US7640702B2 (en) Floor support systems and methods
CN205954921U (en) Novel big board shear wall structure is secretly supported in bolted connection's prefabricated assembled area
CN206174146U (en) Assembly type structure's assembly node
CN115075571B (en) Construction method for inclined joint of steel reinforced concrete wall beam with flange additionally arranged on one side
CN108222062B (en) A kind of underground pipe gallery framework of steel reinforcement temporary fixing rack and longitude and latitude binding method
CN106049704B (en) Prefabrication cast-in-place combined type fair-faced concrete outer wall structure and construction method
CN210316020U (en) Section steel concrete composite structure
CN115354800A (en) Construction method of multi-label concrete wall column
CN211421135U (en) Bottom plate steel bar system for main structure of shield well foundation pit
CN110206193B (en) Rammed earth wall structure with double layers of reinforcing mesh sheets
CN216921349U (en) Concrete cast-in-place pitched roof construction template device
CN215670408U (en) Node connection structure of rib-outlet composite floor slab and cast-in-situ beam
CN114482553B (en) Method for intercepting and treating concrete of wall column with different concrete marks
CN215759633U (en) Concrete beam and wall, post connected node
CN110206311B (en) Rammed earth wall construction method for adding steel bars to square steel pipe column
CN111622356B (en) Construction method for beam-slab-column joints of frame structure
CN111335364A (en) Construction method for steel bar structure at concrete outer wall column when steel plate waterstop meets concrete
EP1715113A2 (en) Modular wall system
CN109826350A (en) A kind of connection method of laminated floor slab
CN110593271A (en) Node for enabling independent lattice column to penetrate through inner supporting beam and construction method of node
CN216195845U (en) Flower basket beam and post-added column connecting node structure
CN110512783A (en) The building cover structure being made of cast-in-place concrete Vierendeel girder and reinforced concrete slab
CN109440980A (en) A kind of layer high filling wall construction and its construction method
CN217580611U (en) Transverse seam-drawing mounting structure of wall column and beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination