CN113837475A - 有向图深度神经网络径流概率预报方法、***、设备及终端 - Google Patents
有向图深度神经网络径流概率预报方法、***、设备及终端 Download PDFInfo
- Publication number
- CN113837475A CN113837475A CN202111135983.6A CN202111135983A CN113837475A CN 113837475 A CN113837475 A CN 113837475A CN 202111135983 A CN202111135983 A CN 202111135983A CN 113837475 A CN113837475 A CN 113837475A
- Authority
- CN
- China
- Prior art keywords
- runoff
- directed graph
- forecasting
- neural network
- deep neural
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000013528 artificial neural network Methods 0.000 title claims abstract description 83
- 238000013277 forecasting method Methods 0.000 title claims abstract description 13
- 238000000034 method Methods 0.000 claims abstract description 92
- 238000012549 training Methods 0.000 claims abstract description 77
- 230000008569 process Effects 0.000 claims abstract description 73
- 230000002776 aggregation Effects 0.000 claims abstract description 29
- 238000004220 aggregation Methods 0.000 claims abstract description 29
- 238000005457 optimization Methods 0.000 claims abstract description 20
- ORILYTVJVMAKLC-UHFFFAOYSA-N Adamantane Natural products C1C(C2)CC3CC1CC2C3 ORILYTVJVMAKLC-UHFFFAOYSA-N 0.000 claims abstract description 18
- 238000003062 neural network model Methods 0.000 claims abstract description 13
- 230000006870 function Effects 0.000 claims description 36
- 239000013598 vector Substances 0.000 claims description 24
- 230000004913 activation Effects 0.000 claims description 20
- 238000009826 distribution Methods 0.000 claims description 16
- 238000011144 upstream manufacturing Methods 0.000 claims description 13
- 239000011159 matrix material Substances 0.000 claims description 12
- 230000007704 transition Effects 0.000 claims description 6
- 238000004590 computer program Methods 0.000 claims description 5
- 238000012545 processing Methods 0.000 claims description 5
- 238000003860 storage Methods 0.000 claims description 5
- 238000010276 construction Methods 0.000 claims description 4
- 238000013527 convolutional neural network Methods 0.000 claims description 4
- 108010014173 Factor X Proteins 0.000 claims description 3
- 230000001364 causal effect Effects 0.000 claims description 3
- 238000005259 measurement Methods 0.000 claims description 3
- 230000008447 perception Effects 0.000 claims description 3
- 238000011160 research Methods 0.000 claims description 3
- 239000000126 substance Substances 0.000 claims description 3
- 238000010606 normalization Methods 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 description 4
- 230000007547 defect Effects 0.000 description 3
- 238000011156 evaluation Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000013136 deep learning model Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000013076 uncertainty analysis Methods 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 125000004122 cyclic group Chemical group 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000013135 deep learning Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000010801 machine learning Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000006116 polymerization reaction Methods 0.000 description 1
- 230000008092 positive effect Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000013179 statistical model Methods 0.000 description 1
- 238000012706 support-vector machine Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/901—Indexing; Data structures therefor; Storage structures
- G06F16/9024—Graphs; Linked lists
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/04—Architecture, e.g. interconnection topology
- G06N3/045—Combinations of networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/02—Neural networks
- G06N3/08—Learning methods
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N7/00—Computing arrangements based on specific mathematical models
- G06N7/01—Probabilistic graphical models, e.g. probabilistic networks
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Strategic Management (AREA)
- Mathematical Physics (AREA)
- Computing Systems (AREA)
- General Health & Medical Sciences (AREA)
- Tourism & Hospitality (AREA)
- Human Resources & Organizations (AREA)
- Evolutionary Computation (AREA)
- Artificial Intelligence (AREA)
- Economics (AREA)
- Health & Medical Sciences (AREA)
- Databases & Information Systems (AREA)
- Marketing (AREA)
- Biophysics (AREA)
- Computational Linguistics (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Business, Economics & Management (AREA)
- Development Economics (AREA)
- Molecular Biology (AREA)
- Biomedical Technology (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Primary Health Care (AREA)
- Probability & Statistics with Applications (AREA)
- Algebra (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111135983.6A CN113837475B (zh) | 2021-09-27 | 2021-09-27 | 有向图深度神经网络径流概率预报方法、***、设备及终端 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202111135983.6A CN113837475B (zh) | 2021-09-27 | 2021-09-27 | 有向图深度神经网络径流概率预报方法、***、设备及终端 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113837475A true CN113837475A (zh) | 2021-12-24 |
CN113837475B CN113837475B (zh) | 2024-04-05 |
Family
ID=78970821
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202111135983.6A Active CN113837475B (zh) | 2021-09-27 | 2021-09-27 | 有向图深度神经网络径流概率预报方法、***、设备及终端 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113837475B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113935603A (zh) * | 2021-09-29 | 2022-01-14 | 中水珠江规划勘测设计有限公司 | 水库群多目标预报预泄调度规则优化方法、***、介质 |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090012746A1 (en) * | 2004-07-07 | 2009-01-08 | Suzanne Kairo | Predicting Sand-Grain Composition and Sand Texture |
CN102034001A (zh) * | 2010-12-16 | 2011-04-27 | 南京大学 | 一种以栅格为模拟单元的分布式水文模型设计方法 |
CN105181898A (zh) * | 2015-09-07 | 2015-12-23 | 李岩 | 基于大密度部署传感器的大气污染监控及管理方法及*** |
CN107944111A (zh) * | 2017-11-16 | 2018-04-20 | 河海大学 | 基于改进图论和水文模拟的河网水系连通度计算方法 |
CN108304668A (zh) * | 2018-02-11 | 2018-07-20 | 河海大学 | 一种结合水文过程数据和历史先验数据的洪水预测方法 |
CN109344999A (zh) * | 2018-09-07 | 2019-02-15 | 华中科技大学 | 一种径流概率预报方法 |
CN109902801A (zh) * | 2019-01-22 | 2019-06-18 | 华中科技大学 | 一种基于变分推理贝叶斯神经网络的洪水集合预报方法 |
CN110930016A (zh) * | 2019-11-19 | 2020-03-27 | 三峡大学 | 一种基于深度q学习的梯级水库随机优化调度方法 |
CN110991687A (zh) * | 2019-09-26 | 2020-04-10 | 深圳市东深电子股份有限公司 | 一种基于经验模型的水资源调度优化方法 |
US20200372349A1 (en) * | 2019-05-20 | 2020-11-26 | ClimateAI, Inc. | Systems and methods of data preprocessing and augmentation for neural network climate forecasting models |
CN112149984A (zh) * | 2020-09-17 | 2020-12-29 | 河海大学 | 一种基于贝叶斯网络的水库调洪多维不确定性风险分析方法 |
CN112506990A (zh) * | 2020-12-03 | 2021-03-16 | 河海大学 | 一种基于时空信息的水文数据异常检测方法 |
-
2021
- 2021-09-27 CN CN202111135983.6A patent/CN113837475B/zh active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20090012746A1 (en) * | 2004-07-07 | 2009-01-08 | Suzanne Kairo | Predicting Sand-Grain Composition and Sand Texture |
CN102034001A (zh) * | 2010-12-16 | 2011-04-27 | 南京大学 | 一种以栅格为模拟单元的分布式水文模型设计方法 |
CN102419788A (zh) * | 2010-12-16 | 2012-04-18 | 南京大学 | 基于渗蓄一体化动态产流机制的分布式水文模型的设计方法 |
CN105181898A (zh) * | 2015-09-07 | 2015-12-23 | 李岩 | 基于大密度部署传感器的大气污染监控及管理方法及*** |
CN107944111A (zh) * | 2017-11-16 | 2018-04-20 | 河海大学 | 基于改进图论和水文模拟的河网水系连通度计算方法 |
CN108304668A (zh) * | 2018-02-11 | 2018-07-20 | 河海大学 | 一种结合水文过程数据和历史先验数据的洪水预测方法 |
CN109344999A (zh) * | 2018-09-07 | 2019-02-15 | 华中科技大学 | 一种径流概率预报方法 |
CN109902801A (zh) * | 2019-01-22 | 2019-06-18 | 华中科技大学 | 一种基于变分推理贝叶斯神经网络的洪水集合预报方法 |
US20200372349A1 (en) * | 2019-05-20 | 2020-11-26 | ClimateAI, Inc. | Systems and methods of data preprocessing and augmentation for neural network climate forecasting models |
CN110991687A (zh) * | 2019-09-26 | 2020-04-10 | 深圳市东深电子股份有限公司 | 一种基于经验模型的水资源调度优化方法 |
CN110930016A (zh) * | 2019-11-19 | 2020-03-27 | 三峡大学 | 一种基于深度q学习的梯级水库随机优化调度方法 |
CN112149984A (zh) * | 2020-09-17 | 2020-12-29 | 河海大学 | 一种基于贝叶斯网络的水库调洪多维不确定性风险分析方法 |
CN112506990A (zh) * | 2020-12-03 | 2021-03-16 | 河海大学 | 一种基于时空信息的水文数据异常检测方法 |
Non-Patent Citations (5)
Title |
---|
周琦;朱跃龙;陆佳民;冯钧;: "组合式水文模型建模方法综述", 国外电子测量技术, no. 02 * |
崔巍;顾冉浩;陈奔月;王文;: "BP与LSTM神经网络在福建小流域水文预报中的应用对比", 人民珠江, no. 02 * |
沈军;聂作先;吴贤云;郭海峰;: "基于隐马尔可夫模型的中小河流致灾雨量阈值研究", 气象, no. 07 * |
许世刚, 王军: "前馈神经网络结构的模糊优选在径流预测中的应用", 水电能源科学, no. 03 * |
陶凤玲;袁俊英;刘海波;李钊年;倪三川;李积花;: "基于人工神经网络的龙羊峡水库入库径流预报", 青海大学学报(自然科学版), no. 04 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113935603A (zh) * | 2021-09-29 | 2022-01-14 | 中水珠江规划勘测设计有限公司 | 水库群多目标预报预泄调度规则优化方法、***、介质 |
CN113935603B (zh) * | 2021-09-29 | 2023-06-02 | 中水珠江规划勘测设计有限公司 | 水库群多目标预报预泄调度规则优化方法、***、介质 |
Also Published As
Publication number | Publication date |
---|---|
CN113837475B (zh) | 2024-04-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Sun et al. | Using Bayesian deep learning to capture uncertainty for residential net load forecasting | |
CN109902801B (zh) | 一种基于变分推理贝叶斯神经网络的洪水集合预报方法 | |
CN105391083B (zh) | 基于变分模态分解和相关向量机的风功率区间短期预测方法 | |
CN111860982A (zh) | 一种基于vmd-fcm-gru的风电场短期风电功率预测方法 | |
CN112488395A (zh) | 一种配电网线损预测方法及*** | |
CN110910004A (zh) | 一种多重不确定性的水库调度规则提取方法及*** | |
CN109063939B (zh) | 一种基于邻域门长短期记忆网络的风速预测方法及*** | |
CN111898831B (zh) | 一种实时洪水概率预报实用化方法 | |
CN111241755A (zh) | 电力负荷预测方法 | |
Li et al. | A novel combined prediction model for monthly mean precipitation with error correction strategy | |
Zhang et al. | Short-term power load forecasting using integrated methods based on long short-term memory | |
Song et al. | Short-term forecasting based on graph convolution networks and multiresolution convolution neural networks for wind power | |
CN115099511A (zh) | 基于优化copula的光伏功率概率估计方法及*** | |
CN112396152A (zh) | 一种基于cs-lstm的洪水预报方法 | |
CN111695290A (zh) | 一种适用于变化环境下的短期径流智能预报混合模型方法 | |
CN117175588B (zh) | 基于时空相关性的用电负荷预测方法及装置 | |
Ding et al. | Serial-parallel dynamic echo state network: A hybrid dynamic model based on a chaotic coyote optimization algorithm for wind speed prediction | |
Zhang et al. | A multi-step probability density prediction model based on gaussian approximation of quantiles for offshore wind power | |
CN111310963A (zh) | 电站的发电数据预测方法、装置、计算机设备和存储介质 | |
CN115329930A (zh) | 一种基于混合深度学习模型的洪水过程概率预报方法 | |
CN113837475B (zh) | 有向图深度神经网络径流概率预报方法、***、设备及终端 | |
Madhiarasan et al. | Analysis of artificial neural network performance based on influencing factors for temperature forecasting applications | |
Zhang et al. | A health condition assessment and prediction method of Francis turbine units using heterogeneous signal fusion and graph-driven health benchmark model | |
Yan et al. | Monthly runoff prediction using modified CEEMD-based weighted integrated model | |
CN113128666A (zh) | 基于Mo-S-LSTMs模型的时间序列多步预测方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Liu Yongqi Inventor after: Hou Guibing Inventor after: Li Yuanyuan Inventor after: Zhang Jian Inventor after: Xu Jingfeng Inventor after: Zhu Juming Inventor after: Lin Ruolan Inventor after: Li Zhenghe Inventor before: Liu Yongqi Inventor before: Hou Guibing Inventor before: Li Yuanyuan Inventor before: Zhang Jian Inventor before: Xu Jingfeng Inventor before: Zhu Juming Inventor before: Lin Ruolan Inventor before: Li Zhenghe |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |