CN113836887A - Checking and accepting method for configuration file of intelligent substation - Google Patents

Checking and accepting method for configuration file of intelligent substation Download PDF

Info

Publication number
CN113836887A
CN113836887A CN202111078066.9A CN202111078066A CN113836887A CN 113836887 A CN113836887 A CN 113836887A CN 202111078066 A CN202111078066 A CN 202111078066A CN 113836887 A CN113836887 A CN 113836887A
Authority
CN
China
Prior art keywords
checking
acceptance
personnel
accepting
file
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111078066.9A
Other languages
Chinese (zh)
Inventor
徐培栋
鲍有理
冯靖
王天序
夏圣杰
李达希
刘春光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
Wuxi Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Power Supply Co of State Grid Jiangsu Electric Power Co Ltd filed Critical Wuxi Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Priority to CN202111078066.9A priority Critical patent/CN113836887A/en
Publication of CN113836887A publication Critical patent/CN113836887A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/194Calculation of difference between files
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/44Arrangements for executing specific programs
    • G06F9/445Program loading or initiating
    • G06F9/44505Configuring for program initiating, e.g. using registry, configuration files
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Software Systems (AREA)
  • Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Computational Linguistics (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Artificial Intelligence (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of intelligent substations, and particularly discloses a checking and accepting method for configuration files of an intelligent substation, which comprises the following steps: initializing and configuring operation roles and authority of checking and accepting personnel; sending a pre-acceptance application to the checking and acceptance personnel; if the pre-acceptance result is failed, sending out prompt information for modifying and debugging the protection equipment to be accepted; if the pre-check result is passed, importing the configuration file and carrying out encryption storage; carrying out consistency analysis on the imported configuration files; if the analysis result is a non-difference point, outputting prompt information for completing acceptance check; and if the analysis result is the difference point, analyzing the difference point and returning to re-execute the step of sending the pre-acceptance application to the checking and acceptance personnel. The checking and acceptance method for the configuration file of the intelligent substation, provided by the invention, can solve the problems of missing of the acceptance means of the configuration file and missing of the full life cycle management and control method of the configuration file.

Description

Checking and accepting method for configuration file of intelligent substation
Technical Field
The invention relates to the technical field of intelligent substations, in particular to a checking and accepting method for configuration files of an intelligent substation.
Background
With the operation of more and more intelligent substations, the steps of secondary acceptance flow, acceptance method and acceptance specification are more and more complicated, and the requirements are increasingly improved. Virtual circuit modification, version or plug-in upgrading, transformation and new construction of intelligent equipment such as intelligent protection, merging units, intelligent terminals and the like all need to download the bottom layer configuration file again, single device configuration file modification relates to a plurality of equipment, and particularly when a new station is checked and accepted or transformed, the configuration file needs to be frequently modified, and the correctness, integrity, traceability and real consistency (the consistency of the configuration file and the SCD file) of the configuration file are very important.
A single configuration file of an intelligent device relates to huge code quantity, power production personnel can only check and accept a heavy loop and functions due to lack of corresponding identification and checking means for massive codes, particularly, field work is often multi-professional and concurrent, after the checking and accepting work of protection equipment is completed, other debugging work, automatic checking and accepting work and the like are often involved, the configuration file of the device is inevitably reinstalled when a problem occurs in any link, and the possibility that the configuration file of the device is completely checked and accepted before commissioning, the SCD of a finally submitted version and the configuration file after the completion of the pre-checking and accepting are inevitably caused to be inconsistent. The problem of wrong configuration can be caused particularly when the configuration file is newly downloaded and installed next time in transformation or plug-in replacement, the incorrect action event is further protected, and further the unreliable event of large-area power supply of a regional power grid is caused, so that the social and economic influences are huge.
Disclosure of Invention
The invention provides a checking and accepting method for configuration files of an intelligent substation, which solves the problems of configuration file checking and accepting means loss and configuration file full life cycle management and control loss in the related technology.
As an aspect of the present invention, a method for checking and accepting an intelligent substation configuration file is provided, where the method includes:
initializing operation roles and authority of configuration checking and accepting personnel, and initializing a configuration checking and accepting substation database;
sending a pre-acceptance application to the checking and acceptance personnel, and receiving a pre-acceptance result of the protection equipment to be accepted fed back by the checking and acceptance personnel;
if the pre-acceptance result is not passed, sending out prompt information for modifying and debugging the protection equipment to be accepted, and returning to the step of sending out the pre-acceptance application to the checking and acceptance personnel;
if the pre-acceptance result is passed, importing the configuration file, and encrypting and storing the configuration file;
carrying out consistency analysis on the imported configuration file and obtaining an analysis result;
if the analysis result is a non-difference point, outputting prompt information for completing acceptance check;
and if the analysis result is the difference point, analyzing the difference point and returning to re-execute the step of sending the pre-acceptance application to the checking and acceptance personnel.
Further, the initializing, configuring, checking operation roles and authority of the checking and accepting personnel includes:
different management authorities are respectively configured according to different operation roles of the checking and accepting personnel,
the operation roles of the checking and accepting personnel comprise an overhaul personnel, an operation and maintenance personnel, a debugging personnel and a manufacturer personnel, the authority of the overhaul personnel comprises checking all configuration files, importing all the configuration files and checking all the configuration files, the checking and managing process is performed on the operation and maintenance personnel, the authority of the operation and maintenance personnel comprises checking and accepting checking results, and the authority of the debugging personnel and the authority of the manufacturer personnel comprise checking and checking results.
Further, the initializing, configuring, checking and accepting the substation database includes:
and (4) realizing standardized and unique compilation of configuration files according to the voltage grade, the interval name, the equipment type, the number set, the device model, the version number, the check code and a manufacturer, and importing and establishing a check and acceptance substation database.
Further, the method for sending a pre-acceptance application to the checking and acceptance staff and receiving the pre-acceptance result of the protection device to be accepted fed back by the checking and acceptance staff comprises the following steps:
sending a pre-acceptance application to the checking and acceptance personnel;
after the checking and acceptance personnel finish the monomer acceptance of the protection equipment to be accepted at intervals, generating a pre-acceptance result of the protection equipment to be accepted;
and receiving the pre-acceptance result of the protection equipment to be accepted fed back by the checking and acceptance personnel.
Furthermore, the checking and acceptance personnel take the interval as a unit to check and accept the monomer of the protection equipment to be checked and accepted, and the checking and acceptance personnel comprises the full function and the loop acceptance of the conventional protection equipment;
wherein conventional protection equipment full-function is checked and accepted and is included that every definite value item homoenergetic correctly moves or does not move, the return circuit is checked and accepted and is included that can realize the complete circuit linkage of correct circuit breaker and the action is correct after the protection action.
Further, the configuration files include a pre-acceptance file, an as built acceptance file, and a submitted SCD parse file.
Further, the consistency analysis of the imported configuration file and the analysis result are obtained, including:
performing consistency analysis on the SCD analysis file and the pre-acceptance file;
performing consistency analysis on all configuration files and pre-acceptance files for completion acceptance before commissioning;
if the SCD analysis file is consistent with the pre-check received file, and all the configuration files before commissioning are consistent with the pre-check received file, obtaining an analysis result without difference points, or obtaining an analysis result with difference points.
Further, if the analysis result is a difference point, analyzing the difference point includes:
and analyzing communication configuration errors, virtual terminal increase and decrease and scheduling naming non-normative, and determining the behavior of protection and no action which can be caused by each difference point to obtain an improved guidance strategy of each difference point.
The checking and acceptance method for the configuration file of the intelligent substation provided by the invention can solve the problems of missing of the checking and acceptance means of the configuration file and missing of a full life cycle management and control method of the configuration file, further avoid the problem of wrong configuration of the intelligent substation during operation, avoid the events of incorrect action protection and large-area power failure of a power grid caused by the wrong configuration, tamp the long-term safe operation level of the intelligent substation during operation, and obviously improve the safety, stability and power supply reliability of the power grid operation.
Drawings
The accompanying drawings, which are included to provide a further understanding of the invention and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention and together with the description serve to explain the principles of the invention and not to limit the invention. In the drawings:
fig. 1 is a flowchart of a checking and accepting method for an intelligent substation configuration file provided by the present invention.
Fig. 2 is a flowchart of a specific embodiment of a checking and accepting method for an intelligent substation configuration file provided by the present invention.
Detailed Description
It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
In order to make those skilled in the art better understand the technical solution of the present invention, the technical solution in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that the terms "first," "second," and the like in the description and claims of the present invention and in the drawings described above are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order. It is to be understood that the data so used may be interchanged under appropriate circumstances in order to facilitate the description of the embodiments of the invention herein. Furthermore, the terms "comprises," "comprising," and "having," and any variations thereof, are intended to cover a non-exclusive inclusion, such that a process, method, system, article, or apparatus that comprises a list of steps or elements is not necessarily limited to those steps or elements expressly listed, but may include other steps or elements not expressly listed or inherent to such process, method, article, or apparatus.
In this embodiment, a method for checking and accepting an intelligent substation configuration file is provided, and fig. 1 is a flowchart of a method for checking and accepting an intelligent substation configuration file according to an embodiment of the present invention, and as shown in fig. 1, the method includes:
s110, initializing operation roles and authority of configuration checking and accepting personnel, and initializing a configuration checking and accepting substation database;
specifically, the user management function module of the checking and accepting terminal is checked intelligently, the user enters the system in the form of a super manager, and login operation roles and authority roles are set in management levels according to different role responsibilities and obligations of field workers such as maintainers, operation and maintenance personnel, debugging personnel and manufacturer personnel.
In this embodiment of the present invention, the initializing, configuring, checking operation roles and authority of the checking and accepting personnel includes:
different management authorities are respectively configured according to different operation roles of the checking and accepting personnel,
the operation roles of the checking and accepting personnel comprise an overhaul personnel, an operation and maintenance personnel, a debugging personnel and a manufacturer personnel, the authority of the overhaul personnel comprises checking all configuration files, importing all the configuration files and checking all the configuration files, the checking and managing process is performed on the operation and maintenance personnel, the authority of the operation and maintenance personnel comprises checking and accepting checking results, and the authority of the debugging personnel and the authority of the manufacturer personnel comprise checking and checking results.
Specifically, the initializing, configuring, checking and accepting the substation database includes:
and (4) realizing standardized and unique compilation of configuration files according to the voltage grade, the interval name, the equipment type, the number set, the device model, the version number, the check code and a manufacturer, and importing and establishing a check and acceptance substation database.
It should be understood that the method for checking and accepting the configuration file of the intelligent substation provided by the embodiment of the present invention may be a software implementation process running on an intelligent checking and accepting terminal.
S120, sending a pre-acceptance application to the checking and acceptance personnel, and receiving a pre-acceptance result of the protection equipment to be accepted fed back by the checking and acceptance personnel;
in the embodiment of the invention, a pre-acceptance application is sent to the checking and acceptance personnel;
after the checking and acceptance personnel finish the monomer acceptance of the protection equipment to be accepted at intervals, generating a pre-acceptance result of the protection equipment to be accepted;
and receiving the pre-acceptance result of the protection equipment to be accepted fed back by the checking and acceptance personnel.
Specifically, as shown in fig. 2, after receiving the acceptance request, the secondary team member completes the pre-acceptance of the protection device to be accepted in units of intervals.
It should be noted that the checking and acceptance personnel checks and accepts the single body of the protection device to be checked and accepted by taking the interval as a unit, and the checking and acceptance personnel checks and accepts the full function and the loop of the conventional protection device;
wherein conventional protection equipment full-function is checked and accepted and is included that every definite value item homoenergetic correctly moves or does not move, the return circuit is checked and accepted and is included that can realize the complete circuit linkage of correct circuit breaker and the action is correct after the protection action.
It should be further noted that the full-function acceptance of the conventional protection device includes that each fixed value item can correctly act or does not act, and the circuit acceptance includes that the correct circuit breaker full-circuit linkage and the action behavior are correct after the protection action, which is a precondition for checking and accepting the configuration file.
S130, if the pre-acceptance result is that the pre-acceptance result does not pass, sending out prompt information for modifying and debugging the protection equipment to be accepted, and returning to the step of sending the pre-acceptance application to the checking and acceptance personnel;
s140, if the pre-check result is passed, importing the configuration file and carrying out encryption storage;
it should be noted that, after the conventional protection equipment has the full functions and the correct circuit acceptance, the acceptance staff should synchronously import the device configuration file into the verification terminal for encrypted storage, and through the intelligent verification acceptance terminal, the acceptance file import function module is divided into three types, namely a pre-acceptance file, an acceptance completion file and an SCD (security coding description) analysis file according to the file types, and in order to prevent the imported configuration file from being maliciously tampered, the configuration file encryption anti-tampering import method is innovatively realized by combining an intelligent encryption algorithm and file coding characteristics, the import + encryption concurrent execution is realized, and the whole process controllability of the configuration file import link is ensured.
S150, carrying out consistency analysis on the imported configuration file, and obtaining an analysis result;
specifically, the configuration files include a pre-acceptance file, a file before power transmission and a submitted SCD analysis file.
In this embodiment of the present invention, the performing consistency analysis on the imported configuration file to obtain an analysis result includes:
performing consistency analysis on the SCD analysis file and the pre-acceptance file;
performing consistency analysis on all configuration files and pre-acceptance files for completion acceptance before commissioning;
if the SCD analysis file is consistent with the pre-check received file, and all configuration files which are completely checked and received before commissioning are consistent with the pre-check received file, obtaining an analysis result without difference points, or obtaining an analysis result with difference points.
Firstly, consistency analysis is carried out on the SCD analysis configuration file of the final submitted version and the configuration file of the prior intermediate acceptance and preservation, and secondly, consistency analysis is carried out on the internal configuration files of all devices subjected to the completion acceptance before commissioning and the configuration file of the prior intermediate acceptance and preservation. The analysis method is characterized in that a configuration file is imported according to the selected history, difference points are rapidly calculated and searched based on the file code value calculation and intelligent checking algorithm of the system, and the acceptance is finished if no difference point exists.
S160, if the analysis result is a non-difference point, outputting prompt information for completing acceptance check;
s170, if the analysis result is the difference point, analyzing the difference point and returning to re-executing the step of sending the pre-acceptance application to the checking and acceptance personnel.
In the embodiment of the present invention, if the analysis result is a difference point, analyzing the difference point includes:
and analyzing communication configuration errors, virtual terminal increase and decrease and scheduling naming non-normative, and determining the behavior of protection and no action which can be caused by each difference point to obtain an improved guidance strategy of each difference point.
The checking personnel develop difference result analysis according to the checking result, research is mainly carried out on problems such as communication configuration errors, virtual terminal increase and decrease, scheduling naming irregularity and the like, protection immobility behaviors possibly caused by each difference result are determined, each difference result is intelligently generated to improve a guidance strategy, the generated strategy can help secondary team production personnel to quickly identify and correct configuration file inconsistency or error configuration conditions, the configuration files of the intelligent device are updated, debugging and checking are carried out again, consistency checking and analysis are carried out again, checking and checking are completed after checking is passed, and operation of newly-launched intelligent station digital configuration 'zero defect and zero hidden danger' is guaranteed.
In summary, the checking and accepting method for the configuration file of the intelligent substation provided by the embodiment of the invention can solve the problems of missing of the checking and accepting means of the configuration file and missing of the full life cycle management and control method of the configuration file, further avoid the problem of wrong configuration of the intelligent substation during operation, avoid the events of incorrect action protection and large-area power failure of the power grid caused by the missing, tamp the long-term safe operation level of the intelligent substation during operation, and obviously improve the safety, stability and power supply reliability of the power grid operation.
It will be understood that the above embodiments are merely exemplary embodiments taken to illustrate the principles of the present invention, which is not limited thereto. It will be apparent to those skilled in the art that various modifications and improvements can be made without departing from the spirit and substance of the invention, and these modifications and improvements are also considered to be within the scope of the invention.

Claims (8)

1. A checking and accepting method for configuration files of an intelligent substation is characterized by comprising the following steps:
initializing operation roles and authority of configuration checking and accepting personnel, and initializing a configuration checking and accepting substation database;
sending a pre-acceptance application to the checking and acceptance personnel, and receiving a pre-acceptance result of the protection equipment to be accepted fed back by the checking and acceptance personnel;
if the pre-acceptance result is not passed, sending out prompt information for modifying and debugging the protection equipment to be accepted, and returning to the step of sending out the pre-acceptance application to the checking and acceptance personnel;
if the pre-acceptance result is passed, importing the configuration file, and encrypting and storing the configuration file;
carrying out consistency analysis on the imported configuration file and obtaining an analysis result;
if the analysis result is a non-difference point, outputting prompt information for completing acceptance check;
and if the analysis result is the difference point, analyzing the difference point and returning to re-execute the step of sending the pre-acceptance application to the checking and acceptance personnel.
2. The method for checking and accepting the configuration file of the intelligent substation according to claim 1, wherein the initializing, configuring and checking the operation role and authority of the checking and accepting personnel comprises the following steps:
different management authorities are respectively configured according to different operation roles of the checking and accepting personnel,
the operation roles of the checking and accepting personnel comprise an overhaul personnel, an operation and maintenance personnel, a debugging personnel and a manufacturer personnel, the authority of the overhaul personnel comprises checking all configuration files, importing all the configuration files and checking all the configuration files, the checking and managing process is performed on the operation and maintenance personnel, the authority of the operation and maintenance personnel comprises checking and accepting checking results, and the authority of the debugging personnel and the authority of the manufacturer personnel comprise checking and checking results.
3. The method for checking and accepting the configuration file of the intelligent substation according to claim 1, wherein the initializing the configuration checking and accepting substation database comprises:
and (4) realizing standardized and unique compilation of configuration files according to the voltage grade, the interval name, the equipment type, the number set, the device model, the version number, the check code and a manufacturer, and importing and establishing a check and acceptance substation database.
4. The method for checking and accepting the configuration file of the intelligent substation according to claim 1, wherein the sending of the pre-check acceptance application to the checking and accepting personnel and the receiving of the pre-check acceptance result of the protection device to be checked and accepted fed back by the checking and accepting personnel comprises:
sending a pre-acceptance application to the checking and acceptance personnel;
after the checking and acceptance personnel finish the monomer acceptance of the protection equipment to be accepted at intervals, generating a pre-acceptance result of the protection equipment to be accepted;
and receiving the pre-acceptance result of the protection equipment to be accepted fed back by the checking and acceptance personnel.
5. The method for checking and accepting the configuration file of the intelligent substation according to claim 4, wherein the checking and accepting personnel checks and accepts the single body of the protection equipment to be checked and accepted at intervals, wherein the checking and accepting personnel checks and accepts the full function and the loop of the conventional protection equipment;
wherein conventional protection equipment full-function is checked and accepted and is included that every definite value item homoenergetic correctly moves or does not move, the return circuit is checked and accepted and is included that can realize the complete circuit linkage of correct circuit breaker and the action is correct after the protection action.
6. The method of checking and accepting an intelligent substation configuration file according to claim 1, wherein the configuration file comprises a pre-acceptance file, an as-built acceptance file and a submitted SCD parse file.
7. The method for checking and accepting the configuration file of the intelligent substation according to claim 6, wherein the consistency analysis of the imported configuration file and the analysis result are obtained by:
performing consistency analysis on the SCD analysis file and the pre-acceptance file;
performing consistency analysis on all configuration files and pre-acceptance files for completion acceptance before commissioning;
if the SCD analysis file is consistent with the pre-check received file, and all the configuration files before commissioning are consistent with the pre-check received file, obtaining an analysis result without difference points, or obtaining an analysis result with difference points.
8. The method for checking and accepting the configuration file of the intelligent substation according to claim 7, wherein if the analysis result is a difference point, analyzing the difference point comprises:
and analyzing communication configuration errors, virtual terminal increase and decrease and scheduling naming non-normative, and determining the behavior of protection and no action which can be caused by each difference point to obtain an improved guidance strategy of each difference point.
CN202111078066.9A 2021-09-15 2021-09-15 Checking and accepting method for configuration file of intelligent substation Pending CN113836887A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111078066.9A CN113836887A (en) 2021-09-15 2021-09-15 Checking and accepting method for configuration file of intelligent substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111078066.9A CN113836887A (en) 2021-09-15 2021-09-15 Checking and accepting method for configuration file of intelligent substation

Publications (1)

Publication Number Publication Date
CN113836887A true CN113836887A (en) 2021-12-24

Family

ID=78959324

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111078066.9A Pending CN113836887A (en) 2021-09-15 2021-09-15 Checking and accepting method for configuration file of intelligent substation

Country Status (1)

Country Link
CN (1) CN113836887A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117076187A (en) * 2023-08-28 2023-11-17 国网江苏省电力有限公司南京供电分公司 Virtual loop verification method, device, equipment and medium

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065213A (en) * 2012-12-14 2013-04-24 河南省电力公司许昌供电公司 Converting station standardization inspection and acceptance auxiliary method based on workflow engine
CN109992571A (en) * 2019-03-26 2019-07-09 国网河南省电力公司电力科学研究院 A kind of intelligent substation configuration file line closed loop check system and method for calibration
CN110865849A (en) * 2019-11-04 2020-03-06 国网四川省电力公司电力科学研究院 Intelligent substation configuration file management and control method for improving debugging and operation and inspection efficiency
CN112366818A (en) * 2020-09-29 2021-02-12 内蒙古电力(集团)有限责任公司电力调度控制分公司 Automatic checking and accepting method and system for monitoring information of intelligent substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065213A (en) * 2012-12-14 2013-04-24 河南省电力公司许昌供电公司 Converting station standardization inspection and acceptance auxiliary method based on workflow engine
CN109992571A (en) * 2019-03-26 2019-07-09 国网河南省电力公司电力科学研究院 A kind of intelligent substation configuration file line closed loop check system and method for calibration
CN110865849A (en) * 2019-11-04 2020-03-06 国网四川省电力公司电力科学研究院 Intelligent substation configuration file management and control method for improving debugging and operation and inspection efficiency
CN112366818A (en) * 2020-09-29 2021-02-12 内蒙古电力(集团)有限责任公司电力调度控制分公司 Automatic checking and accepting method and system for monitoring information of intelligent substation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117076187A (en) * 2023-08-28 2023-11-17 国网江苏省电力有限公司南京供电分公司 Virtual loop verification method, device, equipment and medium

Similar Documents

Publication Publication Date Title
CN105389166B (en) A kind of method that self-described plug and play distribution terminal automatically accesses
CN104133443A (en) Method for automatically generating power grid dispatching operation order through power grid overhaul application forms
BR102015007965A2 (en) SYSTEM, COMPUTER-RELATED NON-TRANSIENT MEDIA AND METHOD
CN112700246B (en) Block chain-based data processing method, device, equipment and readable storage medium
CN106992520A (en) Power distribution network based on multi-source data stops monitoring method of sending a telegram in reply
CN109782724B (en) Control method for preventing misoperation-locking and terminal equipment
CN107797812A (en) A kind of charger remote online upgrade method and system
KR101919668B1 (en) Apparatus and method for test and evaluation of security patch for distribution automation system
CN105337978B (en) A kind of section method for verifying authority and system based on security service blocking
CN109587142A (en) A kind of the data safety AM access module and equipment of service-oriented stream
CN113836887A (en) Checking and accepting method for configuration file of intelligent substation
CN109683923B (en) Method and system for checking configuration file version of power distribution automation system
CN113553078A (en) Trackside equipment system upgrading method and device, electronic equipment and readable storage medium
CN110348545B (en) AR intelligent operation ticket method and device based on ERP system
CN104484275A (en) Method and system capable of remotely testing smart cards
CN111611624B (en) Verification method and system for partitioned digital signature of information point table file
CN103279702A (en) Method for monitoring full-substation model file version during debugging of intelligent substation
CN112667272A (en) Ammeter upgrading method and system, intelligent ammeter and storage medium
WO2023125706A1 (en) Test method and system for mileage order generation of battery swapping vehicle, device and medium
WO2020077051A1 (en) System and method for bot automation lifecycle management
CN113467852B (en) Configuration and verification method and system for inter-interval protection configuration file of intelligent substation
CN115577389A (en) Treatment method and system based on block chain system
CN113590375A (en) Block chain-based stability control device information verification method and system
CN114331326A (en) Job permission management system, method, device and equipment
CN110175736B (en) Automatic card disassembling and hanging method for power system regulation and control center

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination