CN113832958A - Anti-slide pile construction method with mechanical cooperation with manual excavation - Google Patents

Anti-slide pile construction method with mechanical cooperation with manual excavation Download PDF

Info

Publication number
CN113832958A
CN113832958A CN202111050584.XA CN202111050584A CN113832958A CN 113832958 A CN113832958 A CN 113832958A CN 202111050584 A CN202111050584 A CN 202111050584A CN 113832958 A CN113832958 A CN 113832958A
Authority
CN
China
Prior art keywords
pile
excavation
holes
manual
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202111050584.XA
Other languages
Chinese (zh)
Other versions
CN113832958B (en
Inventor
段宇
陈天亮
王宁
呼哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC SHEC Third Highway Engineering Co Ltd
Original Assignee
CCCC SHEC Third Highway Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC SHEC Third Highway Engineering Co Ltd filed Critical CCCC SHEC Third Highway Engineering Co Ltd
Priority to CN202111050584.XA priority Critical patent/CN113832958B/en
Publication of CN113832958A publication Critical patent/CN113832958A/en
Application granted granted Critical
Publication of CN113832958B publication Critical patent/CN113832958B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/207Securing of slopes or inclines with means incorporating sheet piles or piles
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/23Dune restoration or creation; Cliff stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a construction method of an anti-slide pile by mechanical cooperation with manual excavation, which comprises the following steps: after the ground is leveled, paying off and positioning rectangular pile holes, determining the excavation side line of the foundation pit, and manually excavating the foundation pit; constructing a locking notch; manually digging a hole to be fine and flat; the method comprises the following steps of determining the diameter of a rotary drilling bit according to the size of a rectangular pile, installing a drilling machine in place, and excavating a rotary drilling bit to match with manual pile hole excavation, wherein the pile hole excavation comprises the steps of: drilling holes in the four corner supports close to the rectangular-section pile retaining wall by using a rotary drilling rig, and excavating a center hole: overexcavating the geometric center of the peripheral holes to form a central hole, manually modifying, backfilling and supporting a mold: manually chiseling residual soil and stone which are not excavated in the peripheral holes, backfilling the residual soil and stone into the central hole, leveling to each designed depth, roughly leveling the ground, then erecting a retaining wall template and carrying out the next procedure of construction; pouring a retaining wall; hoisting a reinforcement cage; and (5) pouring concrete. The invention adopts mechanical cooperation and manual construction, and has the advantages of high hole forming speed, high construction efficiency, simple operation, low safety risk and the like.

Description

Anti-slide pile construction method with mechanical cooperation with manual excavation
Technical Field
The invention belongs to the technical field of rectangular slide-resistant pile construction, and particularly relates to a slide-resistant pile construction method through mechanical cooperation and manual excavation.
Background
In the construction process of the slide-resistant pile in the landslide section, a common excavation mode is manual hole digging or mechanical excavation, and the manual hole digging is suitable for clay and silty clay with better geological conditions or clay containing a small amount of sand gravel. Both the circular-section piles and the rectangular-section slide-resistant piles are suitable, but the safety risk is high and the efficiency is low. The rotary drilling hole is suitable for various stratums including rock layers, is suitable for a round section pile, and is relatively low in efficiency if matched with manual or mechanical hole expansion if used for a rectangular section slide-resistant pile.
Disclosure of Invention
The invention provides a slide-resistant pile construction method by mechanical cooperation with manual excavation, which solves the problem of low effect of a rectangular section pile.
The technical scheme of the invention is as follows: a construction method of an anti-slide pile by mechanical cooperation with manual excavation comprises the following steps:
1) after the ground is leveled, according to the set axis control points and the measured elevation level points, the piles are numbered one by one according to the pile position diagram, the pile positions are released according to the concrete positions corresponding to the pile foundation, the center of the pile position and the positions of the four corners of the pile are determined, lime lines are scattered to serve as the excavation boundary lines of the pile holes, and after the pile positions are positioned, the pile holes are excavated manually;
2) according to the center position of a lofting pile body, the inner diameter position of a lock opening is set out, C30 reinforced concrete is poured into the lock opening, the top surface of the lock opening is 30cm higher than the ground, concrete is hardened within 1m of the periphery of the lock opening, the thickness of the concrete is 10cm, a cross pile is buried while the lock opening is poured, a steel bar with a ground flat opening is adopted for the pile, the type of the steel bar adopts a steel bar with the diameter of phi 25, paint with red and white is brushed on the periphery of the lock opening, safety protective guards are arranged on the periphery of the lock opening, a winch foundation support is cast in place by C30 concrete, the thickness of the support is 150mm, a phi 10@150 x 150 steel bar net piece is arranged inside, the size and the position of the support are determined according to the actual situation on site, and the support and the lock opening are poured at the same time for construction;
3) manually using a pick, a spade and an air pick to finely level the bottom of the hole;
4) determining the diameter of a rotary drilling bit according to the size of the rectangular pile, wherein the diameter of the drill bit is preferably not less than 1/2 of the short side of the slide-resistant pile, installing a drilling machine in place, and excavating a pile hole by matching the rotary drilling bit with manpower;
dig soon and bore the manual work of cooperation and carry out stake hole excavation and include:
A) excavating peripheral holes: using rotary drilling rig to drill near rectangleDrilling holes in the four corner supports of the protective wall of the cross-section pile to reach the designed depth h of each section1Stopping excavating to form four peripheral holes;
B) excavating a center hole: the method comprises the following steps of over-digging at the geometric centers of peripheral holes to form central holes, wherein the central holes are used for providing working faces for over-digging, placing un-dug soil bodies on the periphery of a protective wall to optimize the digging process and reduce secondary digging, and the volume of the central holes can meet the requirement that the periphery of the peripheral holes are completely accommodated by the excavated soil bodies;
C) artificially modifying, backfilling and supporting a mold: manually chiseling residual soil and stone which are not excavated in the peripheral holes, backfilling the residual soil and stone into the central hole, leveling to each designed depth, roughly leveling the ground, then erecting a retaining wall template and carrying out the next procedure of construction;
5) pouring a retaining wall;
6) hoisting a reinforcement cage;
7) and (5) pouring concrete.
Further, the depth h of the central hole2Calculated according to the following formula:
Figure BDA0003252799860000021
furthermore, the excavation positions of the peripheral holes are 5cm away from four corners of the guard wall of the rectangular-section pile.
Furthermore, the peripheral holes are overlapped at the center, the overlapped point is the center of the central hole, a soil pile is not required to be formed, and after the construction of the four peripheral holes is completed, rough flattening is carried out on the field to prepare for the construction of the central hole excavation.
Furthermore, in the manual modification backfilling and formwork erecting, earth and stone near the retaining wall are manually excavated by adopting a shovel matched with a pneumatic pick earth or a water-milled diamond and backfilled to the central hole.
Furthermore, the peripheral holes can be excavated from the backer side to the line side in sequence in the clockwise direction during excavation.
The invention has the advantages that: the construction method for the slide-resistant pile by adopting machinery to cooperate with manual work solves the problems that the efficiency of crushing and rock entering of the manual hole digging pile is low, blasting and excavation are not allowed under the complex environment, and the hole forming construction difficulty is very high, and simultaneously solves the problem that the efficacy is relatively low when the rotary drilling hole forming is used for the slide-resistant pile with the rectangular cross section.
Drawings
FIG. 1 is an excavation schematic diagram of the anti-slide pile construction method of the invention with mechanical cooperation and manual excavation;
FIG. 2 is a schematic diagram of excavation depth of the slide-resistant pile construction method with mechanical cooperation and manual excavation of the invention;
Detailed Description
The present invention will now be described more fully hereinafter with reference to the accompanying drawings, in which a person skilled in the art can, without any creative effort, fully implement the present invention.
The specific implementation mode of the invention is as follows: a construction method of an anti-slide pile by mechanical cooperation with manual excavation comprises the following steps:
1) after the ground is leveled, according to the set axis control points and the measured elevation level points, the piles are numbered one by one according to the pile position diagram, the pile positions are released according to the concrete positions corresponding to the pile foundation, the center of the pile position and the positions of the four corners of the pile are determined, lime lines are scattered to serve as the excavation boundary lines of the pile holes, and after the pile positions are positioned, the pile holes are excavated manually;
2) according to the center position of a lofting pile body, the inner diameter position of a lock opening is set out, C30 reinforced concrete is poured into the lock opening, the top surface of the lock opening is 30cm higher than the ground, concrete is hardened within 1m of the periphery of the lock opening, the thickness of the concrete is 10cm, a cross pile is buried while the lock opening is poured, a steel bar with a ground flat opening is adopted for the pile, the type of the steel bar adopts a steel bar with the diameter of phi 25, paint with red and white is brushed on the periphery of the lock opening, safety protective guards are arranged on the periphery of the lock opening, a winch foundation support is cast in place by C30 concrete, the thickness of the support is 150mm, a phi 10@150 x 150 steel bar net piece is arranged inside, the size and the position of the support are determined according to the actual situation on site, and the support and the lock opening are poured at the same time for construction;
3) manually using a pick, a spade and an air pick to finely level the bottom of the hole;
4) determining the diameter of a rotary drilling bit according to the size of the rectangular pile, wherein the diameter of the drill bit is preferably not less than 1/2 of the short side of the slide-resistant pile, installing a drilling machine in place, and excavating a pile hole by matching the rotary drilling bit with manpower;
as shown in fig. 1-2, the excavating and drilling of the pile hole in cooperation with manual work comprises:
A) excavating peripheral holes: drilling holes in the four corner supports close to the retaining wall of the rectangular-section pile by using a rotary drill, and stopping excavation when the hole is drilled to each designed depth h1 to form four peripheral holes;
B) excavating a center hole: the method comprises the following steps of over-digging at the geometric centers of peripheral holes to form central holes, wherein the central holes are used for providing working faces for over-digging, placing un-dug soil bodies on the periphery of a protective wall to optimize the digging process and reduce secondary digging, and the volume of the central holes can meet the requirement that the periphery of the peripheral holes are completely accommodated by the excavated soil bodies;
C) artificially modifying, backfilling and supporting a mold: manually chiseling residual soil and stone which are not excavated in the peripheral holes, backfilling the residual soil and stone into the central hole, leveling to each designed depth, roughly leveling the ground, then erecting a retaining wall template and carrying out the next procedure of construction;
5) pouring a retaining wall;
6) hoisting a reinforcement cage;
7) and (5) pouring concrete.
Further, the depth h of the central hole2Calculated according to the following formula:
Figure BDA0003252799860000041
furthermore, the excavation positions of the peripheral holes are 5cm away from four corners of the guard wall of the rectangular-section pile.
Furthermore, the peripheral holes are overlapped at the center, the overlapped point is the center of the central hole, a soil pile is not required to be formed, and after the construction of the four peripheral holes is completed, rough flattening is carried out on the field to prepare for the construction of the central hole excavation.
Furthermore, in the manual modification backfilling and formwork erecting, earth and stone near the retaining wall are manually excavated by adopting a shovel matched with a pneumatic pick earth or a water-milled diamond and backfilled to the central hole.
Further, the peripheral holes may be excavated sequentially from the backer side to the line side in a clockwise direction, as shown in fig. 1.
While the preferred embodiments of the invention have been described, it is to be understood that the invention is not limited to the precise embodiments described, and that equipment and structures not described in detail are understood to be practiced as commonly known in the art; any simple modification, equivalent change and modification of the above embodiments according to the technical essence of the present invention by those skilled in the art can be made without departing from the technical scope of the present invention, and still fall within the protection scope of the technical solution of the present invention.

Claims (8)

1. The construction method of the slide-resistant pile by mechanical cooperation with manual excavation is characterized by comprising the following steps of:
1) after the ground flattening, carry out rectangle stake hole unwrapping wire location, confirm the foundation ditch excavation sideline, the manual work carries out the foundation ditch excavation: after the ground is leveled, according to the set axis control points and the measured elevation level points, the piles are numbered one by one according to the pile position diagram, the pile positions are released according to the concrete positions corresponding to the pile foundation, the center of the pile position and the positions of the four corners of the pile are determined, lime lines are scattered to serve as the excavation boundary lines of the pile holes, and after the pile positions are positioned, the pile holes are excavated manually;
2) constructing a locking notch and a winch support;
3) manually using a pick, a spade and an air pick to finely level the bottom of the hole;
4) determining the diameter of a rotary drilling bit according to the size of the rectangular pile, installing a drilling machine in place, and excavating pile holes by matching the rotary drilling bit with manpower;
5) pouring a retaining wall;
6) hoisting a reinforcement cage;
7) and (5) pouring concrete.
2. The method for constructing the slide-resistant pile by mechanical cooperation of manual excavation according to claim 1, wherein the concrete manner in the step 2 is as follows: according to the center position of a lofting pile body, the inner diameter position of a lock opening is set out, C30 reinforced concrete is poured into the lock opening, the top surface of the lock opening is 30cm higher than the ground, concrete is hardened within 1m of the periphery of the lock opening, the thickness of the concrete is 10cm, a cross pile is buried while the lock opening is poured, a steel bar with a ground flat opening is adopted as the pile protector, the type of the steel bar is phi 25, paint with red and white intervals is brushed on the periphery of the lock opening, safety protective guards are arranged on the periphery of the lock opening, a winch foundation support is cast in place by C30 concrete, the thickness of the support is 150mm, a phi 10@150 x 150 steel bar mesh is arranged inside the support, the size and the position of the support are determined according to the actual situation on site, and the support and the lock opening are poured simultaneously.
3. The slide-resistant pile construction method based on mechanical cooperation with manual excavation according to claim 2, wherein the rotary drilling and manual cooperation with pile hole excavation comprises the following steps:
A) excavating peripheral holes: drilling holes in the four corner supports close to the protecting wall of the rectangular-section pile by using a rotary drilling rig to reach the designed depth h of each section1Stopping excavating to form four peripheral holes;
B) excavating a center hole: the method comprises the following steps of over-digging at the geometric centers of peripheral holes to form central holes, wherein the central holes are used for providing working faces for over-digging, placing un-dug soil bodies on the periphery of a protective wall to optimize the digging process and reduce secondary digging, and the volume of the central holes can meet the requirement that the periphery of the peripheral holes are completely accommodated by the excavated soil bodies;
C) artificially modifying, backfilling and supporting a mold: and (4) manually chiseling residual soil and stone which are not excavated in the peripheral holes, backfilling the residual soil and stone into the central hole, leveling to each designed depth, roughly leveling the ground, then erecting a retaining wall template, and carrying out the next procedure of construction.
4. The method of constructing a slide pile by mechanical cooperation of manual excavation according to claim 3, wherein the depth h of the central hole2Calculated according to the following formula:
Figure FDA0003252799850000021
5. the method for constructing the slide-resistant pile by mechanical cooperation of manual excavation according to claim 4, wherein the excavation position of the peripheral holes is 5cm away from four corners of the rectangular-section pile retaining wall.
6. The method of claim 5, wherein the peripheral holes are overlapped at a central position, the overlapping point is the center of the central hole, soil should not be piled, and after the construction of the four peripheral holes is completed, the site is roughly leveled to prepare for the central hole excavation.
7. The method for constructing a slide-resistant pile by mechanical cooperation of manual excavation according to claim 6, wherein the manual modification, backfilling and formwork supporting are performed by manually excavating and backfilling earth and stone near the retaining wall to a central hole by using a spade in cooperation with a pick earth or by using a water-milled diamond.
8. The method for constructing a slide-resistant pile by mechanical cooperation of manual excavation according to claim 7, wherein the peripheral holes are excavated sequentially from the backer side to the line side in a clockwise direction.
CN202111050584.XA 2021-09-08 2021-09-08 Anti-slide pile construction method with mechanical cooperation with manual excavation Active CN113832958B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111050584.XA CN113832958B (en) 2021-09-08 2021-09-08 Anti-slide pile construction method with mechanical cooperation with manual excavation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111050584.XA CN113832958B (en) 2021-09-08 2021-09-08 Anti-slide pile construction method with mechanical cooperation with manual excavation

Publications (2)

Publication Number Publication Date
CN113832958A true CN113832958A (en) 2021-12-24
CN113832958B CN113832958B (en) 2023-04-18

Family

ID=78958804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111050584.XA Active CN113832958B (en) 2021-09-08 2021-09-08 Anti-slide pile construction method with mechanical cooperation with manual excavation

Country Status (1)

Country Link
CN (1) CN113832958B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351694A (en) * 2022-01-17 2022-04-15 中国五冶集团有限公司 Foundation pile foundation pore-forming construction method
CN115354673A (en) * 2022-08-19 2022-11-18 四川省公路规划勘察设计研究院有限公司 Hole forming method for anti-slide pile in red bed soft rock area and hoisting type manual auxiliary device
CN115492095A (en) * 2022-10-11 2022-12-20 攀钢集团工程技术有限公司 Method for quickly forming hole in retaining wall type rectangular slide-resistant pile
CN116005693A (en) * 2023-01-04 2023-04-25 北京住总集团有限责任公司 Rock area combined type hole digging anti-slide pile structure and construction method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4778220A (en) * 1985-12-21 1988-10-18 Klaus Linde Tunnel driving apparatus
JPH0365739U (en) * 1989-10-31 1991-06-26
JPH10219681A (en) * 1997-02-04 1998-08-18 Hikari Giken Kogyo Kk Bottom expanded footing creating construction method and device for power transmission steel tower
JP2000145381A (en) * 1998-11-09 2000-05-26 Kajima Corp Tail seal for expansion-contraction type shield machine
CN102677671A (en) * 2011-03-17 2012-09-19 江苏核电有限公司 Construction method of precast pile in thick-slag-stone-layer field
CN102733376A (en) * 2012-07-02 2012-10-17 朱建新 Composite pile and construction method thereof
CN108487268A (en) * 2018-06-04 2018-09-04 华东交通大学 A kind of square hollow ladder reducing anti-slide pile structure and construction method
CN108505935A (en) * 2018-04-17 2018-09-07 上海建工集团股份有限公司 Rectangle pile foundation drilling construction equipment and construction method
CN109630015A (en) * 2018-11-26 2019-04-16 中铁二十局集团第二工程有限公司 A kind of friction pile mechanical hole building method
CN112267824A (en) * 2020-10-16 2021-01-26 北京三一智造科技有限公司 Pile foundation construction method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4778220A (en) * 1985-12-21 1988-10-18 Klaus Linde Tunnel driving apparatus
JPH0365739U (en) * 1989-10-31 1991-06-26
JPH10219681A (en) * 1997-02-04 1998-08-18 Hikari Giken Kogyo Kk Bottom expanded footing creating construction method and device for power transmission steel tower
JP2000145381A (en) * 1998-11-09 2000-05-26 Kajima Corp Tail seal for expansion-contraction type shield machine
CN102677671A (en) * 2011-03-17 2012-09-19 江苏核电有限公司 Construction method of precast pile in thick-slag-stone-layer field
CN102733376A (en) * 2012-07-02 2012-10-17 朱建新 Composite pile and construction method thereof
CN108505935A (en) * 2018-04-17 2018-09-07 上海建工集团股份有限公司 Rectangle pile foundation drilling construction equipment and construction method
CN108487268A (en) * 2018-06-04 2018-09-04 华东交通大学 A kind of square hollow ladder reducing anti-slide pile structure and construction method
CN109630015A (en) * 2018-11-26 2019-04-16 中铁二十局集团第二工程有限公司 A kind of friction pile mechanical hole building method
CN112267824A (en) * 2020-10-16 2021-01-26 北京三一智造科技有限公司 Pile foundation construction method

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
刘永明等: "矩形抗滑桩旋挖钻引孔辅助人工开挖技术", 《四川建筑》 *
李德荣等: "旋挖钻配合人工分步开挖抗滑桩施工工艺数值分析", 《河南科技》 *
铁道部工务局: "《路基 修订版》", 30 September 1993, 中国铁道出版社 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114351694A (en) * 2022-01-17 2022-04-15 中国五冶集团有限公司 Foundation pile foundation pore-forming construction method
CN115354673A (en) * 2022-08-19 2022-11-18 四川省公路规划勘察设计研究院有限公司 Hole forming method for anti-slide pile in red bed soft rock area and hoisting type manual auxiliary device
CN115354673B (en) * 2022-08-19 2023-09-05 四川省公路规划勘察设计研究院有限公司 Anti-slide pile pore-forming method for red-layer soft rock area and hoisting type artificial auxiliary device
CN115492095A (en) * 2022-10-11 2022-12-20 攀钢集团工程技术有限公司 Method for quickly forming hole in retaining wall type rectangular slide-resistant pile
CN116005693A (en) * 2023-01-04 2023-04-25 北京住总集团有限责任公司 Rock area combined type hole digging anti-slide pile structure and construction method thereof
CN116005693B (en) * 2023-01-04 2023-08-25 北京住总集团有限责任公司 Rock area combined type hole digging anti-slide pile structure and construction method thereof

Also Published As

Publication number Publication date
CN113832958B (en) 2023-04-18

Similar Documents

Publication Publication Date Title
CN113832958B (en) Anti-slide pile construction method with mechanical cooperation with manual excavation
CN110593753A (en) Mechanical rapid hole forming construction method for rectangular slide-resistant pile
CN109183787A (en) A kind of forming method of man-made digging pile mould-pipe
CN112064751A (en) Deep groove construction method for drainage pipeline
CN113216832A (en) Water-mill drilling construction method for pile hole in karst area
CN111608174A (en) Karst area karst cave treatment method based on punched cast-in-place pile
CN112609690A (en) Construction method of rotary drilling cast-in-place pile in sea-filling geological complex area
CN113174961A (en) Side slope foundation pit supporting method
CN104480929A (en) Pile and wall integrated construction method for applying occlusive pile into permanent basement external wall
CN109208594B (en) Treatment method for steel casing sinking meeting boulder, steel casing structure and drilled pile
CN107059904A (en) A kind of underground pipe gallery ponding well excavation method
CN114059527A (en) Large-diameter mixing pile construction method suitable for high-groundwater-level hard soil layer
CN101994314A (en) Longhole rectangular terraced antiskid pile jump-preventing excavating construction
CN111561262A (en) Hole forming method of rotary drilling rig for large-size pile hole in karst area
CN111608459A (en) Construction method of underground diaphragm wall in underground air-raid shelter area
CN112281897A (en) Construction method of bridge pile foundation
CN216159751U (en) Anti-slide pile hole digging construction structure
CN111042144B (en) Excavation method for foundation pit of underground beam under condition of continuous flow of riverway in cold region
CN104988981B (en) A kind of well construction method of riding on present situation operation shield method drainage pipeline
CN113737781A (en) Combined type hole digging pile construction structure and construction method thereof
CN112982381A (en) Construction method of slide-resistant pile
CN112942399A (en) Open caisson mechanical construction device and method for penetrating rock stratum
CN112065433A (en) Pipe jacking working well supporting and water stopping assembly and construction method
CN112726565A (en) Construction method for rotary digging pile penetrating through construction waste
CN114645521B (en) Construction method for import of emergency water discharge hole of existing reservoir

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant