CN102733376A - Composite pile and construction method thereof - Google Patents

Composite pile and construction method thereof Download PDF

Info

Publication number
CN102733376A
CN102733376A CN201210229106XA CN201210229106A CN102733376A CN 102733376 A CN102733376 A CN 102733376A CN 201210229106X A CN201210229106X A CN 201210229106XA CN 201210229106 A CN201210229106 A CN 201210229106A CN 102733376 A CN102733376 A CN 102733376A
Authority
CN
China
Prior art keywords
pile
tube
outer tube
stake
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210229106XA
Other languages
Chinese (zh)
Other versions
CN102733376B (en
Inventor
朱建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Jinzhuang Geotechnical Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210229106.XA priority Critical patent/CN102733376B/en
Priority to CN201910639878.2A priority patent/CN110318393B/en
Priority to CN201910639879.7A priority patent/CN110318394B/en
Priority to CN201410088076.4A priority patent/CN103821138B/en
Publication of CN102733376A publication Critical patent/CN102733376A/en
Application granted granted Critical
Publication of CN102733376B publication Critical patent/CN102733376B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a composite pile and a construction method thereof. The composite pile comprises a first pile as a peripheral pile, and a second pile as a core pile, wherein the first pile is a cast-in-situ pile; a second pile is a cast-in-situ pile or a precast pile; a centre distance d between the first pile and the second pile is equal to 0; area ratio S of the second pile to the first pile is S2/S1; length ratio L of the second pile to the first pile is L2/L1, wherein S belongs to (0, 1), and L is more than 0.5. According to the invention, construction is convenient and reasonable; proper construction devices and construction processes are selected according to stratum conditions, site conditions, ambient environment and work amount; tube sinking and tube drawing systems can be a set of device, and also can be different independent devices; a pile is constructed integrally by a device, and also is constructed by a plurality of devices; and a plurality of devices operate in a flow line.

Description

Composite pile and job practices thereof
Technical field
The present invention relates to a kind of composite pile and job practices thereof.
Background technology
The construction technology of existing tube-sinking cast-in-situ pile, compaction pile, preformed pile is generally run into the pan soil district and is difficult to construction, is difficult to pass through, and generally adopts soil borrowing lead-hole, and loss part bearing capacity is often worked hard but get little result; Generally run into soft clay area and risk one's life to strengthen the lengthening stake and obtain a bearing capacity, often expensively do not please.
Summary of the invention
The object of the present invention is to provide that a kind of construction feature of environmental protection is good, cost performance is good, reliable quality composite pile and job practices thereof.
Technical solution of the present invention is:
A kind of composite pile; It is characterized in that: comprise that it is characterized in that: first is present walling pile, and second is present walling pile or preformed pile as first of outer skirt piles with as second of core stake; First dowel section area is S1, the long L1 of being of total stake; To be that S2, total stake are long be L2 to second dowel section area, first with second center to center distance d=0, second area with first compares S Ratio=S2/S1, second length with first compares L Ratio=L2/L1, wherein S Ratio∈ (0,1), L Ratio>0.5; Work as S RatioDuring ∈ (0,0.25), second as first the body of putting more energy into; Work as S RatioDuring ∈ (0.25,0.75), first and second the formation composite pile that interacts; Work as S RatioDuring ∈ (0.75,1), first as second circular thin-wall stake; Compound service factor between second and first (frictional force raising coefficient) f 1-2∈ (1.5,3.0).
First is present walling pile, pile body have expand neck, hole enlargement, expansion along pile body at the bottom of, one or more forms in the full thread, whole line, a mutual screw thread, straight line; Said present walling pile is solid pile or hollow pile, and wherein hollow pile is the stake of pen container type tube or the not hollow type tube stake of back cover of bottom of bottom back cover.
Second is present walling pile or preformed pile; Said present walling pile have expand neck, hole enlargement, expansion along pile body at the bottom of, one or more forms in the full thread, whole line, a mutual screw thread, straight line; Said preformed pile is solid pile or hollow pile, and wherein the hollow pile inner chamber is the form of full section or segmentation perfusion steel concrete.
A kind of job practices of composite pile is characterized in that: comprise the following steps:
(1) construction is first: comprise one of following method:
Method A:
(1) telephone-moving is in place: mobile device is located in outer tube on the setting stake position;
(2) immersed tube: the degree of depth that outer tube is sunk down into setting;
(3) build moulding: on carry in the rammer system, build pile body;
(4) tube drawing moulding: extract outer tube, forming pile;
Method B:
(1) telephone-moving is in place: mobile device is located in drilling rod on the setting stake position;
(2) spinning sinks: the degree of depth that drilling rod spinning is sunk down into setting;
(3) revolve to pull on and carry:
Drilling rod revolved draw, curing compound is pressed irritate to the stake hole simultaneously, revolve to pull on and carry, accomplish solid pile to setting height;
Or: drilling rod revolved draw, simultaneously curing compound is injected the soil body, revolve to pull on and carry, and repeat spinning and sink to revolving and draw step, with curing compound and cutting of soil body positive mechanical and stirring spinning, completion solid pile with drilling rod to setting height;
(4) when being set at hollow pile for first, then accomplish solid pile construction back in the time of 1 ~ 10 hour in step (3), carry out the construction of one of following method:
(a) telephone-moving is in place, and the concentric spinning of auger stem sinks down into set depth, revolves to pull on and carries, and forms hollow pile, and the drilling diameter of this auger boring is less than the stake bore dia of step (2) drilling rod spinning sinking formation; The depth of pore forming of this auger boring forms the pen container type tube stake of bottom back cover less than the stake hole depth that step (2) drilling rod spinning sinks to forming; Or the depth of pore forming of this auger boring is not less than the stake hole depth that step (2) drilling rod spinning sinks to forming, the not hollow type tube stake of back cover bottom forming;
(b) telephone-moving is in place, drops hammer certainly to mention with one heart and does the movement of falling object, and interior rammer punching pile body forms sheared edge, and dropping hammer certainly to thresh moves up and down, and forms hollow pile; This rams the stake bore dia that the pile body drilling diameter sinks to forming less than step (2) drilling rod spinning in dropping hammer, this rams the pile body depth of pore forming less than the stake hole depth that step (2) drilling rod spinning sinks in dropping hammer, form the pen container type tube stake of bottom back cover; Or ram the stake hole depth that the pile body depth of pore forming is not less than step (2) drilling rod spinning sinking formation in dropping hammer certainly, form the not hollow type tube stake of back cover of bottom;
(c) telephone-moving is in place; Adopt static pressure, back-pressure, hammering vibration or the concentric immersed tube pile sinking of other external force to set depth; The tube drawing pile pulling forms hollow pile to setting height, and the drilling diameter of this immersed tube pile sinking is less than the stake bore dia of step (2) drilling rod spinning sinking formation; The depth of pore forming of this immersed tube pile sinking forms the pen container type tube stake of bottom back cover less than the stake hole depth that step (2) drilling rod spinning sinks to forming; Or the depth of pore forming of this immersed tube pile sinking is not less than the stake hole depth that step (2) drilling rod spinning sinks to forming, the not hollow type tube stake of back cover bottom forming;
(2) construction is second: comprise one of following method:
Method A:
(1) in place: that outer concentric tube is located on first stake position of setting;
(2) immersed tube: the degree of depth that outer tube is sunk down into setting;
(3) build moulding: on carry in the rammer system, build pile body or transfer precast pile, when transferring precast pile, gap, precast pile outside is filled with the curing compound filling;
(4) tube drawing moulding: extract outer tube, forming pile;
Method B:
Adopt static pressure, back-pressure, hammering, vibration or other external force and first concentric pile sinking to set depth; Second when being hollow preformed pile, with lower sealing on the hollow pile, back cover adopts shoe or iron plate during pile sinking; Bind and adopt stopper or iron plate; Behind the earth excavation, take out stopper or the iron plate bound, build steel concrete by designing requirement segmentation or full section then.
Pile body is one or more complex forms in straight line, screw thread, the mutual line thread type, and the employing expanding method expands at the bottom of neck, hole enlargement, the expansion pile body.
Construct among first second the method A of method A and construction, outer tube is a single tube steel pipe casing; Interior rammer system is a single tube inner tamping tube form; The external diameter of single tube inner tamping tube is littler than outer tube diameter; The top of inner tamping tube be provided with diameter greater than outer external diameter of pipe, with the dish of ramming of tup coupling; The steel plate back cover is adopted in the bottom of inner tamping tube, and the diameter of steel plate is rammed the length that the length of coiling lower end to inner tamping tube bottom is not more than outer tube between inner tamping tube external diameter and outer tube diameter; Or interior rammer system is a single tube inner tamping tube hammer; The diameter of single tube inner tamping tube hammer is less than outer tube diameter; In single tube inner tamping tube hammer inner chamber filling slag, cast iron water, the coarse-fine aggregate one or more; The upper and lower side of single tube inner tamping tube hammer seals with steel plate, and the epimere of single tube inner tamping tube hammer is hollow tubular, and hypomere is solid hammer shape; Or interior rammer system is a diameter less than the interior rammer of outer tube diameter from dropping hammer; Or interior rammer system is the inner tamping tube of diameter less than outer tube diameter, and the steel plate back cover is used in the bottom of inner tamping tube, and steel plate top filling coarse-fine aggregate, steel plate, burlap or rubber cushion ram from dropping hammer or interior rammer electrically operated hammer in inner tamping tube is built-in.
Construct among first second the method A of method A and construction, the immersed tube method includes one or more in the following manner:
(1) potential energy directly acts on outer tube, directly outer tube is sunk to set depth;
(2) potential energy directly acts on inner and outer pipes, directly the inner and outer pipes system synchronization is sunk to set depth;
(3) rammer system in potential energy directly acts on: inner tamping tube hammer in the outer tube or the interior hammer ram in the inner tamping tube are through manually-operated, mechanically actuated or automation mechanized operation; Freely falling body or continuous hammering move up and down, and sink to set depth synchronously by the moving outer tube of dribbling of ramming that is provided with on the inner tamping tube; When pore-forming does not collapse the hole, do not establish outer tube, interior rammer system directly sinks to set depth;
(4) rammer system and outer tube in potential energy acts on respectively:
A) rammer system in potential energy directly acts on: the interior hammer ram in the interior hammer ram in the outer tube or hammer of the inner tamping tube in the outer tube or the inner tamping tube is through manually-operated, mechanically actuated or automation mechanized operation; Freely falling body or continuous hammering move up and down; The soil body under the punching outer tube or pile body form and shear the soil body or sheared edge;
B) potential energy directly acts on outer tube, and outer tube adopts one of following method to sink at least: 1. under the outer tube deadweight, outer tube sinks from gravity along shearing the soil body or sheared edge; 2. start back-pressure or static pressure water booster system on the outer tube, outer tube sinks along shearing the pressurization of the soil body or sheared edge; 3. start the vibrating device on the outer tube, outer tube is along shearing the soil body or sheared edge vibration-sunk; 4. start vibration and water booster system on the outer tube simultaneously, outer tube along shear the soil body or sheared edge shake depress heavy; 5. start the spinning apparatus on the outer tube, outer tube sinks along shearing the soil body or sheared edge spinning; 6. start the dematron device on the outer tube, outer tube is sunk along shearing the soil body or sheared edge rubbing and pressure;
C) interactive step a), b), sink down into set depth up to inner and outer pipes.
Construct among first second the method A of method A and construction; After the immersed tube step, ram the expansion moulding earlier and build moulding again; The method that ram to expand moulding is: on put forward the interior rammer system in the outer tube, by setting inventory inserts is dropped in the outer tube, on pull out outer tube certain altitude h >=0; In ram system repeatedly and ram inserts and form enlarged footing, adjust the compacted degree of the soil body and size, the shape of tamper diffusion head through adjusting following coefficient: degree of lifting h on the height H that feeds intake, the outer tube, ram the distance c that expands when accomplishing at the bottom of the outer tube at the bottom of the stake, ram at the bottom of the system of ramming in expanding when accomplishing at the bottom of the outer tube apart from E, when ramming inserts at the pile penetration D and the volume V of inserts that set under the impact energy; Concrete adjustment form is:
A) through adjustment compacting coefficient D ∈ (D1, D2 ... Dn V) adjusts the compacted degree of the soil body, when ramming inserts, is setting under the impact energy deflection D1, the D2 of n hammering continuously ... Dn and summation nD thereof;
B) through adjustment shape factor α ∈ (H, h, c, E, D, V) adjust size, the shape of tamper diffusion head:
A) (H, h E) adjust size, the shape of tamper diffusion head, form spindle shape tamper diffusion head through adjustment shape factor α ∈;
Dn=α nd 0[(∑Hi+hn)/hn] 1/2 E=0
B) (c E) adjusts size, the shape of tamper diffusion head, forms the column tamper diffusion head for H, h through adjustment shape factor α ∈;
Dn=α nd 0[(∑Hi+hn-Cn)/hn] 1/2 E=0
C) (E, D V) adjust size, the shape of tamper diffusion head, form spherical tamper diffusion head through adjustment shape factor α ∈;
Dn=α n2 (3V/4 is towering) 1/3E=0;
Wherein Dn expands n time tamper diffusion head calculated diameter for ramming, concrete perfusion height in outer tube when Hi expands i time for ramming, and degree of lifting on outer tube when hn expands n time for ramming, outer tube sinking bottom was to the stake distance at the end when Cn expanded n time for ramming; The E value: go out at the bottom of the interior rammer system outer tube on the occasion of, be negative value in outer tube at the bottom of the interior rammer system, concordant with outer tube at the bottom of the interior rammer system is zero, measurement unit is m; α nBe enlarged footing diameter correction factor, α ∈ (0.8,1.2).
Ram when expanding moulding, form zero level, one-level, secondary or multistage enlarged footing from top to bottom or from bottom to top; Inserts is one or more in brickbat, stone, sand, coarse-fine aggregate, slag, cement mixture, the dried water-bearing concreae; Curing compound is meant the liquid state or the powdery reinforcement material of one or more compositions in cement, lime, sand, stone, flyash, the cement mixture.
Above-mentioned so-called potential energy is through diesel hammer, vibrating hammer, drop hammer certainly, electrically operated hammer, hydraulic hammer, static pressure, back-pressure, auger, stranding shake the potential energy that the pipe acting forms.
When being set at hollow pile for first, after forming hollow pile, also carry out the construction of one of following method:
(a) immersed tube pile sinking in hollow pile, immersed tube pile sinking stake footpath all is not more than the hollow pile internal diameter, and all above the hollow pile bottom, the immersed tube pile sinking is to set depth for the immersed tube pile sinking degree of depth;
(b) in hollow pile, directly build steel concrete to setting height pile, form the sealing retaining wall of pattern foundation pit supporting structure;
(c) in hollow pile, sink to pile tube, pile tube is filled with pile with space on every side with curing compound or anti-friction composition, forms the sealing retaining wall of pattern foundation pit supporting structure.
Said pile tube can be various material such as steel casing, cement pipe pile, pvc pipe, strength matching, and the interior support system of establishing can be wrapped the casing of barrier film outward.Pile tube is filled with anti-friction composition with space all around, can extract pile tube and reuse.
Easy construction of the present invention, rationally, can be according to the size of strata condition, site condition, surrounding environment and engineering quantity; Select suitable construction equipment and construction technology; Immersed tube, tube drawing system both can be covering devices, also can be different self-contained units, both can equipment integrated construction one pile; But the also multiple devices pile of constructing, but multiple devices continuous productive process also.
Below in conjunction with embodiment the present invention is described further.
The specific embodiment
A kind of job practices of composite pile comprises the following steps:
A kind of job practices of composite pile is characterized in that: comprise the following steps:
(1) construction is first: comprise one of following method:
Method A:
(1) telephone-moving is in place: mobile device is located in outer tube on the setting stake position;
(2) immersed tube: the degree of depth that outer tube is sunk down into setting;
(3) build moulding: on carry in the rammer system, build pile body;
(4) tube drawing moulding: extract outer tube, forming pile; According to designing requirement, outer tube is extracted, forming pile after can pressing and putting concrete surface again by interior rammer system.
Method B:
(1) telephone-moving is in place: mobile device is located in drilling rod on the setting stake position;
(2) spinning sinks: the degree of depth that drilling rod spinning is sunk down into setting;
(3) revolve to pull on and carry:
Drilling rod revolved draw, curing compound is pressed irritate to the stake hole simultaneously, revolve to pull on and carry, accomplish solid pile to setting height;
Or: drilling rod revolved draw, simultaneously curing compound is injected the soil body, revolve to pull on and carry, and repeat spinning and sink to revolving and draw step, with curing compound and cutting of soil body positive mechanical and stirring spinning, completion solid pile with drilling rod to setting height;
(4) when being set at hollow pile for first, then accomplish solid pile construction back in the time of 1 ~ 10 hour in step (3), carry out the construction of one of following method:
(a) telephone-moving is in place, and the concentric spinning of auger stem sinks down into set depth, revolves to pull on and carries, and forms hollow pile, and the drilling diameter of this auger boring is less than the stake bore dia of step (2) drilling rod spinning sinking formation; The depth of pore forming of this auger boring forms the pen container type tube stake of bottom back cover less than the stake hole depth that step (2) drilling rod spinning sinks to forming; Or the depth of pore forming of this auger boring is not less than the stake hole depth that step (2) drilling rod spinning sinks to forming, the not hollow type tube stake of back cover bottom forming;
(b) telephone-moving is in place, drops hammer certainly to mention with one heart and does the movement of falling object, and interior rammer punching pile body forms sheared edge, and dropping hammer certainly to thresh moves up and down, and forms hollow pile; This rams the stake bore dia that the pile body drilling diameter sinks to forming less than step (2) drilling rod spinning in dropping hammer, this rams the pile body depth of pore forming less than the stake hole depth that step (2) drilling rod spinning sinks in dropping hammer, form the pen container type tube stake of bottom back cover; Or ram the stake hole depth that the pile body depth of pore forming is not less than step (2) drilling rod spinning sinking formation in dropping hammer certainly, form the not hollow type tube stake of back cover of bottom;
(c) telephone-moving is in place; Adopt static pressure, back-pressure, hammering vibration or the concentric immersed tube pile sinking of other external force to set depth; The tube drawing pile pulling forms hollow pile to setting height, and the drilling diameter of this immersed tube pile sinking is less than the stake bore dia of step (2) drilling rod spinning sinking formation; The depth of pore forming of this immersed tube pile sinking forms the pen container type tube stake of bottom back cover less than the stake hole depth that step (2) drilling rod spinning sinks to forming; Or the depth of pore forming of this immersed tube pile sinking is not less than the stake hole depth that step (2) drilling rod spinning sinks to forming, the not hollow type tube stake of back cover bottom forming;
(2) construction is second: comprise one of following method:
Method A:
(1) in place: that outer concentric tube is located on first stake position of setting;
(2) immersed tube: the degree of depth that outer tube is sunk down into setting;
(3) build moulding: on carry in the rammer system, build pile body or transfer precast pile, when transferring precast pile, gap, precast pile outside is filled with the curing compound filling;
(4) tube drawing moulding: extract outer tube, forming pile;
Method B:
Adopt static pressure, back-pressure, hammering, vibration or the concentric pile sinking of other external force to set depth; Second when being hollow preformed pile, with lower sealing on the hollow pile, back cover adopts shoe or iron plate during pile sinking; Bind and adopt stopper or iron plate; Behind the earth excavation, take out stopper or the iron plate bound, build steel concrete by designing requirement segmentation or full section then.
Pile body is one or more complex forms in straight line, screw thread, the mutual line thread type, and the employing expanding method expands at the bottom of neck, hole enlargement, the expansion pile body.
Curing compound is one or more in cement, lime, water, soil, sand, coarse-fine aggregate, the cement mixture.
First second the method A of method A and construction of constructing is identical.
Construct among first second the method A of method A and construction, outer tube is a single tube steel pipe casing; Interior rammer system is a single tube inner tamping tube form; The external diameter of single tube inner tamping tube is littler than outer tube diameter; The top of inner tamping tube be provided with diameter greater than outer external diameter of pipe, with the dish of ramming of tup coupling; The steel plate back cover is adopted in the bottom of inner tamping tube, and the diameter of steel plate is rammed the length that the length of coiling lower end to inner tamping tube bottom is not more than outer tube between inner tamping tube external diameter and outer tube diameter; Or interior rammer system is single tube inner tamping tube hammer, and the diameter of single tube inner tamping tube hammer is less than outer tube diameter, one or more in single tube inner tamping tube hammer inner chamber filling slag, cast iron water, the coarse-fine aggregate; The upper and lower side of single tube inner tamping tube hammer seals with steel plate; The epimere of single tube inner tamping tube hammer is hollow tubular, and hypomere is solid hammer shape, according to designing requirement; The ram dish of size greater than outer tube can be established in top, length of tube outside the length of ramming dish lower end to the inner tamping tube hammer end is not less than; Or interior rammer system is a diameter less than the interior rammer of outer tube diameter from dropping hammer; Or interior rammer system is the inner tamping tube of diameter less than outer tube diameter; The steel plate back cover is used in the bottom of inner tamping tube; Steel plate top filling coarse-fine aggregate, steel plate, burlap or rubber cushion ram from dropping hammer or interior rammer electrically operated hammer, according to designing requirement in inner tamping tube is built-in; The ram dish of size greater than outer tube can be established in top, ram the length of dish at the bottom of lower end to the inner tamping tube be not less than outside length of tube.
Based on designing requirement, the inner tamping tube bottom can add fetch earth bin device or the sharp type drill soil device of being convenient to flexible dismounting.
Construct among first second the method A of method A and construction, the immersed tube method includes one or more in the following manner:
(1) potential energy directly acts on outer tube, directly outer tube is sunk to set depth;
(2) potential energy directly acts on inner and outer pipes, directly the inner and outer pipes system synchronization is sunk to set depth;
(3) rammer system in potential energy directly acts on: inner tamping tube hammer in the outer tube or the interior hammer ram in the inner tamping tube are through manually-operated, mechanically actuated or automation mechanized operation; Freely falling body or continuous hammering move up and down, and sink to set depth synchronously by the moving outer tube of dribbling of ramming that is provided with on the inner tamping tube; When pore-forming does not collapse the hole, do not establish outer tube, interior rammer system directly sinks to set depth;
(4) rammer system and outer tube in potential energy acts on respectively:
A) rammer system in potential energy directly acts on: the interior hammer ram in the interior hammer ram in the outer tube or hammer of the inner tamping tube in the outer tube or the inner tamping tube is through manually-operated, mechanically actuated or automation mechanized operation; Freely falling body or continuous hammering move up and down; The soil body under the punching outer tube or pile body form and shear the soil body or sheared edge;
B) potential energy directly acts on outer tube, and outer tube adopts one of following method to sink at least: 1. under the outer tube deadweight, outer tube sinks from gravity along shearing the soil body or sheared edge; 2. start back-pressure or static pressure water booster system on the outer tube, outer tube sinks along shearing the pressurization of the soil body or sheared edge; 3. start the vibrating device on the outer tube, outer tube is along shearing the soil body or sheared edge vibration-sunk; 4. start vibration and water booster system on the outer tube simultaneously, outer tube along shear the soil body or sheared edge shake depress heavy; 5. start the spinning apparatus on the outer tube, outer tube sinks along shearing the soil body or sheared edge spinning; 6. start the dematron device on the outer tube, outer tube is sunk along shearing the soil body or sheared edge rubbing and pressure;
C) interactive step a), b), sink down into set depth up to inner and outer pipes.
Construct among first second the method A of method A and construction; After the immersed tube step, ram the expansion moulding earlier and build moulding again; The method that ram to expand moulding is: on put forward the interior rammer system in the outer tube, by setting inventory inserts is dropped in the outer tube, on pull out outer tube certain altitude h >=0; In ram system repeatedly and ram inserts and form enlarged footing, adjust the compacted degree of the soil body and size, the shape of tamper diffusion head through adjusting following coefficient: degree of lifting h on the height H that feeds intake, the outer tube, ram the distance c that expands when accomplishing at the bottom of the outer tube at the bottom of the stake, ram at the bottom of the system of ramming in expanding when accomplishing at the bottom of the outer tube apart from E, when ramming inserts at the pile penetration D and the volume V of inserts that set under the impact energy; Concrete adjustment form is:
A) through adjustment compacting coefficient D ∈ (D1, D2 ... Dn V) adjusts the compacted degree of the soil body, when ramming inserts, is setting under the impact energy deflection D1, the D2 of n hammering continuously ... Dn and summation nD thereof;
B) through adjustment shape factor α ∈ (H, h, c, E, D, V) adjust size, the shape of tamper diffusion head:
A) (H, h E) adjust size, the shape of tamper diffusion head, form spindle shape tamper diffusion head through adjustment shape factor α ∈;
Dn=α nd 0[(∑Hi+hn)/hn] 1/2 E=0
B) (c E) adjusts size, the shape of tamper diffusion head, forms the column tamper diffusion head for H, h through adjustment shape factor α ∈;
Dn=α nd 0[(∑Hi+hn-Cn)/hn] 1/2 E=0
C) (E, D V) adjust size, the shape of tamper diffusion head, form spherical tamper diffusion head through adjustment shape factor α ∈;
Dn=α n2 (3V/4 is towering) 1/3E=0;
Wherein Dn expands n time tamper diffusion head calculated diameter for ramming, concrete perfusion height in outer tube when Hi expands i time for ramming, and degree of lifting on outer tube when hn expands n time for ramming, outer tube sinking bottom was to the stake distance at the end when Cn expanded n time for ramming; The E value: go out at the bottom of the interior rammer system outer tube on the occasion of, be negative value in outer tube at the bottom of the interior rammer system, concordant with outer tube at the bottom of the interior rammer system is zero, measurement unit is m; α nBe enlarged footing diameter correction factor, α ∈ (0.8,1.2).
Ram when expanding moulding, form zero level, one-level, secondary or multistage enlarged footing from top to bottom or from bottom to top; Inserts is one or more in brickbat, stone, sand, coarse-fine aggregate, slag, cement mixture, the dried water-bearing concreae; Curing compound is meant the liquid state or the powdery reinforcement material of one or more compositions in cement, lime, sand, stone, flyash, the cement mixture.
Above-mentioned so-called potential energy is through diesel hammer, vibrating hammer, drop hammer certainly, electrically operated hammer, hydraulic hammer, static pressure, back-pressure, auger, stranding shake the potential energy that the pipe acting forms.
Through adjustment compacting coefficient D, shape factor α, form the inserts enlarged footing from top to bottom, the compacted soil body, influence the soil body, significantly improve the end load, reduce sedimentation, compacting improves factor beta (ratio of the end load that compacting back and compacting are preceding) ∈ (1.5,3.0)
Ram when expanding moulding, form zero level, one-level, secondary or multistage enlarged footing from top to bottom or from bottom to top; Inserts is one or more in brickbat, stone, sand, coarse-fine aggregate, slag, cement mixture, the dried water-bearing concreae; Curing compound is meant the liquid state or the powdery reinforcement material of one or more compositions in cement, lime, sandstone, the flyash.
The strength core composite pile that forms; Comprise that it is characterized in that: first is present walling pile, and second is present walling pile or preformed pile as first of outer skirt piles with as second of core stake; First dowel section area is S1, the long L1 of being of total stake; To be that S2, total stake are long be L2 to second dowel section area, first with second center to center distance d=0, second area with first compares S Ratio=S2/S1, second length with first compares L Ratio=L2/L1, wherein S Ratio∈ (0,1), L Ratio>0.5; Work as S RatioDuring ∈ (0,0.25), second as first the body of putting more energy into; Work as S RatioDuring ∈ (0.25,0.75), first and second the formation composite pile that interacts; Work as S RatioDuring ∈ (0.75,1), first as second circular thin-wall stake; Compound service factor f between second and first 1-2∈ (1.5,3.0).
First is present walling pile; Pile body have expand neck, hole enlargement, expansion along pile body at the bottom of, one or more forms in the full thread, whole line, a mutual spiral, straight line; Said present walling pile is solid pile or hollow pile, and wherein hollow pile is the stake of pen container type tube or the not hollow type tube stake of back cover of bottom of bottom back cover.
Second is present walling pile or preformed pile; Said present walling pile have expand neck, hole enlargement, expansion along pile body at the bottom of, one or more forms in the full thread, whole line, a mutual spiral, straight line; Said preformed pile is solid pile or hollow pile, and wherein the hollow pile inner chamber is the form of full section or segmentation perfusion steel concrete.
Construction equipment can comprise internal-tamping type pipeline sinking pile machine, hammer hidden pipe pile machine, static pressure, immersed tube stake machine, helical stir stake machine, vibrator sunk pile machine, dematron stake machine, tube drawing stake machine, and can be furnished with from drop hammer, diesel hammer, vibrating hammer, electrically operated hammer, hydraulic hammer etc.
When being set at hollow pile for first, after forming hollow pile, also can carry out the construction of one of following method:
(a) adopt immersed tube pile sinking in the hollow pile; Immersed tube pile sinking stake footpath all is not more than the hollow pile internal diameter; The immersed tube pile sinking degree of depth is all above the hollow pile bottom; The immersed tube pile sinking has solved the immersed tube pile sinking degree of depth and tube drawing problem to set depth, the composite pile of two joint present walling piles or present walling pile and preformed pile about having formed.
(b) can adopt and directly build steel concrete to setting height pile in the hollow pile, form the sealing retaining wall of pattern foundation pit supporting structure.
(c) can adopt and sink to pile tube in the hollow pile; Pile tube is filled with pile with space on every side with curing compound or anti-friction composition, forms the sealing retaining wall of pattern foundation pit supporting structure, the interior casing of establishing support system, outsourcing barrier film; Strength matching; Pile tube is filled with anti-friction composition with space on every side, and engineering finish man-hour, extracts the pile tube repeated use.

Claims (10)

1. composite pile; It is characterized in that: comprise that it is characterized in that: first is present walling pile, and second is present walling pile or preformed pile as first of outer skirt piles with as second of core stake; First dowel section area is S1, the long L1 of being of total stake; To be that S2, total stake are long be L2 to second dowel section area, first with second center to center distance d=0, second area with first compares S Ratio=S2/S1, second length with first compares L Ratio=L2/L1, wherein S Ratio∈ (0,1), L Ratio>0.5; Work as S RatioDuring ∈ (0,0.25), second as first the body of putting more energy into; Work as S RatioDuring ∈ (0.25,0.75), first and second the formation composite pile that interacts; Work as S RatioDuring ∈ (0.75,1), first as second circular thin-wall stake; Compound service factor f between second and first 1-2∈ (1.5,3.0).
2. composite pile according to claim 1 is characterized in that: first for present walling pile, pile body have expand neck, hole enlargement, expansion along pile body at the bottom of, one or more forms in the full thread, whole line, a mutual screw thread, straight line; Said present walling pile is solid pile or hollow pile, and wherein hollow pile is the stake of pen container type tube or the not hollow type tube stake of back cover of bottom of bottom back cover.
3. composite pile according to claim 1 is characterized in that: second is present walling pile or preformed pile; Said present walling pile have expand neck, hole enlargement, expansion along pile body at the bottom of, one or more forms in the full thread, whole line, a mutual screw thread, straight line; Said preformed pile is solid pile or hollow pile, and wherein the hollow pile inner chamber is the form of full section or segmentation perfusion steel concrete.
4. the job practices of a composite pile is characterized in that: comprise the following steps:
(1) construction is first: comprise one of following method:
Method A:
(1) telephone-moving is in place: mobile device is located in outer tube on the setting stake position;
(2) immersed tube: the degree of depth that outer tube is sunk down into setting;
(3) build moulding: on carry in the rammer system, build pile body;
(4) tube drawing moulding: extract outer tube, forming pile;
Method B:
(1) telephone-moving is in place: mobile device is located in drilling rod on the setting stake position;
(2) spinning sinks: the degree of depth that drilling rod spinning is sunk down into setting;
(3) revolve to pull on and carry:
Drilling rod revolved draw, curing compound is pressed irritate to the stake hole simultaneously, revolve to pull on and carry, accomplish solid pile to setting height;
Or: drilling rod revolved draw, simultaneously curing compound is injected the soil body, revolve to pull on and carry, and repeat spinning and sink to revolving and draw step, with curing compound and cutting of soil body positive mechanical and stirring spinning, completion solid pile with drilling rod to setting height;
(4) when being set at hollow pile for first, then accomplish solid pile construction back in the time of 1 ~ 10 hour in step (3), carry out the construction of one of following method:
(a) telephone-moving is in place, and the concentric spinning of auger stem sinks down into set depth, revolves to pull on and carries, and forms hollow pile, and the drilling diameter of this auger boring is less than the stake bore dia of step (2) drilling rod spinning sinking formation; The depth of pore forming of this auger boring forms the pen container type tube stake of bottom back cover less than the stake hole depth that step (2) drilling rod spinning sinks to forming; Or the depth of pore forming of this auger boring is not less than the stake hole depth that step (2) drilling rod spinning sinks to forming, the not hollow type tube stake of back cover bottom forming;
(b) telephone-moving is in place, drops hammer certainly to mention with one heart and does the movement of falling object, and interior rammer punching pile body forms sheared edge, and dropping hammer certainly to thresh moves up and down, and forms hollow pile; This rams the stake bore dia that the pile body drilling diameter sinks to forming less than step (2) drilling rod spinning in dropping hammer, this rams the pile body depth of pore forming less than the stake hole depth that step (2) drilling rod spinning sinks in dropping hammer, form the pen container type tube stake of bottom back cover; Or ram the stake hole depth that the pile body depth of pore forming is not less than step (2) drilling rod spinning sinking formation in dropping hammer certainly, form the not hollow type tube stake of back cover of bottom;
(c) telephone-moving is in place; Adopt static pressure, back-pressure, hammering vibration or the concentric immersed tube pile sinking of other external force to set depth; The tube drawing pile pulling forms hollow pile to setting height, and the drilling diameter of this immersed tube pile sinking is less than the stake bore dia of step (2) drilling rod spinning sinking formation; The depth of pore forming of this immersed tube pile sinking forms the pen container type tube stake of bottom back cover less than the stake hole depth that step (2) drilling rod spinning sinks to forming; Or the depth of pore forming of this immersed tube pile sinking is not less than the stake hole depth that step (2) drilling rod spinning sinks to forming, the not hollow type tube stake of back cover bottom forming;
(2) construction is second: comprise one of following method:
Method A:
(1) in place: that outer concentric tube is located on first stake position of setting;
(2) immersed tube: the degree of depth that outer tube is sunk down into setting;
(3) build moulding: on carry in the rammer system, build pile body or transfer precast pile, when transferring precast pile, gap, precast pile outside is filled with the curing compound filling;
(4) tube drawing moulding: extract outer tube, forming pile;
Method B:
Adopt static pressure, back-pressure, hammering, vibration or other external force and first concentric pile sinking to set depth; Second when being hollow preformed pile, with lower sealing on the hollow pile, back cover adopts shoe or iron plate during pile sinking; Bind and adopt stopper or iron plate; Behind the earth excavation, take out stopper or the iron plate bound, build steel concrete by designing requirement segmentation or full section then.
5. the job practices of composite pile according to claim 4 is characterized in that: among first the method A of method A and second of construction of constructing, outer tube is a single tube steel pipe casing; Interior rammer system is a single tube inner tamping tube form; The external diameter of single tube inner tamping tube is littler than outer tube diameter; The top of inner tamping tube be provided with diameter greater than outer external diameter of pipe, with the dish of ramming of tup coupling; The steel plate back cover is adopted in the bottom of inner tamping tube, and the diameter of steel plate is rammed the length that the length of coiling lower end to inner tamping tube bottom is not more than outer tube between inner tamping tube external diameter and outer tube diameter; Or interior rammer system is a single tube inner tamping tube hammer; The diameter of single tube inner tamping tube hammer is less than outer tube diameter; In single tube inner tamping tube hammer inner chamber filling slag, cast iron water, the coarse-fine aggregate one or more; The upper and lower side of single tube inner tamping tube hammer seals with steel plate, and the epimere of single tube inner tamping tube hammer is hollow tubular, and hypomere is solid hammer shape; Or interior rammer system is a diameter less than the interior rammer of outer tube diameter from dropping hammer; Or interior rammer system is the inner tamping tube of diameter less than outer tube diameter, and the steel plate back cover is used in the bottom of inner tamping tube, and steel plate top filling coarse-fine aggregate, steel plate, burlap or rubber cushion ram from dropping hammer or interior rammer electrically operated hammer in inner tamping tube is built-in.
6. the job practices of composite pile according to claim 5; It is characterized in that: interior rammer system is a single tube inner tamping tube hammer; The diameter of single tube inner tamping tube hammer is less than outer tube diameter, and the single tube inner tamping tube is hammered one or more in inner chamber filling slag, cast iron water, the coarse-fine aggregate into shape, and the upper and lower side of single tube inner tamping tube hammer seals with steel plate; The epimere of single tube inner tamping tube hammer is hollow tubular; Hypomere is solid hammer shape, and the ram dish of size greater than outer tube established on inner tamping tube hammer top, length of tube outside the length of ramming dish lower end to the inner tamping tube hammer end is not less than; Interior rammer system is the inner tamping tube of diameter less than outer tube diameter; The steel plate back cover is used in the bottom of inner tamping tube; Steel plate top filling coarse-fine aggregate, steel plate, burlap or rubber cushion; Ram from dropping hammer or interior rammer electrically operated hammer in inner tamping tube is built-in, the ram dish of size greater than outer tube established on inner tamping tube top, ram length at the bottom of dish lower end to the inner tamping tube be not less than outside length of tube; The inner tamping tube bottom adds fetch earth bin device or the sharp type drill soil device of being convenient to flexible dismounting.
7. according to the job practices of claim 4 or 5 described composite piles, it is characterized in that: among first second the method A of method A and construction of constructing, the immersed tube method includes one or more in the following manner:
(1) potential energy directly acts on outer tube, directly outer tube is sunk to set depth;
(2) potential energy directly acts on inner and outer pipes, directly the inner and outer pipes system synchronization is sunk to set depth;
(3) rammer system in potential energy directly acts on: inner tamping tube hammer in the outer tube or the interior hammer ram in the inner tamping tube are through manually-operated, mechanically actuated or automation mechanized operation; Freely falling body or continuous hammering move up and down, and sink to set depth synchronously by the moving outer tube of dribbling of ramming that is provided with on the inner tamping tube; When pore-forming does not collapse the hole, do not establish outer tube, interior rammer system directly sinks to set depth;
(4) rammer system and outer tube in potential energy acts on respectively:
A) rammer system in potential energy directly acts on: the interior hammer ram in the interior hammer ram in the outer tube or hammer of the inner tamping tube in the outer tube or the inner tamping tube is through manually-operated, mechanically actuated or automation mechanized operation; Freely falling body or continuous hammering move up and down; The soil body under the punching outer tube or pile body form and shear the soil body or sheared edge;
B) potential energy directly acts on outer tube, and outer tube adopts one of following method to sink at least: 1. under the outer tube deadweight, outer tube sinks from gravity along shearing the soil body or sheared edge; 2. start back-pressure or static pressure water booster system on the outer tube, outer tube sinks along shearing the pressurization of the soil body or sheared edge; 3. start the vibrating device on the outer tube, outer tube is along shearing the soil body or sheared edge vibration-sunk; 4. start vibration and water booster system on the outer tube simultaneously, outer tube along shear the soil body or sheared edge shake depress heavy; 5. start the spinning apparatus on the outer tube, outer tube sinks along shearing the soil body or sheared edge spinning; 6. start the dematron device on the outer tube, outer tube is sunk along shearing the soil body or sheared edge rubbing and pressure;
C) interactive step a), b), sink down into set depth up to inner and outer pipes.
8. according to the job practices of claim 4 or 5 described composite piles; It is characterized in that: among first second the method A of method A and construction of constructing; After the immersed tube step, ram the expansion moulding earlier and build moulding again; The method that ram to expand moulding is: on put forward the interior rammer system in the outer tube, by setting inventory inserts is dropped in the outer tube, on pull out outer tube certain altitude h >=0; In ram system repeatedly and ram inserts and form enlarged footing, adjust the compacted degree of the soil body and size, the shape of tamper diffusion head through adjusting following coefficient: degree of lifting h on the height H that feeds intake, the outer tube, ram the distance c that expands when accomplishing at the bottom of the outer tube at the bottom of the stake, ram at the bottom of the system of ramming in expanding when accomplishing at the bottom of the outer tube apart from E, when ramming inserts at the pile penetration D and the volume V of inserts that set under the impact energy; Concrete adjustment form is:
A) through adjustment compacting coefficient D ∈ (D1, D2 ... Dn V) adjusts the compacted degree of the soil body, when ramming inserts, is setting under the impact energy deflection D1, the D2 of n hammering continuously ... Dn and summation nD thereof;
B) through adjustment shape factor α ∈ (H, h, c, E, D, V) adjust size, the shape of tamper diffusion head:
A) (H, h E) adjust size, the shape of tamper diffusion head, form spindle shape tamper diffusion head through adjustment shape factor α ∈;
Dn=α nd 0[(∑Hi+hn)/hn] 1/2 E=0
B) (c E) adjusts size, the shape of tamper diffusion head, forms the column tamper diffusion head for H, h through adjustment shape factor α ∈;
Dn=α nd 0[(∑Hi+hn-Cn)/hn] 1/2 E=0
C) (E, D V) adjust size, the shape of tamper diffusion head, form spherical tamper diffusion head through adjustment shape factor α ∈;
Dn=α n2 (3V/4 is towering) 1/3E=0;
Wherein Dn expands n time tamper diffusion head calculated diameter for ramming, concrete perfusion height in outer tube when Hi expands i time for ramming, and degree of lifting on outer tube when hn expands n time for ramming, outer tube sinking bottom was to the stake distance at the end when Cn expanded n time for ramming; The E value: go out at the bottom of the interior rammer system outer tube on the occasion of, be negative value in outer tube at the bottom of the interior rammer system, concordant with outer tube at the bottom of the interior rammer system is zero, measurement unit is m; α nBe enlarged footing diameter correction factor, α ∈ (0.8,1.2).
9. the job practices of composite pile according to claim 8 is characterized in that: ram when expanding moulding, form zero level, one-level, secondary or multistage enlarged footing from top to bottom or from bottom to top; Inserts is one or more in brickbat, stone, sand, coarse-fine aggregate, slag, cement mixture, the dried water-bearing concreae; Curing compound is meant the liquid state or the powdery reinforcement material of one or more compositions in cement, lime, sand, stone, flyash, the cement mixture.
10. the job practices of composite pile according to claim 4 is characterized in that: when being set at hollow pile for first, after forming hollow pile, also carry out the construction of one of following method:
(a) immersed tube pile sinking in hollow pile, immersed tube pile sinking stake footpath all is not more than the hollow pile internal diameter, and all above the hollow pile bottom, the immersed tube pile sinking is to set depth for the immersed tube pile sinking degree of depth;
(b) in hollow pile, directly build steel concrete to setting height pile, form the sealing retaining wall of pattern foundation pit supporting structure;
(c) in hollow pile, sink to pile tube, pile tube is filled with pile with space on every side with curing compound or anti-friction composition, forms the sealing retaining wall of pattern foundation pit supporting structure.
CN201210229106.XA 2012-07-02 2012-07-02 Composite pile and its construction method Active CN102733376B (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
CN201210229106.XA CN102733376B (en) 2012-07-02 2012-07-02 Composite pile and its construction method
CN201910639878.2A CN110318393B (en) 2012-07-02 2012-07-02 Construction method of composite pile
CN201910639879.7A CN110318394B (en) 2012-07-02 2012-07-02 Construction method of composite pile
CN201410088076.4A CN103821138B (en) 2012-07-02 2012-07-02 The construction method of composite pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210229106.XA CN102733376B (en) 2012-07-02 2012-07-02 Composite pile and its construction method

Related Child Applications (3)

Application Number Title Priority Date Filing Date
CN201910639878.2A Division CN110318393B (en) 2012-07-02 2012-07-02 Construction method of composite pile
CN201410088076.4A Division CN103821138B (en) 2012-07-02 2012-07-02 The construction method of composite pile
CN201910639879.7A Division CN110318394B (en) 2012-07-02 2012-07-02 Construction method of composite pile

Publications (2)

Publication Number Publication Date
CN102733376A true CN102733376A (en) 2012-10-17
CN102733376B CN102733376B (en) 2019-09-17

Family

ID=46989633

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201210229106.XA Active CN102733376B (en) 2012-07-02 2012-07-02 Composite pile and its construction method
CN201910639878.2A Active CN110318393B (en) 2012-07-02 2012-07-02 Construction method of composite pile
CN201910639879.7A Active CN110318394B (en) 2012-07-02 2012-07-02 Construction method of composite pile

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN201910639878.2A Active CN110318393B (en) 2012-07-02 2012-07-02 Construction method of composite pile
CN201910639879.7A Active CN110318394B (en) 2012-07-02 2012-07-02 Construction method of composite pile

Country Status (1)

Country Link
CN (3) CN102733376B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195077A (en) * 2013-04-02 2013-07-10 中国水电顾问集团中南勘测设计研究院 Dam foundation reinforcement frame structure and dam foundation reinforcement method
CN103590393A (en) * 2013-11-21 2014-02-19 朱建新 Construction method of composite pile
CN105350525A (en) * 2015-11-09 2016-02-24 朱建新 Construction method for piles
CN105544543A (en) * 2015-12-09 2016-05-04 浙江科技学院 Multi-grade telescopic pile feeding operation method for static pressure pipe piles
CN105649074A (en) * 2016-03-22 2016-06-08 沙焕焕 Tubular pile expansion concrete stiffened composite pile and construction method thereof
CN106149751A (en) * 2015-05-28 2016-11-23 周口市颍河岩土工程有限公司 Utilize the method that quick lime brick quarrel compaction pile reinforces building construction ground
CN106759289A (en) * 2016-12-06 2017-05-31 朱建新 The construction method and construction equipment of a kind of
CN106759332A (en) * 2016-12-06 2017-05-31 朱建新 The construction method and construction equipment of stake
CN112281842A (en) * 2020-10-22 2021-01-29 陈远 Construction method of static pressure pipe pile
CN112323836A (en) * 2020-11-23 2021-02-05 陈远 Construction method of combined assembly type deep foundation pile
WO2021189840A1 (en) * 2020-10-26 2021-09-30 姚锋祥 Construction method and construction apparatus for static-pressure tube-sinking pile
CN113832958A (en) * 2021-09-08 2021-12-24 中交二公局第三工程有限公司 Anti-slide pile construction method with mechanical cooperation with manual excavation

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112323786A (en) * 2020-11-23 2021-02-05 陈远 Pile construction method
CN112502137A (en) * 2020-11-30 2021-03-16 陈远 Construction method of pile and special equipment

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1414186A (en) * 2002-05-10 2003-04-30 贾燎 Sleeve pile and designing method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB9107672D0 (en) * 1991-04-11 1991-05-29 Roxbury Ltd Improvements in or relating to piles
JPH09235727A (en) * 1995-12-25 1997-09-09 Nkk Corp Fabrication method of soil cement composite pile using bottom expanded shoe and bottom expanded shoe
CN1167860A (en) * 1997-05-31 1997-12-17 段克亚 Cement and soil composite pile, its making method and special equipment
CN1260425A (en) * 1998-12-18 2000-07-19 邹宗煊 Making method for reinforced concrete stiff-core cement soil composite pile and its pile and construction equipment
CN2613518Y (en) * 2003-03-04 2004-04-28 饶英伟 Long core concrete composite pile
CN1632236A (en) * 2003-12-22 2005-06-29 邓亚光 Stiffening core composite pile and construction method thereof
CN101798809B (en) * 2010-03-16 2011-06-08 朱建新 Non-borrow composite underreamed pile constructing method

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1414186A (en) * 2002-05-10 2003-04-30 贾燎 Sleeve pile and designing method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李正等: "刚性芯复合桩试验研究", 《第14届全国结构工程学术会议论文集》, 1 September 2005 (2005-09-01), pages 285 - 288 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195077B (en) * 2013-04-02 2015-09-09 中国电建集团中南勘测设计研究院有限公司 A kind of dam foundation reinforcement frame structure and stabilization of dam foundation method
CN103195077A (en) * 2013-04-02 2013-07-10 中国水电顾问集团中南勘测设计研究院 Dam foundation reinforcement frame structure and dam foundation reinforcement method
CN103590393A (en) * 2013-11-21 2014-02-19 朱建新 Construction method of composite pile
CN106149751A (en) * 2015-05-28 2016-11-23 周口市颍河岩土工程有限公司 Utilize the method that quick lime brick quarrel compaction pile reinforces building construction ground
CN106149751B (en) * 2015-05-28 2018-06-19 周口市颍河岩土工程有限公司 The method for reinforcing building construction ground using quick lime brick quarrel compaction pile
CN105350525A (en) * 2015-11-09 2016-02-24 朱建新 Construction method for piles
CN105544543B (en) * 2015-12-09 2017-07-07 浙江科技学院 A kind of multi-stage expansion pile follower operating method of static pressure pipe pile
CN105544543A (en) * 2015-12-09 2016-05-04 浙江科技学院 Multi-grade telescopic pile feeding operation method for static pressure pipe piles
CN105649074A (en) * 2016-03-22 2016-06-08 沙焕焕 Tubular pile expansion concrete stiffened composite pile and construction method thereof
CN106759289A (en) * 2016-12-06 2017-05-31 朱建新 The construction method and construction equipment of a kind of
CN106759332A (en) * 2016-12-06 2017-05-31 朱建新 The construction method and construction equipment of stake
CN112281842A (en) * 2020-10-22 2021-01-29 陈远 Construction method of static pressure pipe pile
WO2021189840A1 (en) * 2020-10-26 2021-09-30 姚锋祥 Construction method and construction apparatus for static-pressure tube-sinking pile
CN112323836A (en) * 2020-11-23 2021-02-05 陈远 Construction method of combined assembly type deep foundation pile
CN113832958A (en) * 2021-09-08 2021-12-24 中交二公局第三工程有限公司 Anti-slide pile construction method with mechanical cooperation with manual excavation

Also Published As

Publication number Publication date
CN102733376B (en) 2019-09-17
CN110318394B (en) 2020-10-20
CN110318393A (en) 2019-10-11
CN110318394A (en) 2019-10-11
CN110318393B (en) 2020-10-20

Similar Documents

Publication Publication Date Title
CN102733376A (en) Composite pile and construction method thereof
CN103821138B (en) The construction method of composite pile
CN103184734B (en) A kind of construction method implanting slip casting compound pile
WO2018210019A1 (en) Pile formation method for down-the-hole impact rotary jet composite piles
CN104074186B (en) The casing device of pore-forming and construction method thereof in a kind of building lot
CN101798809B (en) Non-borrow composite underreamed pile constructing method
CN102444122A (en) Construction method of pile
CN105350525A (en) Construction method for piles
CN102644269A (en) Non-earth-borrowing composite pile and construction method thereof
CN108118698A (en) The construction method of stake and special Static pressure pile driver
CN103821139A (en) Reamed carrier and stiffness core multi-component composite pile and soft soil foundation strengthening construction method
CN106049465A (en) Construction method for pile
CN216239904U (en) Existing building underpins and consolidates connection structure
CN203213101U (en) Embedding grouting combined pile
CN106049464B (en) The construction method of stake
US6663321B1 (en) Process and device for producing a pile in the earth
CN104404956A (en) Construction method for pedestal piles
CN102635110B (en) Construction method for concrete pile
KR101135163B1 (en) Grout injection and replacement device and the soft ground foundation concrete pile using the same method
CN106013093B (en) A kind of pile construction method
CN100429353C (en) Explosion-enlarging stake construction process
CN106759296A (en) Drainable irregular-section bamboo joint pipe pile and root planting type construction method thereof
CN205776209U (en) The construction equipment of concrete-pile
CN109853565A (en) The construction method of hidden pipe pile
CN106088085B (en) Pile construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhu Jianxin

Inventor after: Xing Feng

Inventor before: Zhu Jianxin

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20191217

Address after: 226000 Nantong City, Jiangsu Province, the 17 building of Tianbao national energy center, No. 128 South Road, worker, farmer, road, Chongchuan District, Sichuan Province

Patentee after: Jiangsu Jin Pile Foundation Engineering Co., Ltd.

Address before: 226000 Jiangsu Province, Nantong City Xinhai garden building 104 room 19

Patentee before: Zhu Jianxin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201126

Address after: 17F, Tianbao building, 128 Gongnong South Road, Chongchuan District, Nantong City, Jiangsu Province 226000

Patentee after: Jiangsu Jinzhuang geotechnical Technology Co., Ltd

Address before: 226000 Nantong City, Jiangsu Province, the 17 building of Tianbao national energy center, No. 128 South Road, worker, farmer, road, Chongchuan District, Sichuan Province

Patentee before: JIANGSU JINZHUAN FOUNDATION ENGINEERING Co.,Ltd.

TR01 Transfer of patent right