CN113668833B - Pre-buried fixed rail type construction operation platform frame for building engineering and installation method - Google Patents

Pre-buried fixed rail type construction operation platform frame for building engineering and installation method Download PDF

Info

Publication number
CN113668833B
CN113668833B CN202110887563.7A CN202110887563A CN113668833B CN 113668833 B CN113668833 B CN 113668833B CN 202110887563 A CN202110887563 A CN 202110887563A CN 113668833 B CN113668833 B CN 113668833B
Authority
CN
China
Prior art keywords
construction
frame
operation platform
rail type
construction operation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110887563.7A
Other languages
Chinese (zh)
Other versions
CN113668833A (en
Inventor
杨曙兰
杨杰
冯宁宁
李健男
周军文
鲁良辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changzhou Institute of Technology
Original Assignee
Changzhou Institute of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changzhou Institute of Technology filed Critical Changzhou Institute of Technology
Priority to CN202110887563.7A priority Critical patent/CN113668833B/en
Publication of CN113668833A publication Critical patent/CN113668833A/en
Application granted granted Critical
Publication of CN113668833B publication Critical patent/CN113668833B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/007Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/283Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G2003/286Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/14Railings
    • E04G2005/148Railings latticed or netted

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a pre-buried fixed rail type construction operation platform frame for building engineering and an installation method, and the technical scheme is as follows: the construction method comprises the steps of fixing a plurality of horizontal steel rails and a plurality of vertical steel rails on the facade of the outer wall of the building engineering, fixedly connecting any one of the horizontal steel rails and the vertical steel rails through diamond embedded parts embedded in the wall surface to form a rail type grid of the facade of the outer wall of the building engineering, and forming an adjustable wheel set for fixing a construction operation platform on each of the horizontal steel rails and the vertical steel rails and forming an embedded fixed rail type construction operation platform of the building engineering. Compared with the traditional steel scaffold, the hanging basket construction platform frame and the column type climbing construction platform, the embedded fixed rail type construction operation platform frame for the building engineering has the advantages that the construction platform frame is made of the light high-strength composite material, and the installation operation is simple and convenient.

Description

Pre-buried fixed rail type construction operation platform frame for building engineering and installation method
Technical Field
The invention relates to the field of buildings, in particular to a pre-buried fixed rail type construction operation platform frame for constructional engineering and an installation method.
Background
The construction engineering construction is divided into main construction and internal and external decoration construction. Construction operations such as construction, fitment and painting of building facades are frequently performed on construction sites by adopting scaffold erection or hanging basket erection. The existing building external scaffold, high-altitude operation hanging basket platform and column type climbing construction operation platform equipment technology have the following problems:
1. the external scaffold is erected manually and fixed in a mode of being attached to a wall body frame, so that the operation is complicated, the construction efficiency is low, the external scaffold needs to be dismantled after the construction is finished, and the physical effort is consumed;
2. the high-altitude operation hanging basket platform does not need an additional fixing mode, but has poor wind resistance and load resistance through a hoist fixed on the roof of a building and a steel wire rope climbing system, and has great potential safety hazards;
3. the column type climbing construction operation platform is arranged on the column type base, the steel truss column and the operation platform are complex in operation, and when the building is increased, a large number of steel truss column standard sections and fixed facilities are needed, and the column type climbing construction operation platform is economically and obviously lower than an external scaffold and a high-position operation hanging basket platform.
Disclosure of Invention
Aiming at the problems in the background art, the invention aims to provide a pre-buried fixed rail type construction operation platform frame for constructional engineering and an installation method thereof, so as to solve the problems in the background art.
The technical aim of the invention is realized by the following technical scheme:
the utility model provides a building engineering is with pre-buried fixed rail formula construction operation platform frame, includes a plurality of horizontal rail and a plurality of perpendicular rail that fix at building engineering outer wall facade, arbitrary horizontal rail and perpendicular rail form building engineering outer wall facade rail formula net through the pre-buried diamond embedded part fixed connection of wall, arbitrary horizontal rail and perpendicular rail are provided with the adjustable wheelset of fixed construction operation platform and form the pre-buried fixed rail formula construction operation platform of building engineering.
Preferably, the construction operation platform consists of a bottom plate frame, a grid frame, stiffening cross beams, upright posts, diagonal braces and handrails; the bottom plate frame, the grid frame, the stiffening cross beams, the upright posts, the diagonal braces, the reinforcing plates and the armrests are fixedly connected with each other through bolts.
Preferably, the construction work platform is provided with a power unit, a braking unit, a locking unit, a power control box, a cable frame, a material frame, a tool frame, a safety rope and a fixing ring; the power unit, the locking unit, the power control box, the cable rack, the material rack and the tool rack are fixedly connected with the construction operation platform rack through bolts.
Preferably, the construction work platform is operated by the cooperation of the adjustable wheel set and the locking unit.
Preferably, the single-joint length of any one of the horizontal steel rail and any one of the vertical steel rail is calculated according to the spacing between the building engineering outer wall body and the floor slab.
Preferably, the bottom plate frame and the reinforcing plate are made of steel; the grid frame, the stiffening cross beams, the upright posts and the diagonal braces are composite material sectional materials, and the composite material sectional materials are fiber reinforced resin matrix composite materials.
Preferably, the cable rack, the material rack and the tool rack are composite material profiles, and the composite material profiles are fiber reinforced resin matrix composite materials.
The invention also provides a mounting method of the embedded fixed rail type construction operation platform frame for the building engineering, which comprises the following steps:
s1, building an outer wall elevation rail type grid system of a building engineering, wherein a plurality of horizontal steel rails and vertical steel rails with different lengths are fixedly connected through diamond embedded parts pre-embedded in a building outer wall body and a floor plate through bolts, and thus rail type grid building work is completed;
s2, when the construction operation platform moves to any intersection point of the rail type grid, fixing pins in the other direction on the clamping shaft of the adjustable wheel set, connecting the adjustable wheel set in the other direction at the moment, and loosening the pins in the current state to finish switching between the horizontal direction and the vertical direction;
s3, the construction operation platform is fixed on the steel rail in any direction through the adjustable wheel set, and along with construction requirements, the construction operation platform moves and stops on any horizontal steel rail or vertical steel rail through the cooperation of the braking unit and the locking unit under the driving of the power unit.
And S4, when the elevation rail type grid system of the outer wall of the building engineering is erected, partial erection is carried out according to the construction progress and the requirements to achieve the climbing type construction effect, and the construction operation can be carried out by repeating the steps S1-S3.
In summary, the invention has the following advantages:
1. compared with the traditional steel scaffold, the hanging basket construction platform frame and the column type climbing construction platform, the embedded fixed rail type construction operation platform frame for the building engineering has the advantages that the construction platform frame is made of the light high-strength composite material, and the installation operation is simple and convenient.
2. Compared with the traditional hanging basket construction platform frame, the construction platform frame for the construction engineering uses the rail type grid pre-buried and fixed with the outer wall as a foundation, the construction platform frame can stably and reliably operate at any point on the rail type grid, the construction position is flexible and changeable, the whole wind resistance and load resistance of the construction platform frame are strong, and the construction platform frame is safe and stable.
3. Compared with the traditional steel scaffold, the hanging basket construction platform frame and the column type climbing construction platform, the rail type climbing construction platform can be partially erected according to the construction progress and the technological requirements, has better flexibility and economy, is simple and convenient to install and operate, greatly increases the construction efficiency and the construction quality, achieves the excellent performance which is not possessed by the traditional operation platform, and has certain popularization.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present invention;
FIG. 2 is a front view of the connection of the diamond embedded part and the wall floor slab;
FIG. 3 is a cross-sectional view of the connection of the diamond embedded part and the wall floor slab;
FIG. 4 is a schematic view of a wall track type grid in accordance with the present invention;
FIG. 5 is a schematic view of the adjustable wheelset and horizontal rail position of the present invention;
FIG. 6 is a schematic view of the adjustable wheelset and vertical rail position of the present invention;
FIG. 7 is a schematic view of an adjustable wheelset of the present invention;
FIG. 8 is a schematic view of the construction work platform structure of the present invention;
FIG. 9 is a schematic view of the functional components of the construction work platform of the present invention;
in the figure: 1. a construction operation platform; 2. a horizontal rail; 3. a vertical rail; 4. a diamond embedded part; 41. fastening a screw; 42. a bolt; 5. a wall body; 6. a floor slab; 7. a rail mesh; 8. an adjustable wheel set; 81. a roller; 82. a peg; 83. a clamping shaft; 9. a base plate frame; 10. a grid frame; 11. stiffening the cross beam; 12. a column; 13. diagonal bracing; 14. a reinforcing plate; 15. a handrail 1; 16. a power unit; 17. a locking unit; 18. a power control box; 19. a cable rack; 20. a material rack; 21. a tool holder; 22. a safety rope; 23. and a fixing ring.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Example 1
Referring to fig. 1 to 9, an embedded fixed rail type construction platform frame for a building engineering comprises a plurality of horizontal rails 2 and a plurality of vertical rails 3 fixed on the vertical surface of the outer wall of the building engineering, wherein any one of the horizontal rails 2 and the vertical rails 3 is fixedly connected through diamond embedded parts 4 embedded in the wall surface to form a rail type grid 7 of the vertical surface of the outer wall of the building engineering, and any one of the horizontal rails 2 and the vertical rails 3 is provided with an adjustable wheel set 8 for fixing the construction platform 1 and forms the embedded fixed rail type construction platform 1 of the building engineering.
The construction operation platform 1 consists of a bottom plate frame 9, a grid frame 10, stiffening beams 11, upright posts 12, diagonal braces 13 and handrails; the bottom plate frame 9, the grid frame 10, the stiffening cross beams 11, the upright posts 12, the diagonal braces 13, the reinforcing plates 14 and the armrests are fixedly connected with each other through bolts.
The construction work platform 1 is provided with a power unit 16, a braking unit, a locking unit 17, a power supply control box 18, a cable frame 19, a material frame 20, a tool frame 21, a safety rope 22 and a fixing ring 23; the power unit 16, the locking unit 17, the power control box 18, the cable frame 19, the material frame 20 and the tool frame 21 are fixedly connected with the construction work platform 1 through bolts.
Wherein, the construction work platform 1 is operated by the cooperation of the adjustable wheel set 8 and the locking unit 17.
The single-joint length of any horizontal steel rail 2 and any vertical steel rail 3 is calculated according to the distance between the building engineering outer wall 5 and the floor slab.
Wherein the bottom plate frame 9 and the reinforcing plate 14 are made of steel; the grid frame 10, the stiffening cross beams 11, the upright posts 12 and the diagonal braces 13 are composite material profiles, and the composite material profiles are fiber reinforced resin matrix composite materials.
The cable rack 19, the material rack 20 and the tool rack 21 are composite material profiles, and the composite material profiles are fiber reinforced resin matrix composite materials.
Compared with the traditional steel scaffold, the hanging basket construction platform frame and the column climbing construction platform, the embedded fixed rail type construction operation platform frame for the building engineering is simple and convenient to install and operate because the construction platform frame is partially made of the light high-strength composite material.
Compared with a traditional hanging basket construction platform frame, the embedded fixed rail type construction operation platform frame for the building engineering is based on the rail type grid 7 embedded and fixed with the outer wall, the construction operation platform 1 frame can stably and reliably operate at any point position on the rail type grid 7, the construction position is flexible and changeable, the whole wind resistance and load resistance of the construction platform frame are strong, and the construction platform frame is safe and stable.
Compared with the traditional steel scaffold, the hanging basket construction platform frame and the column type climbing construction platform, the rail type grid 7 fixed in advance with the outer wall can be partially erected according to the construction progress and the process requirements, the flexibility and the economy are better, the installation and the operation are simple and convenient, the construction efficiency and the construction quality are greatly improved, the excellent performance which the traditional operation platform does not have is achieved, and the rail type climbing construction platform has certain popularization.
Example 2
The difference from embodiment 1 is that there is also provided a method of installing an embedded fixed rail type construction work platform frame for construction engineering, comprising the steps of:
s1, building a building engineering outer wall elevation rail type grid 7 system, wherein a plurality of horizontal steel rails 2 and vertical steel rails 3 with different lengths are fixedly connected through bolts through diamond embedded parts 4 pre-embedded in a building outer wall body 5 and a floor plate in advance, and thus the rail type grid 7 building work is completed;
s2, when the construction operation platform 1 moves to any intersection point of the rail type grid 7, fixing the bolt 82 in the other direction on the clamping shaft 83 of the adjustable wheel set 8, connecting the adjustable wheel set 8 in the other direction at the moment, and loosening the bolt 82 in the current state to finish the switching between the horizontal direction and the vertical direction;
s3, the construction operation platform 1 is fixed on the steel rail in any direction through the adjustable wheel set 8, and is driven by the power unit 16 to move and stop on any horizontal steel rail 2 or vertical steel rail 3 through the cooperation of the braking unit and the locking unit 17 along with construction requirements, so that construction operation is performed.
And S4, when the building engineering outer wall elevation rail type grid 7 system is erected, partial erection is carried out according to the construction progress and the requirements to achieve the climbing type construction effect, and the construction operation can be carried out by repeating the steps S1-S3.
Example 3
Referring to fig. 1 to 9, as shown in fig. 1 to 9, an embedded fixed rail type construction work platform 1 for construction engineering comprises a construction work platform 1, a plurality of horizontal steel rails 2, a plurality of vertical steel rails 3 and a plurality of diamond embedded parts 4. The horizontal and vertical steel rails 3 are fixedly connected with the diamond embedded parts 4 connected with the building wall 5 to form a building engineering outer wall elevation rail type grid 7. The construction work platform 1 is fixed on a steel rail in any direction through an adjustable wheel set 8. The construction work platform 1 is provided with a power unit 16, a locking unit 17, a power control box 18, a cable rack 19, a material rack 20, a tool rack 21, a safety rope 22, a fixing ring 23 and other objects. The construction work platform 1 can work at any point position on the rail type grid 7 stably and reliably through the cooperation operation of the adjustable wheel sets 8 and the locking devices. The construction work platform 1 and the rail type grid 7 form a pre-buried fixed rail type construction work platform 1 for building engineering.
As shown in fig. 2-4. The vertical face of the outer wall of the building engineering is fixedly provided with a plurality of horizontal steel rails 3 and a plurality of vertical steel rails 3, and any one of the horizontal steel rails 2 and the vertical steel rails 3 is fixedly connected through a diamond embedded part 4 embedded in the wall surface to form a rail type grid 7 of the vertical face of the outer wall of the building engineering.
As shown in fig. 5-7. The construction work platform 1 is fixed on the steel rail in any direction through an adjustable wheel set 8. When the construction operation platform 1 needs to horizontally move, adjusting a horizontal wheel set; and if the vertical movement is required, adjusting the vertical wheel set.
As shown in fig. 8. The construction operation platform 1 is composed of a bottom plate frame 9, a grid frame 10, stiffening cross beams 11, upright posts 12, diagonal braces 13 and handrails. Any bottom plate frame 9, a grid frame 10, stiffening beams 11, upright posts 12, diagonal braces 13, reinforcing plates 14 and handrails are fixedly connected with each other through bolts.
As shown in fig. 9. The construction work platform 1 is provided with a power unit 16, a locking unit 17, a power control box 18, a cable rack 19, a material rack 20, a tool rack 21, a safety rope 22, a fixing ring 23 and other objects. Any power unit 16, locking unit 17, power control box 18, cable frame 19, material frame 20, tool rack 21 all pass through bolt and construction work platform 1 fixed connection.
In this embodiment, any of the base frames 9 is steel. Any grid frame 10, stiffening beams 11, upright posts 12 and diagonal braces 13 can be composite material profiles, and the composite materials are fiber reinforced resin matrix composite materials.
In this embodiment, the cable rack 19 and the material rack 20 may be any one of the tool racks 21, which may be a composite material, and the composite material may be a fiber reinforced resin matrix composite material.
Compared with a traditional hanging basket construction platform frame, the construction platform 1 is based on the rail type grid 7 pre-buried and fixed with the outer wall, the construction platform 1 can stably and reliably work at any point on the rail type grid 7, the construction position is flexible and changeable, the whole wind resistance and load resistance of the construction platform frame are strong, and the construction platform frame is safe and stable. Meanwhile, compared with a hanging basket construction platform frame and a column type climbing construction platform, the embedded fixed rail type construction operation platform 1 for the building engineering is simple and convenient to install and operate because the construction platform frame is partially made of a light high-strength composite material. The rail type grid 7 which is pre-buried and fixed with the outer wall can be partially erected according to the construction progress and the process requirement, the flexibility and the economy are better, the installation and the operation are simple and convenient, the construction efficiency and the construction quality are greatly improved, the excellent performance which is not possessed by the traditional operation platform is achieved, and the popularization is realized to a certain extent.
The connecting piece and the fastening piece in the invention are generally bolts, and suitable connecting and fastening parts can be selected by a person skilled in the art according to actual conditions, and the connecting piece and the fastening piece belong to conventional technical means and are not described in detail.
Standard parts used in the invention can be purchased from the market, special-shaped parts can be customized according to the description of the specification and the drawings, the specific connection modes of the parts adopt conventional means such as mature bolts and rivets in the prior art, and machines, parts and equipment adopt conventional types and conventional connection modes in the prior art and are not described in detail.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (1)

1. A method for installing a pre-buried fixed rail type construction operation platform frame for constructional engineering,
wherein, the embedded fixed rail type construction operation platform frame comprises a plurality of horizontal steel rails (2) and a plurality of vertical steel rails (3) which are fixed on the facade of the outer wall of the building engineering, any one of the horizontal steel rails (2) and the vertical steel rails (3) is fixedly connected through diamond embedded parts (4) embedded on the wall surface to form a rail type grid (7) of the facade of the outer wall of the building engineering, any one of the horizontal steel rails (2) and the vertical steel rails (3)
An adjustable wheel set (8) for fixing the construction operation platform (1) is arranged on the steel rail (3) and forms a construction engineering pre-fixed rail type construction operation platform (1); wherein the adjustable wheel set (8) comprises two C-shaped components with a C-shaped section, and the two C-shaped components are connected with the peg (82) through the clamping shaft (83);
the construction operation platform (1) consists of a bottom plate frame (9), a grid frame (10), stiffening beams (11), upright posts (12), diagonal braces (13), reinforcing plates (14) and handrails; the bottom plate frame (9), the grid frame (10), the stiffening cross beams (11), the upright posts (12), the diagonal braces (13), the reinforcing plates (14) and the armrests are fixedly connected with each other through bolts;
the construction operation platform (1) is provided with a power unit (16), a braking unit, a locking unit (17), a power supply control box (18), a cable frame (19), a material frame (20), a tool frame (21), a safety rope (22) and a fixed ring (23); the power unit (16), the locking unit (17), the power control box (18), the cable frame (19), the material frame (20) and the tool frame (21) are fixedly connected with the construction work platform (1) through bolts;
the single-section length of any horizontal steel rail (2) and any vertical steel rail (3) is calculated according to the spacing between the building engineering outer wall (5) and the floor slab;
the bottom plate frame (9) and the reinforcing plate (14) are made of steel materials; the grid frame (10), the stiffening cross beams (11), the upright posts (12), the diagonal braces (13), the cable frames (19), the material frames (20) and the tool frames (21) are composite material sectional materials, and the composite material sectional materials are fiber reinforced resin matrix composite materials;
the method is characterized in that: the method comprises the following steps:
s1, building a building engineering outer wall elevation rail type grid (7) system, and fixedly connecting a plurality of horizontal steel rails (2) and vertical steel rails (3) with different lengths through diamond embedded parts (4) pre-embedded in a building outer wall body (5) and floor boards in advance through bolts, so as to complete the construction work of the rail type grid (7);
s2, when the construction operation platform (1) moves to any intersection point of the rail type grid (7), fixing pins (82) positioned on clamping shafts (83) of the adjustable wheel sets (8) in the horizontal direction, connecting the adjustable wheel sets (8) in the vertical direction, and loosening the pins (82) in the current horizontal steel rail (2) state to finish switching between the horizontal direction and the vertical direction;
s3, fixing the construction operation platform (1) on a steel rail in any direction through an adjustable wheel set (8), and moving and stopping the construction operation platform on the steel rail (2) in any horizontal direction or the steel rail (3) in vertical direction through the cooperation of a braking unit and a locking unit (17) under the driving of a power unit (16) along with construction requirements;
and S4, when the building engineering outer wall elevation rail type grid (7) system is erected, partial erection is carried out according to the construction progress and the requirements to achieve the climbing type construction effect, and the construction operation can be carried out by repeating the steps S1-S3.
CN202110887563.7A 2021-08-03 2021-08-03 Pre-buried fixed rail type construction operation platform frame for building engineering and installation method Active CN113668833B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110887563.7A CN113668833B (en) 2021-08-03 2021-08-03 Pre-buried fixed rail type construction operation platform frame for building engineering and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110887563.7A CN113668833B (en) 2021-08-03 2021-08-03 Pre-buried fixed rail type construction operation platform frame for building engineering and installation method

Publications (2)

Publication Number Publication Date
CN113668833A CN113668833A (en) 2021-11-19
CN113668833B true CN113668833B (en) 2023-10-27

Family

ID=78541486

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110887563.7A Active CN113668833B (en) 2021-08-03 2021-08-03 Pre-buried fixed rail type construction operation platform frame for building engineering and installation method

Country Status (1)

Country Link
CN (1) CN113668833B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293581A (en) * 2002-04-04 2003-10-15 Nippon Steel Corp Work scaffolding having slide mechanism
JP2004003186A (en) * 2002-05-31 2004-01-08 Sumitomo Mitsui Construction Co Ltd Building structure with track guide disposed therein
CN202039589U (en) * 2011-04-26 2011-11-16 廊坊凯博建设机械科技有限公司 Suspended rail suitable for building elevation decoration construction
CN105672642A (en) * 2016-03-11 2016-06-15 上海建工集团股份有限公司 Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof
CN209413265U (en) * 2018-12-06 2019-09-20 赵建玲 One kind being suitable for elevation of building decoration construction suspended rail
CN110541556A (en) * 2019-09-11 2019-12-06 云南建投建筑机械有限公司 Attached lifting scaffold and climbing method
CN113062579A (en) * 2021-03-05 2021-07-02 上海建工一建集团有限公司 Construction method for reforming existing large-space structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003293581A (en) * 2002-04-04 2003-10-15 Nippon Steel Corp Work scaffolding having slide mechanism
JP2004003186A (en) * 2002-05-31 2004-01-08 Sumitomo Mitsui Construction Co Ltd Building structure with track guide disposed therein
CN202039589U (en) * 2011-04-26 2011-11-16 廊坊凯博建设机械科技有限公司 Suspended rail suitable for building elevation decoration construction
CN105672642A (en) * 2016-03-11 2016-06-15 上海建工集团股份有限公司 Dual-guide-frame multistage lifting working platform with adjustable gaps and construction method thereof
CN209413265U (en) * 2018-12-06 2019-09-20 赵建玲 One kind being suitable for elevation of building decoration construction suspended rail
CN110541556A (en) * 2019-09-11 2019-12-06 云南建投建筑机械有限公司 Attached lifting scaffold and climbing method
CN113062579A (en) * 2021-03-05 2021-07-02 上海建工一建集团有限公司 Construction method for reforming existing large-space structure

Also Published As

Publication number Publication date
CN113668833A (en) 2021-11-19

Similar Documents

Publication Publication Date Title
CN201826525U (en) Climbing shuttering system device for buildings
CN113789948B (en) Large-span atrium side wall sliding rail hanging basket with roof and construction method thereof
CN108625483B (en) Equipment for jacking construction of assembled additional elevator shaft structure
CN103422663A (en) Adhesive lifting scaffold
CN113404281A (en) Climbing type scaffold, climbing and mounting method thereof and construction method of fabricated building
CN101215928B (en) Attached lifting scaffold trolley type inclining-proof device and method of use thereof
CN104790644B (en) Extending and contracting sliding support frame for roof decorative bottom boards
CN110185247A (en) Mobile outrigger platform
CN113668833B (en) Pre-buried fixed rail type construction operation platform frame for building engineering and installation method
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN201695668U (en) Assembly type walkdown platform
CN217761022U (en) Comprehensive operation trolley for construction of air cushion type surge chamber of hydropower station
CN1020645C (en) Integral elevating system for out-mould scaffold of super-high buildings
CN201148725Y (en) Trolley type inclining-proof device adhering to elevating scaffold
CN114412192B (en) Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof
CN115306435A (en) Hydropower station air cushion type surge chamber construction comprehensive operation trolley and use method thereof
CN110469126B (en) Binding trolley for concrete reinforcing steel bars and binding construction method thereof
CN113443535A (en) Down extending type lifting equipment for well construction and mounting method thereof
JP3177735B2 (en) An erect scaffold used to reinforce the perimeter of existing buildings
CN110469105A (en) A kind of over-form construction system and its construction method
CN109944430A (en) A kind of electric lifting platform construction method for special-shaped exterior walls of buildings operation
CN116771155B (en) Attached elevator, elevator construction device and construction method thereof
CN221053135U (en) Overhanging type operation platform for outer wall decoration construction
CN216921262U (en) External climbing platform for building construction
CN214570326U (en) Curtain wall unit plate rail hoisting and hard protection integrated device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant