CN113657866A - Project management system based on urban insurance standardization process - Google Patents
Project management system based on urban insurance standardization process Download PDFInfo
- Publication number
- CN113657866A CN113657866A CN202110992799.7A CN202110992799A CN113657866A CN 113657866 A CN113657866 A CN 113657866A CN 202110992799 A CN202110992799 A CN 202110992799A CN 113657866 A CN113657866 A CN 113657866A
- Authority
- CN
- China
- Prior art keywords
- project
- module
- management
- insurance
- city
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 22
- 239000003814 drug Substances 0.000 claims abstract description 17
- 229940079593 drug Drugs 0.000 claims abstract description 17
- 238000004458 analytical method Methods 0.000 claims abstract description 11
- 230000005540 biological transmission Effects 0.000 abstract description 3
- 238000007726 management method Methods 0.000 description 64
- 238000005516 engineering process Methods 0.000 description 2
- 238000012552 review Methods 0.000 description 2
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000002354 daily effect Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/26—Government or public services
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Economics (AREA)
- Entrepreneurship & Innovation (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- Data Mining & Analysis (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Abstract
The invention relates to the technical field of urban insurance management systems, and particularly discloses a project management system based on an urban insurance standardization process, which comprises a project management server, wherein the project management server is provided with a project basic function unit and an expansion function unit; the project basic function unit comprises a project background analysis module, a project task management module, a project risk early warning module, a project file management module, a project team management module and a project supplier management module, and the expansion function unit comprises a budget management module, a target disassembling module and a project pharmacy drug management module; the method manages the city insurance project in a whole period, and comprises project background analysis, schedule task management, project file management, project team management, budget management and target disassembly; the progress tracking of each person in the project can be realized, the state of the project can be mastered in real time, the safety and reliability of the transmission of files and data are ensured, and the historical file version can be traced.
Description
Technical Field
The invention relates to the technical field of urban insurance management systems, in particular to a project management system based on an urban insurance standardization process.
Background
In the management of the risk projects of various major cities, specially-assigned persons are required to follow the schedule of the projects every day, data are required to be statistically transmitted by Excel, and process files in the projects are scattered in computers of various project personnel.
However, the existing mode lacks of standardized urban insurance project management, the project progress is complicated to follow up, and a large amount of manpower and time are consumed; and the process files are lack of unified management, and the historical files are difficult to trace back.
Disclosure of Invention
The invention aims to provide a project management system based on an urban insurance standardization process, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a project management system based on an urban insurance standardization process comprises a project management server, wherein the project management server is provided with a project basic function unit and an expansion function unit; the project basic function unit comprises a project background analysis module, a project task management module, a project risk early warning module, a project file management module, a project team management module and a project supplier management module, and the expansion function unit comprises a budget management module, a target disassembling module and a project pharmacy drug management module.
Preferably, the item background analysis module investigates the population, basic medical insurance, and city condition of each item city, and meanwhile, investigates data of city administrative regions and town population density, and collects data of city traffic network and broadcast channel.
Preferably, the project task management module creates and reviews the schedule project, establishes a schedule task template according to the commonality of the city risk project, and edits and modifies the template according to the specific condition of each project.
Preferably, the project risk early warning module monitors parameter data of project tasks and sets an alarm threshold; and when the monitored data exceeds the corresponding alarm threshold value, the project risk early warning module sends an alarm signal to the project management server.
Preferably, the project file management module is responsible for uploading files in various formats, managing folder classification teams and previewing and downloading the files.
Preferably, the project team management module receives project configuration data in the project management server and determines participating team personnel according to the project configuration data.
Preferably, the project supplier management module receives project configuration data of the project management server and determines suppliers of participating projects according to the configuration data.
Preferably, the budget management module counts the estimated expenditure and the estimated access of the project task, and calculates the estimated value of the income and the expenditure according to the conditions under different modes.
Preferably, the target dismantling module receives overall target data set by the project management server and conducts target dismantling from a multi-dimensional direction; the multi-dimensional direction target dismantling includes but is not limited to online and offline target dismantling, stage target dismantling, partner target dismantling and first day target dismantling.
Preferably, the project pharmacy and drug management module configures and maintains pharmacy data and drug data in a project according to project conditions, and performs shelving operation on pharmacies and drugs in the project.
Compared with the prior art, the invention has the beneficial effects that: the method effectively manages the city insurance project in a whole period, and mainly comprises project background analysis, schedule task management, project file management, project team management, budget management and target disassembly; the progress tracking of each person in the project can be realized, the state of the project can be mastered in real time, the safety and reliability of the transmission of files and data are ensured, and the historical file version can be traced.
Drawings
FIG. 1 is a schematic structural view of the present invention;
reference numbers in the figures: 1. a project management server; 2. a project background analysis module; 3. a project task management module; 4. a project risk early warning module; 5. a project file management module; 6. a project team management module; 7. a project provider management module; 8. a budget management module; 9. a target disassembling module; 10. project pharmacy drug management module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, the present invention provides a technical solution: a project management system based on an urban insurance standardization process comprises a project management server 1, wherein the project management server 1 is provided with a project basic function unit and an expansion function unit; the project basic functional unit comprises a project background analysis module 2, a project task management module 3, a project risk early warning module 4, a project file management module 5, a project team management module 6 and a project supplier management module 7, and the expansion functional unit comprises a budget management module 8, a target dismantling module 9 and a project pharmacy drug management module 10.
Further, the item background analysis module 2 investigates the population, basic medical insurance, and city conditions of the city of each item, and meanwhile, investigates data of the population density of the administrative regions and the cities and towns of the city, and collects data of the city traffic network and the broadcast channel.
Further, the project task management module 3 creates and reviews the schedule project, establishes a schedule task template according to the commonality of the city risk project, and edits and modifies the template according to the specific condition of each project.
Further, the project risk early warning module 4 monitors parameter data of project tasks and sets an alarm threshold; and when the monitored data exceeds the corresponding alarm threshold value, the project risk early warning module 4 sends an alarm signal to the project management server 1.
Further, the project file management module 5 is responsible for uploading files in various formats, managing folder categories, and previewing and downloading files.
Further, the project team management module 6 receives project configuration data in the project management server 1, and determines participating team personnel according to the project configuration data.
Further, the project supplier management module 7 receives project configuration data of the project management server 1, and determines suppliers of participating projects according to the configuration data.
Further, the budget management module 8 counts the estimated expenditure and the estimated access of the project task, and calculates the budget value of the income and the expenditure according to the conditions under different modes.
Further, the target dismantling module 9 receives the overall target data set by the project management server 1, and conducts target dismantling from a multi-dimensional direction; the multi-dimensional direction target dismantling includes but is not limited to online and offline target dismantling, stage target dismantling, partner target dismantling and first day target dismantling.
Further, the project pharmacy and drug management module 10 arranges pharmacy data and drug data in the maintenance project according to the project situation, and performs shelving operation on the pharmacy and the drug in the project.
The working principle is as follows: the project background analysis module 2 is used for investigating the population of the city, basic medical insurance participation and city conditions of each project, and sorting and collecting data for project personnel to analyze and use; data investigation is carried out on population density of municipal administrative districts and towns, and district sections which are mainly popularized can be planned for projects; and providing favorable data for project planning and propaganda according to the collected and input data of the urban traffic network, the broadcast channel and the like. The project task management module 3 sets a schedule task template according to the commonality of the city risk projects, and the template can be edited and modified according to the specific condition of each project; creating schedule tasks, wherein the personnel added to the tasks can receive reminders, remind project personnel before each task is about to start, edit and modify the created tasks, and update the current completion state of the tasks; and task condition overview, project management personnel can check the current progress overview of the project and master the condition of the project in real time. An alarm threshold value is set through the project risk early warning module 4, data exceeding a warning line is alarmed, and related personnel are informed to take emergency measures through the technology, so that extra loss is avoided. The project team management module 6 and the project supplier management module 7 are responsible for determining the participating personnel and participating suppliers of the project based on the configuration data of the project.
The budget management module 8 fills in the predicted expenditure and income of the recording project, and the predicted expenditure and income are calculated according to the conditions of different modes; the target disassembling module 9 performs multidimensional target disassembling on the overall target, specifically, online and offline target disassembling, stage target disassembling, cooperative target disassembling and first-day target disassembling; the project pharmacy and drug management module 10 arranges and maintains pharmacy data and drug data in a project according to project conditions, and can perform shelving operation on pharmacies and drugs in the project.
The system provided by the invention can be accessed through a mobile terminal and can also be accessed into data through a pc terminal; the project management of the unified standardized flow of the urban insurance project is realized, the clear responsibility and the clear division of labor of project personnel are ensured, and the work is planned, the completion time node is provided, the inspection is provided, and the summary is provided. Standardized work flow is formulated and implemented, work thinking and work methods are optimized, repeated work is effectively avoided, daily work is modularized and reproducible, and accordingly work efficiency is improved. The project is decomposed in a modularized mode, the division of labor of personnel in the project is determined, the work flow is detailed, the project management level is improved, and the project implementation cost is saved. Through the combination of the PC end and the mobile end, progress tracking of each person in the project can be achieved, the state of the project can be mastered in real time, safety and reliability of file and data transmission are guaranteed, and the historical file version can be traced.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (10)
1. A project management system based on urban insurance standardization process is characterized in that: the project management system comprises a project management server (1), wherein the project management server (1) is provided with a project basic function unit and an expansion function unit; the project basic functional unit comprises a project background analysis module (2), a project task management module (3), a project risk early warning module (4), a project file management module (5), a project team management module (6) and a project supplier management module (7), and the expansion functional unit comprises a budget management module (8), a target disassembly module (9) and a project pharmacy drug management module (10).
2. The project management system based on the city insurance standardization process of claim 1, wherein: the project background analysis module (2) investigates the population, basic medical insurance participation and city conditions of the city of each project, simultaneously investigates the population density of the city administrative regions and the cities and towns, and collects and records city traffic network and broadcast channel data.
3. The project management system based on the city insurance standardization process of claim 1, wherein: the project task management module (3) creates and browses the schedule projects, establishes a schedule task template according to the commonality of the city risk projects, and edits and modifies the template according to the specific condition of each project.
4. The project management system based on the city insurance standardization process of claim 1, wherein: the project risk early warning module (4) monitors parameter data of project tasks and sets an alarm threshold; and when the monitored data exceeds the corresponding alarm threshold value, the project risk early warning module (4) sends an alarm signal to the project management server (1).
5. The project management system based on the city insurance standardization process of claim 1, wherein: the project file management module (5) is responsible for uploading files in various formats, managing folder classification teams and previewing and downloading the files.
6. The project management system based on the city insurance standardization process of claim 1, wherein: the project team management module (6) receives project configuration data in the project management server (1) and determines participating team personnel according to the project configuration data.
7. The project management system based on the city insurance standardization process of claim 1, wherein: the project supplier management module (7) receives project configuration data of the project management server (1) and determines suppliers participating in the project according to the configuration data.
8. The project management system based on the city insurance standardization process of claim 1, wherein: the budget management module (8) counts the estimated expenditure and the estimated access of project tasks, and calculates the budget value of income and expenditure according to the conditions in different modes.
9. The project management system based on the city insurance standardization process of claim 1, wherein: the target disassembling module (9) receives the total target data set by the project management server (1) and performs target disassembling from a multi-dimensional direction; the multi-dimensional direction target dismantling includes but is not limited to online and offline target dismantling, stage target dismantling, partner target dismantling and first day target dismantling.
10. The project management system based on the city insurance standardization process of claim 1, wherein: the project pharmacy drug management module (10) configures and maintains pharmacy data and drug data in a project according to project conditions, and carries out shelf loading and unloading operation on pharmacies and drugs in the project.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110992799.7A CN113657866A (en) | 2021-08-27 | 2021-08-27 | Project management system based on urban insurance standardization process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110992799.7A CN113657866A (en) | 2021-08-27 | 2021-08-27 | Project management system based on urban insurance standardization process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN113657866A true CN113657866A (en) | 2021-11-16 |
Family
ID=78493042
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110992799.7A Pending CN113657866A (en) | 2021-08-27 | 2021-08-27 | Project management system based on urban insurance standardization process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113657866A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102254254A (en) * | 2011-07-22 | 2011-11-23 | 大连亿创天地科技发展有限公司 | Medicine supervision and administration system for Internet pharmacy |
CN108932589A (en) * | 2018-07-05 | 2018-12-04 | 武汉科技大学 | A kind of IT application in enterprises project implementation management system |
CN111353686A (en) * | 2020-01-17 | 2020-06-30 | 北京优联信驰信息科技有限公司 | Micro-task control method, computer-readable storage medium, computer program, and electronic device |
CN112862432A (en) * | 2021-01-29 | 2021-05-28 | 上海妙一生物科技有限公司 | Generation method and device of clinical research project management process |
CN113112181A (en) * | 2021-04-30 | 2021-07-13 | 平安普惠企业管理有限公司 | Project management method and related device |
-
2021
- 2021-08-27 CN CN202110992799.7A patent/CN113657866A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102254254A (en) * | 2011-07-22 | 2011-11-23 | 大连亿创天地科技发展有限公司 | Medicine supervision and administration system for Internet pharmacy |
CN108932589A (en) * | 2018-07-05 | 2018-12-04 | 武汉科技大学 | A kind of IT application in enterprises project implementation management system |
CN111353686A (en) * | 2020-01-17 | 2020-06-30 | 北京优联信驰信息科技有限公司 | Micro-task control method, computer-readable storage medium, computer program, and electronic device |
CN112862432A (en) * | 2021-01-29 | 2021-05-28 | 上海妙一生物科技有限公司 | Generation method and device of clinical research project management process |
CN113112181A (en) * | 2021-04-30 | 2021-07-13 | 平安普惠企业管理有限公司 | Project management method and related device |
Non-Patent Citations (1)
Title |
---|
李勐: ""项目管理在社保管理信息***开发中的应用研究"", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》, no. 04, pages 161 - 8 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2022116548A1 (en) | Power emergency command system | |
CN108320069B (en) | Production and manufacturing execution system | |
CN103337012B (en) | Towards the multi-threaded intelligent comprehensive alert analysis method of grid equipment monitoring | |
CN104766151A (en) | Quality management and control method for electricity transaction data warehouses and management and control system thereof | |
CN110597791B (en) | Knowledge database construction and management method for operation and maintenance of electric power metering equipment | |
CN113179173B (en) | Operation and maintenance monitoring system for expressway system | |
CN110850781A (en) | Mine management system based on SaaS cloud platform | |
CN109829615B (en) | Target task multistage monitoring device and method based on proprietary cloud | |
CN111047162A (en) | Campus potential safety hazard troubleshooting system and method | |
CN114338741A (en) | Intelligent operation and maintenance management system for vehicle | |
CN113657866A (en) | Project management system based on urban insurance standardization process | |
CN117575493A (en) | Project management method, management platform, device and storage medium thereof | |
CN115689788A (en) | Financial data analysis method | |
CN116955304A (en) | Track traffic resource sharing and calling system based on cloud platform | |
CN116012031A (en) | Intelligent inspection digital platform and system for electric power marketing | |
Merino et al. | Impact of data quality in real-time big data systems | |
CN115564068A (en) | Method and system for monitoring and managing inspection and maintenance of drainage pipe network and facilities and storage medium | |
Smith et al. | Realizing the promise of intelligent transportation systems (ITS) data archives | |
CN114349083A (en) | Distributed rural sewage facility operation and maintenance management and control platform | |
CN113420890A (en) | Cultural relic resource restoration management system | |
CN116542638B (en) | Decision support system and method for nuclear power installation | |
CN215679427U (en) | Meteorological data operation monitoring management system on duty | |
CN116976809B (en) | Intelligent brain system for water affairs | |
CN117391623A (en) | Modularized intelligent construction management system | |
Van Rensburg | A generic software platform for performance monitoring of deep-level mine systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20211116 |