CN1136095C - Manufacturing method of composited tube and device therefor - Google Patents

Manufacturing method of composited tube and device therefor Download PDF

Info

Publication number
CN1136095C
CN1136095C CNB001302485A CN00130248A CN1136095C CN 1136095 C CN1136095 C CN 1136095C CN B001302485 A CNB001302485 A CN B001302485A CN 00130248 A CN00130248 A CN 00130248A CN 1136095 C CN1136095 C CN 1136095C
Authority
CN
China
Prior art keywords
tube
pipe
metal tube
interior pipe
technology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB001302485A
Other languages
Chinese (zh)
Other versions
CN1291544A (en
Inventor
宋周显
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN1291544A publication Critical patent/CN1291544A/en
Application granted granted Critical
Publication of CN1136095C publication Critical patent/CN1136095C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C48/00Extrusion moulding, i.e. expressing the moulding material through a die or nozzle which imparts the desired form; Apparatus therefor
    • B29C48/16Articles comprising two or more components, e.g. co-extruded layers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C65/00Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor
    • B29C65/48Joining or sealing of preformed parts, e.g. welding of plastics materials; Apparatus therefor using adhesives, i.e. using supplementary joining material; solvent bonding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29DPRODUCING PARTICULAR ARTICLES FROM PLASTICS OR FROM SUBSTANCES IN A PLASTIC STATE
    • B29D23/00Producing tubular articles
    • B29D23/001Pipes; Pipe joints
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B15/00Layered products comprising a layer of metal
    • B32B15/04Layered products comprising a layer of metal comprising metal as the main or only constituent of a layer, which is next to another layer of the same or of a different material
    • B32B15/08Layered products comprising a layer of metal comprising metal as the main or only constituent of a layer, which is next to another layer of the same or of a different material of synthetic resin
    • B32B15/085Layered products comprising a layer of metal comprising metal as the main or only constituent of a layer, which is next to another layer of the same or of a different material of synthetic resin comprising polyolefins
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B2597/00Tubular articles, e.g. hoses, pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Extrusion Moulding Of Plastics Or The Like (AREA)
  • Lining Or Joining Of Plastics Or The Like (AREA)

Abstract

The present invention relates to a manufacturing method of a composite tube and a device thereof, namely an improved manufacturing method of a composite tube and a relevant device for covering various resins. The present invention is formed from the molding technology for forming an inner resin tube, the glue-coating technology for cooling after the tube is preheated and adhesives are coated, the metal tube molding technology for welding the formed inner tube, the jointing technology for jointing the inner tube and the metal tube and the outer tube manufacturing technology for sheathing an outer tube outside the metal tube. In addition, the leading and taking technology is added following the glue-coating technology, the metal tube molding technology and the outer tube manufacturing technology. The present invention can realize the automation of all kinds of technology, bulk production can not be influenced by the external working environment, the device required by the technology is simple, firm and economical and has the advantage of long service life.

Description

A kind of composite pipe production method and device
The invention relates at metal tube surfaces externally and internally covering resin with the process of manufacturing multiple tube and the improvement method of process units; Composite pipe production method and the relative assembly just invented through improving in order to cover resin with various character.Surfaces externally and internally at metal tube covers the resin that one deck has certain characteristic, makes multiple tube, is mainly used in warm water and cold water pipes.Its preparation method is as follows: for the inner surface covering resin at narrow tube, earlier the resin that covers in the pipe is made into tubulose, makes and the forming metal pipe to the periphery of pitch tube then, last outer race crust at metal tube.
This multiple tube producing device and preparation method are represented by Figure 12 artwork.Figure 13 structure chart and Figure 14 structure chart are publication 99-6415 numbers.Concrete manufacturing process is as follows: by extruding (extrusion) machine moulding and twist in the interior plastic tube (51) on the wheel and the metal tape (531) that twists on the wheel is sent to the metal tube make-up machine, this process is realized by feeding mechanism (142).The metal tape (531) that feeding mechanism (42) is supplied with encases the inside plastic tube of being supplied with by mould (34) (51) and forms metal tube (53), and this process is realized by metal tube shaped device (143); For metal tube shaped device (143) can be made metal tube (53), use two end faces of bonding machine weld metal band (531), this is realized by welder (144); The be locked outer surface of interior plastic tube (51) of the metal tube (53) of burn-oning for welder (144) draws metal tube, makes its extension, thereby can pass through axle sleeve hole, and this is realized by metal tube initiating device (15 ').Through the metal tube (53) of metal tube initiating device (15 ') the moulding interior plastic tube (51) that is elongated and is locked, at this moment metal tube (53) is peripheral form again by extruder outside plastic tube (54), these are characteristics of this multiple tube producing device.
By extruding (extrusions) machine moulding and twist in the interior plastic tube (51) on the wheel and the metal tape (531) that twists on the wheel is sent to the metal tube make-up machine, this is supply stage (142) realization.The metal tape (531) that feeding mechanism (42) is supplied with encases the inside plastic tube of being supplied with by mould (34) (51) and forms metal tube (53), and this is metal tube formative stage (143); For metal tube shaped device (143) can be made metal tube (53), use two end faces of bonding machine weld metal band (531), this is welding stage (144); The be locked outer surface of interior plastic tube (51) of the metal tube (53) of burn-oning for welder (144) draws metal tube, makes its extension, thereby can the channel axis trepanning, and this is by metal tube initiating device (15 ').Through the metal tube (53) of metal tube initiating device (15 ') the moulding interior plastic tube (51) that is elongated and is locked, at this moment metal tube (53) is peripheral form again by extruder outside plastic tube (54), these are this multiple tube preparation methods.
Therefore, interior pitch tube (51) is by interior pipe forming apparatus (111) extrusion modling, and by cooling device (112) and initiating device (113) typing, supply to next process (141) by winding wheel (55) afterwards, meanwhile the utilization of the mould (34) of metal tube shaped device (143) twists in the thin plate (531 on the wheel; Metal tape) clamps interior plastic tube and form pipe, weld by welder (144) then.Because of lamella thickness little, technically be difficult to realize butt welding (Butt welding), so two cross sections are carried on the arm weld (Wrap welding) again after connecing certain width, at this moment metal tube (53) has just entangled interior pipe (51), but the two is not bonded together.At next process, to pass through metal tube initiating device (15 ') drawing metal tube (53), dwindle the diameter of metal tube, the outer surface of interior pipe (51) and the inner surface of metal tube are locked, utilize the adhesive (52) that spreads upon inner tube outer surface bonding again, cover outer tube (54) by outer pipe forming apparatus (161) in the periphery of metal tube afterwards, finish multiple tube; By multiple tube devices for taking-up (162), batch multiple tube (5) then, finally finish product by winding wheel (55).
As the device of realizing said process, interior pipe (51) is by extruder (omitting diagram) extrusion modling, be sent to next process with wheel, thin plate (153) is also on wheel, material is supplied with in rotation by two wheels, metal tube shaped device (143) shown in Figure 13 utilizes the bunseam welding, and (the distribution workshop practictice heard in blue or green literary composition, on January 15th, 82,175 pages) formation metal tube (53), again the metal tube of moulding (53) is welded with common bonding machine (peripheral solder of thin plate is used the alternating-current resistance welding usually), use initiating device shown in Figure 14 (113) drawing metal tube (53) again, pipe and metal tube in bonding are afterwards at the peripheral outer tube (54) that covers of metal tube (53).But said method and device have following shortcoming (because of not having technical difference between " device invention " and " the method invention ", so two kinds of inventions are described together).In the middle of the interior pipe moulding process, interior pipe forming apparatus (111, extruder extruding) and cooling device (112) and initiating device (113) all be common unit, interior pipe is made the back and is twisted in wheel by devices for taking-up (114), therefore (51) length of pipe is subjected to the restriction of wheel specification size in, so whole technology can not be implemented in linearize (online), process efficiency is low.As the shaped device (143) of metal tube, bunseam welding as shown in figure 12 when rolling up thin plate (531) tubulation continuously, needs only between numerous wheels even the generation fine error will generate useless pipe.Repair the required operation of these errors and depend on professional's technical ability, be restricted so produce in batches, especially the thin plate of Gong Geiing (531) approaches not only but also narrow, and longer, easily shakes during supply, and this will cause serious problem when tubulation.For pipe and metal tube (53) in bonding, need drawing metal tube (53), if the inner materials of metal tube (53) is inhomogeneous, the extension degree of each several part is different so, and is bonding also inhomogeneous.Metal tube (53) is by welded seal, because the percentage elongation at welding position and other position is different when thermal deformation, some bubbles so often mix between interior pipe (51) and the metal tube (53), especially not butt joint (bun) but carry on the arm under the state that meets (wrap) in the thin plate close mouth, the inner surface of metal tube (53) must have offset, percentage elongation is also different, so the generation of waste product is unavoidable.Other device, since too general, so can light produce multiple tube (5) with these equipment, also be suspicious thing, so those equipment omit at this.
The purpose of this invention is to provide a kind of composite pipe production method and device of improving, first, by the automation of whole technologies, save labourer's manpower, increase the flexibility of technology: second, be not subjected to the interference of operate outside condition, even be subjected to ectocine also to realize the batch process of certified products in the same old way, the 3rd, the device of finishing each technology is simple firm again structure, therefore durability is good, the saving funds.
To achieve these goals, the present invention adopts following design:
A kind of composite pipe production method, the resin of dissolving forms interior pipe (51) by the mould and the cooling of certain specification, and this is an interior pipe moulding process (11).Pipe (51) in the preheating in the coating technique (12), the periphery is smeared adhesive (52) and is cooled off afterwards.In metal tube moulding process (14), interior pipe (51) passes through shaping jig (3) with aluminium sheet (531), twists in moulding and welding in the sleeve pipe.Pipe (51) and metal tube (53) in joint technology (15) engages.In the cover outer tube technology (16), smear adhesive (52), put the outer tube (54) and the cooling of heating afterwards to the periphery of metal tube (53).It more than is exactly composite pipe production method.
It is characterized in that: in coating technique (12), metal tube moulding process (14) and cover outer tube technology (16) afterwards, added respectively and drawn taking technique (13), it is a kind ofly to get device (2) by drawing of forming of a pair of belt (23) that moves with speed up and down.
Before the welding sequence of metal tube moulding process (14), arrange curve metallization processes (17), exactly hoop (hoopunit) (171) turn an angle pipe.
A kind of device that is used for above-mentioned composite pipe production method, the resin of dissolving forms interior pipe (51) by the mould of certain specification, is transferred to given size cooling afterwards, and this is interior pipe manufacturing apparatus, pipe (51) in the glue spreading apparatus preheating, the periphery is smeared adhesive (52) and is cooled off afterwards.The material feeding mechanism batches thin plate (531) and is fed to next process with certain tension force and interior pipe (51) afterwards.Shaped device is accepted thin plate (531) and the interior pipe (51) that supply is come, and is rolled onto on the metal tube (53).The metal tube of high-frequency welder welding fabrication (53) bond sites.Metal tube on the engagement device seam welding (53) and interior pipe (51).Glue spreading apparatus is smeared adhesive (52) and cooling in the periphery of metal tube (53).Outer pipe manufacturing apparatus is in the outer race upper exterior tube (54) and the cooling of metal tube (53).More than to combine be exactly the multiple tube manufacturing installation to device.
It is characterized in that, coating adhesive (52), shaping jig (3) and outer pipe manufacturing apparatus (54) add to draw afterwards gets device (2), it is exactly the upper and lower pair of driving wheels (21 of rotating by motor, 21) with rotatable follower (22,22) go up cover belt (23,23), this driving wheel (21), follower (22) and belt (23) are adjusted upper-lower position by a pair of cylinder (25,25) that is installed in top.
This draws the belt (23,23) of getting device (2) respectively certain thickness and middle porose (231).
A kind of device that is used for above-mentioned composite pipe production method, the resin of dissolving forms interior pipe (51) by the mould of certain specification, is transferred to given size cooling afterwards, and this is interior pipe manufacturing apparatus.Pipe (51) in the glue spreading apparatus preheating, periphery are smeared adhesive (52) and cooling.The material feeding mechanism batches thin plate, with pipe (51) and thin plate in certain tension force supply.Shaped device is accepted thin plate (531) and the interior pipe (51) that supply is come, and it is twisted on the metal tube (53).The bond sites of the metal tube of high-frequency welder welding fabrication (53).Metal tube on the engagement device seam welding (53) and interior pipe (51).Glue spreading apparatus is in the peripheral coated with adhesive (52) and the cooling of metal tube (53).Outer pipe manufacturing apparatus is in the outer race upper exterior tube (54) and the cooling of metal tube (53).Above several means combines and forms the multiple tube manufacturing installation.
It is characterized in that, upper and lower two moulds (32 of shaped device, 34) firm on fixture stand (31), the mould of upside (32) lining has can be by the support ditch (33) of interior pipe (51), on the mould of downside (34), arranging most anchor clamps (3) of formation through hole (35) by certain distance, so that thin plate little by little is rolled onto on the pipe box.
A kind of device that is used for above-mentioned composite pipe production method, the resin of dissolving forms interior pipe (51) by the mould of certain specification, is transferred to given size cooling afterwards, and this is interior pipe manufacturing apparatus.Pipe (51) in the glue spreading apparatus preheating, the periphery is smeared adhesive (52) and is cooled off afterwards.The material feeding mechanism batches thin plate (531), with pipe (51) and thin plate (531) in certain tension force supply.Shaped device is accepted thin plate (531) and the interior pipe (51) that supply is come, and is rolled onto on the metal tube (53).The metal tube of high-frequency welder welding fabrication (53) is the position continuously.Metal tube on the engagement device seam welding (53) and interior pipe (51).Glue spreading apparatus is smeared adhesive (52) and cooling in the periphery of metal tube (53).Outer pipe manufacturing apparatus is in the outer race upper exterior tube (54) and the cooling of metal tube (53).Above device is combined into the multiple tube manufacturing installation.
It is characterized in that, engagement device (4) by self-rotation wheel (42) and on take turns (43) and form.There is semi-circular chase (421) centre of self-rotation wheel (42), goes up rotation thereby support it at shaping frame (41).Semi-circular chase (431) is arranged in the middle of the last wheel (43), when it is docked to self-rotation wheel (43) top, form one just round, thereby on shaping frame (41), can move up and down.
A kind of device that is used for above-mentioned composite pipe production method, the resin of dissolving forms interior pipe (51) by the mould of certain specification, is transferred to given size cooling afterwards, and this is interior pipe manufacturing apparatus.Pipe (51) in the glue spreading apparatus preheating, periphery are smeared adhesive (52) and cooling.The material feeding mechanism batches thin plate, with pipe (51) and thin plate in certain tension force supply.Shaped device is accepted thin plate (531) and the interior pipe (51) that supply is come, and it is twisted on the metal tube (53).The bond sites of the metal tube of high-frequency welder welding fabrication (53).Connect metal tube (53) and interior pipe (51) on the table apparatus seam welding.Glue spreading apparatus is in the peripheral coated with adhesive (52) and the cooling of metal tube (53).Outer pipe manufacturing apparatus is in the outer race upper exterior tube (54) and the cooling of metal tube (53).Above several means combines and forms the multiple tube manufacturing installation.
It is characterized in that left and right wheels engagement device (4) is exactly semi-circular chase (441,441) butt joint in the middle of a pair of left and right wheels (44,44), form one just round, rotation on forming supporter, and can move left and right.
A kind of device that is used for above-mentioned composite pipe production method, the resin of dissolving forms interior pipe (51) by the mould of certain specification, is transferred to given size cooling afterwards, and this is interior pipe manufacturing apparatus.Pipe (51) in the glue spreading apparatus preheating, periphery are smeared adhesive (52) and cooling.The material feeding mechanism batches thin plate, with pipe (51) and thin plate in certain tension force supply.Shaped device is accepted thin plate (531) and the interior pipe (51) that supply is come, and it is twisted on the metal tube (53).The bond sites of the metal tube of high-frequency welder welding fabrication (53).Metal tube on the engagement device seam welding (53) and interior pipe (51).Glue spreading apparatus is in the peripheral coated with adhesive (52) and the cooling of metal tube (53).Outer pipe manufacturing apparatus is in the outer race upper exterior tube (54) and the cooling of metal tube (53).Above several means combines and forms the multiple tube manufacturing installation.
It is characterized in that last lower whorl engagement device (4) that a cover is above and the above left and right wheels engagement device (4) of a cover cross one another, and semi-circular chase (421) is arranged in the middle of the self-rotation wheel (42) in the last lower whorl engagement device, support self-rotation wheel rotation on forming supporter.In the middle of going up wheel (43) in addition semi-circular chase (431) is arranged also, when its butt joint self-rotation wheel (42) top, chase forms just round, can move up and down on forming supporter (41).Left and right wheels engagement device (4) is made up of a pair of left and right wheels (44,44).One of semi-circular chase (431,431) butt joint formation in the middle of the left and right wheels is just round, thereby allows its one side of rotation on one side move left and right on forming supporter (41).
The utility model is described in further detail below in conjunction with accompanying drawing.
Fig. 1 is an artwork of the present invention;
Fig. 2 is an another kind of artwork of the present invention;
Fig. 3 is flowage structure figure of the present invention;
Fig. 4 is the A-A cross section enlarged drawing of Fig. 3;
Fig. 5 is another structure enlarged drawing of Fig. 4;
Fig. 6 is an another kind of structure chart of the present invention;
The B part enlarged drawing of Fig. 7 Fig. 6;
Fig. 8 is an another kind of structure chart of the present invention;
Fig. 9 is an another kind of structure chart of the present invention:
Figure 10 is finished product state figure of the present invention;
Figure 11 is the C portion enlarged drawing of Figure 10;
Figure 12 is the artwork of old invention;
Figure 13 is the flowage structure figure of old invention;
Figure 14 is another structure chart of old invention;
Fig. 1 is whole artwork of the present invention;
The mould of the resin of fusion by the lattice of establishing rules, pipe moulding process (11) in the pipe one in cooling forms; The interior pipe of preheating front is also smeared adhesive (52) in the periphery, cools off a coating technique afterwards again; In pipe and aluminium sheet (531) be sent to shaping jig (3) together, through shaping jig (3) be shaped to include in the tube of pipe, and finish welding-metal tube moulding process (14); Bonding above-mentioned interior pipe and metal tube---joint technology (1S); Adhesive (52) is smeared in the periphery of metal tube, squeezes out outer tube (54) and heating, cooling, thus peripheral one deck outer tube (54) the outer tube manufacturing process (16) that covers of metal tube.Also add following technology by the multiple tube preparation method that above-mentioned several technologies are formed.After adhesive application process (12) and metal tube moulding process (14) and the outer tube manufacturing process (16), get device (2) by drawing of constituting of the belt (23) that rotates with speed up and down and form and draw taking technique (13).
Fig. 2 is another artwork of the present invention.
Also add following technology in the middle of the said structure of the present invention: before the welder that use (14) in above-mentioned metal tube moulding process, add curve metallization processes (17), pipe is rotated to an angle in the middle of moving process exactly utilize hoop (hoop unit).
Fig. 3 is a core technology of the present invention-draw the structure chart of getting device (2), and Fig. 4 is the A-A cross section enlarged drawing of Fig. 3.
The mould of the resin of fusion by the lattice of establishing rules, pipe moulding process (11) in the pipe one in cooling forms; The interior pipe of preheating front is also smeared adhesive (52) in the periphery, cools off a coating technique afterwards again; In pipe and aluminium sheet (531) be sent to shaping jig (3) together, through shaping jig (3) be shaped to include in the tube of pipe, and finish and weld a metal tube moulding process (14); Bonding above-mentioned interior pipe and metal tube-joint technology (15); Adhesive (52) is smeared in the periphery of metal tube, squeezes out outer tube (54) and heating, cooling, thus peripheral one deck outer tube (the 54)-outer tube manufacturing process (16) that covers of metal tube.
It is characterised in that drawing that coating adhesive (52), shaping jig (3) and outer pipe manufacturing apparatus (54) add afterwards get device (2), it is exactly the upper and lower pair of driving wheels (21 of rotating by motor, 21) with rotatable follower (22,22) go up cover belt (23,23), this driving wheel (21), follower (22) and belt (23) are adjusted upper-lower position by a pair of cylinder (25,25) that is installed in top.
Fig. 5 is an another kind of structure chart of the present invention, in order to compare with Fig. 4, to cut open and amplifies from the A-A line of Fig. 3 and shown section.
Said structure is that drawing the belt (23,23) of getting device (2) respectively has certain thickness, middle part porose (231).This is improved multiple tube manufacturing installation.
Fig. 6 is the configuration status figure that shows another pith-anchor clamps of the present invention (3); Fig. 7 is anchor clamps (3), is the B part enlarged drawing of Fig. 6.
The mould of the resin of fusion by the lattice of establishing rules, pipe moulding process (11) in the pipe one in cooling forms; The interior pipe of preheating front is also smeared adhesive (52) in the periphery, cools off a coating technique afterwards again; In pipe and aluminium sheet (531) be sent to shaping jig (3) together, through shaping jig (3) be shaped to include in the tube of pipe, and finish welding-metal tube moulding process (14); Bonding above-mentioned interior pipe and metal tube-joint technology (15); Adhesive (52) is smeared in the periphery of metal tube, squeezes out outer tube (54) and heating, cooling, thus peripheral one deck outer tube (the 54)-outer tube manufacturing process (16) that covers of metal tube.
It is characterised in that, upper and lower two moulds (32 of shaped device, 34) firm on fixture stand (31), the mould of upside (32) lining has can be by the support ditch (33) of interior pipe (51), in the mould county (34) of downside, arranging most anchor clamps (3) of formation through hole (35) by certain distance, so that thin plate little by little is rolled onto on the pipe box.This is through improved multiple tube manufacturing installation.
Fig. 8 is the structure chart that shows the another kind of structure of the present invention.
The mould of the resin of fusion by the lattice of establishing rules, pipe moulding process (11) in the pipe one in cooling forms: the interior pipe of preheating front is also smeared adhesive (52) in the periphery, cool off a coating technique afterwards again: interior pipe and aluminium sheet (531) are sent to shaping jig (3) together, through shaping jig (3) be shaped to include in the tube of pipe, and finish welding one metal tube moulding process (14); Bonding above-mentioned interior pipe and metal tube-joint technology (15); Adhesive (52) is smeared in the periphery of metal tube, squeezes out outer tube (54) and heating, cooling, thus peripheral one deck outer tube (the 54)-outer tube manufacturing process (16) that covers of metal tube.
Its feature is engagement device.Engagement device (4) by self-rotation wheel (42) and on take turns (43) and form.There is semi-circular chase (421) centre of self-rotation wheel (42), goes up rotation thereby support it at shaping frame (41).Semi-circular chase (431) is arranged in the middle of the last wheel (43), when it is docked to self-rotation wheel (42) top, form one just round, thereby on shaping frame (41), can move up and down.
Fig. 9 is the structure chart that shows the another kind of structure of the present invention.
The mould of the resin of fusion by the lattice of establishing rules, pipe moulding process (11) in the pipe one in cooling forms; The interior pipe of preheating front is also smeared adhesive (52) in the periphery, cool off a coating technique afterwards again: interior pipe and aluminium sheet (531) are sent to shaping jig (3) together, through shaping jig (3) be shaped to include in the tube of pipe, and finish welding one metal tube moulding process (14); Bonding above-mentioned interior pipe and metal tube-joint technology (15); Adhesive (52) is smeared in the periphery of metal tube, squeezes out outer tube (54) and heating, cooling, thus peripheral one deck outer tube (the 54)-outer tube manufacturing process (16) that covers of metal tube.
It is characterised in that left and right wheels engagement device (4), is exactly semi-circular chase (441,441) butt joint in the middle of a pair of left and right wheels (44,44), form one just round, rotation on forming supporter, and can move left and right.
The present invention who forms by above-mentioned part, the C part enlarged drawing of borrowing finished product state figure-Figure 10 of the present invention and Figure 10 just Figure 11 further specifies as follows:
According to flowage structure of the present invention, as the compound pipe molding Process, concrete technology is as follows: interior pipe moulding process (11)-and the mould of the resin of fusion through the lattice of establishing rules, pipe (51) in cooling forms; The above-mentioned interior pipe of coating technique (12)-preheating (51) is also smeared adhesive (52) in the periphery and is cooled off; Metal tube moulding process (14)-above-mentioned interior pipe and aluminium sheet supply to forming supporter (3) together, become the tube that includes interior pipe (51), and welding; Joint technology (15)-the sticking platform of pipe (51) and outer tube (53) in above-mentioned; Outer tube manufacturing process (16)-smear adhesive (52) at above-mentioned metal tube (53) outer surface through extruding, heating, cooling outer tube (54), is enclosed within the metal tube afterwards.It more than is basic technology; Coating technique (12) and metal tube moulding process (14) and outer tube manufacturing process (16) are added afterwards again and are drawn taking technique (13) in addition, and it gets device (2 by drawing of constituting of a pair of belt (23) that rotates at the same rate up and down; Haul-offM/C) realize; Above-mentioned technology and publication 99-6415 Process-pipe (51) twists in winding wheel (55) afterwards in making separately, compare by a dead lift next process, because of it streamline (online) as basic, so the minimum streamline length that needs 183m.And smooth and easy in technology, and the place that can avoid conflicting with other technology is appended and is drawn taking technique (13).Its structure is as follows: can draw raw material after interior pipe (51) and metal tube (53) and outer tube (54) moulding, help moulding.The taking technique (13) that draws of the present invention adopts by drawing of forming of a pair of belt (23) up and down and gets device (2), prevents to be drawn by driving wheel the outside cut of generation when getting.
Another kind of structure of the present invention is curve metallization processes (17), exactly hoop (171:hoop unit) is the pipe of last procedure rotate to an angle (Round).Before the needed welder of metal tube moulding process (14), adding technology as mentioned above, length is completely wanted 180m at least, so old technology is cut apart whole technology, pipe (51) in making in addition.But the present invention is implemented in linearize (online), has improved process efficiency, and in order rationally to arrange Facility Layout (layout), curve metallization processes (17) has been added in the centre, makes processing line furnish into broken line type from linear pattern.Can occur the temperature distortion after metal tube (53) has welded, curve metallization processes (17) is arranged in welder can prevent to produce more changeable shape before.Hoop (hoop unit) (171) is that the pipe (51,53) that straight line transmits is rotated 180 degree devices with decided diameter.For example, the periphery of major diameter circle wheel (wheel) make can guiding pipe (53) chase, steadily rotate respectively with this and to manage; Perhaps the wheel of many minor diameters is arranged to large diameter circumference, drives pipe (53) by these many steamboats and rotate gradually.
In multiple tube manufacturing installation structure of the present invention, the resin of dissolving, the mould of passage certain specification form interior pipe (51) and adjust to given size (Sizing) and cool off afterwards, and this is interior pipe manufacturing apparatus.Pipe (51) in the glue spreading apparatus preheating is smeared adhesive (52) and cooling.The material feeding mechanism batches thin plate (531), and with the interior pipe of certain tension force supply (51) and thin plate (531), shaped device is accepted thin plate (531) and the interior pipe (51) that supply is come, and is rolled onto metal tube (53).The metal tube of high-frequency welding equipment welding fabrication (53), metal tube on the engagement device seam welding (53) and interior pipe (5), glue spreading apparatus is smeared adhesive (52) and cooling to the periphery of metal tube (53), and outer pipe manufacturing apparatus is in the outer race upper exterior tube (54) and the cooling of metal tube (53).Above device is a basic device.In the streamline (Line) that constitutes by above device, draw in adhesive (52), shaping jig (3) and the increase of outer pipe manufacturing apparatus back and to get device (2).By motor-driven pair of driving wheels (21 up and down, 21) put belt (23,23), this driving wheel (21), follower (22) and belt (23) are by the cylinder that is installed in top (Cylinder) (25,25) adjust up and down, this drawing gets device (2) and can adjust the component locations that moves between each device.The up and down a pair of belt of being made by rubber (23,23) is enclosed within on the driving wheel (21) and follower (22) of motor (not have expression among the figure) driving, with same direction with fast transfer member, so transfer tube (51 lightly as sectional drawing 4,53,54), do not stay cut.On wheel of upside (21,22) and the belt (23) a pair of cylinder (Cylinder) (25,25) has been installed, wheel and belt are up and down according to part dimension, keep suitable distance between the parts.Follower (22,22) go up installation tension adjusting device (24,24), be exactly rotary handle (242), passive wheel shaft (241) advances or retreats, follower (22,22) and transfer distance variableization between the wheel (21,21), belt (23,23) tension force, thus the parts periphery neither stay draw subcutaneous ulcer again can (Sleep) out of hand.Up and down belt (23,23) must with parts on contact and could pass parts, as shown in Figure 4, this moment, belt contained the parts periphery a little.Belt (23,23) when retreating the wheel (21,21,22,22) under the belt do not support after the middle part, could flexibly pass parts.For addressing this problem, just as shown in Figure 4, disconnect after the middle part of wheel (21,21,22,22) that just connect with axle can better solution, the belt of narrating after just being to use (23,23).Even such design variations is arranged, it still belongs within the technology of the present invention thought range, obviously is the thing within the scope of authority.
In the structure of apparatus of the present invention, drawing the belt (23,23) of getting device (2) has certain thickness, and in the middle of it porose (231), thereby the parts on the pipe (51,53,54) can not stayed cut even press yet.
In the middle of the present invention's one multiple tube manufacturing installation, as shaped device, arranging most anchor clamps (3) by certain distance, it is firm on fixture stand (31) by last two bed dies (32,34), and can move up and down, thereby easy to adjust.The support ditch (33) that passes through for interior pipe (51) is arranged on the last side mold (32), and following side mold (34) has forming through hole (35), thereby thin plate can be rolled onto on the pipe in order.Following side mold in the anchor clamps (3) (34,34 ...) on forming through hole (35) is arranged, make thin plate form circle gradually from linear state.The thin plate (531) that is fed to first forming through hole (35) is a linear state, and it just forms circle during by last forming through hole (35), and be hidden within the interior pipe (51) of last side mold (32) inside the metal tube (53) this moment.In the former invention, with anchor clamps of the present invention (3) difference, use Butt seam welding, thereby most wheel is pressed into pipe to thin plate, but this way is difficult to adjust the wheel spacing, thin plate (531) thickness is little, and breadth is narrow, when mobile owing to own wt trembles.Move also vibration easily of pipe (51) in the resin of coming in addition simultaneously, and this vibration becomes a deadly defect.Pipe (51) and thin plate (531) in the anchor clamps (3) of current invention support respectively and move, thus above problem can not take place.Even the thin plate that used thickness is little (531), two ends can be not overlapping in moving for thin plate, makes pipe under the state that is close to, and the multiple tube of Zhi Zaoing (5) size is correct in this way, can overlap upper thin sheet fully.
Another structure of apparatus of the present invention is exactly to go up lower whorl engagement device (4).It by self-rotation wheel (42) and on take turns (43) and form.There is semi-circular chase (421) centre of self-rotation wheel, can go up rotation at forming supporter (41).In the middle of the last wheel semi-circular chase (431) is arranged also, when it was docked to the top of self-rotation wheel (42), two chases (421,431) formed just round, can move up and down on forming supporter (41).Metal tube (53) move to by self-rotation wheel (42) and on when taking turns (43) formed chase (421,431) diameter diminish, thereby the inner face of metal tube (53) is close to interior pipe (51) periphery, and adhesive (52) has been coated in interior pipe periphery (51), and pipe (51) firmly sticks in the metal tube (53) in guaranteeing.The invention in past is dwindled the diameter of metal tube (53) with fashion of extrusion, but because the thermal field that welding is produced, material can not evenly extend, and causes the bond quality problem.The present invention utilizes a pair of wheel the (42,43) to carry out local diameter to dwindle operation, so above-mentioned defective can not take place.In addition, the axle (47) that can control the last wheel of rotation (43) is installed on the shelf (41), and when rotation was installed in the handle (45) on shelf (41) top, Handle axis (46) can move up and down axle (47), and it equals " gear and pinion (Rack; Pinion) " principle.
One of apparatus of the present invention are exactly left and right wheels engagement device (4).It is made up of a pair of left and right wheels (44,44), and semi-circular chase (431, the 431) butt joint in the middle of the wheel forms just round, goes up rotation at shaping frame (41), and can about adjust, it is similar to catch up with lower whorl engagement device (4), role also is the same.
One of apparatus of the present invention are exactly above last lower whorl engagement device (4) of a cover and above left and right wheels engagement device (the 4 ') cross arrangement of a cover.When metal tube (53) passed through the chase (421,431,441) of each wheel (42,43,44), diameter diminished gradually.Because last lower whorl engagement device (4) and left and right wheels engagement device (4 ') cross arrangement, metal tube (53) dwindles gradually, reaches the purpose of pipe (51) in the fluid-tight engagement.The engagement device (4,4 ') that uses is many more, and diameter diminishes more gradually, but considers from economic angle, and the device about three covers can be raised the efficiency and economy simultaneously.
Introduce the present invention below---the manufacture method of multiple tube:
Put into resin in the extruder jar, squeeze out the interior pipe (51) of internal diameter φ 15mm under 180~200 ℃ of temperature, comprehensive analysis of conditions of CUN KOU pulse and skin of the forearm (Sizing) under vacuum 40~50mmHg state is by pipe (51) in making after the 20L bosh.If make cold water with pipe, use be high density polyethylene (LUTMERAP150 of HDPE:LG chemical company); If make warm water with managing, use is bridge formation high density polyethylene (SKPOLYLNKXL380 of CrosslinkableHDPE:SK company), its characteristic such as table 1, table 2.<table 1 〉
Characteristic Test method (ASTM) Unit Value
Melt index (190 ℃, 2.16kg) D1238 g/10min 3.6
Density D1505 g/cm 2 0.926
Crystallization/dissolved click DSC C 125
<table 2 〉
Characteristic Unit Test method Standard value Measured value
The fusion flow (190 ℃, a 5kg) density hot strength percentage elongation Izod impact strength Vicat extension point bridge formation degree g/10min g/cm 2 Kg/cm 2 % Kg.cm/cm ℃ % ASTMD1238 ASTMD1505 ASTMD638 ASTMD638 ASTMD256 ASTMD1525 SKMETHOD 0.2-0.4 0.918-0.952 >200 >300 No break >122 >65 0.3 0.950 250 400 No break 125 66-68
⊙ master batch mixing ratio: 5%
⊙ extruder specified temp (℃)
DIE:200~230, head: 200~210, heating region: 140~210
⊙ builds bridge
90 ℃ hot water precipitation four hours
5-6 hour low pressure heating (0.15bar) (Saunas)
⊙ packing: 25kg vacuum aluminium packing
After interior pipe (51) continuously pre-heating,, smeared film shape adhesive (SKPOLYGLUEHE910G of 52:SK company) in interior pipe (51) periphery by spray glue (52) mould.The characteristic such as the table 3 of adhesive (52).<table 3 〉
The real side value of characteristic unit's test method standard value
Fusion flow g/10min ASTM D1238 3.8-4.5 4.11 density g/cm 2ASTM D792 0.942-0.946 0.945 hot strength Kg/cm 2ASTM D638>150 200 percentage elongation % ASTM D638>550 750 hardness shore D ASTM D2240>505 55 are than Ka Te extension point ℃ ASTM D1525>110 110.6 water absorption rate wt% ASTM D570>0.01<0.01 disrumpent feelings temperature ℃ ASTM D746<-70<-70 oxidation sensitive time min DSC>5 13 (oxygen induction time) fusion point ℃ DSC 126-128 128
⊙ packing: 25kg, 500kg
Get device (2) and the interior pipe (51) of coated with adhesive (52) is drawn with the speed of 1~20m/min get with drawing, and change 180 ° of moving directions with hoop (171) (hoop unit).From thin plate feeding mechanism (142) just the same speed of thin plate (531) winding wheel and interior pipe (51) launch the thin plate (531: characteristic reference table 4) of the wide 58~61mm of thick 0.25~0.5mm, allow it pass through each mould (32 on the anchor clamps (3), 34), make built-in interior metal tube (52) of managing the diameter phi 18.4~19.2mm of (51) afterwards by last mould (3), carry out Bart's deep welding at bonding machine then and meet (Butt-Seam Weling).Bonding machine is a high frequency, welds with the speed of 6~20m/min with the electric current of 50~70A.
The device (4,4 ', 4) of the metal tube of moulding (53) by forming by the two left and right wheels engagement devices (4 ') that put lower whorl engagement device (4) and intermediate interdigitated arrangement, thus be bonded together with interior pipe (51).Several pairs of engagement device (4,4 ', 4) are respectively φ 19.6, φ 19.4, φ 19.2 to the diameter of wheel.
The metal tube of making (53) is by the resin extruder of spray HDPE, and cover upper exterior tube (54) afterwards by 300~400 ℃ heater, makes the inside and outside pitch tube (51,54) of metal tube (53) to combine closely.Cover upper exterior tube (54) is coated with adhesive (52) before, guarantees the outer tube fluid-tight engagement.The multiple tube of producing (5) twists in winding wheel shown in Figure 10 (55) to it by certain-length and becomes commodity afterwards as shown in figure 11, can be with the printing machine branding of loading onto code before the volume etc.
Make a multiple tube (5) according to above preparation method, carry out visual inspection earlier, arbitrarily cut 3 afterwards, at experiments such as Korea S's water pressure resistance that chemical experiment research carries out, its result such as table 4.<table 4 〉
Experimental result
Experimental project Unit Test result Experimental technique
Water pressure resistance adhesion strength strain insulator power load — kgf/mm kgf Qualified 0.76 374 KSD920-98
High temperature creep strength (23 ± 2 ℃ of water, 60kgf/cm, one hour) Qualified
The heating deformation layer separates fusing point % — — 0.1 it is no abnormal
As mentioned above, the present invention carries out automation to whole technology, reduces a staff, and the flexibly changing technological process does not influence the operate outside environment.Even externalities is arranged, also can manufacture qualified products.Each device is simple and reliable, and durability is strong, and the saving funds are a kind of significant inventions.

Claims (5)

1, a kind of composite pipe production method, the resin of dissolving forms interior pipe (51) by mould and cooling, and this is an interior pipe moulding process (11); Pipe (51) in the preheating in the coating technique (12), the periphery is smeared adhesive (52) and is cooled off afterwards; In metal tube moulding process (14), interior pipe (51) passes through shaping jig (3) with aluminium sheet (531), twists in moulding and welding in the sleeve pipe; Pipe (51) and metal tube (53) in joint technology (15) engages; In the cover outer tube technology (16), smear adhesive (52), put the outer tube (54) and the cooling of heating afterwards to the periphery of metal tube (53); It more than is exactly composite pipe production method.
It is characterized in that: in coating technique (12), metal tube moulding process (14) and cover outer tube technology (16) afterwards, added respectively and drawn taking technique (13), it is a kind ofly to get device (2) by drawing of forming of a pair of belt (23) that moves with speed up and down.
2, composite pipe production method according to claim 1 is characterized in that: arranged curve metallization processes (17) before the welding sequence of metal tube moulding process (14), be exactly hoop (hoop unit) (171) is the pipe rotational angle.
3, a kind of multiple tube manufacturing installation as claimed in claim 1, the resin of dissolving forms interior pipe (51) by the mould of certain specification, is transferred to given size cooling afterwards, and this is interior pipe manufacturing apparatus, pipe (51) in the glue spreading apparatus preheating, the periphery is smeared adhesive (52) and is cooled off afterwards; The material feeding mechanism batches thin plate (531) and is fed to next process with tension force and interior pipe (51) afterwards; Shaped device is accepted thin plate (531) and the interior pipe (51) that supply is come, and is rolled onto on the metal tube (53); The metal tube of high-frequency welder welding fabrication (53) bond sites, metal tube on the engagement device seam welding (53) and interior pipe (51); Glue spreading apparatus is smeared adhesive (52) and cooling in the periphery of metal tube (53); Outer pipe manufacturing apparatus is in the outer race upper exterior tube (54) and the cooling of metal tube (53); More than to combine be exactly the multiple tube manufacturing installation to device, it is characterized in that:
Described coating adhesive (52), shaping jig (3) and outer pipe manufacturing apparatus (54) add to draw afterwards gets device (2), it is exactly the upper and lower pair of driving wheels (21 of rotating by motor, 21) with rotatable follower (22,22) go up cover belt (23,23), this driving wheel (21), follower (22) and belt (23) are adjusted upper-lower position by a pair of cylinder (25,25) that is installed in top;
Upper and lower two moulds (32 of described shaped device, 34) firm on fixture stand (31), the mould of upside (32) lining has can be by the support ditch (33) of interior pipe (51), on the mould of downside (34), arranging most anchor clamps (3) of formation through hole (35) by distance, so that thin plate little by little is rolled onto on the pipe box;
Described go up lower whorl engagement device (4) by self-rotation wheel (42) and on take turns (43) and form; There is semi-circular chase (421) centre of self-rotation wheel (42), goes up rotation thereby support it at shaping frame (41); Semi-circular chase (431) is arranged in the middle of the last wheel (43), when it is docked to self-rotation wheel (43) top, form one just round, thereby on shaping frame (41), can move up and down;
Described left and right wheels engagement device (4 ') is exactly semi-circular chase (441,441) butt joint in the middle of a pair of left and right wheels (44,44), form one just round, rotation on forming supporter, and can move left and right.
4, multiple tube manufacturing installation according to claim 3 is characterized in that, drawing the belt (23,23) of getting device (2) respectively has thickness and middle porose (231).
5, multiple tube manufacturing installation according to claim 3 is characterized in that, the arrangement that crosses one another of last lower whorl engagement device (4) that a cover is above and the left and right wheels engagement device (4 ') more than the cover.
CNB001302485A 1999-11-19 2000-11-01 Manufacturing method of composited tube and device therefor Expired - Fee Related CN1136095C (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
KR1019990051484A KR100360764B1 (en) 1999-11-19 1999-11-19 Manufacturing method of composite pipe and device thereof
KR199951484 1999-11-19

Publications (2)

Publication Number Publication Date
CN1291544A CN1291544A (en) 2001-04-18
CN1136095C true CN1136095C (en) 2004-01-28

Family

ID=19620814

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB001302485A Expired - Fee Related CN1136095C (en) 1999-11-19 2000-11-01 Manufacturing method of composited tube and device therefor

Country Status (2)

Country Link
KR (1) KR100360764B1 (en)
CN (1) CN1136095C (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010104762A (en) * 2001-10-22 2001-11-28 박진하 Improved composite pipe manufacturing method and apparatus
KR20030004242A (en) * 2002-12-05 2003-01-14 박진하 Improved composite pipe manufacturing method and apparatus
CN102069367B (en) * 2010-12-29 2012-05-23 东莞市龙基电子有限公司 Method for manufacturing PTC radiating element
CN102789836B (en) * 2011-05-20 2014-04-23 泰科电子(上海)有限公司 Insulated conduit bus and manufacturing method thereof
FR2994241B1 (en) * 2012-08-03 2015-03-06 Technip France UNDERWATER FLEXIBLE DRIVEN COMPRISING A LAYER COMPRISING AN INCREASED THERMAL RESISTANCE POLYETHYLENE
CN104358946A (en) * 2014-11-21 2015-02-18 金寿汉 Rigid corrugated composite pipe and manufacturing method of rigid corrugated composite pipe
KR102174209B1 (en) * 2019-12-16 2020-11-04 주식회사 미성 Coating Inspection Apparatus Composite Pipe
KR102149363B1 (en) * 2019-12-16 2020-08-28 조재훈 Apparatus for pressing composite pipe

Also Published As

Publication number Publication date
CN1291544A (en) 2001-04-18
KR20010047315A (en) 2001-06-15
KR100360764B1 (en) 2002-11-18

Similar Documents

Publication Publication Date Title
CN1136095C (en) Manufacturing method of composited tube and device therefor
CN109080167B (en) A kind of continuous fiber composite material structural member original position increasing material manufacturing method
CN103008381B (en) A kind of method stirring shunting mould and application stirring shunting mould extrudate
CN105778484B (en) The modified nylon materials and its Method of printing of a kind of 3D printing applied to FDM technology
CN105034393A (en) High-speed FDM 3D printer and printing method
CN103707528A (en) High-permeability membrane production line and high-permeability membrane production process
CN109648850B (en) 3D printing nozzle and forming method of liquid crystal polymer film
CN100532072C (en) Steel wire net-belt reinforced plastic steel composite pipe manufacture equipment and processing method for the said pipes
CN1174819C (en) Multi wrapping metal tube and making method and equipment
CN110523980B (en) Electrofusion additive manufacturing method for tee pipe fitting
CN203726843U (en) High-permeable membrane production line
CN109664508A (en) A kind of spray head matrix arrangement 3D printing molding machine and method
CN206520224U (en) Efficient rubber cold feed extruder
CN211363380U (en) Metal core insulation extrusion molding device
TWI277466B (en) Manufacturing method for aluminum alloy rim
CN208685311U (en) Extruder is used in a kind of production of rtificial leather
CN204526059U (en) A kind of special-shaped wall Guan Cheng, socket mould and bell and spigot manufacturing equipment thereof
TWI707759B (en) Film forming method and device for iron core coated roller
CN107672157A (en) A kind of side feeding 3D printing equipment and its printing shaping method
CN208978256U (en) A kind of rotating die head
CN202623312U (en) Extruding and molding equipment of single polymer composite material
CN112622016A (en) Pouring equipment for preparing fused quartz ceramic and pouring process thereof
CN213919700U (en) Composite material annular structural member processing device
CN218138719U (en) Refractory material forming device
TWI786743B (en) Metal laminate manufacturing device and method

Legal Events

Date Code Title Description
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20040128

Termination date: 20121101