CN113417479B - Building wall construction device and application method thereof - Google Patents

Building wall construction device and application method thereof Download PDF

Info

Publication number
CN113417479B
CN113417479B CN202110739792.4A CN202110739792A CN113417479B CN 113417479 B CN113417479 B CN 113417479B CN 202110739792 A CN202110739792 A CN 202110739792A CN 113417479 B CN113417479 B CN 113417479B
Authority
CN
China
Prior art keywords
lifting
plate
conveying
construction
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110739792.4A
Other languages
Chinese (zh)
Other versions
CN113417479A (en
Inventor
苗志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Taisanyan Engineering Management Co ltd
Original Assignee
Fujian Taisanyan Engineering Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Taisanyan Engineering Management Co ltd filed Critical Fujian Taisanyan Engineering Management Co ltd
Priority to CN202110739792.4A priority Critical patent/CN113417479B/en
Publication of CN113417479A publication Critical patent/CN113417479A/en
Application granted granted Critical
Publication of CN113417479B publication Critical patent/CN113417479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/22Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of building construction, in particular to a building wall construction device and a use method thereof.

Description

Building wall construction device and application method thereof
Technical Field
The invention relates to the technical field of building construction, in particular to a building wall construction device and a use method thereof.
Background
As is well known, a building masonry construction apparatus is an auxiliary apparatus for supporting constructors in building masonry construction, and is widely used in the field of building construction.
Through retrieving, chinese patent publication No. CN 212002378U's patent discloses a building construction device, comprising a base plate, the equal fixedly connected with casing in both sides at bottom plate top, the both sides of casing inner chamber all are provided with stabilising arrangement, the outside at casing inner chamber back all is provided with drive arrangement, drive arrangement includes the mounting panel, the positive fixedly connected with motor of mounting panel, the output fixedly connected with pivot of motor, the positive fixedly connected with gear of pivot, the top fixedly connected with shell of bottom plate, the both sides of shell inner chamber all are provided with slider, the inner chamber of shell is vertical to be provided with the movable rod, it need not be with the help of building scaffold one deck to carry out the building and build highly and need not fix with bolt jig a bit, people's labour has been reduced, and work efficiency has been improved, thereby building construction device's practicality has been improved. When the existing building wall construction device is used, the existing building wall construction device is found to simply realize the lifting function, but after the lifting, materials such as bricks are inconvenient to transport, so that the building wall construction is affected, besides, although the distribution of the materials is realized by using a frame, a support column, a limiting wheel, a support frame, a servo motor, a chain and a conveying plate in other existing patent technologies, for example, CN107840081A is disclosed, the vertical lifting of the materials is realized by using CN104405138B in the patent technology, but the gravity center of a transport system of the materials is changed continuously due to the transportation of different dimensions of the materials in the material distribution process, and heavier balancing weights are required to be configured on a base to realize the stabilization of the gravity center, but the weight of the whole device is greatly increased, and the transportation between different operation areas are inconvenient.
Disclosure of Invention
(one) solving the technical problems
Aiming at the defects of the prior art, the invention provides a building wall construction device and a use method thereof, which can be lifted along with the height of a wall, are convenient for conveying various materials, and can realize stable gravity center in the material transportation process without balancing weights, thereby improving the efficiency of building wall construction.
(II) technical scheme
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides a building construction equipment, includes backup pad, hydraulic means, a plurality of hydraulic lifting rods, construction board, conveying motor and conveying board, the bottom plate four corners of backup pad all is provided with the bracing piece, hydraulic means installs in the bottom of backup pad, and a plurality of hydraulic lifting rods are installed respectively in the four corners department at backup pad top, and a plurality of hydraulic lifting rods all are connected with hydraulic means, the bottom of construction board is fixed on the top of a plurality of hydraulic lifting rods, the front side and the rear side of backup pad right-hand member all are provided with the dead lever, the rear side fixedly connected with fixed plate of dead lever that is located the rear side, conveying motor installs on the fixed plate, all fixedly connected with lifter on two dead levers, all is provided with the pivot between the top and the bottom of two lifter, all fixedly connected with sprocket in two pivots, and the pivot that is located the bottom is connected with conveying motor's output, has the drive chain on two sprocket, the conveying board is fixed in the left side of drive chain;
the automatic feeding device is characterized by further comprising a lifting motor, a lifting worm and a lifting plate, wherein the lifting motor is arranged on the conveying plate, a lifting box is fixed on the conveying plate, a lifting worm wheel is rotatably connected in the lifting box and meshed with the lifting worm, the lifting worm extends out of the lifting box and is connected with the output end of the lifting motor, a lifting threaded hole is formed in the lifting worm wheel, a lifting threaded rod is connected with the inner thread of the lifting threaded hole, the lifting threaded rod extends out of the bottom of the lifting box and the conveying plate, the lifting plate is fixed at the top end of the lifting threaded rod, a conveying box is placed on the lifting plate, the left side wall of the conveying box is rotatably connected with the conveying box, and a conveying port is formed in the top of the conveying box;
the left baffle plate in the two baffle plates is rotationally connected with the left side of the construction plate, the right baffle plate in the two baffle plates is fixedly connected with the right side of the construction plate, a through hole is formed in the bottom of the construction plate body, a rotary roller is inserted in the through hole, square inserting holes are formed in two ends of the rotary roller, square through holes are formed in two ends of the bottom of the left baffle plate, an inserting rod body is inserted between the square inserting holes and the square through holes, the rod body of the inserting rod is composed of a plurality of square sections and a plurality of cylindrical sections which are alternately arranged, the square section of one end part is inserted into the square inserting holes, an allocation rope is wound on the rotary roller, the end part of the allocation rope is connected onto a rotating shaft through a rope passing hole in the construction plate body, and the length of the allocation rope body enables the left baffle plate to reach the highest point and the lowest point when the conveying plate reaches the lowest point and the highest point of the lifting stroke;
the two guard plates are respectively fixed on the front side and the rear side of the construction plate, the right side of the construction plate is provided with a positioning plate, and the top end of the guard plate positioned on the right side is provided with an infrared positioning device.
The lifting box and the fixing rod positioned at the rear side are respectively provided with ball bearings, and the inner sides of the ball bearings are respectively connected with the lifting worm and the rotating shaft.
The inside of bracing piece all is provided with the support screw hole, rotate between bracing piece and the backup pad and be connected, the inside equal threaded connection of support screw hole has the support threaded rod, and the bottom of support threaded rod all is fixed with the backing plate.
The application method of the building wall construction device comprises the following steps:
firstly, placing the device at a wall building construction position through a base plate, and rotating a supporting rod to adjust the height of a supporting threaded rod so as to keep the supporting plate, a conveying plate and a construction plate horizontal;
step two, transversely pushing the left baffle to enable two square through holes at the bottom of the left baffle to be located on the cylindrical section, then rotating the left baffle to enable the left baffle to be an inclined plane, enabling constructors to step on the construction board, enabling the inclined plane-shaped left baffle to serve as a transferring medium of other materials, enabling a rotating roller and an adjusting rope on the rotating roller to be kept fixed in the process, and then reversely pushing the left baffle to enable the two square through holes at the bottom of the left baffle to be located on the square section;
thirdly, lifting constructors to the wall building height by a hydraulic lifting rod according to the wall building height through a hydraulic device, starting a conveying motor to lower a conveying plate and the lifting plate to the lowest position, then placing materials in a conveying box, and then driving a rotating shaft and a chain wheel to rotate by using the conveying motor to enable a transmission chain wheel to drive the conveying plate to ascend;
step four, after the conveying plate is contacted with the positioning plate, the conveying motor automatically stops working, and then the lifting worm and the lifting worm wheel are driven to rotate by using the lifting motor, so that the lifting worm wheel drives the lifting threaded rod and the lifting plate to ascend;
step five, after the infrared positioning device detects the lifting plate, stopping the lifting motor, discharging materials in the material conveying box by constructors, descending the material conveying box by the lifting motor, bringing the conveying plate to the lowest position again by using the conveying motor, and repeating the material conveying work, thereby completing the wall construction;
in the third to fifth steps, the length of the rope body is regulated so that when the conveying plate reaches the lowest point and the highest point of the lifting travel, the left baffle plate reaches the highest point and the lowest point, and the gravity center of the building wall construction device is kept stable dynamically.
(III) beneficial effects
Compared with the prior art, the invention provides a building wall construction device and a use method thereof, and the building wall construction device has the following beneficial effects: the invention provides a building wall construction device and a use method thereof, which can be lifted along with the height of a wall, is convenient for conveying various materials, and can realize stable gravity center in the material transportation process without balancing weights, thereby improving the efficiency of building wall construction.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is an enlarged view of part A of the structural schematic of the present invention;
FIG. 3 is a schematic view of the structure of the lift box of the present invention;
fig. 4 is a schematic structural view of the transmission chain of the present invention.
In the figure: 1. a support plate; 2. a hydraulic device; 3. a hydraulic lifting rod; 4. a construction plate; 5. a conveying motor; 6. a conveying plate; 7. a support rod; 8. a fixed rod; 9. a fixing plate; 10. a lifting rod; 11. a rotating shaft; 12. a sprocket; 13. a drive chain; 14. a lifting motor; 15. lifting the worm; 16. a lifting plate; 17. a lifting box; 18. lifting worm wheels; 19. lifting the threaded rod; 20. a feed box; 21. a baffle; 22. a guard board; 23. a positioning plate; 24. an infrared positioning device; 25. a ball bearing; 26. supporting a threaded rod; 27. a backing plate.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-4, the building wall construction device of the invention comprises a supporting plate 1, a hydraulic device 2, a plurality of hydraulic lifting rods 3, a construction plate 4, a conveying motor 5 and a conveying plate 6, wherein supporting rods 7 are respectively arranged at four corners of a bottom plate of the supporting plate 1, the hydraulic device 2 is arranged at the bottom of the supporting plate 1, the plurality of hydraulic lifting rods 3 are respectively arranged at four corners of the top of the supporting plate 1, the plurality of hydraulic lifting rods 3 are respectively connected with the hydraulic device 2, the bottom of the construction plate 4 is fixed at the top ends of the plurality of hydraulic lifting rods 3, fixing rods 8 are respectively arranged at the front side and the rear side of the right end of the supporting plate 1, a fixing plate 9 is fixedly connected to the rear side of the fixing rod 8 at the rear side, the conveying motor 5 is arranged on the fixing plate 9, lifting rods 10 are respectively fixedly connected to the two fixing rods 8, rotating shafts 11 are respectively arranged between the top ends and the bottom ends of the two lifting rods 10, chain wheels 12 are respectively fixedly connected to the rotating shafts 11 at the bottom are connected with the output ends of the conveying motor 5, driving plates 12 are meshed with driving chains 13, and driving chains 13 are fixedly arranged at the left sides of the driving plates 13;
the automatic feeding device is characterized by further comprising a lifting motor 14, a lifting worm 15 and a lifting plate 16, wherein the lifting motor 14 is arranged on the conveying plate 6, a lifting box 17 is fixed on the conveying plate 6, a lifting worm wheel 18 is rotatably connected to the inside of the lifting box 17, the lifting worm wheel 18 is meshed with the lifting worm 15, the lifting worm 15 extends out of the lifting box 17 and is connected with the output end of the lifting motor 14, lifting threaded holes are formed in the lifting worm wheel 18, lifting threaded rods 19 are connected to the inner threads of the lifting threaded holes, the lifting threaded rods 19 extend out of the lifting box 17 and the bottom of the conveying plate 6, the lifting plate 16 is fixed on the top end of the lifting threaded rods 19, a conveying box 20 is placed on the lifting plate 16, the left side wall of the conveying box 20 is rotatably connected with the conveying box 20, and a material conveying port is formed in the top of the conveying box 20;
the left baffle plate 21 of the two baffle plates 21 is rotationally connected with the left side of the construction plate 4, the right baffle plate 21 of the two baffle plates 21 is fixedly connected with the right side of the construction plate 4, a through hole is formed in the bottom of the construction plate 4, a rotary roller is inserted in the through hole, square inserting holes are formed in two ends of the rotary roller, square through holes are formed in two ends of the bottom of the left baffle plate 21, an inserting rod is inserted between the square inserting holes and the square through holes, the inserting rod body is composed of a plurality of square sections and a plurality of cylindrical sections which are alternately arranged, the square section of one end is inserted into the square inserting holes, an adjusting rope is wound on the rotary roller, the end of the adjusting rope is connected to the rotary shaft 11 through a rope passing hole in the plate body of the construction plate 4, and the length of the adjusting rope body enables the left baffle plate 21 to reach the highest point and the lowest point when the conveying plate 6 reaches the lowest point and the highest point of the lifting stroke;
the two guard plates 22 are respectively fixed on the front side and the rear side of the construction plate 4, a positioning plate 23 is arranged on the right side of the construction plate 4, and an infrared positioning device 24 is arranged at the top end of the baffle plate 21 positioned on the right side.
The lifting box 17 and the fixing rod 8 at the rear side are respectively provided with ball bearings 25, and the inner sides of the ball bearings 25 are respectively connected with the lifting worm 15 and the rotating shaft 11.
The inside of bracing piece 7 all is provided with the support screw hole, rotate between bracing piece 7 and the backup pad 1 and be connected, the inside of support screw hole all threaded connection has support threaded rod 26, and the bottom of support threaded rod 26 all is fixed with backing plate 27.
The height of the construction board 4 can be lifted through the hydraulic device 2 and the hydraulic lifting rod 3, so that constructors can lift on the construction board 4 according to the wall building height, meanwhile, the conveying motor 5 drives the chain wheel 12 and the transmission chain 13 to rotate, the conveying board 6 drives the conveying box 20 to lift, and the lifting motor 14 is used for fine adjustment of the height of the conveying box 20, so that the conveying box 20 is convenient for conveying materials, and the wall building construction of a building is facilitated; the lifting device is characterized by further comprising a lifting motor 14, a lifting worm 15 and a lifting plate 16, wherein the lifting motor 14 is arranged on the conveying plate 6, a lifting box 17 is fixed on the conveying plate 6, a lifting worm wheel 18 is connected in a rotating manner in the lifting box 17, the lifting worm wheel 18 is meshed with the lifting worm 15, the lifting worm 15 extends out of the lifting box 17 and is connected with the output end of the lifting motor 14, a lifting threaded hole is formed in the lifting worm wheel 18, a lifting threaded rod 19 is connected with the internal threads of the lifting threaded hole, the lifting threaded rod 19 extends out of the lifting box 17 and the bottom plate of the conveying plate 6, the lifting plate 16 is fixed at the top end of the lifting threaded rod 19, the side surface of the lifting plate 16 is connected with a transmission chain 13, the lifting worm wheel 15 and the lifting worm wheel 18 are driven to rotate by the lifting motor 14, so that the lifting worm wheel 18 drives the lifting threaded rod 19 and the lifting plate 16 to lift, and the conveying height of materials can be finely adjusted according to construction requirements, and the conveying efficiency of the materials is improved; the lifting plate 16 is provided with a material conveying box 20, the left side wall of the material conveying box 20 is rotationally connected with the material conveying box 20, the top of the material conveying box 20 is provided with a material conveying opening, and materials can be conveniently conveyed through the material conveying box 20; the construction plate comprises a construction plate 4, and is characterized by further comprising two baffle plates 21 and two guard plates 22, wherein one baffle plate 21 of the two baffle plates 21 is rotationally connected with the left side of the construction plate 4, the other baffle plate 21 of the two baffle plates 21 is fixedly connected with the right side of the construction plate 4, the two guard plates 22 are respectively fixed on the front side and the rear side of the construction plate 4, and constructors can be prevented from falling off the construction plate 4 through the baffle plates 21 and the guard plates 22.
It should be noted that, the right side of the construction board 4 is provided with a positioning board 23, the top end of the baffle 21 positioned on the right side is provided with an infrared positioning device 24, and the lifting positions of the conveying board 6 and the lifting board 16 can be positioned by the positioning board 23 and the infrared positioning device 24, so that the conveying of materials is facilitated; the lifting box 17 and the fixed rod 8 positioned at the rear side are respectively provided with a ball bearing 25, the inner sides of the ball bearings 25 are respectively connected with the lifting worm 15 and the rotating shaft 11 positioned at the bottom, and the friction force during rotation of the lifting worm 15 and the rotating shaft 11 can be reduced through the ball bearings 25; the inside of bracing piece 7 all is provided with the support screw hole, rotates between bracing piece 7 and the backup pad 1 to be connected, and the equal threaded connection in inside of support screw hole has support threaded rod 26, and the bottom of support threaded rod 26 all is fixed with backing plate 27, can adjust the height of support threaded rod 26 through rotating bracing piece 7 to can make backup pad 1 and construction board 4 keep the level, thereby improve the stability when its uses.
The application method of the building wall construction device comprises the following steps:
firstly, placing the device at a wall building construction position through a backing plate 27, and rotating a supporting rod 7 to adjust the height of a supporting threaded rod 26 so as to keep the supporting plate 1, a conveying plate 6 and a construction plate 4 horizontal;
step two, transversely pushing the left baffle plate 21 to enable two square through holes at the bottom of the left baffle plate 21 to be located on the cylindrical section, then rotating the left baffle plate 21 to enable the left baffle plate 21 to be an inclined plane, enabling constructors to step on the construction plate 4, enabling the left baffle plate 21 in the shape of the inclined plane to serve as a transferring medium of other materials, enabling a rotating roller and an adjusting rope on the rotating roller to be kept fixed in the process, and then reversely pushing the left baffle plate 21 to enable the two square through holes at the bottom of the left baffle plate 21 to be located on the square section;
thirdly, lifting a constructor to the wall building height by a hydraulic lifting rod 3 according to the wall building height through a hydraulic device 2, starting a conveying motor 5 to lower a conveying plate 6 and a lifting plate 16 to the lowest position, then placing materials in a conveying box 20, and then using the conveying motor 5 to drive a rotating shaft 11 and a chain wheel 12 to rotate so that a driving chain wheel 12 drives the conveying plate 6 to ascend;
step four, after the conveying plate 6 is contacted with the positioning plate 23, the conveying motor 5 automatically stops working, and then the lifting worm 15 and the lifting worm wheel 18 are driven to rotate by using the lifting motor 14, so that the lifting worm wheel 18 drives the lifting threaded rod 19 and the lifting plate 16 to ascend;
fifthly, after the infrared positioning device 24 detects the lifting plate 16, stopping the lifting motor 14, then unloading materials in the material conveying box 20 by constructors, then descending the material conveying box 20 through the lifting motor 14, using the conveying motor 5 to bring the conveying plate 6 to the lowest position again, and repeating the material conveying work, thereby completing the wall construction;
wherein in the steps three to five, the lengths of the rope bodies are adjusted so that when the conveying plate 6 reaches the lowest point and the highest point of the lifting travel, the left baffle plate 21 reaches the highest point and the lowest point, and the gravity center of the building wall construction device is kept dynamically stable.
In summary, the working principle and working process of the construction device for building the wall are that when the device is used, the device is placed at a building position through the backing plate 27, the supporting rod 7 is rotated to adjust the height of the supporting threaded rod 26, the supporting plate 1, the conveying plate 6 and the construction plate 4 are kept horizontal, then the baffle 21 on the left side is rotated, the constructor steps on the construction plate 4, then the hydraulic lifting rod 3 lifts the constructor to the building height according to the building height through the hydraulic device 2, then the conveying motor 5 is started to lower the conveying plate 6 and the lifting plate 16 to the lowest position, then the material is placed in the conveying box 20, then the conveying motor 5 is used to drive the rotating shaft 11 and the chain wheel 12 to rotate, the transmission chain wheel 12 drives the conveying plate 6 to lift, after the conveying plate 6 contacts with the positioning plate 23, the conveying motor 5 automatically stops working, then, the lifting motor 14 is used for driving the lifting worm 15 and the lifting worm wheel 18 to rotate, the lifting worm wheel 18 drives the lifting threaded rod 19 and the lifting plate 16 to ascend, after the infrared positioning device 24 detects the lifting plate 16, the lifting motor 14 stops working, then, constructors unload materials in the conveying box 20, then, the conveying box 20 is descended through the lifting motor 14, the conveying motor 5 is used for bringing the conveying plate 6 back to the lowest position, the material conveying work is repeated, thus, the wall building construction is completed, the lengths of the rope bodies are regulated, when the conveying plate 6 reaches the lowest point and the highest point of the lifting stroke, the left baffle 21 reaches the highest point and the lowest point, and the gravity center of the building wall building construction device keeps stable dynamically.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a building construction equipment of building wall which characterized in that: including backup pad (1), hydraulic means (2), a plurality of hydraulic lifting rods (3), construction board (4), conveying motor (5) and conveying board (6), the bottom plate four corners of backup pad (1) all is provided with bracing piece (7), the bottom at backup pad (1) is installed in hydraulic means (2), the four corners department at backup pad (1) top is installed respectively to a plurality of hydraulic lifting rods (3), a plurality of hydraulic lifting rods (3) all are connected with hydraulic means (2), the top at a plurality of hydraulic lifting rods (3) is fixed to the bottom of construction board (4), the front side and the rear side of backup pad (1) right-hand member all are provided with dead lever (8), the rear side fixedly connected with dead plate (9) that are located rear side dead lever (8), conveying motor (5) are installed on dead plate (9), all fixedly connected with lifter (10) on two dead levers (8), all be provided with pivot (11) between pivot and the bottom of two lifter (10), all fixedly connected with motor (12) are located the pivot (11) of output sprocket (12) and are connected with sprocket (13) on two sprocket (13), the conveying plate (6) is fixed on the left side of the transmission chain (13);
the automatic feeding device is characterized by further comprising a lifting motor (14), a lifting worm (15) and a lifting plate (16), wherein the lifting motor (14) is installed on the conveying plate (6), a lifting box (17) is fixed on the conveying plate (6), a lifting worm wheel (18) is rotatably connected to the inside of the lifting box (17), the lifting worm wheel (18) is meshed with the lifting worm (15), the lifting worm (15) extends out of the lifting box (17) and is connected with the output end of the lifting motor (14), a lifting threaded hole is formed in the lifting worm wheel (18), a lifting threaded rod (19) is connected to the inner threads of the lifting threaded hole, the lifting threaded rod (19) extends out of the bottoms of the lifting box (17) and the conveying plate (6), the lifting plate (16) is fixed on the top end of the lifting threaded rod (19), a feeding box (20) is placed on the lifting plate (16), the left side wall of the feeding box (20) is rotatably connected with the feeding box (20), and a feeding port is formed in the top of the feeding box (20).
The construction equipment is characterized by further comprising two baffles (21) and two guard plates (22), wherein a left baffle (21) in the two baffles (21) is rotationally connected with the left side of the construction board (4), a right baffle (21) in the two baffles (21) is fixedly connected with the right side of the construction board (4), a through hole is formed in the bottom of a board body of the construction board (4), a rotary roller is inserted in the through hole, square inserting holes are formed in two ends of the rotary roller, square through holes are formed in two ends of the bottom of the left baffle (21), an inserting rod is inserted between the square inserting holes and the square through holes, the rod body of the inserting rod consists of a plurality of square sections and a plurality of cylindrical sections which are alternately arranged, the square section of one end is inserted into the square inserting holes, a blending rope is wound on the rotary roller, the end of the blending rope is connected to a rotary shaft (11) through a rope passing hole in the board body of the construction board (4), and the length of the blending rope is such that when the conveying board (6) reaches the lowest point and the highest point of the lifting stroke, the left baffle (21) reaches the lowest point and the highest point;
the two guard plates (22) are respectively fixed on the front side and the rear side of the construction plate (4), a positioning plate (23) is arranged on the right side of the construction plate (4), and an infrared positioning device (24) is arranged at the top end of the guard plate (21) positioned on the right side.
2. The building masonry construction unit according to claim 1, wherein: the lifting box (17) and the fixing rod (8) positioned at the rear side are respectively provided with ball bearings (25), and the inner sides of the ball bearings (25) are respectively connected with the lifting worm (15) and the rotating shaft (11).
3. The building masonry construction unit according to claim 2, wherein: the inside of bracing piece (7) all is provided with the support screw hole, rotate between bracing piece (7) and backup pad (1) and be connected, the inside of support screw hole all threaded connection has support threaded rod (26), and the bottom of support threaded rod (26) all is fixed with backing plate (27).
4. A method of using the building walling unit of any one of claims 1 to 3, wherein: the method comprises the following steps:
the device is placed at a wall building construction position through a base plate (27), and the supporting rod (7) is rotated to adjust the height of the supporting threaded rod (26) so that the supporting plate (1), the conveying plate (6) and the construction plate (4) are kept horizontal;
step two, transversely pushing the left baffle plate (21) to enable two square through holes at the bottom of the left baffle plate (21) to be located on the cylindrical section, then rotating the left baffle plate (21) to enable the left baffle plate (21) to be an inclined plane, enabling constructors to step on the construction plate (4), enabling the inclined plane-shaped left baffle plate (21) to serve as a transferring medium of other materials, enabling a rotating roller and an adjusting rope on the rotating roller to be kept fixed in the process, and then reversely pushing the left baffle plate (21) to enable the two square through holes at the bottom of the left baffle plate (21) to be located on the square section;
thirdly, lifting a constructor to the wall building height by a hydraulic lifting rod (3) through a hydraulic device (2) according to the wall building height, starting a conveying motor (5) to lower a conveying plate (6) and a lifting plate (16) to the lowest position, then placing materials in a conveying box (20), and then using the conveying motor (5) to drive a rotating shaft (11) and a chain wheel (12) to rotate so that a transmission chain wheel (12) drives the conveying plate (6) to ascend;
step four, after the conveying plate (6) is contacted with the positioning plate (23), the conveying motor (5) automatically stops working, and then the lifting worm (15) and the lifting worm wheel (18) are driven to rotate by the lifting motor (14), so that the lifting worm wheel (18) drives the lifting threaded rod (19) and the lifting plate (16) to ascend;
fifthly, after the infrared positioning device (24) detects the lifting plate (16), stopping the lifting motor (14), unloading materials in the material conveying box (20) by constructors, descending the material conveying box (20) through the lifting motor (14), bringing the conveying plate (6) to the lowest position again by using the conveying motor (5), and repeating the material conveying work, thereby completing the wall building construction;
in the third to fifth steps, the length of the rope body is regulated so that when the conveying plate (6) reaches the lowest point and the highest point of the lifting travel, the left baffle plate (21) reaches the highest point and the lowest point, and the gravity center of the building wall construction device is kept dynamically stable.
CN202110739792.4A 2021-06-30 2021-06-30 Building wall construction device and application method thereof Active CN113417479B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110739792.4A CN113417479B (en) 2021-06-30 2021-06-30 Building wall construction device and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110739792.4A CN113417479B (en) 2021-06-30 2021-06-30 Building wall construction device and application method thereof

Publications (2)

Publication Number Publication Date
CN113417479A CN113417479A (en) 2021-09-21
CN113417479B true CN113417479B (en) 2023-08-11

Family

ID=77717495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110739792.4A Active CN113417479B (en) 2021-06-30 2021-06-30 Building wall construction device and application method thereof

Country Status (1)

Country Link
CN (1) CN113417479B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960446B (en) * 2022-06-13 2023-12-12 北京韬盛科技发展有限公司 Heavy intelligent jacking supporting equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952546A (en) * 2018-08-08 2018-12-07 陆永柱 The method that the objects such as pendent lamp, air-conditioning are carried out to be sent to supply automatically
CN209464237U (en) * 2017-10-17 2019-10-08 况翠红 A kind of small medical waste water carrier
CN110374315A (en) * 2019-07-24 2019-10-25 黄光平 A kind of construction security platform
CN210764143U (en) * 2019-07-11 2020-06-16 单江 Material lifting platform for architectural decoration
CN212532217U (en) * 2020-05-25 2021-02-12 李占利 Construction is with elevating gear who has protective structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209464237U (en) * 2017-10-17 2019-10-08 况翠红 A kind of small medical waste water carrier
CN108952546A (en) * 2018-08-08 2018-12-07 陆永柱 The method that the objects such as pendent lamp, air-conditioning are carried out to be sent to supply automatically
CN210764143U (en) * 2019-07-11 2020-06-16 单江 Material lifting platform for architectural decoration
CN110374315A (en) * 2019-07-24 2019-10-25 黄光平 A kind of construction security platform
CN212532217U (en) * 2020-05-25 2021-02-12 李占利 Construction is with elevating gear who has protective structure

Also Published As

Publication number Publication date
CN113417479A (en) 2021-09-21

Similar Documents

Publication Publication Date Title
CN113417479B (en) Building wall construction device and application method thereof
CN212333683U (en) Assembled material transfer device for building that commonality is good
CN210233433U (en) Concrete curing box base
CN217837550U (en) Online sheet storage system equipment for glass storage
CN111852044B (en) Intelligent construction system for glass heat-insulation greenhouse
CN216659960U (en) A conveyer for air entrainment piece
CN114031007A (en) Mechanical parts hoist and mount transfer device that prevents inclining
CN221191231U (en) Special hoisting frame for steel plate wall
CN220868736U (en) Wall building stand
CN220412689U (en) Plate suction crane
CN221114000U (en) Adjustable automobile front cover plate feeding car structure
CN219905390U (en) Transfer frame with overturning function
CN218231677U (en) A stable lifting machine of raw materials for grape wine production
CN212637565U (en) Transfer device for carpet coiled material
CN213294559U (en) Stable lifting device for steel structure machining
CN214688505U (en) Printing equipment is used in production of salt industry wrapping bag
CN217623622U (en) A beam column conveyer for building municipal works
CN219705065U (en) Multifunctional water pump assembly workbench
CN215974762U (en) Wall material production line is with going out board device
CN214084341U (en) Steel pipe production guided transport dolly
CN220244430U (en) Artificial board transfer device
CN218859779U (en) Toughened glass makes with transportation heap and adds device
CN216971757U (en) Panel hoisting device
CN216271120U (en) Rais livestock or poultry with dampproofing holding vessel of fodder
CN219103701U (en) Sintering sagger material scraping device for kiln circulating line

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230703

Address after: Room 2101, Building 9, Singapore City, Chifeng Road, Chidian Town, Jinjiang City, Quanzhou City, Fujian Province, 362200

Applicant after: Fujian Taisanyan Engineering Management Co.,Ltd.

Address before: 510000 No. 29, Guangxiao Road, Yuexiu District, Guangzhou, Guangdong

Applicant before: Miao Zhiqiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant