CN113417479A - Building wall construction device and using method thereof - Google Patents

Building wall construction device and using method thereof Download PDF

Info

Publication number
CN113417479A
CN113417479A CN202110739792.4A CN202110739792A CN113417479A CN 113417479 A CN113417479 A CN 113417479A CN 202110739792 A CN202110739792 A CN 202110739792A CN 113417479 A CN113417479 A CN 113417479A
Authority
CN
China
Prior art keywords
plate
lifting
conveying
construction
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202110739792.4A
Other languages
Chinese (zh)
Other versions
CN113417479B (en
Inventor
苗志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Taisanyan Engineering Management Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202110739792.4A priority Critical patent/CN113417479B/en
Publication of CN113417479A publication Critical patent/CN113417479A/en
Application granted granted Critical
Publication of CN113417479B publication Critical patent/CN113417479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/22Tools or apparatus for setting building elements with mortar, e.g. bricklaying machines
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of building construction, in particular to a building wall building construction device and a using method thereof, which comprises a supporting plate, a hydraulic device, a plurality of hydraulic lifting rods, a construction plate, a conveying motor and a conveying plate, wherein the hydraulic device is arranged at the bottom of the supporting plate, the plurality of hydraulic lifting rods are all connected with the hydraulic device, the bottom of the construction plate is fixed at the top ends of the plurality of hydraulic lifting rods, the conveying motor is arranged on a fixed plate, the two fixing rods are all fixedly connected with the lifting rods, rotating shafts are arranged between the top ends and the bottom ends of the two lifting rods, the two rotating shafts are both fixedly connected with chain wheels, the rotating shaft at the bottom is connected with the output end of the conveying motor, the two chain wheels are engaged with a transmission chain, the conveying plate is fixed at the left side of the transmission chain, when it can follow the height of building a wall and go up and down, the transport of the material of still being convenient for to improve the efficiency of building the construction of building a wall.

Description

Building wall construction device and using method thereof
Technical Field
The invention relates to the technical field of building construction, in particular to a building wall building construction device and a using method thereof.
Background
As is well known, a building construction apparatus is an auxiliary apparatus for supporting constructors in building construction, and is widely used in the field of building construction.
Through the retrieval, chinese patent publication is CN 212002378U's patent discloses a building construction equipment of building a wall, comprising a base plate, the equal fixedly connected with casing in both sides at bottom plate top, the both sides of casing inner chamber all are provided with stabilising arrangement, the outside at the casing inner chamber back all is provided with drive arrangement, drive arrangement includes the mounting panel, the positive fixedly connected with motor of mounting panel, the output fixedly connected with pivot of motor, the positive fixedly connected with gear of pivot, the top fixedly connected with shell of bottom plate, the both sides of shell inner chamber all are provided with slider, the vertical carriage release lever that is provided with of inner chamber of shell, it need not build the height with the help of building scaffold one deck and do not need to fix with bolt anchor clamps a bit by a bit, people's labour has been reduced, people's work efficiency has been improved, thereby building construction equipment's practicality has been improved. The discovery during current building construction equipment of building a wall uses, it has only simply realized raising and lowering functions, but after rising, materials such as fragment of brick are not convenient to be transported, thereby the going on of building construction of building a wall has been influenced, in addition though for example CN107840081A discloses the frame among the current other patent technologies, the support column, spacing wheel, the support frame, servo motor, the chain, the delivery board, realize the distribution of material, CN104405138B has realized the vertical lift of material in the patent technology, but because the transportation of the different dimensions of material in the material distribution in-process, make the focus of the conveying system of material constantly change, consequently need dispose heavier balancing weight on the base and practice the stability of focus, but the weight greatly increased of whole device like this, be not convenient for the transportation between different operation regions.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides a building wall construction device and a using method thereof, which can lift along with the height of a building wall, are convenient for conveying various materials, and can realize the stable gravity center in the material conveying process without a balancing weight, thereby improving the efficiency of building wall construction.
(II) technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: a building wall building construction device comprises a supporting plate, a hydraulic device, a plurality of hydraulic lifting rods, a construction plate, a conveying motor and a conveying plate, wherein supporting rods are arranged at four corners of a bottom plate of the supporting plate, the hydraulic device is arranged at the bottom of the supporting plate, the hydraulic lifting rods are respectively arranged at four corners of the top of the supporting plate and are connected with the hydraulic device, the bottom of the construction plate is fixed at the top ends of the hydraulic lifting rods, fixing rods are arranged on the front side and the rear side of the right end of the supporting plate, a fixing plate is fixedly connected with the rear side of the fixing rod positioned on the rear side, the conveying motor is arranged on the fixing plate, the lifting rods are fixedly connected with the fixing rods, a rotating shaft is arranged between the top ends and the bottom ends of the two lifting rods, a chain wheel is fixedly connected with the two rotating shafts, and the rotating shaft positioned at the bottom is connected with the output end of the conveying motor, the two chain wheels are meshed with a transmission chain, and the conveying plate is fixed on the left side of the transmission chain;
the lifting worm wheel is meshed with the lifting worm, the lifting worm extends out of the lifting box and is connected with the output end of the lifting motor, a lifting threaded hole is formed in the lifting worm wheel, a lifting threaded rod is connected to the inner thread of the lifting threaded hole and extends out of the bottoms of the lifting box and the conveying plate, the lifting plate is fixed to the top end of the lifting threaded rod, a material conveying box is placed on the lifting plate, the left side wall of the material conveying box is rotatably connected with the material conveying box, and a material conveying port is formed in the top of the material conveying box;
the construction plate is characterized by further comprising two baffle plates and two guard plates, wherein the left baffle plate of the two baffle plates is rotatably connected with the left side of the construction plate, the right baffle plate of the two baffle plates is fixedly connected with the right side of the construction plate, a through hole is formed in the bottom of the construction plate body, a rotating roller is inserted in the through hole, square inserting holes are formed in two ends of the rotating roller, square through holes are formed in two ends of the bottom of the left baffle plate, an inserting rod is inserted between the square inserting holes and the square through hole, a rod body of the inserting rod is composed of a plurality of square sections and a plurality of cylindrical sections which are alternately arranged, the square section of one end part is inserted into the square inserting hole, a blending rope is wound on the rotating roller, the end part of the blending rope is connected to the rotating shaft through a rope passing hole in the construction plate body, and the length of the blending rope body is such that when the conveying plate reaches the lowest point and the highest point of the lifting stroke, the left baffle reaches the highest point and the lowest point;
two protective plates are fixed on the front side and the rear side of the construction plate respectively, a positioning plate is arranged on the right side of the construction plate, and an infrared positioning device is arranged at the top end of a baffle plate on the right side.
The lifting box and the fixing rod positioned at the rear side are provided with ball bearings, and the inner sides of the ball bearings are respectively connected with the lifting worm and the rotating shaft.
The inside of bracing piece all is provided with the support screw hole, rotate between bracing piece and the backup pad and be connected, the equal threaded connection in inside of support screw hole has the support threaded rod, and the bottom of support threaded rod all is fixed with the backing plate.
The use method of the building walling construction device comprises the following steps:
the device is placed at a wall building construction position through a base plate, and the height of a supporting threaded rod is adjusted by rotating a supporting rod, so that a supporting plate, a conveying plate and a construction plate are kept horizontal;
step two, transversely pushing the left baffle plate to enable the two square through holes at the bottom of the left baffle plate to be located on the cylindrical section, then rotating the left baffle plate to enable the left baffle plate to be an inclined plane, enabling a constructor to step on the construction plate, enabling the inclined plane-shaped left baffle plate to serve as a transfer medium for other materials, keeping the rotating roller and an adjusting rope on the rotating roller fixed in the process, and then reversely pushing the left baffle plate to enable the two square through holes at the bottom of the left baffle plate to be located on the square section;
thirdly, enabling a hydraulic lifting rod to lift constructors to the height of the building wall through a hydraulic device according to the height of the building wall, starting a conveying motor to lower a conveying plate and a lifting plate to the lowest position, then placing materials in a conveying box, and then driving a rotating shaft and a chain wheel to rotate by using the conveying motor to enable a transmission chain wheel to drive the conveying plate to rise;
after the conveying plate is contacted with the positioning plate, the conveying motor automatically stops working, and then the lifting motor is used for driving the lifting worm and the lifting worm wheel to rotate, so that the lifting worm wheel drives the lifting threaded rod and the lifting plate to ascend;
step five, after the infrared positioning device detects the lifting plate, the lifting motor stops working, then constructors unload materials in the material conveying box, then the material conveying box descends through the lifting motor, the conveying plate is brought to the lowest position again through the conveying motor, and the material conveying work is repeated, so that the wall building construction is completed;
in the third step, the length of the rope body is adjusted, so that when the conveying plate reaches the lowest point and the highest point of the lifting stroke, the left baffle plate reaches the highest point and the lowest point, and the gravity center of the building wall building construction device is kept dynamically stable.
(III) advantageous effects
Compared with the prior art, the invention provides a building walling construction device and a using method thereof, and the building walling construction device has the following beneficial effects: the invention provides a building wall construction device and a using method thereof, which can lift along with the height of a building wall, facilitate the conveying of various materials and realize the gravity center stabilization in the material transportation process without a balancing weight, thereby improving the efficiency of building wall construction.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of a portion A of the structural diagram of the present invention;
FIG. 3 is a schematic structural view of the lift box of the present invention;
fig. 4 is a schematic structural diagram of the drive chain of the present invention.
In the figure: 1. a support plate; 2. a hydraulic device; 3. a hydraulic lifting rod; 4. constructing a plate; 5. a conveying motor; 6. a conveying plate; 7. a support bar; 8. fixing the rod; 9. a fixing plate; 10. a lifting rod; 11. a rotating shaft; 12. a sprocket; 13. a drive chain; 14. a lifting motor; 15. a lifting worm; 16. a lifting plate; 17. a lifting box; 18. a lifting worm gear; 19. lifting a threaded rod; 20. a material conveying box; 21. a baffle plate; 22. a guard plate; 23. positioning a plate; 24. an infrared positioning device; 25. a ball bearing; 26. supporting the threaded rod; 27. a backing plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-4, the building wall building construction device of the present invention comprises a supporting plate 1, a hydraulic device 2, a plurality of hydraulic lifting rods 3, a construction plate 4, a conveying motor 5 and a conveying plate 6, wherein four corners of a bottom plate of the supporting plate 1 are all provided with supporting rods 7, the hydraulic device 2 is installed at the bottom of the supporting plate 1, the plurality of hydraulic lifting rods 3 are respectively installed at four corners of the top of the supporting plate 1, the plurality of hydraulic lifting rods 3 are all connected with the hydraulic device 2, the bottom of the construction plate 4 is fixed at the top ends of the plurality of hydraulic lifting rods 3, fixing rods 8 are respectively arranged at the front side and the rear side of the right end of the supporting plate 1, a fixing plate 9 is fixedly connected at the rear side of the fixing rod 8 positioned at the rear side, the conveying motor 5 is installed on the fixing plate 9, the lifting rods 10 are respectively fixedly connected on the two fixing rods 8, and a rotating shaft 11 is arranged between the top ends and the bottom ends of the two lifting rods 10, the two rotating shafts 11 are fixedly connected with chain wheels 12, the rotating shaft 11 positioned at the bottom is connected with the output end of the conveying motor 5, the two chain wheels 12 are meshed with a transmission chain 13, and the conveying plate 6 is fixed on the left side of the transmission chain 13;
the conveying device is characterized by further comprising a lifting motor 14, a lifting worm 15 and a lifting plate 16, wherein the lifting motor 14 is installed on the conveying plate 6, a lifting box 17 is fixed on the conveying plate 6, a lifting worm wheel 18 is rotatably connected inside the lifting box 17, the lifting worm wheel 18 is meshed with the lifting worm 15, the lifting worm 15 extends out of the lifting box 17 and is connected with the output end of the lifting motor 14, a lifting threaded hole is formed in the lifting worm wheel 18, a lifting threaded rod 19 is connected with the lifting threaded hole in a threaded manner, the lifting threaded rod 19 extends out of the lifting box 17 and the bottom of the conveying plate 6, the lifting plate 16 is fixed at the top end of the lifting threaded rod 19, a conveying box 20 is placed on the lifting plate 16, the left side wall of the conveying box 20 is rotatably connected with the conveying box 20, and a conveying port is formed in the top of the conveying box 20;
the construction plate is characterized by further comprising two baffle plates 21 and two guard plates 22, wherein a left baffle plate 21 of the two baffle plates 21 is rotatably connected with the left side of the construction plate 4, a right baffle plate 21 of the two baffle plates 21 is fixedly connected with the right side of the construction plate 4, a through hole is formed in the bottom of the plate body of the construction plate 4, a rotating roller is inserted in the through hole, square insertion holes are formed in two ends of the rotating roller, a square through hole is formed in two ends of the bottom of the left baffle plate 21, an insertion rod is inserted between the square insertion holes and the square through hole, the rod body of the insertion rod is composed of a plurality of square sections and a plurality of cylindrical sections which are alternately arranged, the square section of one end is inserted into the square insertion hole, a blending rope is wound on the rotating roller, the end of the blending rope is connected to the rotating shaft 11 through a rope passing hole in the plate body of the construction plate 4, and the length of the blending rope is such that when the conveying plate 6, the left baffle 21 reaches the highest point and the lowest point;
two guard plates 22 are respectively fixed at the front side and the rear side of construction board 4, the right side of construction board 4 is provided with locating plate 23, and the baffle 21 top that is located the right side is provided with infrared positioner 24.
The lifting box 17 and the fixing rod 8 positioned at the rear side are both provided with ball bearings 25, and the inner sides of the ball bearings 25 are respectively connected with the lifting worm 15 and the rotating shaft 11.
The inside of bracing piece 7 all is provided with the support screw hole, rotate between bracing piece 7 and the backup pad 1 and be connected, the equal threaded connection in inside of support screw hole has support threaded rod 26, and the bottom of support threaded rod 26 all is fixed with backing plate 27.
The height of the construction plate 4 can be lifted through the hydraulic device 2 and the hydraulic lifting rod 3, so that a constructor can lift on the construction plate 4 according to the height of a building wall, meanwhile, the conveying motor 5 drives the chain wheel 12 and the transmission chain 13 to rotate, the conveying plate 6 drives the conveying box 20 to lift, and the lifting motor 14 is used for finely adjusting the height of the conveying box 20, so that the conveying box 20 can convey materials conveniently, and the building wall building construction can be conveniently carried out; the lifting device also comprises a lifting motor 14, a lifting worm 15 and a lifting plate 16, wherein the lifting motor 14 is installed on the conveying plate 6, a lifting box 17 is fixed on the conveying plate 6, a lifting worm wheel 18 is rotatably connected inside the lifting box 17, the lifting worm wheel 18 is meshed with the lifting worm 15, the lifting worm 15 extends out of the lifting box 17 and is connected with the output end of the lifting motor 14, a lifting threaded hole is formed inside the lifting worm wheel 18, a lifting threaded rod 19 is connected with the inner thread of the lifting threaded hole, the lifting threaded rod 19 extends out of the lifting box 17 and the bottom plate of the conveying plate 6, the lifting plate 16 is fixed at the top end of the lifting threaded rod 19, the side surface of the lifting plate 16 is connected with a transmission chain 13, the lifting worm 15 and the lifting worm wheel 18 are driven by the lifting motor 14 to rotate, so that the lifting worm wheel 18 drives the lifting threaded rod 19 and the lifting, the efficiency of material conveying is improved; a material conveying box 20 is placed on the lifting plate 16, the left side wall of the material conveying box 20 is rotatably connected with the material conveying box 20, and a material conveying port is formed in the top of the material conveying box 20, so that materials can be conveyed conveniently through the material conveying box 20; still include two baffles 21 and two backplate 22, one baffle 21 in two baffles 21 rotates with the left side of construction board 4 to be connected, another baffle 21 in two baffles 21 and the right side fixed connection of construction board 4, and two backplate 22 are fixed respectively in the front side and the rear side of construction board 4, can prevent that constructor from falling by construction board 4 through baffle 21 and backplate 22.
It should be further noted that the right side of the construction plate 4 is provided with a positioning plate 23, the top end of the baffle 21 positioned on the right side is provided with an infrared positioning device 24, and the lifting positions of the conveying plate 6 and the lifting plate 16 can be positioned through the positioning plate 23 and the infrared positioning device 24, so that the conveying of materials is facilitated; the lifting box 17 and the fixing rod 8 positioned at the rear side are respectively provided with a ball bearing 25, the inner sides of the ball bearings 25 are respectively connected with the lifting worm 15 and the rotating shaft 11 positioned at the bottom, and the friction force generated when the lifting worm 15 and the rotating shaft 11 rotate can be reduced through the ball bearings 25; the inside of bracing piece 7 all is provided with the support screw hole, rotates between bracing piece 7 and the backup pad 1 to be connected, and the equal threaded connection in inside of support screw hole has supporting threaded rod 26, and supporting threaded rod 26's bottom all is fixed with backing plate 27, can highly adjust supporting threaded rod 26 through rotating bracing piece 7 to can make backup pad 1 and construction board 4 keep the level, thereby improve the stability when it uses.
The use method of the building walling construction device comprises the following steps:
step one, the device is placed at a wall building construction position through a backing plate 27, and the supporting rod 7 is rotated to adjust the height of the supporting threaded rod 26, so that the supporting plate 1, the conveying plate 6 and the construction plate 4 are kept horizontal;
step two, transversely pushing the left baffle 21 to enable two square through holes at the bottom of the left baffle 21 to be located on the cylindrical section, then rotating the left baffle 21 to enable the left baffle 21 to be an inclined plane, enabling constructors to step on the construction board 4, enabling the inclined plane-shaped left baffle 21 to serve as a transfer medium for other materials, keeping the rotary roller and an adjusting rope on the rotary roller fixed in the process, and then reversely pushing the left baffle 21 to enable two square through holes at the bottom of the left baffle 21 to be located on the square section;
thirdly, the hydraulic lifting rod 3 is used for lifting the constructors to the wall building height through the hydraulic device 2 according to the wall building height, the conveying motor 5 is started to lower the conveying plate 6 and the lifting plate 16 to the lowest position, then the materials are placed in the conveying box 20, the conveying motor 5 is used for driving the rotating shaft 11 and the chain wheel 12 to rotate, and the transmission chain wheel 12 is used for driving the conveying plate 6 to ascend;
step four, after the conveying plate 6 is contacted with the positioning plate 23, the conveying motor 5 automatically stops working, and then the lifting motor 14 is used for driving the lifting worm 15 and the lifting worm wheel 18 to rotate, so that the lifting worm wheel 18 drives the lifting threaded rod 19 and the lifting plate 16 to ascend;
step five, after the infrared positioning device 24 detects the lifting plate 16, the lifting motor 14 stops working, then a constructor unloads materials in the material conveying box 20, then the material conveying box 20 descends through the lifting motor 14, the conveying plate 6 is brought to the lowest position again through the conveying motor 5, and the material conveying work is repeated, so that the wall building construction is completed;
in the third to fifth steps, the length of the rope body is adjusted, so that when the conveying plate 6 reaches the lowest point and the highest point of the lifting stroke, the left baffle 21 reaches the highest point and the lowest point, and the gravity center of the building wall building construction device is kept dynamically stable.
In conclusion, the working principle and the working process of the building wall construction device are that when the building wall construction device is used, the device is placed at a wall construction position through the backing plate 27, the supporting rod 7 is rotated to adjust the height of the supporting threaded rod 26, the supporting plate 1, the conveying plate 6 and the construction plate 4 are kept horizontal, then the baffle plate 21 at the left side is rotated to enable a constructor to step on the construction plate 4, then the hydraulic lifting rod 3 enables the constructor to be lifted to the wall construction height through the hydraulic device 2 according to the wall construction height, then the conveying motor 5 is started to lower the conveying plate 6 and the lifting plate 16 to the lowest position, then materials are placed inside the conveying box 20, then the conveying motor 5 is used to drive the rotating shaft 11 and the chain wheel 12 to rotate, the conveying chain wheel 12 is used to drive the conveying plate 6 to ascend, the conveying plate 6 is in contact with the positioning plate 23, then the conveying motor 5 stops working automatically, and then the lifting motor 14 is used to drive the lifting worm 15 and the lifting worm wheel 18 to rotate, the lifting worm gear 18 drives the lifting threaded rod 19 and the lifting plate 16 to ascend, the lifting motor 14 stops working after the infrared positioning device 24 detects the lifting plate 16, then a constructor unloads materials in the material conveying box 20, then the material conveying box 20 descends through the lifting motor 14, the conveying plate 6 is brought to the lowest position again through the conveying motor 5, the material conveying work is repeated, and therefore wall building construction is completed, the length of a rope body is adjusted, so that when the conveying plate 6 reaches the lowest point and the highest point of a lifting stroke, the left baffle 21 reaches the highest point and the lowest point, and the gravity center of the building wall building construction device is kept dynamically stable.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (4)

1. The utility model provides a building construction equipment of building a wall which characterized in that: comprises a supporting plate (1), a hydraulic device (2), a plurality of hydraulic lifting rods (3), a construction plate (4), a conveying motor (5) and a conveying plate (6), wherein supporting rods (7) are arranged at four corners of a bottom plate of the supporting plate (1), the hydraulic device (2) is arranged at the bottom of the supporting plate (1), the hydraulic lifting rods (3) are respectively arranged at four corners of the top of the supporting plate (1), the hydraulic lifting rods (3) are connected with the hydraulic device (2), the bottom of the construction plate (4) is fixed at the top ends of the hydraulic lifting rods (3), fixing rods (8) are arranged at the front side and the rear side of the right end of the supporting plate (1), a fixing plate (9) is fixedly connected at the rear side of the fixing rod (8) at the rear side, the conveying motor (5) is arranged on the fixing plate (9), and lifting rods (10) are fixedly connected on the two fixing rods (8), rotating shafts (11) are arranged between the top ends and the bottom ends of the two lifting rods (10), chain wheels (12) are fixedly connected to the two rotating shafts (11), the rotating shaft (11) positioned at the bottom is connected with the output end of the conveying motor (5), transmission chains (13) are meshed to the two chain wheels (12), and the conveying plate (6) is fixed to the left side of the transmission chains (13);
still include elevator motor (14), lift worm (15) and lifter plate (16), elevator motor (14) are installed on conveyer plate (6), be fixed with lift case (17) on conveyer plate (6), the inside of lift case (17) is rotated and is connected with lift worm wheel (18), lift worm wheel (18) with elevator worm (15) meshing, lift worm (15) stretch out lift case (17) and are connected with the output of elevator motor (14), and the inside of lift worm wheel (18) is provided with the lift screw hole, and the inside threaded connection of lift screw hole has lift threaded rod (19), lift threaded rod (19) stretch out the bottom of lift case (17) and conveyer plate (6), the top at lift threaded rod (19) is fixed to lifter plate (16), place case (20) on lifter plate (16), the left side wall and the defeated case (20) of defeated material are rotated and are connected, a material conveying port is arranged at the top of the material conveying box (20);
the construction plate is characterized by further comprising two baffles (21) and two guard plates (22), wherein a left baffle (21) of the two baffles (21) is rotatably connected with the left side of the construction plate (4), a right baffle (21) of the two baffles (21) is fixedly connected with the right side of the construction plate (4), a through hole is formed in the bottom of the plate body of the construction plate (4), a rotating roller is inserted into the through hole, square insertion holes are formed in two ends of the rotating roller, a square through hole is formed in two ends of the bottom of the left baffle (21), an insertion rod is inserted between the square insertion holes and the square through hole, the rod body of the insertion rod is composed of a plurality of square sections and a plurality of cylindrical sections which are alternately arranged, the square section of one end is inserted into the square insertion hole, a deployment rope is wound on the rotating roller, and the end of the deployment rope is connected to the rotating shaft (11) through a rope passing hole in the plate body of the construction plate (4), the length of the rope body of the adjusting rope enables the left baffle (21) to reach the highest point and the lowest point when the conveying plate (6) reaches the lowest point and the highest point of the lifting stroke;
two protective plates (22) are respectively fixed on the front side and the rear side of the construction plate (4), a positioning plate (23) is arranged on the right side of the construction plate (4), and an infrared positioning device (24) is arranged at the top end of a baffle (21) on the right side.
2. The building walling construction device according to claim 1, wherein: the lifting box (17) and the fixing rod (8) positioned at the rear side are provided with ball bearings (25), and the inner sides of the ball bearings (25) are respectively connected with the lifting worm (15) and the rotating shaft (11).
3. The building walling construction device according to claim 2, wherein: the inside of bracing piece (7) all is provided with the support screw hole, rotate between bracing piece (7) and backup pad (1) and be connected, the equal threaded connection in inside of support screw hole has support threaded rod (26), and the bottom of support threaded rod (26) all is fixed with backing plate (27).
4. A method of using the building walling construction device according to any one of claims 1 to 3, wherein: the method comprises the following steps:
the device is placed at a wall building construction position through a backing plate (27), and the height of a supporting threaded rod (26) is adjusted by rotating a supporting rod (7), so that a supporting plate (1), a conveying plate (6) and a construction plate (4) are kept horizontal;
step two, transversely pushing the left baffle (21) to enable two square through holes at the bottom of the left baffle (21) to be located on the cylindrical section, then rotating the left baffle (21) to enable the left baffle (21) to be an inclined plane, enabling constructors to step on the construction plate (4), enabling the inclined plane-shaped left baffle (21) to serve as a transfer medium for other materials, keeping the rotary roller and an adjusting rope on the rotary roller fixed in the process, and then reversely pushing the left baffle (21) to enable the two square through holes at the bottom of the left baffle (21) to be located on the square section;
thirdly, the hydraulic lifting rod (3) is used for lifting the constructors to the wall building height through the hydraulic device (2) according to the wall building height, the conveying motor (5) is started to lower the conveying plate (6) and the lifting plate (16) to the lowest position, then the materials are placed in the conveying box (20), the conveying motor (5) is used for driving the rotating shaft (11) and the chain wheel (12) to rotate, and the transmission chain wheel (12) is used for driving the conveying plate (6) to ascend;
after the conveying plate (6) is contacted with the positioning plate (23), the conveying motor (5) automatically stops working, and then the lifting motor (14) is used for driving the lifting worm (15) and the lifting worm wheel (18) to rotate, so that the lifting worm wheel (18) drives the lifting threaded rod (19) and the lifting plate (16) to ascend;
step five, after the infrared positioning device (24) detects the lifting plate (16), the lifting motor (14) stops working, then constructors unload materials in the material conveying box (20), the material conveying box (20) descends through the lifting motor (14), the conveying plate (6) is brought to the lowest position again through the conveying motor (5), and material conveying work is repeated, so that wall building construction is completed;
in the third step, the length of the rope body is adjusted, so that when the conveying plate (6) reaches the lowest point and the highest point of the lifting stroke, the left baffle (21) reaches the highest point and the lowest point, and the gravity center of the building walling construction device is kept dynamically stable.
CN202110739792.4A 2021-06-30 2021-06-30 Building wall construction device and application method thereof Active CN113417479B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110739792.4A CN113417479B (en) 2021-06-30 2021-06-30 Building wall construction device and application method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110739792.4A CN113417479B (en) 2021-06-30 2021-06-30 Building wall construction device and application method thereof

Publications (2)

Publication Number Publication Date
CN113417479A true CN113417479A (en) 2021-09-21
CN113417479B CN113417479B (en) 2023-08-11

Family

ID=77717495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110739792.4A Active CN113417479B (en) 2021-06-30 2021-06-30 Building wall construction device and application method thereof

Country Status (1)

Country Link
CN (1) CN113417479B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960446A (en) * 2022-06-13 2022-08-30 北京韬盛科技发展有限公司 Heavy intelligent jacking supporting equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108952546A (en) * 2018-08-08 2018-12-07 陆永柱 The method that the objects such as pendent lamp, air-conditioning are carried out to be sent to supply automatically
CN209464237U (en) * 2017-10-17 2019-10-08 况翠红 A kind of small medical waste water carrier
CN110374315A (en) * 2019-07-24 2019-10-25 黄光平 A kind of construction security platform
CN210764143U (en) * 2019-07-11 2020-06-16 单江 Material lifting platform for architectural decoration
CN212532217U (en) * 2020-05-25 2021-02-12 李占利 Construction is with elevating gear who has protective structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN209464237U (en) * 2017-10-17 2019-10-08 况翠红 A kind of small medical waste water carrier
CN108952546A (en) * 2018-08-08 2018-12-07 陆永柱 The method that the objects such as pendent lamp, air-conditioning are carried out to be sent to supply automatically
CN210764143U (en) * 2019-07-11 2020-06-16 单江 Material lifting platform for architectural decoration
CN110374315A (en) * 2019-07-24 2019-10-25 黄光平 A kind of construction security platform
CN212532217U (en) * 2020-05-25 2021-02-12 李占利 Construction is with elevating gear who has protective structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114960446A (en) * 2022-06-13 2022-08-30 北京韬盛科技发展有限公司 Heavy intelligent jacking supporting equipment
CN114960446B (en) * 2022-06-13 2023-12-12 北京韬盛科技发展有限公司 Heavy intelligent jacking supporting equipment

Also Published As

Publication number Publication date
CN113417479B (en) 2023-08-11

Similar Documents

Publication Publication Date Title
CN113417479A (en) Building wall construction device and using method thereof
CN213265536U (en) Transport truck
CN218663576U (en) Logistics lifting table
CN216659960U (en) A conveyer for air entrainment piece
CN213293798U (en) Keyboard backlight board carries detection device
CN214031459U (en) Building engineering material lifting machine
CN212508325U (en) Supporting scaffold for painting inner wall of tunnel
CN209063229U (en) A kind of 3D mattress core material or mattress attached material coiled material cut feed device
CN211870594U (en) Insulating tube location transportation frame
CN111852044A (en) Intelligent construction system for glass heat-insulation greenhouse
CN220578821U (en) Lifting device for setting up exhibition stand
CN220868736U (en) Wall building stand
CN211569404U (en) Glass curtain wall transmission line
CN219546515U (en) Ascending material conveying device
CN212762862U (en) Automatic discharging device of sand planing machine for wood board processing
CN218371504U (en) Lifting device for glass production
CN221418350U (en) Semi-automatic mill welt transfer device
CN212579903U (en) Stable and durable device for transporting fireproof door
CN220093073U (en) Transfer table for lathe machining
CN220849595U (en) Drill rod transferring device of drilling machine
CN113941996B (en) Telescopic handling manipulator capable of being positioned at multiple angles
CN217349326U (en) Novel electromechanical device transport table easy to assemble and disassemble
CN220867037U (en) Multifunctional lifting platform for building construction
CN217779739U (en) Assembled is externally-hung wallboard conveyor for building
CN216271806U (en) Material discharge apparatus for building science and technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230703

Address after: Room 2101, Building 9, Singapore City, Chifeng Road, Chidian Town, Jinjiang City, Quanzhou City, Fujian Province, 362200

Applicant after: Fujian Taisanyan Engineering Management Co.,Ltd.

Address before: 510000 No. 29, Guangxiao Road, Yuexiu District, Guangzhou, Guangdong

Applicant before: Miao Zhiqiang

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant