CN113373926B - Separating device for pile head breaking and construction method - Google Patents

Separating device for pile head breaking and construction method Download PDF

Info

Publication number
CN113373926B
CN113373926B CN202110628214.3A CN202110628214A CN113373926B CN 113373926 B CN113373926 B CN 113373926B CN 202110628214 A CN202110628214 A CN 202110628214A CN 113373926 B CN113373926 B CN 113373926B
Authority
CN
China
Prior art keywords
breaking
pile
steel bar
reinforcement
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110628214.3A
Other languages
Chinese (zh)
Other versions
CN113373926A (en
Inventor
赵继文
陈勇丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Road And Bridge Construction Co ltd Overseas Branch
Road and Bridge International Co Ltd
Original Assignee
China Communications Road And Bridge Construction Co ltd Overseas Branch
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communications Road And Bridge Construction Co ltd Overseas Branch, Road and Bridge International Co Ltd filed Critical China Communications Road And Bridge Construction Co ltd Overseas Branch
Priority to CN202110628214.3A priority Critical patent/CN113373926B/en
Publication of CN113373926A publication Critical patent/CN113373926A/en
Application granted granted Critical
Publication of CN113373926B publication Critical patent/CN113373926B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D9/00Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a separation device for pile head breaking and a construction method, wherein the separation device comprises an outer steel bar ring and an inner steel bar ring, the diameter of the outer steel bar ring is equal to or larger than the outer diameter of a pile foundation steel bar cage, the diameter of the inner steel bar ring is smaller than the inner diameter of the pile foundation steel bar cage, a steel bar net is welded between the inner steel bar ring and the outer steel bar ring, and at least 6 breaking boxes are annularly and equidistantly arranged at the bottom of the outer steel bar ring. The separation device is arranged at the position 5-10cm above the pile top elevation on the reinforcement cage, after pile foundation concrete pouring is completed and the design strength is achieved, concrete outside each breaking box is broken, the breaking boxes are broken and removed to form a hydraulic jack placement groove, ultrathin hydraulic jacks are arranged in the groove, the jacks are controlled to synchronously push upwards, the pile heads are broken along the separation device, and finally the pile heads are integrally lifted away from the pile tops. The invention has simple operation, less equipment and manpower investment, high work efficiency, and the separating device can be recycled and reused, thereby saving the cost.

Description

Separating device for pile head breaking and construction method
Technical Field
The invention belongs to the field of pile foundation construction of bridge engineering, building engineering and hydraulic engineering, and particularly relates to a separation device for pile head breaking and a pile head breaking method.
Background
The underwater concrete filling pile is a conventional foundation structure in the field of civil engineering, and is widely applied to construction in the fields of bridge engineering, building engineering, hydraulic engineering and the like. Because the pile top can have slurry when pouring under water, the pile body is required to be overfilled to ensure the concrete strength of the designed pile body, after the pile body pouring is completed, the pile head overfilled concrete is required to be broken, the main reinforcement is stripped off, and then the pile body is applied to a bearing platform, a tie beam and the like to form an integral stress structure. Pile head breaking is an important procedure in pile foundation construction, and the quality and efficiency of pile head breaking directly influence the development of subsequent work. At present, a pneumatic pick or a hydraulic pile breaker is mainly adopted for pile head breaking, and the pneumatic pick breaking method has low construction efficiency, large dust, large noise and high labor intensity; by adopting the hydraulic pile breaker, the working efficiency can be improved, but the equipment cost is high, and the follow-up cleaning work and auxiliary construction investment are large.
Disclosure of Invention
The invention aims to provide a separating device for pile head breaking and a pile head breaking method aiming at the defects of the existing pile head breaking method, so as to simplify the pile head breaking process, reduce the construction cost and improve the construction efficiency.
The invention provides a separating device for pile head rupture, which is characterized in that: the pile foundation reinforcement cage comprises an outer reinforcement ring and an inner reinforcement ring, the circle centers of the inner reinforcement ring and the outer reinforcement ring are overlapped, the diameter of the outer reinforcement ring is equal to or larger than the outer diameter of the pile foundation reinforcement cage, the diameter of the inner reinforcement ring is smaller than the inner diameter of the pile foundation reinforcement cage, a reinforcement net is welded between the inner reinforcement ring and the outer reinforcement ring, at least 6 breaking boxes are circumferentially distributed at equal intervals on the outer reinforcement ring, the inner reinforcement ring and the reinforcement net, the breaking boxes are made of foamed plastic materials, the top surface and the bottom surface parallel to the reinforcement net are arranged on the breaking boxes, the volume of the breaking boxes can accommodate an ultrathin hydraulic jack, and the breaking boxes are fixedly bound with the outer reinforcement ring.
The construction method for pile head breaking by adopting the separation device for pile head breaking is characterized by comprising the following steps of:
(1) When the pile foundation reinforcement cage is lowered, winding or wrapping the concrete bonding preventing material at the position of each reinforcement of the reinforcement cage above the designed elevation of the pile top; installing a separation device at a position 5-10cm above the pile top elevation on the reinforcement cage, sleeving an outer reinforcement ring on the periphery of the reinforcement cage, positioning an inner reinforcement ring in the reinforcement cage, and binding and fixing the outer reinforcement ring and the reinforcement cage; marking the positions of the breaking boxes on the top of the reinforcement cage opposite to each breaking box;
(2) After pile foundation concrete pouring is completed and the design strength is reached, excavating foundation pit soil around the pile head, finding out the position of each breaking box according to the mark, breaking the concrete outside the breaking boxes, and breaking and removing the breaking boxes to form a hydraulic jack placement groove;
(3) An ultrathin hydraulic jack is arranged in each hydraulic jack placement groove, each jack is controlled to synchronously push upwards, so that the pile head is broken along the inner and outer steel bar rings and the steel bar meshes of the separation device, and the pile head is integrally lifted off the pile top by vertical lifting of lifting equipment.
The separating device can form a pile head fracture surface and a plurality of hydraulic jack placement grooves, when the pile head is broken, the hydraulic jacks synchronously push upwards to fracture pile head concrete along the separating device, so that the pile head is broken integrally.
Drawings
FIG. 1 is a schematic structural view of a separator;
Fig. 2 is a schematic view showing an installation state of the spacer on the pile foundation reinforcement cage.
Detailed Description
As shown in fig. 1, the separating device for pile head breaking provided by the invention comprises an outer steel bar ring 1 and an inner steel bar ring 2, wherein the circle centers of the inner steel bar ring and the outer steel bar ring are coincident, the diameter of the outer steel bar ring is equal to or larger than the outer diameter of a pile foundation steel bar cage, the diameter of the inner steel bar ring is smaller than the inner diameter of the pile foundation steel bar cage, a steel bar net 3 is welded between the inner steel bar ring and the outer steel bar ring, concrete bonding prevention materials are wound or wrapped on steel bars of the outer steel bar ring, the inner steel bar ring and the steel bar net, and the concrete bonding prevention materials can be plastic adhesive tapes, sponges, foam materials and the like; at least 6 breaking boxes 4 are circumferentially and equidistantly arranged at the bottom of the outer steel bar ring, the breaking boxes are made of foam plastic materials, the breaking boxes are provided with top surfaces and bottom surfaces which are parallel to the steel bar meshes, the volume of the breaking boxes can accommodate an ultrathin hydraulic jack, and the breaking boxes 4 are fixedly bound with the outer steel bar ring 1.
When the separation device is used, the separation device is arranged at a position above the pile top elevation on the pile foundation reinforcement cage, and when pile foundation concrete is poured, the concrete guide pipe penetrates through the reinforcement ring to pour concrete into the pile hole. After the concrete pouring is completed, the separating device forms a separating section between the pile top and the pile head, so that the pile head is convenient to break integrally.
In order to improve the separation effect of the separation device, the area of the reinforcing mesh should be increased as much as possible, so that the size of the inner reinforcing ring should be as small as possible on the premise of meeting the requirement of lowering the guide pipe, and the radius of the inner reinforcing ring does not exceed 1/3 of the radius of the outer reinforcing ring when the separation device is implemented.
The breaking box is arranged to form a plurality of spaces capable of placing ultrathin hydraulic jacks on pile head concrete in a circumferential direction, and when the pile head is broken, the pile head concrete is broken along the separating device through the hydraulic jacks. The breaking box is made of foam plastic materials, so that the breaking box is convenient to break and clean in the later period. In specific implementation, the breaking box can be a hollow box body or a solid foam plastic block.
The invention adopts the separation device to break pile heads, and the concrete construction method is as follows:
(1) As shown in fig. 2, when the pile foundation reinforcement cage 5 is lowered, plastic adhesive tapes, sponges, foam materials and other concrete bonding-preventing materials are wound or wrapped at the position of each reinforcement of the reinforcement cage above the designed elevation of the pile top, so that the reinforcement can be separated from the concrete when the pile head is broken; the separation device is arranged at the position 5-10cm above the pile top elevation on the reinforcement cage, the outer reinforcement ring 1 is sleeved on the periphery of the reinforcement cage 5, the inner reinforcement ring 2 is positioned in the reinforcement cage, and the outer reinforcement ring and the reinforcement cage are bound and fixed by plastic ropes or adhesive tapes and other materials which are not easy to bond with concrete;
Because the breaking boxes can be poured in the concrete after the concrete is poured, marks can be arranged on the top of the reinforcement cage opposite to each breaking box 4, so that the position for searching the breaking box can be judged after the concrete is poured;
(2) After pile foundation concrete pouring is completed and the design strength is reached, excavating foundation pit soil around the pile head, finding out the position of each breaking box according to the mark, breaking out the concrete outside the breaking box, breaking and removing the breaking box 4, and forming a hydraulic jack placement groove at the position where the breaking box is installed;
(3) An ultrathin hydraulic jack is arranged in each hydraulic jack arranging groove, and steel backing plates are arranged at the bottom and the top of the jack. As a specific implementation mode, the invention can select an ultrathin hydraulic jack meeting the following performance indexes: the bearing capacity is 5-150 tons, the body height is 32-100 mm, the working stroke is 6-18 mm, and the working pressure is above 70 MPa.
And controlling each hydraulic jack to synchronously push upwards to break the pile head along the inner and outer steel bar rings and the steel bar meshes of the separation device, and then adopting lifting equipment to vertically lift the pile head to integrally lift the pile head away from the pile head so as to finish pile head breaking.

Claims (3)

1. A separator for pile head rupture, characterized by: the pile foundation reinforcement cage comprises an outer reinforcement ring and an inner reinforcement ring, the circle centers of the inner reinforcement ring and the outer reinforcement ring are overlapped, the diameter of the outer reinforcement ring is equal to or larger than the outer diameter of the pile foundation reinforcement cage, the diameter of the inner reinforcement ring is smaller than the inner diameter of the pile foundation reinforcement cage, a reinforcement net is welded between the inner reinforcement ring and the outer reinforcement ring, at least 6 breaking boxes are circumferentially distributed at equal intervals on the outer reinforcement ring, the inner reinforcement ring and the reinforcement net, the breaking boxes are made of foamed plastic materials, the top surface and the bottom surface parallel to the reinforcement net are arranged on the breaking boxes, the volume of the breaking boxes can accommodate an ultrathin hydraulic jack, and the breaking boxes are fixedly bound with the outer reinforcement ring.
2. The separator for pile head rupture according to claim 1, wherein: the radius of the inner steel bar ring is not more than 1/3 of the radius of the outer steel bar ring.
3. A construction method for pile head breaking using the partition device for pile head breaking according to claim 1, comprising the steps of:
(1) When the pile foundation reinforcement cage is lowered, winding or wrapping the concrete bonding preventing material at the position of each reinforcement of the reinforcement cage above the designed elevation of the pile top; installing a separation device at a position 5-10cm above the pile top elevation on the reinforcement cage, sleeving an outer reinforcement ring on the periphery of the reinforcement cage, positioning an inner reinforcement ring in the reinforcement cage, and binding and fixing the outer reinforcement ring and the reinforcement cage; marking the positions of the breaking boxes on the top of the reinforcement cage opposite to each breaking box;
(2) After pile foundation concrete pouring is completed and the design strength is reached, excavating foundation pit soil around the pile head, finding out the position of each breaking box according to the mark, breaking the concrete outside the breaking boxes, and breaking and removing the breaking boxes to form a hydraulic jack placement groove;
(3) An ultrathin hydraulic jack is arranged in each hydraulic jack placement groove, each jack is controlled to synchronously push upwards, so that the pile head is broken along the inner and outer steel bar rings and the steel bar meshes of the separation device, and the pile head is integrally lifted off the pile top by vertical lifting of lifting equipment.
CN202110628214.3A 2021-06-06 2021-06-06 Separating device for pile head breaking and construction method Active CN113373926B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110628214.3A CN113373926B (en) 2021-06-06 2021-06-06 Separating device for pile head breaking and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110628214.3A CN113373926B (en) 2021-06-06 2021-06-06 Separating device for pile head breaking and construction method

Publications (2)

Publication Number Publication Date
CN113373926A CN113373926A (en) 2021-09-10
CN113373926B true CN113373926B (en) 2024-05-07

Family

ID=77575882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110628214.3A Active CN113373926B (en) 2021-06-06 2021-06-06 Separating device for pile head breaking and construction method

Country Status (1)

Country Link
CN (1) CN113373926B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114718070A (en) * 2022-05-06 2022-07-08 中铁广州工程局集团第三工程有限公司 Construction method for breaking soil between piles and pile heads of super-irrigation cast-in-place pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425159A (en) * 2011-08-31 2012-04-25 浙江大学城市学院 Pile cutting construction method of bored concrete pile
CN102587380A (en) * 2012-02-08 2012-07-18 湖南省第二工程有限公司 Construction method for wholly removing drilling pile head
CN106759336A (en) * 2016-12-19 2017-05-31 中交路桥建设有限公司 A kind of cast-in-situ bored pile quickly abolishes pile crown construction method
CN108547303A (en) * 2018-04-11 2018-09-18 云南建投基础工程有限责任公司 A kind of filling pile head abolishes auxiliary device and pile crown restructuring bankrupt
CN111236230A (en) * 2020-01-17 2020-06-05 徐胜祥 Construction method of pre-arranged type fracture concrete pile head
CN215165580U (en) * 2021-06-06 2021-12-14 中交路桥建设有限公司 Separating device for pile head breaking

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102425159A (en) * 2011-08-31 2012-04-25 浙江大学城市学院 Pile cutting construction method of bored concrete pile
CN102587380A (en) * 2012-02-08 2012-07-18 湖南省第二工程有限公司 Construction method for wholly removing drilling pile head
CN106759336A (en) * 2016-12-19 2017-05-31 中交路桥建设有限公司 A kind of cast-in-situ bored pile quickly abolishes pile crown construction method
CN108547303A (en) * 2018-04-11 2018-09-18 云南建投基础工程有限责任公司 A kind of filling pile head abolishes auxiliary device and pile crown restructuring bankrupt
CN111236230A (en) * 2020-01-17 2020-06-05 徐胜祥 Construction method of pre-arranged type fracture concrete pile head
CN215165580U (en) * 2021-06-06 2021-12-14 中交路桥建设有限公司 Separating device for pile head breaking

Also Published As

Publication number Publication date
CN113373926A (en) 2021-09-10

Similar Documents

Publication Publication Date Title
CN111764379B (en) Construction method and structure applied to reverse construction steel pipe pile
CN110259184A (en) Column construction method is pulled out based on Removing Columns combined support jack-up system
CN113373926B (en) Separating device for pile head breaking and construction method
CN109537579B (en) Construction method of cast-in-situ bored pile
CN113774822B (en) Dismantling method of old reinforced concrete bridge
CN215165580U (en) Separating device for pile head breaking
CN112431208A (en) Construction method for deep foundation pit supporting by adopting component type force transmission belt
CN210031772U (en) Concrete bored concrete pile cuts a spacer
CN112096054A (en) Simple formwork support and integral casting method for large-depth elevator shaft and collector well in building bottom plate
CN213709507U (en) Pile foundation long casing subsection quick-release device
CN214883645U (en) Static pile press capable of realizing full-automatic welding and pile drawing-free hole cleaning
CN210395347U (en) Pile head structure of concrete filling pile
CN212611991U (en) Cast in situ concrete pier foundation formwork hangs muscle structure
CN114561873A (en) Bridge high pier construction method
CN104963344B (en) The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out
CN109098438B (en) Template for large beam column irrigation
CN220598429U (en) Static separator for pile head of filling pile
CN219508546U (en) Auxiliary structure for pile head wedge fracture of filling pile and filling pile
JP2848484B2 (en) Temporary retaining concrete formwork device
CN217419585U (en) Device for assisting in breaking pile head of concrete cast-in-place pile
CN218667558U (en) High-efficient protector is used in construction of foundation ditch crown beam
CN112195915B (en) Method for conveniently breaking pile head of large-diameter secant pile
CN220977737U (en) Synchronous static pressure system for underwater vertical structure of reinforced bridge
CN221030142U (en) Bored concrete pile head processing apparatus
CN215406141U (en) Take canvas slip casting club-footed bored concrete pile structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant