CN113339008A - Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface - Google Patents

Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface Download PDF

Info

Publication number
CN113339008A
CN113339008A CN202110670589.6A CN202110670589A CN113339008A CN 113339008 A CN113339008 A CN 113339008A CN 202110670589 A CN202110670589 A CN 202110670589A CN 113339008 A CN113339008 A CN 113339008A
Authority
CN
China
Prior art keywords
water
grouting
steel plate
deformation joint
stop steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202110670589.6A
Other languages
Chinese (zh)
Inventor
高雪冬
佟显涛
顾金权
桂波
祖培禄
孙磊
吴强
李睿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Group Co Ltd
Sixth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Group Co Ltd, Sixth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority to CN202110670589.6A priority Critical patent/CN113339008A/en
Publication of CN113339008A publication Critical patent/CN113339008A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a method for installing a post-plugging type water stop steel plate on the back side of a subway deformation joint, which comprises the steps of firstly judging the amount of water leakage at the deformation joint, and if the amount of water leakage at the deformation joint is larger, pre-stopping water on a concrete structure on the peripheral side of the deformation joint in a punching and grouting mode; preparing a water stop steel plate, a rubber cushion and a rubber slab; cleaning the concrete surface in the range of two sides of the deformation joint; installing a water stop steel plate, wherein the center of the water stop steel plate is opposite to the center of the deformation joint, the side edge of the water stop steel plate is pressed by a rubber cushion, and a steel backing plate and a rubber cushion plate are sequentially laid between the expansion bolt and the water stop steel plate; welding joints between the installed adjacent water stop steel plates to form closed loops, and welding 4 branch heads on each water stop steel plate; and (3) injecting hydrophilic polyurethane grouting material into the water-stop steel plate from the 4-branch head from bottom to top, and performing supplementary grouting on the part with water seepage 3-5 days after the completion of the injection until no leakage is achieved.

Description

Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface
Technical Field
The invention belongs to the technical field of subway water stopping, and particularly relates to a method for installing a rear plugging type water stopping steel plate on the back side of a subway deformation joint.
Background
In subway engineering, the waterproof grade of a subway station is one grade, water seepage is not allowed, and the surface of a structure is free of wet stain; the subway section has a two-stage waterproof grade, water leakage is not allowed, and a small amount of wet stains can be formed on the surface of the structure; in recent years, with the rapid development of national subway construction, the water leakage phenomenon caused by the reasons of design, construction, waterproof material quality and the like is all the most difficult to treat due to the water leakage at the deformation joint, and the problem of water leakage again in a short time due to the expansion and contraction quantity at the deformation joint according to a conventional treatment method is caused.
The existing technique for stopping water leakage at deformation joint is to embed a long needle along the deformation joint circle, seal and ring the outer side with water leakage, inject hydrophilic polyurethane grouting material into the deformation joint through the long needle after the water leakage reaches the specified strength, and the grouting material and water undergo chemical reaction to foam the volume expansion, so as to stop the water leakage passage to achieve the purpose of stopping water. Current movement joint department leaking stoppage technique can reach the effect of stagnant water in short time, but movement joint department has small flexible volume, especially northern area, the four seasons are clear every year, underground structure also can be because of the temperature produces expend with heat and contract with cold phenomenon, lead to the flexible volume increase of movement joint department, the rigidity shutoff of leaking through the water in the prior art outside, movement joint department in case produces flexible volume, the rigidity shutoff will become invalid, lead to movement joint department to leak again, the subway station can cause customer's complaint, the interval can lead to the contact net to touch water and cause the vehicle phenomenon of stopping transport.
Disclosure of Invention
The invention aims to provide a method for installing a rear plugging type water stop steel plate on the back side of a subway deformation joint.
The technical scheme of the invention is that the method for installing the rear plugging type water stop steel plate on the back side of the subway deformation joint comprises the following steps:
the method comprises the following steps: before construction, the amount of water leakage at the deformation joint is judged, if the amount of water leakage at the deformation joint is large, water is required to be pre-stopped for the concrete structure on the peripheral side of the deformation joint in a punching and grouting mode, and then the following steps are carried out; if the water leakage amount at the deformation joint is small, directly performing the following steps;
step two: preparing a water stop steel plate with the specification of 500mm x 2000mm, a rubber cushion with the width of 100mm and the thickness of 5mm and a rubber plate with the width of 60mm x 8 cm;
step three: cleaning the concrete surface within the range of 300mm on the left side and the right side by taking the deformation joint as the center, leveling the concave part without leakage of water, and leveling the convex part by using an electric pick;
step four: according to the sequence from bottom to top, an electric hammer and an expansion bolt are utilized to sequentially mount a water stop steel plate on a concrete structure at the side edge of a bottom plate deformation joint, two side plate deformation joints and a top plate deformation joint, the center of the water stop steel plate is opposite to the center of the deformation joint, the side edge of the water stop steel plate is pressed with a rubber gasket with the width of 100mm and the thickness of 5mm, and a steel base plate with the thickness of 5mm and a rubber gasket with the thickness of 60mm 8cm are sequentially laid between the expansion bolt and the water stop steel plate;
step five: welding joints between adjacent water stop steel plates installed in the fourth step to form closed loops, and welding 4 branch heads on each water stop steel plate;
step six: according to the installation sequence of the water-stop steel plate, hydrophilic polyurethane grouting material is injected into the water-stop steel plate from the 4-branch head from bottom to top, and the water-seepage place is subjected to grouting repair after the grouting is completed for 3-5 days until no leakage is achieved.
Further, the process of drilling and grouting in the first step is as follows: drilling the concrete structure through a water drill with the diameter of phi 40 to form grouting holes, wherein at least two grouting holes are arranged, one grouting hole is used for grouting, and the other grouting hole is used for draining water and checking whether grouting is in place; the grouting is performed according to the sequence of low and high, the grouting pipe is a phi 32 steel pipe, a grout stop valve is installed at the tail of the grouting pipe, a threaded joint is manufactured, after drilling is completed, the grouting pipe is installed manually, in order to prevent grout leakage between the grouting pipe and an orifice gap, geotextile is filled in a gap between the grouting pipe and the orifice, then grout liquid is injected outside the structure through the grouting pipe, a micro-expanding agent is added, the grouting pressure is not more than 0.3MPa, after each grouting, the grout stop valve is closed, and the pipeline is screwed down and then connected with another grouting pipe for continuous grouting.
Furthermore, the specification of the expansion bolt in the fourth step is M16 expansion bolt, and the adjacent distance between the adjacent expansion bolts is 150 mm.
The invention adopting the technical scheme can bring the following beneficial effects: the installation method of the subway deformation joint back-side rear plugging type water stop steel plate can establish non-rigid plugging between the water stop steel plate and a concrete structure at a deformation joint, fully considers the expansion amount at the deformation joint, and has the characteristics of simplicity and convenience in construction, convenience in maintenance and long service life.
Detailed Description
The installation method of the back plugging type water stop steel plate on the back side of the subway deformation joint is characterized by comprising the following steps of:
the method comprises the following steps: before construction, the amount of water leakage at the deformation joint is judged, if the amount of water leakage at the deformation joint is large, water is required to be pre-stopped for the concrete structure on the peripheral side of the deformation joint in a punching and grouting mode, and then the following steps are carried out; if the water leakage amount at the deformation joint is small, directly performing the following steps;
step two: preparing a water stop steel plate with the specification of 500mm x 2000mm, a rubber cushion with the width of 100mm and the thickness of 5mm and a rubber plate with the width of 60mm x 8 cm;
step three: cleaning the concrete surface within the range of 300mm on the left side and the right side by taking the deformation joint as the center, leveling the concave part without leakage of water, and leveling the convex part by using an electric pick;
step four: according to the sequence from bottom to top, an electric hammer and an expansion bolt are utilized to sequentially mount a water stop steel plate on a concrete structure at the side edge of a bottom plate deformation joint, two side plate deformation joints and a top plate deformation joint, the center of the water stop steel plate is opposite to the center of the deformation joint, the side edge of the water stop steel plate is pressed with a rubber gasket with the width of 100mm and the thickness of 5mm, and a steel base plate with the thickness of 5mm and a rubber gasket with the thickness of 60mm 8cm are sequentially laid between the expansion bolt and the water stop steel plate;
step five: welding joints between adjacent water stop steel plates installed in the fourth step to form closed loops, and welding 4 branch heads on each water stop steel plate;
step six: according to the installation sequence of the water-stop steel plate, hydrophilic polyurethane grouting material is injected into the water-stop steel plate from the 4-branch head from bottom to top, and the water-seepage place is subjected to grouting repair after the grouting is completed for 3-5 days until no leakage is achieved.
The process of punching and grouting in the first step is as follows: drilling the concrete structure through a water drill with the diameter of phi 40 to form grouting holes, wherein at least two grouting holes are arranged, one grouting hole is used for grouting, and the other grouting hole is used for draining water and checking whether grouting is in place; the grouting is performed according to the sequence of low and high, the grouting pipe is a phi 32 steel pipe, a grout stop valve is installed at the tail of the grouting pipe, a threaded joint is manufactured, after drilling is completed, the grouting pipe is installed manually, in order to prevent grout leakage between the grouting pipe and an orifice gap, geotextile is filled in a gap between the grouting pipe and the orifice, then grout liquid is injected outside the structure through the grouting pipe, a micro-expanding agent is added, the grouting pressure is not more than 0.3MPa, after each grouting, the grout stop valve is closed, and the pipeline is screwed down and then connected with another grouting pipe for continuous grouting.
The specification of the expansion bolt in the fourth step is M16 expansion bolt, and the adjacent distance between the adjacent expansion bolts is 150 mm.

Claims (5)

1. The installation method of the back plugging type water stop steel plate on the back side of the subway deformation joint is characterized by comprising the following steps of:
the method comprises the following steps: before construction, the amount of water leakage at the deformation joint is judged, if the amount of water leakage at the deformation joint is large, water is required to be pre-stopped for the concrete structure on the peripheral side of the deformation joint in a punching and grouting mode, and then the following steps are carried out; if the water leakage amount at the deformation joint is small, directly performing the following steps;
step two: preparing a water stop steel plate with the specification of 500mm x 2000mm, a rubber cushion with the width of 100mm and the thickness of 5mm and a rubber plate with the width of 60mm x 8 cm;
step three: cleaning the concrete surface within the range of 300mm on the left side and the right side by taking the deformation joint as the center, leveling the concave part without leakage of water, and leveling the convex part by using an electric pick;
step four: according to the sequence from bottom to top, an electric hammer and an expansion bolt are utilized to sequentially mount a water stop steel plate on a concrete structure at the side edge of a bottom plate deformation joint, two side plate deformation joints and a top plate deformation joint, the center of the water stop steel plate is opposite to the center of the deformation joint, the side edge of the water stop steel plate is pressed with a rubber gasket with the width of 100mm and the thickness of 5mm, and a steel base plate with the thickness of 5mm and a rubber gasket with the thickness of 60mm 8cm are sequentially laid between the expansion bolt and the water stop steel plate;
step five: welding joints between adjacent water stop steel plates installed in the fourth step to form closed loops, and welding 4 branch heads on each water stop steel plate;
step six: according to the installation sequence of the water-stop steel plate, hydrophilic polyurethane grouting material is injected into the water-stop steel plate from the 4-branch head from bottom to top, and the water-seepage place is subjected to grouting repair after the grouting is completed for 3-5 days until no leakage is achieved.
2. The method for installing the back plugging type water stop steel plate on the back side of the subway deformation joint according to claim 1, wherein the step I of punching and grouting comprises the following steps: drilling the concrete structure through a water drill with the diameter of phi 40 to form grouting holes, wherein at least two grouting holes are arranged, one grouting hole is used for grouting, and the other grouting hole is used for draining water and checking whether grouting is in place; the grouting is performed according to the sequence of low and high, the grouting pipe is a phi 32 steel pipe, a grout stop valve is installed at the tail of the grouting pipe, a threaded joint is manufactured, after drilling is completed, the grouting pipe is installed manually, in order to prevent grout leakage between the grouting pipe and an orifice gap, geotextile is filled in a gap between the grouting pipe and the orifice, then grout liquid is injected outside the structure through the grouting pipe, a micro-expanding agent is added, the grouting pressure is not more than 0.3MPa, after each grouting, the grout stop valve is closed, and the pipeline is screwed down and then connected with another grouting pipe for continuous grouting.
3. The method for installing the back blocking type water stop steel plate on the back surface side of the subway deformation joint as claimed in claim 1, wherein said expansion bolts in step four are M16 expansion bolts, and the distance between adjacent expansion bolts is 150 mm.
4. The method for installing the back side rear plugging type water stop steel plate of the subway deformation joint according to claim 1, wherein the judgment criteria of large water leakage amount and small water leakage amount in the first step are as follows: when the water leakage amount is more than or equal to 10L/h, the water leakage amount is larger, and when the water leakage amount is less than 10L/h, the water leakage amount is smaller.
5. The method for installing the subway deformation joint water-stop steel plate with the rear plugging on the back side of the water surface as claimed in claim 2, wherein the micro-expanding agent is an FS high-performance fiber expanding agent.
CN202110670589.6A 2021-06-17 2021-06-17 Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface Pending CN113339008A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110670589.6A CN113339008A (en) 2021-06-17 2021-06-17 Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110670589.6A CN113339008A (en) 2021-06-17 2021-06-17 Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface

Publications (1)

Publication Number Publication Date
CN113339008A true CN113339008A (en) 2021-09-03

Family

ID=77475805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110670589.6A Pending CN113339008A (en) 2021-06-17 2021-06-17 Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface

Country Status (1)

Country Link
CN (1) CN113339008A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06341227A (en) * 1993-06-01 1994-12-13 Shimizu Corp Water stop construction method for placing joint part of concrete structure
CN101372840A (en) * 2007-08-21 2009-02-25 上海市建筑科学研究院(集团)有限公司 Mounting method with detachable rubber water stop mounted inside
CN101864778A (en) * 2010-06-30 2010-10-20 广东省基础工程公司 Method for leaking stoppage of external wall of underground structure
CN105297782A (en) * 2015-11-19 2016-02-03 东南大学 Underground concrete structure expansion joint treatment structure and construction method thereof
CN105297743A (en) * 2015-11-03 2016-02-03 中国电建集团华东勘测设计研究院有限公司 Diaphragm wall defect leakage water stop and drainage structure and construction method thereof
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN109610504A (en) * 2018-12-11 2019-04-12 中国铁路设计集团有限公司 A kind of progressive regulation method of railway open trench tunnel lining deformation joints percolating water
CN210263442U (en) * 2019-04-30 2020-04-07 江苏省科佳工程设计有限公司 Deformation joint leakage repair structure
CN112878367A (en) * 2021-01-23 2021-06-01 北京隧盾市政建设有限公司 Method for treating water leakage of construction joint and crack of subway main structure
CN112900512A (en) * 2021-01-25 2021-06-04 广州建筑产业开发有限公司 Basement bottom plate crack punching, reinforcing and repairing construction method

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06341227A (en) * 1993-06-01 1994-12-13 Shimizu Corp Water stop construction method for placing joint part of concrete structure
CN101372840A (en) * 2007-08-21 2009-02-25 上海市建筑科学研究院(集团)有限公司 Mounting method with detachable rubber water stop mounted inside
CN101864778A (en) * 2010-06-30 2010-10-20 广东省基础工程公司 Method for leaking stoppage of external wall of underground structure
CN105297743A (en) * 2015-11-03 2016-02-03 中国电建集团华东勘测设计研究院有限公司 Diaphragm wall defect leakage water stop and drainage structure and construction method thereof
CN105297782A (en) * 2015-11-19 2016-02-03 东南大学 Underground concrete structure expansion joint treatment structure and construction method thereof
CN106088364A (en) * 2016-07-25 2016-11-09 浙江万达建设集团有限公司 A kind of Novel underground room antiseep attachment structure and construction method thereof
CN109610504A (en) * 2018-12-11 2019-04-12 中国铁路设计集团有限公司 A kind of progressive regulation method of railway open trench tunnel lining deformation joints percolating water
CN210263442U (en) * 2019-04-30 2020-04-07 江苏省科佳工程设计有限公司 Deformation joint leakage repair structure
CN112878367A (en) * 2021-01-23 2021-06-01 北京隧盾市政建设有限公司 Method for treating water leakage of construction joint and crack of subway main structure
CN112900512A (en) * 2021-01-25 2021-06-04 广州建筑产业开发有限公司 Basement bottom plate crack punching, reinforcing and repairing construction method

Similar Documents

Publication Publication Date Title
CN111485922B (en) Method for treating water leakage, block falling and slurry turning of ELF railway tunnel
CN201176640Y (en) Grouting type expansion steel edge water-stop meet with water
CN203429601U (en) Sealing-up structure for intersection position of reservoir bank water-tight face plate and concrete gravity dam cross joint
CN110878700A (en) Tunnel waterproof structure and construction method thereof
CN210946696U (en) Dam concrete seepage-proofing panel seepage underwater repair combined structure
CN205152995U (en) Local seepage processing apparatus of underground continuous wall
CN105297782A (en) Underground concrete structure expansion joint treatment structure and construction method thereof
CN202689047U (en) Waterproof structure applied to construction joint in fabricated tube section of immersed tube
CN113339008A (en) Method for installing subway deformation joint water-stopping steel plate with rear side plugging on back surface
CN113373962A (en) Combined leaking stoppage construction method for deep foundation pit
CN210341998U (en) Novel post-cast strip structure
CN215857878U (en) Drainage structures is prevented in basement bottom plate post-cast strip
CN108505545B (en) Waterproof method for building foundation raft penetrating through underground pipe group
CN214739268U (en) Fishbone type high-pressure grouting steel inner column
CN111878119B (en) Subway tunnel ballast bed pipe piece wall post-grouting method
CN214274717U (en) Soft soil slot major diameter pipeline sharing support
CN205205831U (en) Ground even wall defect seepage ends drainage structures
CN209741914U (en) Immersed tube filled with construction waste inside for sea reclamation or bridge
CN219196057U (en) Strong-pressure plugging structure for expansion joint of basement roof
CN104154324A (en) Integrated mixed installation method of anchor blocks and valve well
CN220599829U (en) Leakage-proof device
KR100441935B1 (en) Devices of holding concrete form tie for water proof grouting
CN220581884U (en) Keep somewhere rigidity through-wall pipe waterproof construction
CN221321021U (en) Variable cross-section dewatering well penetrating through bottom plate in foundation pit
CN117966779A (en) Method for treating underground engineering leakage water without chiseling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination